California Earthquake Protection
- Based in
- Alameda
- On San Francisco permits
- Feb 2001 to May 2015
- Last 24 months
- 0 permits filed
45 permits since 2000: 42 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2015 | Completed final sign-off Sep 2020 | 4430 25th St | voluntary improvement in substructural area inside of building. installation of plywood panels, anchor bolts, transfer ties to floor system. non engineered. all work inside of building.Details
voluntary improvement in substructural area inside of building. installation of plywood panels, anchor bolts, transfer ties to floor system. non engineered. all work inside of building. | $18,273 |
| Sep 10, 2014 | Completed final sign-off Dec 2015 | 378 06th Av | voluntary seismic strengthening, installation of anchor bolts, holddowns, shear walls, steel beam and columnDetails
voluntary seismic strengthening, installation of anchor bolts, holddowns, shear walls, steel beam and column | $69,910 |
| Jan 14, 2014 | Completed final sign-off Jul 2015 | 254 Central Av | soft story mitigation, add plywood shear walls, anchor bolts, holdowns, shear clips at storage/crawl space level.Details
soft story mitigation, add plywood shear walls, anchor bolts, holdowns, shear clips at storage/crawl space level. | $30,000 |
| Jan 8, 2014 | Completed final sign-off Jul 2015 | 248 Central Av | installation of plywood shearwalls, anchor bolts, holdowns, shearclips & transfer ties. soft story mitigation @ storage/crawlspace level.Details
installation of plywood shearwalls, anchor bolts, holdowns, shearclips & transfer ties. soft story mitigation @ storage/crawlspace level. | $30,000 |
| Sep 26, 2013 | Completed final sign-off Oct 2013 | 783 25th Av | installation of plywood bracing, anchor bolts, universal anchor plates and transfer ties to the floor system. all work is in the street level garage and utility/storage rooms. all works to be done in the bldg. no exterior work or alteration.Details
installation of plywood bracing, anchor bolts, universal anchor plates and transfer ties to the floor system. all work is in the street level garage and utility/storage rooms. all works to be done in the bldg. no exterior work or alteration. | $13,689 |
| Jul 31, 2013 | Completed final sign-off Aug 2013 | 344 03rd Av | installation of a bolts 5/8"x12"l.-32" o/c set in epoxy, plywood 5/8" cdx bracing nailed 4" edge and 6" in field w/ 2-1/4" x .0148 nails. al work inside ground level of garage/storage area of building. no exterior workDetails
installation of a bolts 5/8"x12"l.-32" o/c set in epoxy, plywood 5/8" cdx bracing nailed 4" edge and 6" in field w/ 2-1/4" x .0148 nails. al work inside ground level of garage/storage area of building. no exterior work | $10,941 |
| Mar 22, 2013 | Completed final sign-off May 2013 | 1350 Pacheco St | repair damage to bldg.caused by auto striking the exterior at se corner. damaged area is approx. 8'lx9'h. remove exterior stucco & wood sheathing. reframe as required, install new plywood sheathing cdx 5 ply 3/4". sheathing to be nailed 4"on edge & 6"in field.install new wire paper & stucco to matchDetails
repair damage to bldg.caused by auto striking the exterior at se corner. damaged area is approx. 8'lx9'h. remove exterior stucco & wood sheathing. reframe as required, install new plywood sheathing cdx 5 ply 3/4". sheathing to be nailed 4"on edge & 6"in field.install new wire paper & stucco to match | $558 |
| Oct 31, 2011 | Completed final sign-off Nov 2011 | 1249 Rhode Island St | voluntary non-engineered substructural improvements. installation of anchor bolts, plywood bracing and foundation anchors.Details
voluntary non-engineered substructural improvements. installation of anchor bolts, plywood bracing and foundation anchors. | $12,798 |
| Jun 27, 2011 | Completed final sign-off Jul 2011 | 142 Denslowe Dr | voluntary, non engineered sub structural improvements. installtion of anchor bolts, plywood bracing and beam column connectors. al work to be completed in garage and crawl spaceDetails
voluntary, non engineered sub structural improvements. installtion of anchor bolts, plywood bracing and beam column connectors. al work to be completed in garage and crawl space | $16,788 |
| May 23, 2011 | Completed final sign-off Aug 2011 | 526 Hugo St | amend pa# 2010-1213-6598-add lvl beamDetails
amend pa# 2010-1213-6598-add lvl beam | $850 |
| May 17, 2011 | Completed final sign-off Aug 2011 | 526 Hugo St | voluntary nonengineered sub structural improvement. installation anchor bolts, holdowns, plywood btacing and foundation repair. partial replacement. all work is in the garage area inside the building. note: only storage rooms shown and labeled in garage area. plywood strengthening work only underDetails
voluntary nonengineered sub structural improvement. installation anchor bolts, holdowns, plywood btacing and foundation repair. partial replacement. all work is in the garage area inside the building. note: only storage rooms shown and labeled in garage area. plywood strengthening work only under | $27,383 |
| Jan 27, 2011 | Completed final sign-off Feb 2011 | 1488 14th Av | voluntary, non engineering sub-structural improvement. installation of anchor bolts, and plywood bracing. all work to be done in garage and crawl space in side of bldg.Details
voluntary, non engineering sub-structural improvement. installation of anchor bolts, and plywood bracing. all work to be done in garage and crawl space in side of bldg. | $19,516 |
| Dec 14, 2010 | Completed final sign-off Dec 2010 | 145 Moreland St | non engineered sub structural improvements, installation of anchor bolts, set in epoxy plate washers @ plywood bracing work, steel studs, from foundation to floor, joists; bolts 2 set in epoxy joist bolting, plate washers, plywood bracing, cdx plywood, 5 ply nailed 4" edge; all work inside buildingDetails
non engineered sub structural improvements, installation of anchor bolts, set in epoxy plate washers @ plywood bracing work, steel studs, from foundation to floor, joists; bolts 2 set in epoxy joist bolting, plate washers, plywood bracing, cdx plywood, 5 ply nailed 4" edge; all work inside building | $9,277 |
| Nov 30, 2010 | Completed final sign-off Dec 2010 | 609 Rockdale Dr | voluntary, non-engineered sub-structural improvement. installationof anchor bolts 5/8"x12"l (8"embedment) 32" o/c w/ 3"x3"x1/4" plate washers, holdowns hdu4/hdq8 w/12" min. embedment. all a. bolts +4.d bolts setinset (simplson) epoxy. installation of plywood bracing, 5/8" cdx 4'x8' 5 plyDetails
voluntary, non-engineered sub-structural improvement. installationof anchor bolts 5/8"x12"l (8"embedment) 32" o/c w/ 3"x3"x1/4" plate washers, holdowns hdu4/hdq8 w/12" min. embedment. all a. bolts +4.d bolts setinset (simplson) epoxy. installation of plywood bracing, 5/8" cdx 4'x8' 5 ply | $13,981 |
| Jun 8, 2010 | Completed final sign-off Jun 2010 | 2815 Moraga St | voluntary non engineered sub structural improvement, installation of anchor bolts, holdowns and plywood bracing.Details
voluntary non engineered sub structural improvement, installation of anchor bolts, holdowns and plywood bracing. | $19,718 |
| Apr 13, 2010 | Completed final sign-off Apr 2010 | 2211 32nd Av | voluntary non-engineered sub structural strengthening, installation of anchor bolts, plate washers & plywood bracing cdx plywood nailed. nails with simpson holdowns bolts set in epoxy. all work to be done inside of building at the basement level/garage. no adding roomsDetails
voluntary non-engineered sub structural strengthening, installation of anchor bolts, plate washers & plywood bracing cdx plywood nailed. nails with simpson holdowns bolts set in epoxy. all work to be done inside of building at the basement level/garage. no adding rooms | $10,394 |
| Jan 14, 2010 | Completed final sign-off Jan 2010 | 2504 Washington St | remove non-structural clay blk infill wall, (e) posts & beam to remain. build new stud wall w/new mud sill & bolts set in epoxy. install type x drywall on ea side & fire taped anchor bolts to be galvanized w/plate washers on center. end dist 9" on mud sillDetails
remove non-structural clay blk infill wall, (e) posts & beam to remain. build new stud wall w/new mud sill & bolts set in epoxy. install type x drywall on ea side & fire taped anchor bolts to be galvanized w/plate washers on center. end dist 9" on mud sill | $1,200 |
| Jan 13, 2010 | Completed final sign-off Jan 2010 | 50 Fanning Wy | voluntary non engineered substructural improvements. install anchor bolts 5/8x12l.32-0" center set in simpson et epoxy w/3x3" plate washers, plywood bracing, ply plywood-nailed, hold downs. beam/column connectors simpson, install steel angles. all work inside bldg at ground level in garage/basementDetails
voluntary non engineered substructural improvements. install anchor bolts 5/8x12l.32-0" center set in simpson et epoxy w/3x3" plate washers, plywood bracing, ply plywood-nailed, hold downs. beam/column connectors simpson, install steel angles. all work inside bldg at ground level in garage/basement | $12,621 |
| Jan 7, 2010 | Completed final sign-off Jan 2010 | 2542 33rd Av | voluntary non-ekngineered sub-structural improvement. install anchor bolts 5/8"x12"l - 32"-0/center,set in simpson epoxy w/3"x3" plate washers, plywood bracing 5/8" cdx plywood nailed 4" edge & 6" infield w/2'x4" x.148" -0 nails, holddowns, beam/column connectors simpson. all work inside bldg.Details
voluntary non-ekngineered sub-structural improvement. install anchor bolts 5/8"x12"l - 32"-0/center,set in simpson epoxy w/3"x3" plate washers, plywood bracing 5/8" cdx plywood nailed 4" edge & 6" infield w/2'x4" x.148" -0 nails, holddowns, beam/column connectors simpson. all work inside bldg. | $14,090 |
| Dec 22, 2009 | Completed final sign-off Jan 2010 | 551 42nd Av | voluntary seismic strengthening; installation of steel moment frame with engineered plans. all work inside of lower level garage (no adding rooms)Details
voluntary seismic strengthening; installation of steel moment frame with engineered plans. all work inside of lower level garage (no adding rooms) | $30,917 |
| Aug 24, 2009 | Completed final sign-off Jan 2010 | 2504 Washington St | voluntary (partial) stengthening, engineered steel moment frame as shown os sheets s1 and s2.Details
voluntary (partial) stengthening, engineered steel moment frame as shown os sheets s1 and s2. | $30,012 |
| Aug 24, 2009 | Completed final sign-off Jan 2010 | 2504 Washington St | voluntary strenghting (partial) with 5/8" cdx plywood @ garage and store room. 4" edge. 6"field. anchor bolts set in epoxy 8" embredment 3/4" diameter 3x3"x1/4" washers, hdq8 holdowns atend of wall at garage and store room level only.Details
voluntary strenghting (partial) with 5/8" cdx plywood @ garage and store room. 4" edge. 6"field. anchor bolts set in epoxy 8" embredment 3/4" diameter 3x3"x1/4" washers, hdq8 holdowns atend of wall at garage and store room level only. | $28,000 |
| Jun 22, 2009 | Completed final sign-off Dec 2009 | 1495 Oak St | install new frame and grade beam at garage wall " soft story". new frame and beam not visible from street. non engineered installation of anchor bolts, holdowns and plywood bracing in garage and crawl spaceDetails
install new frame and grade beam at garage wall " soft story". new frame and beam not visible from street. non engineered installation of anchor bolts, holdowns and plywood bracing in garage and crawl space | $5,000 |
| May 12, 2009 | Completed final sign-off May 2009 | 340 17th Av | voluntary,non enginered stru improv-install anchor bolts, flat washers,holdowns, lt. rod & plywood 5/8" cdx, nail 4" on edge & 6" infield w/ 2 1/4" x .18" dia nails. l-70 or hio to d. top plates. all work inside bldg in bsmt.Details
voluntary,non enginered stru improv-install anchor bolts, flat washers,holdowns, lt. rod & plywood 5/8" cdx, nail 4" on edge & 6" infield w/ 2 1/4" x .18" dia nails. l-70 or hio to d. top plates. all work inside bldg in bsmt. | $6,000 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 1410 14th Av | voluntary non-engineered sub-structural improvement. installation of anchor bolts, holdowns and plywood bracing in garage. all work inside of building.Details
voluntary non-engineered sub-structural improvement. installation of anchor bolts, holdowns and plywood bracing in garage. all work inside of building. | $9,776 |
| Feb 10, 2009 | Completed final sign-off Feb 2009 | 8344 Geary Bl | voluntary, non engineered sub structural improvement. installation of anchor bolts, holddowns, plywood bracing and beam and column connectors. all work done inside of building in garage/basementDetails
voluntary, non engineered sub structural improvement. installation of anchor bolts, holddowns, plywood bracing and beam and column connectors. all work done inside of building in garage/basement | $12,998 |
| Jan 13, 2009 | Completed final sign-off Jan 2009 | 1631 20th Av | voluntary non engineered sub structural strengthening. installation of anchor bolts, holdowns, plywood bracing. all work to be done on interior of bldg.Details
voluntary non engineered sub structural strengthening. installation of anchor bolts, holdowns, plywood bracing. all work to be done on interior of bldg. | $15,304 |
| Oct 3, 2008 | Completed final sign-off Oct 2008 | 553 42nd Av | voluntary non engineered substructural strengthening. installation of anchor bolts 5/8" x 12" l . epoxy type 32" o/center w/3x3 plate washers, phd 5 (simpson) holdowns w/ 5/8" x 18" l epoxy boldts. plywood sheathing 5/8" cdx nailing 4" edge & 6" field with 2 1/4" x 148" dia nails, l 7o t h1o @Details
voluntary non engineered substructural strengthening. installation of anchor bolts 5/8" x 12" l . epoxy type 32" o/center w/3x3 plate washers, phd 5 (simpson) holdowns w/ 5/8" x 18" l epoxy boldts. plywood sheathing 5/8" cdx nailing 4" edge & 6" field with 2 1/4" x 148" dia nails, l 7o t h1o @ | $13,152 |
| Apr 18, 2008 | Completed final sign-off May 2008 | 131 Marietta Dr | voluntary non engineered sub-structural strengthening. install ankler bolts.plywood sheathing. shear nails, anchor bolts use plate washers. 7" min embedment for bolts, in garage and crawl space.Details
voluntary non engineered sub-structural strengthening. install ankler bolts.plywood sheathing. shear nails, anchor bolts use plate washers. 7" min embedment for bolts, in garage and crawl space. | $18,765 |
| Jan 30, 2008 | Completed final sign-off Mar 2008 | 2856 Scott St | voluntary strengthening of front wall of garage.Details
voluntary strengthening of front wall of garage. | $43,000 |
| Apr 16, 2007 | Completed final sign-off May 2007 | 409 Clipper St | voluntary non engineered sub, structural strengthening, install anchor bolts 5/8"x12"l, 32"o/center with 2-1/4x2-1/4x1/4"plate washers. epoxy injection method (simpson etepoxy) holdowns, simpson phd5 with 5/8"x18"bolt. epoxy injection method. plywood sheathing cdx 5/8"5 ply,nailed 4"o/c edge,Details
voluntary non engineered sub, structural strengthening, install anchor bolts 5/8"x12"l, 32"o/center with 2-1/4x2-1/4x1/4"plate washers. epoxy injection method (simpson etepoxy) holdowns, simpson phd5 with 5/8"x18"bolt. epoxy injection method. plywood sheathing cdx 5/8"5 ply,nailed 4"o/c edge, | $8,907 |
| Mar 20, 2007 | Completed final sign-off May 2007 | 2856 Scott St | revision to app #200701252636. extend foundation. add piersDetails
revision to app #200701252636. extend foundation. add piers | $20,578 |
| Jan 25, 2007 | Completed final sign-off May 2007 | 2856 Scott St | work done for all unit from #1 to #6. voluntary sub structural strentgthening, installation of anchor bolts, holdowns, plywood sheathing, concrete pier (1), foundation repair, and post/beam reinforcements. no calcs no special insp.Details
work done for all unit from #1 to #6. voluntary sub structural strentgthening, installation of anchor bolts, holdowns, plywood sheathing, concrete pier (1), foundation repair, and post/beam reinforcements. no calcs no special insp. | $61,658 |
| Jan 9, 2007 | Never finaled issued Jan 2007, no final | 1991 43rd Av | voluntary non-engineered sub structural strengthening. installation of a bolt, hold downsphd-5, plywood sheathing, see specifications attached.Details
voluntary non-engineered sub structural strengthening. installation of a bolt, hold downsphd-5, plywood sheathing, see specifications attached. | $16,547 |
| Mar 2, 2005 | Completed final sign-off Mar 2005 | 1935 14th Av | voluntary,non engineered sub structural strengthening in basement.install of 5/8"x12"l anchor boltsDetails
voluntary,non engineered sub structural strengthening in basement.install of 5/8"x12"l anchor bolts | $23,310 |
| Sep 10, 2004 | Completed final sign-off Oct 2004 | 176 Escolta Wy | voluntary structial strenthening & installation of anchorbelts 32" o/c, bolts 5/8" x 12" (8" embedmeDetails
voluntary structial strenthening & installation of anchorbelts 32" o/c, bolts 5/8" x 12" (8" embedme | $10,122 |
| Jan 22, 2004 | Completed final sign-off Feb 2004 | 3342 Divisadero St | coluntary sub-structrual non engineered strengething - insulation of anchor bolts, hold downs andDetails
coluntary sub-structrual non engineered strengething - insulation of anchor bolts, hold downs and | $15,836 |
| Mar 17, 2003 | Completed final sign-off Mar 2003 | 885 Noe St | voluntary. non engineered. substructural strengthening.installation of anchor bolts, holdowns + plywDetails
voluntary. non engineered. substructural strengthening.installation of anchor bolts, holdowns + plyw | $6,132 |
| May 20, 2002 | Completed final sign-off Jun 2002 | 1350 Pacheco St | voluntary structural strenghthening, installation of anchor boltsDetails
voluntary structural strenghthening, installation of anchor bolts | $16,923 |
| Apr 26, 2002 | Completed final sign-off May 2002 | 2297 Green St | voluntary substructural strenthening,installation of plywood 12"min embedment 18 quantity anchor bolDetails
voluntary substructural strenthening,installation of plywood 12"min embedment 18 quantity anchor bol | $17,161 |
| Mar 6, 2002 | Completed final sign-off Apr 2002 | 1417 14th Av | voluntary sub-structural strengthening/installation of anchor/bolts/plywood sheathing and beam columDetails
voluntary sub-structural strengthening/installation of anchor/bolts/plywood sheathing and beam colum | $8,600 |
| Feb 13, 2002 | Completed final sign-off Mar 2002 | 127 Parker Av | installation of anchor bolts,holdowns,plywood sheathing & sections of new foundation replacing existDetails
installation of anchor bolts,holdowns,plywood sheathing & sections of new foundation replacing exist | $32,000 |
| Jan 24, 2002 | Expired or cancelled expired May 2006 | 280 30th Av | install flate washers,anchor system. & for future plywood sheating.Details
install flate washers,anchor system. & for future plywood sheating. | $1,286 |
| Oct 10, 2001 | Completed final sign-off Oct 2001 | 408 Hugo St | installation of anchor bolts,hold downs & plywood sheathingDetails
installation of anchor bolts,hold downs & plywood sheathing | $14,168 |
| Feb 5, 2001 | Expired or cancelled expired Aug 2001 | 4058 Cesar Chavez St | installation of anchor bolts holdowns and plywood sheatingDetails
installation of anchor bolts holdowns and plywood sheating | $6,317 |