Block 0187, lot 010
1450 Washington St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 4
- Units
- 22
- Rooms
- 23 bathrooms
- Building
- 20,929 sq ft
- Lot
- 9,452 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1450 Washington St | Camarina Construction Corp | unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower panDetails
unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower pan | $45,000 |
| Dec 31, 2021 | Never finaled issued Dec 2021, no final | 1440 Washington St | Mendez-Ortiz Contractors | #1: renovate kitchen and bathroom in-kind. plumbing and electrical as neededDetails
#1: renovate kitchen and bathroom in-kind. plumbing and electrical as needed | $26,500 |
| Jul 19, 2021 | Completed final sign-off Sep 2022 | 1440 Washington St | International Fire Inc | upgrade of (e) fire alarm systems with addition of radios for mointoring of systems and low frrequency sounders in each slieeping room. like for like under sffc sfc1103.7.6.1.Details
upgrade of (e) fire alarm systems with addition of radios for mointoring of systems and low frrequency sounders in each slieeping room. like for like under sffc sfc1103.7.6.1. | $21,000 |
| Jan 28, 2021 | Completed final sign-off Jun 2021 | 1450 Washington St | G M Building And Construction Inc | apt 5: remodel kitchen & bathroom.Details
apt 5: remodel kitchen & bathroom. | $22,500 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 1440 Washington St | street spaceDetails
street space | ||
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 1440 Washington St | street spaceDetails
street space | ||
| Oct 4, 2017 | Never finaled issued Oct 2017, no final | 1440 Washington St | streetspaceDetails
streetspace | ||
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 1440 Washington St | street spaceDetails
street space | ||
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 1440 Washington St | street spaceDetails
street space | ||
| Apr 6, 2016 | Never finaled issued Apr 2016, no final | 1440 Washington St | street spaceDetails
street space | ||
| Feb 16, 2016 | Expired or cancelled cancelled Apr 2026 | 1440 Washington St | Camarina Construction Corp | (2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph **Details
(2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph ** | $50,000 |
| Oct 8, 2015 | Completed final sign-off Dec 2016 | 1440 Washington St | Camarina Construction Corp | compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4. n/a for maher ordinance no. 155-13.Details
compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4. n/a for maher ordinance no. 155-13. | $60,000 |
| Mar 27, 2012 | Never finaled issued Mar 2012, no final | 1450 Washington St | street spaceDetails
street space | ||
| Nov 28, 2011 | Never finaled issued Nov 2011, no final | 1440 Washington St | street spaceDetails
street space | ||
| Sep 26, 2011 | Completed final sign-off Nov 2011 | 1440 Washington St | Camarina Construction Corp | unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4Details
unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4 | $20,000 |
| Sep 14, 2010 | Never finaled issued Sep 2010, no final | 1440 Washington St | street spaceDetails
street space | ||
| Aug 13, 2010 | Completed final sign-off Oct 2010 | 1440 Washington St | Regency General Contractors Inc | repair of existing rear yard retaining wallDetails
repair of existing rear yard retaining wall | $40,000 |
| Feb 18, 2009 | Completed final sign-off Mar 2009 | 1440 Washington St | On-Site Maintenance | work on#1450 washington #4. to obtain final inspection for work approved under pa#200704259596. all work has been completed.Details
work on#1450 washington #4. to obtain final inspection for work approved under pa#200704259596. all work has been completed. | |
| Mar 4, 2008 | Completed final sign-off Aug 2008 | 1440 Washington St | On-Site Maintenance | 1446 #5-kitchen and bath remodel, no structural, cabinets, counter, tile and flourscent lighting. #5Details
1446 #5-kitchen and bath remodel, no structural, cabinets, counter, tile and flourscent lighting. #5 | $25,100 |
| Feb 5, 2008 | Completed final sign-off Jul 2008 | 1440 Washington St | On-Site Maintenance | unit #2-kitchen & bath remodel, no structural. cabinets, counter, tile, flourscent lighting.Details
unit #2-kitchen & bath remodel, no structural. cabinets, counter, tile, flourscent lighting. | $25,001 |
| Jan 17, 2008 | Never finaled issued Jan 2008, no final | 1440 Washington St | street spaceDetails
street space | ||
| Dec 28, 2007 | Expired or cancelled cancelled Jan 2026 | 1446 Washington St | add habitable space to units 1 and 2 by lowering the basement floor and 2 spiral stair cases connecting the lower space. construct 8 new windows and 1 new door. replace foundation under units 1 and 2.Details
add habitable space to units 1 and 2 by lowering the basement floor and 2 spiral stair cases connecting the lower space. construct 8 new windows and 1 new door. replace foundation under units 1 and 2. | $100,000 | |
| Nov 6, 2007 | Never finaled issued Nov 2007, no final | 1440 Washington St | street space permit only.Details
street space permit only. | ||
| Nov 6, 2007 | Completed final sign-off Mar 2008 | 1440 Washington St | On-Site Maintenance | work @ unit# 5 only. kitchen & bath remodel. no structural work. new cabinets, counter. new florescent lighting.Details
work @ unit# 5 only. kitchen & bath remodel. no structural work. new cabinets, counter. new florescent lighting. | $15,000 |
| Oct 15, 2007 | Completed final sign-off Nov 2007 | 1440 Washington St | unit-7, add three new windows to match existing. unit-a remodel existing bathroom,demo/addition of new non-bearing walls.Details
unit-7, add three new windows to match existing. unit-a remodel existing bathroom,demo/addition of new non-bearing walls. | $4,000 | |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 1450 Washington St | street spaceDetails
street space | ||
| Aug 17, 2007 | Completed final sign-off Jan 2008 | 1450 Washington St | On-Site Maintenance | work @ unit# 8 only. kitchen / bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluoresent or motion controlled sensor. exhaust termination 3' min from property line & bldg openings.Details
work @ unit# 8 only. kitchen / bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluoresent or motion controlled sensor. exhaust termination 3' min from property line & bldg openings. | $19,000 |
| Aug 1, 2007 | Never finaled issued Aug 2007, no final | 1440 Washington St | street spaceDetails
street space | ||
| Jul 17, 2007 | Completed final sign-off Mar 2008 | 1440 Washington St | On-Site Maintenance | kitchen and bathroom remodel inkind. no structural changes. no wndw door or wall alteration. kitchen atleast 50 % of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor. exhaust termination 3' min from pl. bldg openingsDetails
kitchen and bathroom remodel inkind. no structural changes. no wndw door or wall alteration. kitchen atleast 50 % of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor. exhaust termination 3' min from pl. bldg openings | $15,000 |
| Jul 12, 2007 | Expired or cancelled expired Dec 2009 | 1446 Washington St | demo nonbearing wall, fill in door and new closet in unit #4Details
demo nonbearing wall, fill in door and new closet in unit #4 | $600 | |
| Jun 18, 2007 | Never finaled issued Jun 2007, no final | 1446 Washington St | street spaceDetails
street space | ||
| Jun 15, 2007 | Completed final sign-off Mar 2008 | 1440 Washington St | On-Site Maintenance | #7-kitchen/bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg. opening.Details
#7-kitchen/bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg. opening. | $15,000 |
| Jun 15, 2007 | Completed final sign-off Sep 2007 | 1450 Washington St | On-Site Maintenance | #2-kitchen/bathroom remodel in kind. no structural changes.building,plumbing & electrical code upgrades.no window door or wall alterations. kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor. exhaust termination 3'min from pl or bldg. opening.Details
#2-kitchen/bathroom remodel in kind. no structural changes.building,plumbing & electrical code upgrades.no window door or wall alterations. kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor. exhaust termination 3'min from pl or bldg. opening. | $15,000 |
| Jun 15, 2007 | Completed final sign-off Oct 2007 | 1450 Washington St | On-Site Maintenance | #6-kitchen/bathroom remodel in kind.no structural changes.building plumbing & electrical code upgrades.no window door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg.oepning.Details
#6-kitchen/bathroom remodel in kind.no structural changes.building plumbing & electrical code upgrades.no window door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg.oepning. | $15,000 |
| May 24, 2007 | Completed final sign-off Mar 2008 | 1440 Washington St | On-Site Maintenance | unit#4. kitchen/bath remodel in kind no structural changes building plumbing & electrical code upgrades. no window door or wall alterations. kitchen: at least 50 % of lighting wattage must be fluorescent. bath: fluorescent of motion controlled sensor.Details
unit#4. kitchen/bath remodel in kind no structural changes building plumbing & electrical code upgrades. no window door or wall alterations. kitchen: at least 50 % of lighting wattage must be fluorescent. bath: fluorescent of motion controlled sensor. | $15,000 |
| May 23, 2007 | Completed final sign-off Jun 2008 | 1450 Washington St | On-Site Maintenance | unit#1.kitahcne/bath remodel in kind no structural changes building plumbing & electrical code upgrade. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor.Details
unit#1.kitahcne/bath remodel in kind no structural changes building plumbing & electrical code upgrade. no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. | $15,000 |
| May 23, 2007 | Expired or cancelled expired Oct 2008 | 1446 Washington St | On-Site Maintenance | unit#4. kitchen/bath remodel in kind. no structural changes. building plumbing & electrical code upgrades. no windows door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath fluorescent of motion controlled sensor.Details
unit#4. kitchen/bath remodel in kind. no structural changes. building plumbing & electrical code upgrades. no windows door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath fluorescent of motion controlled sensor. | $15,000 |
| May 16, 2007 | Never finaled issued May 2007, no final | 1450 Washington St | street spaceDetails
street space | ||
| Apr 25, 2007 | Never finaled issued Apr 2007, no final | 1440 Washington St | On-Site Maintenance | kichen and bath remodel in kind. no structural changes. no wndow, wall or door alterations. kchn alteration 50% of light wattage mus be fluorescent . bath fluorescent or motion controlled sensorDetails
kichen and bath remodel in kind. no structural changes. no wndow, wall or door alterations. kchn alteration 50% of light wattage mus be fluorescent . bath fluorescent or motion controlled sensor | $15,000 |
| Apr 6, 2007 | Completed final sign-off Mar 2009 | 1440 Washington St | On-Site Maintenance | unit #4- change of unit # from 6 to 4. revise/correct appl#200703307672.Details
unit #4- change of unit # from 6 to 4. revise/correct appl#200703307672. | |
| Mar 30, 2007 | Never finaled issued Mar 2007, no final | 1440 Washington St | On-Site Maintenance | #6- kitchen/bath remodel in kind. no structural changes.building, plumbing & electrical code upgrades. no window or door alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent of controlled motion sensor.Details
#6- kitchen/bath remodel in kind. no structural changes.building, plumbing & electrical code upgrades. no window or door alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent of controlled motion sensor. | $15,000 |
| Feb 13, 2007 | Never finaled issued Feb 2007, no final | 1446 Washington Bl | street spaceDetails
street space | ||
| Feb 13, 2007 | Completed final sign-off Oct 2007 | 1446 Washington St | On-Site Maintenance | kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrading. no window or door work. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor.Details
kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrading. no window or door work. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Jan 20, 2006 | Never finaled issued Jan 2006, no final | 1440 Washington St | High Quality Roofing Co. | reroofingDetails
reroofing | $20,500 |
| Jan 20, 2004 | Never finaled issued Jan 2004, no final | 1440 Washington St | street space permitDetails
street space permit | ||
| Dec 16, 2003 | Never finaled issued Dec 2003, no final | 1440 Washington St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (16), Camarina Construction Corp (4), G M Building And Construction Inc, High Quality Roofing Co., International Fire Inc, Mendez-Ortiz Contractors, Regency General Contractors Inc
- Architects
- Daniel Barringer, Mark Bucciarelli
- Engineers
- Donald David (2), Daniel Barringer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.