Thomas Swayze
- Listed as
- engineer
- Firm
- Cornerstone
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Dec 2025
17 permits since 2000 (engineer on 17 permits): 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Sep 2026 | 838 Pacific Av | Cahill Contractors Llc. | repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110.Details
repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110. | $200,000 |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 2200 Van Ness Av | Amone Corp | revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing.Details
revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing. | |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 2500 Mason St | Cw Horton General Contractor, Kdc Construction | revision to 201711164128 to shear wall modifications to rooms 4424 & 4625. maher n/aDetails
revision to 201711164128 to shear wall modifications to rooms 4424 & 4625. maher n/a | $10,000 |
| Dec 12, 2017 | Expired or cancelled cancelled Jan 2026 | 2500 Mason St | Build Group Inc. | exterior renovation of public area 1st fl awnings, gates, pool deck enclosure, doors and frame, ceiling lighting, finishesDetails
exterior renovation of public area 1st fl awnings, gates, pool deck enclosure, doors and frame, ceiling lighting, finishes | $400,000 |
| Nov 15, 2017 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to pa#201510200191 s-1 to confirm type of construction for the community center is type 1b, fire wall plan check comment shown on reference drawings (attached) is not applicable to this project. the 3-hr wall is not required. n/a ordinance #155-13Details
revision to pa#201510200191 s-1 to confirm type of construction for the community center is type 1b, fire wall plan check comment shown on reference drawings (attached) is not applicable to this project. the 3-hr wall is not required. n/a ordinance #155-13 | |
| Oct 4, 2017 | Completed final sign-off Dec 2017 | 1139 Scott St | Nibbi Bros Assoc Inc. | revision to pa#201505015161, trash compactpor enclosure to provide cast in place concrete walls in lieu of cmu walls. n/a ordinance #155-13Details
revision to pa#201505015161, trash compactpor enclosure to provide cast in place concrete walls in lieu of cmu walls. n/a ordinance #155-13 | |
| Mar 6, 2015 | Completed final sign-off Jul 2017 | 491 31st Av | moh rad priority permit. per sheet a0.01. new windows, interior upgrades, accessibility upgrades, roofing replacement. ext trim replacement, ext paint, minor structural, repair, unit kitchen replacement in kind.Details
moh rad priority permit. per sheet a0.01. new windows, interior upgrades, accessibility upgrades, roofing replacement. ext trim replacement, ext paint, minor structural, repair, unit kitchen replacement in kind. | $6,133,912 | |
| Mar 6, 2015 | Completed final sign-off Sep 2017 | 227 Bay St | Amone Corp | moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a ***Details
moh rad priority permit. per sheet a0.01. exterior revised from cement plaster to composite siding. interior upgrades, accessibility upgrades, roofing replacement. windows, exterior paint, lobby remodel. legalize room count as 50 units total. ** maher: n/a *** | $6,191,281 |
| Jan 16, 2014 | Completed final sign-off Jun 2015 | 1 Zoo Rd | Nibbi Bros Assoc Inc. | demolition to (e) floor slab. replace w/ (n) slab, (n) struct support for (n) exhibit components. (n) custom exhibit faux rock work & tree, mesh enclosure, waterfalls, displace enclosure, (n) work path, casework, painting & graphics. seismic strengthening.Details
demolition to (e) floor slab. replace w/ (n) slab, (n) struct support for (n) exhibit components. (n) custom exhibit faux rock work & tree, mesh enclosure, waterfalls, displace enclosure, (n) work path, casework, painting & graphics. seismic strengthening. | $2,000,000 |
| Apr 19, 2012 | Completed final sign-off Feb 2014 | 2902 Washington St | replacement in-kind of existing rear exit stair with structural upgrades.Details
replacement in-kind of existing rear exit stair with structural upgrades. | $15,000 | |
| Oct 30, 2008 | Completed final sign-off Feb 2010 | 225 Bush St | Novo Construction Inc | remove at ground fl east & west lobbies: selected doors & selected storefront. construction: install at ground floor selected exterior address sign, selected doors & selected storefront. interior scope of work to be permitted seperately. m.e.p. under seperate permit.Details
remove at ground fl east & west lobbies: selected doors & selected storefront. construction: install at ground floor selected exterior address sign, selected doors & selected storefront. interior scope of work to be permitted seperately. m.e.p. under seperate permit. | $250,000 |
| Feb 13, 2008 | Completed final sign-off Oct 2008 | 154 Prentiss St | S A Baxter Inc. | revision to appl #200504180195-s1: revise roof framing & add 3 built-in shelf/closets a0t 3rd floor.Details
revision to appl #200504180195-s1: revise roof framing & add 3 built-in shelf/closets a0t 3rd floor. | |
| Aug 2, 2007 | Completed final sign-off Jan 2008 | 1354 05th Av | Lorber Company Inc Dba Superior Builders | voluntary structural upgrade of garage level. demo of existing garage level ceiling & replace with 1 hr. rated floor/ceiling assembly on north side of garage. increase project valuation per inspector dennis carlin by $100,000.Details
voluntary structural upgrade of garage level. demo of existing garage level ceiling & replace with 1 hr. rated floor/ceiling assembly on north side of garage. increase project valuation per inspector dennis carlin by $100,000. | $100,000 |
| Jan 26, 2007 | Completed final sign-off Jan 2008 | 1354 05th Av | Lorber Company Inc Dba Superior Builders | new interior layout & 1/2 bath on 3/f. demo & replace 2/f kitchen & bath, repair doors, windows & finishes, 2 new skylights.Details
new interior layout & 1/2 bath on 3/f. demo & replace 2/f kitchen & bath, repair doors, windows & finishes, 2 new skylights. | $85,000 |
| Nov 15, 2006 | Completed final sign-off May 2007 | 149 Prentiss St | S A Baxter Inc. | gut & remodel of interior, expand kitchen (43 sqft). repair exterior entry, replace windows & doors.Details
gut & remodel of interior, expand kitchen (43 sqft). repair exterior entry, replace windows & doors. | $90,000 |
| Apr 11, 2006 | Completed final sign-off Jun 2006 | 550 Davis St | infill of existing interior vaulted ceiling to increase dwelling #12 by 68 s.f. on 2/fDetails
infill of existing interior vaulted ceiling to increase dwelling #12 by 68 s.f. on 2/f | $8,000 | |
| Apr 9, 2001 | Completed final sign-off Apr 2011 | 491 Bay Shore Bl | Rsr Constr/Robinson Construction Co | erect 2-story, retail, material sales & parking new building.Details
erect 2-story, retail, material sales & parking new building. | $14,500,000 |