Block 0740, lot 009
620 Eddy St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 35
- Rooms
- 34 bedrooms, 35 bathrooms
- Building
- 16,363 sq ft
- Lot
- 6,300 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off May 2026 | 620 Eddy St | repair ceiling sheetrock in basement. to comply with nov 202172702.Details
repair ceiling sheetrock in basement. to comply with nov 202172702. | $1,000 | |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 620 Eddy St | Strong Builders Construction Inc. | bathroom remodel apt 5. no structural work, no walss being moved. maher naDetails
bathroom remodel apt 5. no structural work, no walss being moved. maher na | $5,000 |
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 620 Eddy St | A M West Mechanical Inc. | install sprinkler system in the unit. 6 sprinklers total. ref 201511092093Details
install sprinkler system in the unit. 6 sprinklers total. ref 201511092093 | $3,000 |
| Nov 9, 2015 | Completed final sign-off May 2017 | 620 Eddy St | Strong Builders Construction Inc. | (unit legalization ordinance 43-14) reconfiguration of existing partitions & legalize one dwelling unit (efficiency) to comply with nov 201566672 dated 08-27-15; maher n/aDetails
(unit legalization ordinance 43-14) reconfiguration of existing partitions & legalize one dwelling unit (efficiency) to comply with nov 201566672 dated 08-27-15; maher n/a | $12,000 |
| Feb 19, 2010 | Never finaled issued Feb 2010, no final | 620 Eddy St | street space & mta permitsDetails
street space & mta permits | ||
| Feb 1, 2010 | Completed final sign-off May 2010 | 620 Eddy St | Associated Materials / Dba: Alside Inc. | window replacement only-same size & location. same configuration 81-windows total. new windows to be vinyl. no window replacement in front facing eddy street.Details
window replacement only-same size & location. same configuration 81-windows total. new windows to be vinyl. no window replacement in front facing eddy street. | $20,000 |
| Apr 1, 2008 | Never finaled issued Apr 2008, no final | 620 Eddy St | street space permit.Details
street space permit. | ||
| Mar 5, 2008 | Completed final sign-off May 2008 | 620 Eddy St | F B E And Sons General Const | apt 42: kitchen an bath remodel. no structural work, no lighting. replace window in bathroom lightwellDetails
apt 42: kitchen an bath remodel. no structural work, no lighting. replace window in bathroom lightwell | $15,000 |
| Feb 22, 2008 | Never finaled issued Feb 2008, no final | 620 Eddy St | F B E And Sons General Const | apt 8 , 7, and 29: kitchen and bath remodel, remove and replace kitchen cabinet, counter, floor tile, wall . replace window at bathroom lightwell. no structural work, no lighting. not visible from street.Details
apt 8 , 7, and 29: kitchen and bath remodel, remove and replace kitchen cabinet, counter, floor tile, wall . replace window at bathroom lightwell. no structural work, no lighting. not visible from street. | $45,000 |
| Jan 29, 2008 | Never finaled issued Jan 2008, no final | 620 Eddy St | street spaceDetails
street space | ||
| Jan 25, 2008 | Completed final sign-off Mar 2008 | 620 Eddy St | F B E And Sons General Const | work @ apt# 9 & # 23 only: kitchen and bathroom remodel, no structural work, no lighting work, replace window in bathroom and lightwellDetails
work @ apt# 9 & # 23 only: kitchen and bathroom remodel, no structural work, no lighting work, replace window in bathroom and lightwell | $30,000 |
| Oct 3, 2007 | Completed final sign-off Feb 2008 | 620 Eddy St | F B E And Sons General Const | apt.1-4-39: kitchen & bathroom remodel. no structural work, no lighting work, replace window @ bathroom lightwell.Details
apt.1-4-39: kitchen & bathroom remodel. no structural work, no lighting work, replace window @ bathroom lightwell. | $45,000 |
| Jun 4, 2007 | Completed final sign-off Nov 2007 | 620 Eddy St | F B E And Sons General Const | apt# 28: 1 kitchen & 1 bathroom remodel. apt# 33: 1 kitchen & 1 bathroom remodel. no structural work. no lighting work. no windows.Details
apt# 28: 1 kitchen & 1 bathroom remodel. apt# 33: 1 kitchen & 1 bathroom remodel. no structural work. no lighting work. no windows. | $30,000 |
| May 8, 2007 | Completed final sign-off Nov 2007 | 620 Eddy St | F B E And Sons General Const | apt #20 & #36 - exist kitchen/bath/no change to partitions/no window. apt 20 -kitchen and bathroom remodel. apt 36 - kitchen and bathroom remodel. no structural work. no lightning work. no windows work.Details
apt #20 & #36 - exist kitchen/bath/no change to partitions/no window. apt 20 -kitchen and bathroom remodel. apt 36 - kitchen and bathroom remodel. no structural work. no lightning work. no windows work. | $30,000 |
| Feb 20, 2007 | Completed final sign-off May 2007 | 620 Eddy St | F B E And Sons General Const | apt# 5 & # 27. ktichen & bathroom remodel. no structural work. no lighting work.Details
apt# 5 & # 27. ktichen & bathroom remodel. no structural work. no lighting work. | $30,000 |
| Jan 3, 2007 | Completed final sign-off May 2007 | 620 Eddy St | F B E And Sons General Const | apt# 25, kitchen & bathroom remodel. apt# 43, kitchen & bathroom remodel. no structural. no lighting work on both.Details
apt# 25, kitchen & bathroom remodel. apt# 43, kitchen & bathroom remodel. no structural. no lighting work on both. | $25,000 |
| Dec 14, 2006 | Completed final sign-off Mar 2007 | 620 Eddy St | F B E And Sons General Const | apt#38 ,1 kitchen and 1 bathroom remodel. no structural work-no lighting work.Details
apt#38 ,1 kitchen and 1 bathroom remodel. no structural work-no lighting work. | $15,000 |
| Jun 1, 2004 | Completed final sign-off Oct 2004 | 620 Eddy St | Lam Pui Electrical & Plumbing Inc. | remodel existing bathroom,kitche,bedroom,and outside hallway sheetrock after fired.Details
remodel existing bathroom,kitche,bedroom,and outside hallway sheetrock after fired. | $12,000 |
| Apr 22, 2002 | Expired or cancelled expired Aug 2002 | 620 Eddy St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- F B E And Sons General Const (9), Strong Builders Construction Inc. (2), A M West Mechanical Inc., Associated Materials / Dba: Alside Inc., Lam Pui Electrical & Plumbing Inc.
- Architects
- Roberta Wahl
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.