Block 1221, lot 028
248 Central Ave
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 14
- Rooms
- 14 bathrooms
- Building
- 15,120 sq ft
- Lot
- 5,431 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 248 Central Av | Malagic Construction | unit 256a: partial kitchen remodel: replace kitchen cabinets & countertops with new, in kind. no structual work, no wall modifiations, no change in fixture location.Details
unit 256a: partial kitchen remodel: replace kitchen cabinets & countertops with new, in kind. no structual work, no wall modifiations, no change in fixture location. | $18,500 |
| Mar 6, 2026 | In progress issued Jul 2026 | 248 Central Av | interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bathDetails
interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bath | $315,000 | |
| Jan 23, 2026 | In progress issued Feb 2026 | 254 Central Av | interior remodel to units 254b and 258b central ave. remodel kitchen and bath only,remove bearing walls.Details
interior remodel to units 254b and 258b central ave. remodel kitchen and bath only,remove bearing walls. | $90,000 | |
| Jan 23, 2026 | In progress issued Jan 2026 | 1497 Oak St | interior remodel to 1497 oak st (3rd floor) only.relocate kitchen,convert(e)kitchen to home office, remodel(e)bath, add one bath and laundry,move non-bearing walls.Details
interior remodel to 1497 oak st (3rd floor) only.relocate kitchen,convert(e)kitchen to home office, remodel(e)bath, add one bath and laundry,move non-bearing walls. | $80,000 | |
| Dec 15, 2025 | Completed final sign-off Feb 2026 | 250 Central Av | G M Building And Construction Inc | units 250a & 252a: to comply w/ nov 202316343 remodel 2 bathrooms only. electrical and plumbing as needed.Details
units 250a & 252a: to comply w/ nov 202316343 remodel 2 bathrooms only. electrical and plumbing as needed. | $20,000 |
| Jun 9, 2025 | Completed final sign-off Jul 2025 | 248 Central Av | Byington Electric Corp | new as built in ref pa 202404301075 change of device count and locationDetails
new as built in ref pa 202404301075 change of device count and location | |
| Apr 30, 2024 | Completed final sign-off Jun 2025 | 248 Central Av | Byington Electric Corp | upgrade the fire alarm system to ca/sf code interpretation 1106.7.6.1 and wire the lf sounders inside the units and wireless monitoring.Details
upgrade the fire alarm system to ca/sf code interpretation 1106.7.6.1 and wire the lf sounders inside the units and wireless monitoring. | $30,000 |
| Jan 11, 2024 | In progress issued Jan 2024 | 248 Central Av | Nyberg Construction | unit(s) #248, 250a, 252a repair/replace burnt siding. replace 2 interior doors and 2 exterior doors. replace 4 windows/ repair/replace deck boards as needed. replce 2 bathrooms. repair/replace insulation and plaster as needed. repair electrical & plumbing,hvac comply w/ nov#202316343Details
unit(s) #248, 250a, 252a repair/replace burnt siding. replace 2 interior doors and 2 exterior doors. replace 4 windows/ repair/replace deck boards as needed. replce 2 bathrooms. repair/replace insulation and plaster as needed. repair electrical & plumbing,hvac comply w/ nov#202316343 | $120,000 |
| Oct 12, 2021 | Completed final sign-off Nov 2021 | 248 Central Av | Reichart Construction | repair of stair & deck in kind less than 50% -back of building not seen from streetDetails
repair of stair & deck in kind less than 50% -back of building not seen from street | $1,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2021 | 254 Central Av | C G Adams Construction | unit a: revision to pa# 202101253252 to clarify top landing is 49" clear.Details
unit a: revision to pa# 202101253252 to clarify top landing is 49" clear. | |
| Feb 24, 2021 | Completed final sign-off Nov 2021 | 254 Central Av | Home Safety Services Inc | replace handrail with 1 continuous rail.1 3/4"diametre,1.5" from the wall, curved returns. 36" high from step nose. 12" horizontal at top front entrance and interior stairwellDetails
replace handrail with 1 continuous rail.1 3/4"diametre,1.5" from the wall, curved returns. 36" high from step nose. 12" horizontal at top front entrance and interior stairwell | $3,000 |
| Jan 25, 2021 | Completed final sign-off Oct 2021 | 254 Central Av | C G Adams Construction | apt a - install a new incline platform liftDetails
apt a - install a new incline platform lift | $5,000 |
| Nov 28, 2018 | Completed final sign-off Jan 2019 | 258 Central Av | High Quality Roofing | reroof. remove modified bitumen. install modified bitumen.Details
reroof. remove modified bitumen. install modified bitumen. | $29,000 |
| Jun 30, 2017 | Never finaled issued Jun 2017, no final | 248 Central Av | streetspaceDetails
streetspace | ||
| Jan 14, 2014 | Completed final sign-off Jul 2015 | 254 Central Av | California Earthquake Protection | soft story mitigation, add plywood shear walls, anchor bolts, holdowns, shear clips at storage/crawl space level.Details
soft story mitigation, add plywood shear walls, anchor bolts, holdowns, shear clips at storage/crawl space level. | $30,000 |
| Jan 8, 2014 | Completed final sign-off Jul 2015 | 248 Central Av | California Earthquake Protection | installation of plywood shearwalls, anchor bolts, holdowns, shearclips & transfer ties. soft story mitigation @ storage/crawlspace level.Details
installation of plywood shearwalls, anchor bolts, holdowns, shearclips & transfer ties. soft story mitigation @ storage/crawlspace level. | $30,000 |
| Jun 22, 2009 | Completed final sign-off Dec 2009 | 1495 Oak St | California Earthquake Protection | install new frame and grade beam at garage wall " soft story". new frame and beam not visible from street. non engineered installation of anchor bolts, holdowns and plywood bracing in garage and crawl spaceDetails
install new frame and grade beam at garage wall " soft story". new frame and beam not visible from street. non engineered installation of anchor bolts, holdowns and plywood bracing in garage and crawl space | $5,000 |
| Sep 11, 2006 | Completed final sign-off Nov 2006 | 248 Central Av | Phillip James | repair sections of dry rot rear extension stairways and install handrails per housing inspection notice. less than 50% of stairway to comply with his nov 200671443 dated 9/7/06Details
repair sections of dry rot rear extension stairways and install handrails per housing inspection notice. less than 50% of stairway to comply with his nov 200671443 dated 9/7/06 | $3,500 |
| Feb 14, 2000 | Expired or cancelled expired Sep 2000 | 248 Central Av | Brashear Construction | seismic retrofit, bolt mudsill to foundationDetails
seismic retrofit, bolt mudsill to foundation |