Block 1528, lot 001
5201 Geary Blvd
- City’s use
- Commercial Retail
- Built
- 1912
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 2,880 sq ft
- Lot
- 3,000 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 5201 Geary Bl | Sequoia Signs & Graphics Inc | install 2 electric, single faced wall sign. "peet's coffee". 2'6" x 10'.0" .Details
install 2 electric, single faced wall sign. "peet's coffee". 2'6" x 10'.0" . | $10,000 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 5201 Geary Bl | Sequoia Signs & Graphics Inc | install 1 non-electric, projecting, double faced sign. "peet's coffee". 2'6" x 2'6" .Details
install 1 non-electric, projecting, double faced sign. "peet's coffee". 2'6" x 2'6" . | $4,500 |
| Aug 7, 2018 | Never finaled issued Mar 2019, no final | 5203 Geary Bl | change of use - from specialty grocery to restaurant (sandwich shop). no work to be performed.Details
change of use - from specialty grocery to restaurant (sandwich shop). no work to be performed. | ||
| Sep 8, 2016 | Completed final sign-off Feb 2017 | 5203 Geary Bl | Evra Construction, Custom Remodels | convert (e) shop to specialty grocery, provide new sinks, flooring and cabinetry throughoutDetails
convert (e) shop to specialty grocery, provide new sinks, flooring and cabinetry throughout | $83,000 |
| May 10, 2007 | Completed final sign-off Sep 2007 | 5203 Geary Bl | erect electric wall signDetails
erect electric wall sign | ||
| Apr 9, 2007 | Completed final sign-off Jul 2007 | 5203 Geary Bl | relocate entry door and install a power door, actiuator made necessary by the installation of a new sidewalk for adjacent tenant. correct problems w/ the sidewalk but increased the entry landing into 5203 geary blvd.Details
relocate entry door and install a power door, actiuator made necessary by the installation of a new sidewalk for adjacent tenant. correct problems w/ the sidewalk but increased the entry landing into 5203 geary blvd. | $7,500 | |
| Jan 10, 2007 | Never finaled issued Jan 2007, no final | 5201 Geary Bl | street spaceDetails
street space | ||
| Dec 15, 2006 | Never finaled issued Dec 2006, no final | 5201 Geary Bl | street space permit only.Details
street space permit only. | ||
| Dec 11, 2006 | Expired or cancelled withdrawn May 2007 | 5201 Geary Bl | to address complaint 200683716, ref. to appl#200611026728, add 3 (n) structural posts near rear of bldg., add 2 (n) structural posts on both sides of window along 16th ave. pour 4" min conc. slab with #3 @18" o.c. each way over 2" sand throughout store.Details
to address complaint 200683716, ref. to appl#200611026728, add 3 (n) structural posts near rear of bldg., add 2 (n) structural posts on both sides of window along 16th ave. pour 4" min conc. slab with #3 @18" o.c. each way over 2" sand throughout store. | $17,000 | |
| Nov 7, 2006 | Never finaled issued Nov 2006, no final | 5201 Geary Bl | street space permitDetails
street space permit | ||
| Nov 2, 2006 | Completed final sign-off Feb 2007 | 5201 Geary Bl | structural addition to approved ti permit #200610134973. work is for 3 n)_ support collmns at storefront & currensponding beam & framing on roof wlak includes new storefront olnyDetails
structural addition to approved ti permit #200610134973. work is for 3 n)_ support collmns at storefront & currensponding beam & framing on roof wlak includes new storefront olny | $13,000 | |
| Oct 13, 2006 | Completed final sign-off Feb 2007 | 5201 Geary Bl | t.i. for (n) coffee cafe including (n) partitions, (n)fixtures, finishes equipment,(n)storefront & entry with level landing (n) mechanical & lighting. signage under separate permit. no structural work under this permit.no structural demolition,no storefront demolition under this permit.Details
t.i. for (n) coffee cafe including (n) partitions, (n)fixtures, finishes equipment,(n)storefront & entry with level landing (n) mechanical & lighting. signage under separate permit. no structural work under this permit.no structural demolition,no storefront demolition under this permit. | $450,000 | |
| Sep 27, 2006 | Completed final sign-off Feb 2007 | 5201 Geary Bl | Johnston Sign Company | install illuminated wall cabinets (2).Details
install illuminated wall cabinets (2). | |
| Sep 27, 2006 | Completed final sign-off Feb 2007 | 5201 Geary Bl | Johnston Sign Company | install one illuminated double faced window sign.Details
install one illuminated double faced window sign. | |
| Sep 25, 2006 | Completed final sign-off Dec 2006 | 5201 Geary Bl | interior non structural demo in adavance of new tenant improvementDetails
interior non structural demo in adavance of new tenant improvement | $5,000 | |
| Aug 21, 2006 | Expired or cancelled expired Jun 2008 | 5201 Geary Bl | A-Plus Roofing Co | reroofingDetails
reroofing | $16,400 |
| Jul 13, 2006 | Never finaled issued Jan 2007, no final | 5201 Geary Bl | formula retail application & change of use from retail to coffee cafe. no construction under this permitDetails
formula retail application & change of use from retail to coffee cafe. no construction under this permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Johnston Sign Company (2), Sequoia Signs & Graphics Inc (2), A-Plus Roofing Co, Custom Remodels, Evra Construction
- Architects
- Roberta Wahl
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.