Roberta Wahl
- Listed as
- architect, engineer
- Firm
- Plum Architects
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Jun 2026
108 permits since 2000 (architect on 106 permits, engineer on 3 permits): 76 completed, 8 in progress, 12 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jul 2026 | 260 22nd Av | new interior stair and roof access skylight for new 436sq.ft. roof deck at unit 260 22nd ave. upgrade existing entry and stair to 1-hr corridor at all floors.Details
new interior stair and roof access skylight for new 436sq.ft. roof deck at unit 260 22nd ave. upgrade existing entry and stair to 1-hr corridor at all floors. | $75,000 | |
| Feb 19, 2026 | In progress issued Feb 2026 | 4819 Anza St | G&C Construction Services Inc. | revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floorDetails
revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floor | $150,000 |
| Feb 18, 2026 | In progress filed Feb 2026, not yet issued | 687 Kansas St | revision for pa 202501178573 framing laundry; unit 689 rconfigure closet wall, remove portion, reconfigure bath, reconfigure bthroom and kitchen remodel, add bathroom & 2 skylights; unit 68 install pantry and washer/dryerDetails
revision for pa 202501178573 framing laundry; unit 689 rconfigure closet wall, remove portion, reconfigure bath, reconfigure bthroom and kitchen remodel, add bathroom & 2 skylights; unit 68 install pantry and washer/dryer | $50,000 | |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | Planart Construction Corp | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Aug 6, 2025 | Completed final sign-off Jun 2026 | 1369 26th Av | Hong Shink Construction | legalize (e) 1/f unt per nov202293112 & 202293060.remove (e) stair btwn 1/f -2/f; relocate (e) unit entry;reconfig (e) kitchen;relocate (e) bath,provide 1h p|l & passageway to new adu & 1h sep to adj unit/garage/storage areas.provision f/s at unit and to entry under sep permit.Details
legalize (e) 1/f unt per nov202293112 & 202293060.remove (e) stair btwn 1/f -2/f; relocate (e) unit entry;reconfig (e) kitchen;relocate (e) bath,provide 1h p|l & passageway to new adu & 1h sep to adj unit/garage/storage areas.provision f/s at unit and to entry under sep permit. | $100,000 |
| May 23, 2025 | In progress filed May 2025, not yet issued | 718 Ashbury St | new full bath at unit 718.Details
new full bath at unit 718. | $41,000 | |
| Mar 14, 2025 | Completed final sign-off Sep 2025 | 2273 California St | Kevin Webb Construction Inc | 3/f bathroom remodel. removal of non-bearing chase wall. removal and replacement in place toilet, bathtub/shower. addition of a tempered glass panel and door to enclose the (e) toilet. work at 2273 california only. no exterior work.Details
3/f bathroom remodel. removal of non-bearing chase wall. removal and replacement in place toilet, bathtub/shower. addition of a tempered glass panel and door to enclose the (e) toilet. work at 2273 california only. no exterior work. | $20,000 |
| Mar 14, 2025 | In progress issued May 2025 | 624 12th Av | removal of (e) deck and stair, replace with 363 sq.ft. exterior deck, guardrail, handrail and stair. remove (e) window and install sliding doors to deck from sunroom.Details
removal of (e) deck and stair, replace with 363 sq.ft. exterior deck, guardrail, handrail and stair. remove (e) window and install sliding doors to deck from sunroom. | $75,000 | |
| Jan 31, 2025 | In progress filed Jan 2025, not yet issued | 522 Ortega St | Edri Construction Inc *See Notes* | conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairsDetails
conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairs | $318,700 |
| Jan 17, 2025 | Completed final sign-off Jul 2026 | 687 Kansas St | 7 Hills Construction, Kevin Webb Construction Inc | restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems.Details
restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems. | $200,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 670 05th Av | S And L Remodeling And Design Inc | first flr atlerations: remove wall in half, re-add shower, replace laundry sink with counter sinkDetails
first flr atlerations: remove wall in half, re-add shower, replace laundry sink with counter sink | $10,000 |
| Jul 12, 2024 | In progress filed Jul 2024, not yet issued | 795 Noriega St | interior alterations to (2) existing bathrooms add 1 steam shower & 1 saunaDetails
interior alterations to (2) existing bathrooms add 1 steam shower & 1 sauna | $27,900 | |
| Dec 13, 2023 | Completed final sign-off Jan 2026 | 3213 Pierce St | Tombay Construction | making bathroom and accessible, cosmetic improvements, adding lighting adding greas trap adding bar and seating, making entrance ada compliantDetails
making bathroom and accessible, cosmetic improvements, adding lighting adding greas trap adding bar and seating, making entrance ada compliant | $105,000 |
| Aug 17, 2023 | Completed final sign-off Apr 2024 | 599 24th Av | A L V Construction Inc | revision to 202112235002 to relocate laundry.replace 14 windows with new double hung aluminum clad windows. convert (e) 2nd fl office to bedroom. revise foundation design for (e) site condition.Details
revision to 202112235002 to relocate laundry.replace 14 windows with new double hung aluminum clad windows. convert (e) 2nd fl office to bedroom. revise foundation design for (e) site condition. | $50,000 |
| Apr 28, 2023 | Completed final sign-off Nov 2024 | 643 19th Av | P 3 Construction & Remodeling Inc | converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard.Details
converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard. | $250,000 |
| Apr 4, 2023 | Completed final sign-off Oct 2024 | 46 Entrada Ct | Kevin Webb Construction Inc | abating nov 202181771 by legalizing e below grade rooms. provide code compliant entry plus 1 hr separation from non occupied gr fl rooms and remodel e 1 bath existingDetails
abating nov 202181771 by legalizing e below grade rooms. provide code compliant entry plus 1 hr separation from non occupied gr fl rooms and remodel e 1 bath existing | $85,000 |
| Dec 9, 2022 | Completed final sign-off Jun 2023 | 864 Union St | the scope of work consists of converting an existing half bath to full bath.Details
the scope of work consists of converting an existing half bath to full bath. | $80,000 | |
| Aug 8, 2022 | Completed final sign-off Dec 2023 | 4011 25th St | P 3 Construction & Remodeling Inc | remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage.Details
remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage. | $37,000 |
| Jun 7, 2022 | Completed final sign-off Jul 2022 | 750 Persia Av | Spryscapes Const Inc. | replace front stairs in-kind.Details
replace front stairs in-kind. | $20,500 |
| Apr 5, 2022 | Completed final sign-off Aug 2022 | 2011 17th Av | North South Construction Inc | revision to pa# 202109249107. adu wall unit heater to be reused to electric.Details
revision to pa# 202109249107. adu wall unit heater to be reused to electric. | |
| Mar 29, 2022 | Completed final sign-off Dec 2022 | 352 30th Av | unit# 352. revision to pa# 202203150038. interior remodel to remove non-bearing wall between dining room and to install new kitchen peninsula.Details
unit# 352. revision to pa# 202203150038. interior remodel to remove non-bearing wall between dining room and to install new kitchen peninsula. | ||
| Mar 16, 2022 | Completed final sign-off Oct 2022 | 599 24th Av | A L V Construction Inc | revision to pa# 202112235002. at anza elev, raise sill of one window and replace w/ alum clad triple casements. infill window in new master bathroom & replace window at front facade with new alum clad double hung in master bath.Details
revision to pa# 202112235002. at anza elev, raise sill of one window and replace w/ alum clad triple casements. infill window in new master bathroom & replace window at front facade with new alum clad double hung in master bath. | $3,000 |
| Jan 11, 2022 | Completed final sign-off Mar 2025 | 4536 20th St | project scope includes an interior remodel to remove an extg kitchen partition and install new cabinets.Details
project scope includes an interior remodel to remove an extg kitchen partition and install new cabinets. | $20,500 | |
| Dec 23, 2021 | Completed final sign-off Apr 2024 | 599 24th Av | A L V Construction Inc | remodel existing 1st fl kitchen. relocate existing 1st fl powder rm. remodel e 2nd fl bathDetails
remodel existing 1st fl kitchen. relocate existing 1st fl powder rm. remodel e 2nd fl bath | $50,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2022 | 2223 12th Av | Reliable Construction Inc | revison to bpa 202106233072. change layout of 2nd fl kitchen walls; change layout of 1st fl bedroom door. (n) work 224 sq ft of conditioned space @ 1st floor garageDetails
revison to bpa 202106233072. change layout of 2nd fl kitchen walls; change layout of 1st fl bedroom door. (n) work 224 sq ft of conditioned space @ 1st floor garage | $60,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2023 | 2113 Broderick St | Del Plata Builders Inc | general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellarDetails
general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellar | $15,000 |
| Sep 24, 2021 | Completed final sign-off Aug 2022 | 2011 17th Av | North South Construction Inc | 1)legalization of an unauthorized unit as 2011a 17th ave consisting of 3 ground floor rooms; replace of extg ango alley entry in kind. 2) 1 hour seperation between unit and garage. 3) sprinkler in unit under seperate permitDetails
1)legalization of an unauthorized unit as 2011a 17th ave consisting of 3 ground floor rooms; replace of extg ango alley entry in kind. 2) 1 hour seperation between unit and garage. 3) sprinkler in unit under seperate permit | $18,000 |
| Jun 11, 2021 | Never finaled issued Jun 2022, no final | 1900 Fell St | Lindquist Custom Construction Inc | voluntary access improvents, accessible entrance at the first fl. along clayton st.Details
voluntary access improvents, accessible entrance at the first fl. along clayton st. | $20,000 |
| Jun 7, 2021 | Never finaled filed Jun 2021, never issued | 627 46th Av | vertical addition to convert an (e) 2-story residence to 3-story residence w/ interior stair. remodel (e) kitchen.Details
vertical addition to convert an (e) 2-story residence to 3-story residence w/ interior stair. remodel (e) kitchen. | $365,000 | |
| Feb 2, 2021 | Never finaled issued Dec 2021, no final | 1831 Grant Av | rooms down addition in unit 103 (~360sf). maher n/aDetails
rooms down addition in unit 103 (~360sf). maher n/a | $105,000 | |
| Dec 9, 2020 | Completed final sign-off Dec 2021 | 858 Cole St | abe ordinance no. 51-16 minor t.i to install (n) restroom.Details
abe ordinance no. 51-16 minor t.i to install (n) restroom. | $10,000 | |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538.Details
revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538. | |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537.Details
revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537. | |
| Oct 7, 2020 | Never finaled issued Nov 2020, no final | 1831 Grant Av | Kevin Webb Construction Inc | 1/fl: infill above (e) garage to install a tenant laundry & storage room.Details
1/fl: infill above (e) garage to install a tenant laundry & storage room. | $22,000 |
| Oct 7, 2020 | Completed final sign-off Jun 2023 | 2554 Greenwich St | unit #3: remodeling the kitchen, relocating the washer & dryer, removing a non-bearing wing wall & replacing in-kind rear (north) sliding glass doors in the existing third floor unitDetails
unit #3: remodeling the kitchen, relocating the washer & dryer, removing a non-bearing wing wall & replacing in-kind rear (north) sliding glass doors in the existing third floor unit | $30,000 | |
| May 20, 2020 | Completed final sign-off Aug 2020 | 305 16th Av | removal and replacement of rotted (e) bathroom fixtures, r/r (e) finishes at bathroom, replace of electrical fixtures in bathroom, remove non-load bearing closet partition wall in bathroom, relocate bathroom door (shift).Details
removal and replacement of rotted (e) bathroom fixtures, r/r (e) finishes at bathroom, replace of electrical fixtures in bathroom, remove non-load bearing closet partition wall in bathroom, relocate bathroom door (shift). | $8,000 | |
| Feb 13, 2020 | Completed final sign-off May 2020 | 934 Clement St | remove ~20lf of interior partition between (2) ground fl retail spaces. (934-936 clement)Details
remove ~20lf of interior partition between (2) ground fl retail spaces. (934-936 clement) | $1,500 | |
| Feb 5, 2020 | Expired or cancelled cancelled Apr 2026 | 862 Cole St | Grand Finishes | interior remodel to existing cafe to provide beer/wine service. install bar tap and new refrigerator, reconfigure cabinets, install water glass fillerDetails
interior remodel to existing cafe to provide beer/wine service. install bar tap and new refrigerator, reconfigure cabinets, install water glass filler | $20,000 |
| Jan 24, 2020 | Expired or cancelled expired Aug 2022 | 415 Holly Park Cr | North South Construction Inc | to comply w/ nov #202010303: revision to pa #2018-1218-8635 to replace +/- 80 lf of dry rot damaged exterior walls.Details
to comply w/ nov #202010303: revision to pa #2018-1218-8635 to replace +/- 80 lf of dry rot damaged exterior walls. | $12,000 |
| Jan 10, 2020 | Completed final sign-off Jan 2020 | 54 Seward St | revision to 201802131199: at rear replace/ enlarge 2 windows. install 2 railings/balcony. replace existing egress stair in kind. comply w/ 2019-004620 enfDetails
revision to 201802131199: at rear replace/ enlarge 2 windows. install 2 railings/balcony. replace existing egress stair in kind. comply w/ 2019-004620 enf | $40,000 | |
| Dec 20, 2019 | Never finaled issued Feb 2021, no final | 1387 Valencia St | Hoi's Construction | interior remodel of (e) restrooms & some administrative offices architectural only. mechanical, electrical, fire alarm & sprinkler submitals under sep. permit.Details
interior remodel of (e) restrooms & some administrative offices architectural only. mechanical, electrical, fire alarm & sprinkler submitals under sep. permit. | $152,000 |
| Dec 20, 2019 | Completed final sign-off Aug 2021 | 2577 Folsom St | Align Construction Inc | interior bathroom/kitchen remodel at 2nd fl. unit to install laundryDetails
interior bathroom/kitchen remodel at 2nd fl. unit to install laundry | $62,000 |
| Nov 26, 2019 | Expired or cancelled expired Oct 2025 | 67 Jules Av | North South Construction Inc | general int. remodel of extg kitchen and 2 bath, provide new rear deck and convert 100 sq ft of garage to living area. no window replacement at front facade.Details
general int. remodel of extg kitchen and 2 bath, provide new rear deck and convert 100 sq ft of garage to living area. no window replacement at front facade. | $86,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2021 | 1449 Jefferson St | Wilkinson Preservation Fine Home Mainten | 2 bath remodel on 2nd & 3rd fl, 1 kitchen remodel 2nd fl, replace 2 extg fire inserts, install guardrail at 3rd floor mezzanine.Details
2 bath remodel on 2nd & 3rd fl, 1 kitchen remodel 2nd fl, replace 2 extg fire inserts, install guardrail at 3rd floor mezzanine. | $62,000 |
| Sep 12, 2019 | Never finaled issued Feb 2020, no final | 3251 Pierce St | Bauman Landscape & Construction Inc. | remodel extg restaurant tenant space, including new type 1 hoods a finishes/appliances. n/a for maherDetails
remodel extg restaurant tenant space, including new type 1 hoods a finishes/appliances. n/a for maher | $58,000 |
| Jul 11, 2019 | Expired or cancelled cancelled Aug 2023 | 755 Morse St | install new 6" underground in accordance w/ nfpa 24 and fire department bulletin 2.09Details
install new 6" underground in accordance w/ nfpa 24 and fire department bulletin 2.09 | $750,000 | |
| Jul 10, 2019 | Expired or cancelled withdrawn Apr 2020 | 1831 Grant Av | general renovation to convert (e) laundy to dwelling unit, including adding kitchen and bath per ord #162-16. add new laundy/storage.Details
general renovation to convert (e) laundy to dwelling unit, including adding kitchen and bath per ord #162-16. add new laundy/storage. | $42,000 | |
| Jun 6, 2019 | Completed final sign-off Jan 2020 | 190 Amber Dr | revisionn to 201810112976 adding a shower to downstairs bathroomDetails
revisionn to 201810112976 adding a shower to downstairs bathroom | $5,000 | |
| May 24, 2019 | Completed final sign-off Jan 2021 | 1911 Hayes St | K A Lau Construction | barrier removal. bathroom ada. ada entry push pad.Details
barrier removal. bathroom ada. ada entry push pad. | $20,000 |
| Apr 26, 2019 | Completed final sign-off Nov 2019 | 2239 Market St | Euro Plumbing Inc, General Contractor | remove (e) awning and replace (e) glazing for commercial storefronts. accessible storefront entry to be provided under commercial seismic upgrade pa #201809129921.Details
remove (e) awning and replace (e) glazing for commercial storefronts. accessible storefront entry to be provided under commercial seismic upgrade pa #201809129921. | $32,000 |
| Jan 25, 2019 | Completed final sign-off Apr 2021 | 41 Telegraph Pl | Wilkinson Preservation Fine Home Mainten | interior remodel to kitchen and 3 baths, install elevator, infill e 1st fl lightwell and install radiant heatDetails
interior remodel to kitchen and 3 baths, install elevator, infill e 1st fl lightwell and install radiant heat | $285,000 |
| Jan 18, 2019 | Completed final sign-off Nov 2019 | 2299 Lombard St | Yama Construction | change of use of existing restaurant (a2) to retail shop (m) including general interior ti, replacing finishes & relocating interior partitions. maher n/a.Details
change of use of existing restaurant (a2) to retail shop (m) including general interior ti, replacing finishes & relocating interior partitions. maher n/a. | $105,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2020 | 233 Maple St | minor interior alterations at the 3rd flr level. to relocate (e) stair wall.Details
minor interior alterations at the 3rd flr level. to relocate (e) stair wall. | $32,000 | |
| May 23, 2018 | Completed final sign-off Apr 2019 | 1761 Page St | remove rear enclosed decks. replace extg 2nd and 3rd floors rear doors with windows.Details
remove rear enclosed decks. replace extg 2nd and 3rd floors rear doors with windows. | $45,000 | |
| Mar 30, 2018 | Completed final sign-off Nov 2019 | 4536 20th St | addiition of second unit. all work is within interior of lower level to comply with nov 201152910. connect new stiar to exiting rear yard stairDetails
addiition of second unit. all work is within interior of lower level to comply with nov 201152910. connect new stiar to exiting rear yard stair | $50,000 | |
| Mar 15, 2018 | Never finaled filed Mar 2018, never issued | 619 22nd Av | horizontal & vertical addition @ rear yard of (e) 2 stories single family home to add new unit w/ 3 bedrms and 4 bathrms.Details
horizontal & vertical addition @ rear yard of (e) 2 stories single family home to add new unit w/ 3 bedrms and 4 bathrms. | $747,000 | |
| Feb 13, 2018 | Completed final sign-off Feb 2020 | 54 Seward St | interior remodel-excavate basement crawlspace, repair (e) retaining walls, relocate (e) kitchen and bath, enclose (e) 2nd and 3rd fl ligh well, widen (e) rear patio doors; excavate<50 c.y.Details
interior remodel-excavate basement crawlspace, repair (e) retaining walls, relocate (e) kitchen and bath, enclose (e) 2nd and 3rd fl ligh well, widen (e) rear patio doors; excavate<50 c.y. | $195,000 | |
| Nov 7, 2017 | Completed final sign-off Feb 2019 | 500 Quintara St | Grand Finishes | administrative permit to correct pa#2016-1216-5215 from "1 basement to zero basement" for proposed alterationDetails
administrative permit to correct pa#2016-1216-5215 from "1 basement to zero basement" for proposed alteration | |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 1565 Grove St | Quality Painting Construction | #1565: exchange one rear windowDetails
#1565: exchange one rear window | $1,400 |
| Sep 13, 2017 | Completed final sign-off Nov 2018 | 2311 Balboa St | Quality Painting Construction | revision to pa #201511051876 - to add a roof deck.Details
revision to pa #201511051876 - to add a roof deck. | $15,000 |
| Aug 28, 2017 | Completed final sign-off Sep 2017 | 1571 Grove St | unit #1571 - exchange one rear windowDetails
unit #1571 - exchange one rear window | $1,400 | |
| Jul 28, 2017 | Never finaled issued Aug 2017, no final | 862 Cole St | Grand Finishes | installing a wooden planter over the sidewalk. non electricalDetails
installing a wooden planter over the sidewalk. non electrical | $200 |
| Apr 25, 2017 | Expired or cancelled cancelled Jan 2026 | 459 Geary St | revision to pa #201703151498 to correct occupancy per inspector's request. change of occupancy on 1st floor & basement only form a-3 "gallery" to a-2 "event space". no more a-3 occupancy.Details
revision to pa #201703151498 to correct occupancy per inspector's request. change of occupancy on 1st floor & basement only form a-3 "gallery" to a-2 "event space". no more a-3 occupancy. | ||
| Mar 30, 2017 | Completed final sign-off Nov 2017 | 350 Lexington St | Kevin Webb Construction Inc | replace extg wood burning fire place with a gas insert and surround.Details
replace extg wood burning fire place with a gas insert and surround. | $4,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 459 Geary St | basement & 1st floor - revision to pa #201701278081 to correct occupancy loads.Details
basement & 1st floor - revision to pa #201701278081 to correct occupancy loads. | ||
| Mar 14, 2017 | Completed final sign-off Jul 2017 | 307 16th Av | bathroom & bedroom alteration.with removal & replacement of (e) plaster for (n) 5/8 type v drywall, relocation non-structural partition, replacmeent of bathroom fixtures.Details
bathroom & bedroom alteration.with removal & replacement of (e) plaster for (n) 5/8 type v drywall, relocation non-structural partition, replacmeent of bathroom fixtures. | $10,000 | |
| Jan 27, 2017 | Never finaled issued Feb 2017, no final | 459 Geary St | change of use to both a3 gallery & a-2 event space (not a restaurant) for basement & 1st floor.Details
change of use to both a3 gallery & a-2 event space (not a restaurant) for basement & 1st floor. | ||
| Sep 26, 2016 | Completed final sign-off Apr 2017 | 730 Polk St | D & R Remodeling Services | 4th floor - revision to pa#201603111839 to remove waiting room & to create new layout of two exam rooms & a nurse station. maher ord 155-13 not required.Details
4th floor - revision to pa#201603111839 to remove waiting room & to create new layout of two exam rooms & a nurse station. maher ord 155-13 not required. | |
| Sep 20, 2016 | Completed final sign-off Aug 2017 | 862 Cole St | Grand Finishes | change of use from laundromat to limited restaurant. install sinks, cabintry and water heaterDetails
change of use from laundromat to limited restaurant. install sinks, cabintry and water heater | $37,500 |
| Sep 8, 2016 | Completed final sign-off Feb 2017 | 5203 Geary Bl | Evra Construction, Custom Remodels | convert (e) shop to specialty grocery, provide new sinks, flooring and cabinetry throughoutDetails
convert (e) shop to specialty grocery, provide new sinks, flooring and cabinetry throughout | $83,000 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 421 14th St | replace (e) roof deck in kind and enlarge to ~285 sq ft.Details
replace (e) roof deck in kind and enlarge to ~285 sq ft. | $2,500 | |
| Jul 13, 2016 | Completed final sign-off Apr 2017 | 1565 Grove St | Quality Painting Construction | revision to app#201512215656 to exchange rear and side windows for vinyl due to costs.Details
revision to app#201512215656 to exchange rear and side windows for vinyl due to costs. | |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 3234 Divisadero St | Quality Painting Construction | revision to pa#201603041253 to revise interior partitions and exchange windows at rear. n/a ordinance #155-13Details
revision to pa#201603041253 to revise interior partitions and exchange windows at rear. n/a ordinance #155-13 | $4,000 |
| May 27, 2016 | Completed final sign-off Aug 2017 | 1565 Grove St | Quality Painting Construction | revision to pa 2015-1221-5656 - revise interior partitions on 3rd to include 2 new bath & laundry. revise new sprinkler system from nfpa to nfpa 13r (already submitted separately)Details
revision to pa 2015-1221-5656 - revise interior partitions on 3rd to include 2 new bath & laundry. revise new sprinkler system from nfpa to nfpa 13r (already submitted separately) | $12,000 |
| May 26, 2016 | Completed final sign-off Aug 2017 | 1565 Grove St | Quality Painting Construction | revision to pa 2015-1221-5656 2 new stairs to 2 new roof decks.Details
revision to pa 2015-1221-5656 2 new stairs to 2 new roof decks. | $37,000 |
| Apr 11, 2016 | Completed final sign-off Feb 2019 | 75 Topaz Wy | Skye Builders Inc, Dragon Werks Inc | interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace.Details
interior remodel of a single family, condominium unit,including remodel of (e)kitchen, remodel of (e)bath, addition of a (n)bathroom and relocation of an (e)gas fireplace. | $220,000 |
| Mar 11, 2016 | Completed final sign-off Mar 2017 | 730 Polk St | D & R Remodeling Services | 4th floor: office remodel. demo interior partitions to create new layout. n/a for maherDetails
4th floor: office remodel. demo interior partitions to create new layout. n/a for maher | $10,805 |
| Mar 4, 2016 | Completed final sign-off Dec 2016 | 3234 Divisadero St | Quality Painting Construction | unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof.Details
unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof. | $165,000 |
| Feb 26, 2016 | Completed final sign-off Oct 2016 | 862 Cole St | Wong Construction Inc | soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom,1 hr rated exit passageway and stair.plumbing,mechanical,electrical systems work with new finishses. ref pa#201602058985.Details
soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom,1 hr rated exit passageway and stair.plumbing,mechanical,electrical systems work with new finishses. ref pa#201602058985. | $2,000 |
| Feb 26, 2016 | Completed final sign-off Oct 2016 | 862 Cole St | Wong Construction Inc | soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom, 1 hr rated exit passageway and stair. plumbing mechanicali & electrical systems work & new finishes. ref pa20160602058985. commercial portionDetails
soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom, 1 hr rated exit passageway and stair. plumbing mechanicali & electrical systems work & new finishes. ref pa20160602058985. commercial portion | $85,000 |
| Feb 5, 2016 | Completed final sign-off Oct 2016 | 862 Cole St | Wong Construction Inc | soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom, 1 hr rated exit passageway and stair. residential porition only.mechanical, plumbing, electrical systems work & new finishes.see also pa201602260648 & pa201602260644Details
soft story improvements of existing basement crawl space at 1st fl mercantile w associated remodel improvement including ada restroom, 1 hr rated exit passageway and stair. residential porition only.mechanical, plumbing, electrical systems work & new finishes.see also pa201602260648 & pa201602260644 | $215,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2017 | 1567 Grove St | Quality Painting Construction | to comply with nov 201497581 items 1 & 3, general renovation of 1st story to include regrading, new garage layout, new habitable master bedroom. new foundations & slab. structural seismic upgrades. new interior partitions each unit. replacement of kitchen & baths with new at each unit. new windows,Details
to comply with nov 201497581 items 1 & 3, general renovation of 1st story to include regrading, new garage layout, new habitable master bedroom. new foundations & slab. structural seismic upgrades. new interior partitions each unit. replacement of kitchen & baths with new at each unit. new windows, | $500,000 |
| Nov 9, 2015 | Completed final sign-off May 2017 | 620 Eddy St | Strong Builders Construction Inc. | (unit legalization ordinance 43-14) reconfiguration of existing partitions & legalize one dwelling unit (efficiency) to comply with nov 201566672 dated 08-27-15; maher n/aDetails
(unit legalization ordinance 43-14) reconfiguration of existing partitions & legalize one dwelling unit (efficiency) to comply with nov 201566672 dated 08-27-15; maher n/a | $12,000 |
| Sep 4, 2015 | Completed final sign-off Feb 2016 | 314 Victoria St | Quality Painting Construction | build out of unoccupied space on the 1st floor to 477 sq ft of conditioned space consisting of a bedroom and bathroom and a bathroom remodel on the 2nd floor.Details
build out of unoccupied space on the 1st floor to 477 sq ft of conditioned space consisting of a bedroom and bathroom and a bathroom remodel on the 2nd floor. | $20,000 |
| Jun 24, 2015 | Completed final sign-off May 2016 | 817 Oak St | Georgio Atana | general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2ndDetails
general renovation of 1st story to include regrading for increased ceiling height, nw stepped fndations, slabs, nfpa 13 sprinkler system kitchen, wndws, doors, mech, plmg, electrical, finishes and fixture. new internal stair connectin 1st & 2nd story. relocate 2nd flr kitchn to 1st to create 2nd | $25,000 |
| May 14, 2015 | Completed final sign-off Aug 2015 | 2197 Fillmore St | R S V C Company | interior alterations to an extg coffee shop includes new casework,new floor and wall finishes, new light fixtures, new plmg fixtures, replacement of one mechanical unit.Details
interior alterations to an extg coffee shop includes new casework,new floor and wall finishes, new light fixtures, new plmg fixtures, replacement of one mechanical unit. | $199,000 |
| Mar 17, 2015 | Completed final sign-off Aug 2017 | 2405 32nd Av | Quality Painting Construction | construct (n) 3-story single family residence.Details
construct (n) 3-story single family residence. | $160,000 |
| Oct 2, 2014 | Completed final sign-off Apr 2016 | 85 06th Av | Kevin Webb Construction Inc | general renovation of ground and 1st floor to include new finishes of fixtures. new internal stairs to connect ground and 1st fls. regrade ground floor to increase ceiling heights. partial wndw & door replacement. addition of sound proofing to select b.Details
general renovation of ground and 1st floor to include new finishes of fixtures. new internal stairs to connect ground and 1st fls. regrade ground floor to increase ceiling heights. partial wndw & door replacement. addition of sound proofing to select b. | $247,000 |
| Aug 1, 2014 | Completed final sign-off Dec 2019 | 3325 Steiner St | Occidental Express, Strong Builders Construction Inc. | parking reduction for enlargement of existing restaurant; bicycle parking added. no change to existing residential entry.Details
parking reduction for enlargement of existing restaurant; bicycle parking added. no change to existing residential entry. | |
| Sep 25, 2013 | Expired or cancelled cancelled Jan 2026 | 2800 Leavenworth St | addition of counter with steam table, sneezeguard counter top, soda machine, decorative wall panels & epoxy flooring.Details
addition of counter with steam table, sneezeguard counter top, soda machine, decorative wall panels & epoxy flooring. | $21,000 | |
| Nov 27, 2012 | Completed final sign-off Apr 2013 | 212 Sutter St | addition of new door at entryDetails
addition of new door at entry | $4,500 | |
| Nov 6, 2012 | Completed final sign-off Oct 2014 | 38 08th St | A & B Construction | creation of 24 new parking spaces with 1 van accessible space, new ornamental fence, gate & landscaping. removal of (e) driveway & curb cut on 8th st. sidewalk, cut curb & gutter replacement. installation of 3 street treesDetails
creation of 24 new parking spaces with 1 van accessible space, new ornamental fence, gate & landscaping. removal of (e) driveway & curb cut on 8th st. sidewalk, cut curb & gutter replacement. installation of 3 street trees | $40,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 1469 Kearny St | Argo Construction Inc | removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of propertyDetails
removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of property | $18,000 |
| Aug 12, 2008 | Completed final sign-off Jan 2009 | 195 Woolsey St | new concrete slab at entry to create level landing, new handrails at interior and exterior stairs, new level hardware at entry door, replacement of existing exterior lighting.Details
new concrete slab at entry to create level landing, new handrails at interior and exterior stairs, new level hardware at entry door, replacement of existing exterior lighting. | $7,200 | |
| Aug 12, 2008 | Expired or cancelled expired Jun 2011 | 49 Geary St | demolition of interior non structural wall, interior door and misc. built in storage installation of new 1hr non bearing interior wall and 20 min rated double doorDetails
demolition of interior non structural wall, interior door and misc. built in storage installation of new 1hr non bearing interior wall and 20 min rated double door | $8,000 | |
| Jun 13, 2008 | Completed final sign-off Feb 2009 | 417 14th St | correct issues cited in 3r report #3r-5192. legalize 2nd & 3rd floor decks w/modifications. upgrade rails @ exterior stairs to meet code. at ground floor: legalize storage room and sink, install handrails in restroom, add 1-hr protection to exposed steel framing.Details
correct issues cited in 3r report #3r-5192. legalize 2nd & 3rd floor decks w/modifications. upgrade rails @ exterior stairs to meet code. at ground floor: legalize storage room and sink, install handrails in restroom, add 1-hr protection to exposed steel framing. | $12,000 | |
| Apr 10, 2008 | Completed final sign-off May 2008 | 50 Phelan Av | revision to pa #200712049572, to clarify work as a horizontal addition at front of bldg to enclose covered walkway, submitted for planning approval. revison is required to comply w/ nov 200850211Details
revision to pa #200712049572, to clarify work as a horizontal addition at front of bldg to enclose covered walkway, submitted for planning approval. revison is required to comply w/ nov 200850211 | ||
| Dec 4, 2007 | Completed final sign-off May 2008 | 50 Phelan Av | revision to p/a #200705242218 to provide new elec. to a portion of the bldg (known as the covered walkway). modification of (e) ramp, new handrails, and reconfiguration of parking to comply with accessibility requirements. all work to be performed at the maintenance shop building.Details
revision to p/a #200705242218 to provide new elec. to a portion of the bldg (known as the covered walkway). modification of (e) ramp, new handrails, and reconfiguration of parking to comply with accessibility requirements. all work to be performed at the maintenance shop building. | $12,000 | |
| Sep 24, 2007 | Completed final sign-off Jul 2008 | 1050 Mcallister St | Rumi Construction***See Notes*** | replace door hardware, replace toilet partitins, new accessible drinking fountains, accessible signage concrete work for accessible path of travel to front entry, (n) chainlink fence and gate at rear of builiding/ community center. no mechanical work.Details
replace door hardware, replace toilet partitins, new accessible drinking fountains, accessible signage concrete work for accessible path of travel to front entry, (n) chainlink fence and gate at rear of builiding/ community center. no mechanical work. | $85,000 |
| Sep 20, 2007 | Completed final sign-off Nov 2007 | 4468 Mission St | Amone Corp | remodel in the commercial office on ground floor. new interior partition, interior window and accessible ramp and handrails.Details
remodel in the commercial office on ground floor. new interior partition, interior window and accessible ramp and handrails. | $7,920 |