Block 0772, lot 022
1050 Mcallister St
- City’s use
- Commercial Misc
- Lot
- 102,094 sq ft
- Zoning
- RM3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2023 | Completed final sign-off Jun 2023 | 1050 Mcallister St | Bay Alarm Company | charging from dact to an independently power cellular communicatorDetails
charging from dact to an independently power cellular communicator | |
| Apr 23, 2019 | Never finaled issued May 2019, no final | 1181 Golden Gate Av | M Hernandez Construction Inc | temporary power, sewer and water lines connected to the existing ella hill hutch community center. placement of 4 temporary trailers necessitates the removal of 1 exiting tree. temprary trailers are permitted separately by the state of caDetails
temporary power, sewer and water lines connected to the existing ella hill hutch community center. placement of 4 temporary trailers necessitates the removal of 1 exiting tree. temprary trailers are permitted separately by the state of ca | $45,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 1181 Golden Gate Av | propose address at block 0772, lot 022, 1181 golden gate ave.Details
propose address at block 0772, lot 022, 1181 golden gate ave. | ||
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 1050 Mcallister St | Paganini Electric Corp(See Signatories) | replacement of existing light fixtures on property. install new lighting control panel includes tennis court fixture. for existing community center, park, and tennis court.Details
replacement of existing light fixtures on property. install new lighting control panel includes tennis court fixture. for existing community center, park, and tennis court. | $90,000 |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 1050 Mcallister St | Hoi's Construction | ella hill hutch center: computer lab remodel, lobby remodel, hallway ceiling repair. restroom repairs, exterior pathway and parking accessibility upgrades. to replace entry doors at mcallister entrance, in kind.Details
ella hill hutch center: computer lab remodel, lobby remodel, hallway ceiling repair. restroom repairs, exterior pathway and parking accessibility upgrades. to replace entry doors at mcallister entrance, in kind. | $70,000 |
| Mar 9, 2015 | Completed final sign-off Mar 2015 | 1050 Mcallister St | International Fire Equip | change appliance protection of extg ul300 system for new cook line. t.i. 200709243504Details
change appliance protection of extg ul300 system for new cook line. t.i. 200709243504 | $4,000 |
| Jun 23, 2009 | Completed final sign-off Apr 2010 | 1050 Mcallister St | Universal Fire Equipment Co | install fire supression system to protect hood, duct, plenum and cooking equipment under the hoodDetails
install fire supression system to protect hood, duct, plenum and cooking equipment under the hood | $2,500 |
| Sep 24, 2007 | Completed final sign-off Jul 2008 | 1050 Mcallister St | Rumi Construction***See Notes*** | replace door hardware, replace toilet partitins, new accessible drinking fountains, accessible signage concrete work for accessible path of travel to front entry, (n) chainlink fence and gate at rear of builiding/ community center. no mechanical work.Details
replace door hardware, replace toilet partitins, new accessible drinking fountains, accessible signage concrete work for accessible path of travel to front entry, (n) chainlink fence and gate at rear of builiding/ community center. no mechanical work. | $85,000 |
| Aug 21, 2002 | Never finaled issued Aug 2002, no final | 1050 Mcallister St | Rivera Construction | build partition wall (1-hr) to separate (e) play area into 2 smaller play area 20% d.a. upgradeDetails
build partition wall (1-hr) to separate (e) play area into 2 smaller play area 20% d.a. upgrade | $3,250 |
| Apr 2, 2001 | Completed final sign-off May 2001 | 1050 Mcallister St | Fire Innovation | renew appl#9710299 for final inspection onlyDetails
renew appl#9710299 for final inspection only | |
| Feb 7, 2001 | Completed final sign-off May 2001 | 1050 Mcallister St | renewal 9614769: comply with complaint #200113264 and 200113286Details
renewal 9614769: comply with complaint #200113264 and 200113286 | ||
| Oct 24, 2000 | Completed final sign-off May 2001 | 1050 Mcallister St | Innovative Technologies | renewal of pa 9710299Details
renewal of pa 9710299 | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Alarm Company, Fire Innovation, Hoi's Construction, Innovative Technologies, International Fire Equip, M Hernandez Construction Inc, Paganini Electric Corp(See Signatories), Rivera Construction, Rumi Construction***See Notes***, Universal Fire Equipment Co
- Architects
- Eric Haesloop, Roberta Wahl, Tom Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.