Vladimir Libov
- Listed as
- authorized agent-others, contractor
- Firm
- Arcon Construction Corp
- Based in
- Daly City
- On San Francisco permits
- May 2002 to Aug 2026
192 permits since 2000 (contractor on 192 permits, authorized agent-others on 1 permit): 155 completed, 1 in progress, 18 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 192.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 222 Kearny St | Arcon Construction Corp | ste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishesDetails
ste. 304-tenant improvement to include selective demo and construction of non load bearing partitions, modifications to ceiling grid and tile, new light fixtures, new office door and frames. salvage and reuse existing selected materials if possible, millwork and new finishes | $107,068 |
| Apr 20, 2026 | Completed final sign-off Jul 2026 | 164 28th St | Arcon Construction Corp | first floor voluntary foundation upgradeDetails
first floor voluntary foundation upgrade | $3,000 |
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 222 Kearny St | Arcon Construction Corp | modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness roomDetails
modification of e tenant floor plan layout to include additional lobby vestibule off of main elevator lobby to access existing roof deck and relocation of point of entry to the following rooms: 1df, storage room and wellness room | $200,000 |
| Apr 7, 2026 | Completed final sign-off Apr 2026 | 163 28th St | Arcon Construction Corp | to obtain final inspection for work performed under pa#04039230. all work is complete.Details
to obtain final inspection for work performed under pa#04039230. all work is complete. | |
| Mar 30, 2023 | Expired or cancelled withdrawn Jun 2024 | 1070 Green St | Arcon Construction Corp | interior renovation of unit. reconfigure spaces resulting in moving walls, lighting, 8 plumbing. (n) layout/finishes throughout. replace all windows in-kind. ref pa #202208301557Details
interior renovation of unit. reconfigure spaces resulting in moving walls, lighting, 8 plumbing. (n) layout/finishes throughout. replace all windows in-kind. ref pa #202208301557 | |
| Oct 20, 2022 | Completed final sign-off Aug 2026 | 3912 24th St | Arcon Construction Corp | addition at the 4th flr addition to an existing three story mix use containing one commerical unit occupying the first flr and basement and two resd unit. adding second story to the third floor residental unit at fourth flr. creating a two story residential unit with a private roof deck.Details
addition at the 4th flr addition to an existing three story mix use containing one commerical unit occupying the first flr and basement and two resd unit. adding second story to the third floor residental unit at fourth flr. creating a two story residential unit with a private roof deck. | $200,000 |
| Aug 30, 2022 | Completed final sign-off Jun 2024 | 1070 Green St | Arcon Construction Corp, Zone 4 Power Inc, Swinerton Builders | unit 801: interior renovation of unit reconfiguration of spaces resulting in the moving of interior walls. lighting 8 plumbing to be renovated to reflect new layout. new finishes throughout. replacing al 13 windows in kind.Details
unit 801: interior renovation of unit reconfiguration of spaces resulting in the moving of interior walls. lighting 8 plumbing to be renovated to reflect new layout. new finishes throughout. replacing al 13 windows in kind. | $400,000 |
| Jun 30, 2022 | Expired or cancelled withdrawn Mar 2024 | 603 Tennessee St | Arcon Construction Corp | revision to 201602260667 add sliding door to 8 studio units on 2nd f to convert them to 1 bedroom units.Details
revision to 201602260667 add sliding door to 8 studio units on 2nd f to convert them to 1 bedroom units. | $2,000 |
| Feb 19, 2020 | Completed final sign-off Oct 2020 | 4466 24th St | Arcon Construction Corp | response to nov 202016893 drainage system correctionDetails
response to nov 202016893 drainage system correction | $10,000 |
| Dec 13, 2019 | Completed final sign-off May 2020 | 4470 24th St | Arcon Construction Corp | underpinning of (e) foundation for one post.Details
underpinning of (e) foundation for one post. | $5,000 |
| Nov 12, 2019 | Completed final sign-off Mar 2021 | 34 Langton St | Arcon Construction Corp | revision to pa# 2013-1008-8785: move front door back for pg&e cabinet. relocate door to unit #1/garage for structural, mep concernsDetails
revision to pa# 2013-1008-8785: move front door back for pg&e cabinet. relocate door to unit #1/garage for structural, mep concerns | $2,000 |
| Aug 30, 2019 | Never finaled filed Aug 2019, never issued | 255 Shipley St | Arcon Construction Corp | installing of a storm water system. ref pa# 2018-1108-5435.Details
installing of a storm water system. ref pa# 2018-1108-5435. | |
| Aug 1, 2019 | Never finaled issued Jan 2020, no final | 4466 24th St | Arcon Construction Corp | street spaceDetails
street space | |
| May 31, 2019 | Completed final sign-off Aug 2024 | 1099 Dolores St | Arcon Construction Corp, Barron Construction Inc. | demolish single family residentialDetails
demolish single family residential | $20,000 |
| May 15, 2019 | Completed final sign-off Jun 2019 | 3829 Clay St | Arcon Construction Corp | to obtain final inspection for work approved under pa 8714203, 201510281072, 201610281443. all work is completeDetails
to obtain final inspection for work approved under pa 8714203, 201510281072, 201610281443. all work is complete | |
| May 15, 2019 | Completed final sign-off Jun 2019 | 3829 Clay St | Arcon Construction Corp | to obtain final inspection for work approved under pa 201707283273, 201509187466, 201604043903. all work is complete.Details
to obtain final inspection for work approved under pa 201707283273, 201509187466, 201604043903. all work is complete. | |
| Nov 8, 2018 | Never finaled issued Nov 2019, no final | 255 Shipley St | Arcon Construction Corp | demolish a type 3, 2-story auto repair bldg.Details
demolish a type 3, 2-story auto repair bldg. | $8,000 |
| Nov 8, 2018 | Never finaled issued Sep 2021, no final | 255 Shipley St | Arcon Construction Corp | erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph**Details
erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph** | $7,850,000 |
| Sep 26, 2018 | Completed final sign-off Oct 2020 | 4466 24th St | Arcon Construction Corp | structural revision to structural addenum pa #201610281350 s1. substitute simpson frames for conventional steel special moment frames. revise foundation along east and west perimeter. to comply with nov #201848581.Details
structural revision to structural addenum pa #201610281350 s1. substitute simpson frames for conventional steel special moment frames. revise foundation along east and west perimeter. to comply with nov #201848581. | |
| Jul 6, 2018 | Completed final sign-off May 2020 | 4470 24th St | Arcon Construction Corp | void infill at entry walkwayDetails
void infill at entry walkway | $5,000 |
| Jun 12, 2018 | Completed final sign-off May 2019 | 128 Woodland Av | Arcon Construction Corp | structural revision to pa #201710232009: (n) det. 7/a8.1 & det 11/a8.2. show 4x6 post at 4th fl,no new shear walls requiredDetails
structural revision to pa #201710232009: (n) det. 7/a8.1 & det 11/a8.2. show 4x6 post at 4th fl,no new shear walls required | $1,000 |
| Apr 19, 2018 | Completed final sign-off May 2019 | 128 Woodland Av | Arcon Construction Corp | revision to pa 2017-1023-2009 - add bar sink at hall 203 on 2nd floor. underpin existing footing on east garage wallDetails
revision to pa 2017-1023-2009 - add bar sink at hall 203 on 2nd floor. underpin existing footing on east garage wall | $4,000 |
| Feb 14, 2018 | Completed final sign-off Oct 2020 | 4466 24th St | Shamrock Engineering Concrete, Arcon Construction Corp | revision to 201603293298 s1 structural changes to be made to the shoring plan onlyDetails
revision to 201603293298 s1 structural changes to be made to the shoring plan only | $10,000 |
| Jan 22, 2018 | Never finaled issued Jan 2018, no final | 949 Natoma St | Arcon Construction Corp | street spaceDetails
street space | |
| Oct 31, 2017 | Expired or cancelled cancelled Jul 2025 | 4072 18th St | Arcon Construction Corp | ground floor commercial retail space to relocate handicap toilet. create means fo egress. modify plans.Details
ground floor commercial retail space to relocate handicap toilet. create means fo egress. modify plans. | $15,000 |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 4078 18th St | Arcon Construction Corp | to obtain a final inspection for work already approved under pa# , 201206182770, 201208248233 & 201209139719, all work is completeDetails
to obtain a final inspection for work already approved under pa# , 201206182770, 201208248233 & 201209139719, all work is complete | |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 4078 18th St | Arcon Construction Corp | to obtain a final inspection for work already approved under pa# 201302250901,201401307396 , all work is completeDetails
to obtain a final inspection for work already approved under pa# 201302250901,201401307396 , all work is complete | |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 4078 18th St | Arcon Construction Corp | to comply with complaint # 201553571 & 201414795Details
to comply with complaint # 201553571 & 201414795 | |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 4078 18th St | Arcon Construction Corp | to obtain a final inspection for work already approved under pa# 201302079740, 201302250901 & 201302250901, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201302079740, 201302250901 & 201302250901, all work is complete | |
| Jul 28, 2017 | Expired or cancelled expired Jun 2019 | 3829 Clay St | Arcon Construction Corp | new dormer at the rear of the building.Details
new dormer at the rear of the building. | $1,000 |
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 3902 24th St | Arcon Construction Corp | install brace to extg shoring. revision to app#201705197161Details
install brace to extg shoring. revision to app#201705197161 | $4,000 |
| May 19, 2017 | Completed final sign-off Oct 2017 | 3902 24th St | Arcon Construction Corp | in reference to pa 2015-0529-7566 s2, add brace to (e) shoring per plan.Details
in reference to pa 2015-0529-7566 s2, add brace to (e) shoring per plan. | |
| May 10, 2017 | Completed final sign-off Aug 2017 | 949 Natoma St | Arcon Construction Corp | revision to permit #2014-10-10-8646. change north facing wall from stucco to cement board lap sidingDetails
revision to permit #2014-10-10-8646. change north facing wall from stucco to cement board lap siding | |
| May 10, 2017 | Completed final sign-off Oct 2017 | 3900 24th St | Arcon Construction Corp | repair of the dryrot & foundation brick replacement with concrete on the west side along property line @ crawl space.Details
repair of the dryrot & foundation brick replacement with concrete on the west side along property line @ crawl space. | $8,000 |
| Feb 17, 2017 | Completed final sign-off Jul 2021 | 653 28th St | Arcon Construction Corp, Cht Properties Development | to erect 3 stories, 1 basement, type v-b, single family dwelling.Details
to erect 3 stories, 1 basement, type v-b, single family dwelling. | $540,631 |
| Feb 17, 2017 | Completed final sign-off Feb 2019 | 653 28th St | Arcon Construction Corp | demolish a two story single family dwelling.Details
demolish a two story single family dwelling. | $7,520 |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | facade replacements - new 42" guardrail to replace (e) 30" deteriorated railing; replace 2 front doors with (n) glazed doors; replace garage door with similar door with etched glass.Details
facade replacements - new 42" guardrail to replace (e) 30" deteriorated railing; replace 2 front doors with (n) glazed doors; replace garage door with similar door with etched glass. | $5,000 |
| Aug 25, 2016 | Completed final sign-off Nov 2016 | 2377 Francisco St | Arcon Construction Corp | replace existing door with larger width. work on roof deck level.Details
replace existing door with larger width. work on roof deck level. | $1,200 |
| Jul 20, 2016 | Expired or cancelled expired Oct 2025 | 135 Wetmore St | Shamrock Engineering Concrete, Arcon Construction Corp | temporary shoring of vacant site, site permit 2013-0603-8460. maher naDetails
temporary shoring of vacant site, site permit 2013-0603-8460. maher na | $50,000 |
| Apr 4, 2016 | Expired or cancelled expired Jun 2019 | 3829 Clay St | Arcon Construction Corp | new dormers at top floor. n/a ordinance #155-13. revision to pa2015-0220-8839. min 3'-0" from property line, setback 10'-0" from front facade 8'-0" x 7'-0"Details
new dormers at top floor. n/a ordinance #155-13. revision to pa2015-0220-8839. min 3'-0" from property line, setback 10'-0" from front facade 8'-0" x 7'-0" | $25,000 |
| Mar 29, 2016 | Completed final sign-off Aug 2020 | 4466 24th St | Shamrock Engineering Concrete, Arcon Construction Corp | convert (e) 1-story over garage single fmaily home to (2) units. renovate/expand bldg consist of (2) units from basement to 3rd floors & (1) parking space/unit. remove (e) rear wall, horizontal expansion into rear yard, vertical expansion of (2) stories.Details
convert (e) 1-story over garage single fmaily home to (2) units. renovate/expand bldg consist of (2) units from basement to 3rd floors & (1) parking space/unit. remove (e) rear wall, horizontal expansion into rear yard, vertical expansion of (2) stories. | $920,000 |
| Mar 9, 2016 | Completed final sign-off Dec 2016 | 1218 South Van Ness Av | Arcon Construction Corp | voluntary structural upgrade of private elementary school/daycare to reference a/p#201507313076.Details
voluntary structural upgrade of private elementary school/daycare to reference a/p#201507313076. | $30,000 |
| Feb 26, 2016 | Completed final sign-off May 2022 | 603 Tennessee St | Arcon Construction Corp | demolish 2-story, type 5, warehouse building.Details
demolish 2-story, type 5, warehouse building. | $10,000 |
| Feb 26, 2016 | Completed final sign-off Jun 2023 | 603 Tennessee St | Arcon Construction Corp | to erect 6 stories, no basement, type iii-a over i-a, 24 residential units with mixed used building. (r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil. route to dph**Details
to erect 6 stories, no basement, type iii-a over i-a, 24 residential units with mixed used building. (r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil. route to dph** | $3,000,000 |
| Jan 26, 2016 | Completed final sign-off Dec 2016 | 1218 South Van Ness Av | Arcon Construction Corp | revision to app#201507313076 (plan changes for value engineering cost saving)Details
revision to app#201507313076 (plan changes for value engineering cost saving) | |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 603 Tennessee St | Arcon Construction Corp | voluntary disconnection of illegal kitchen and removal at 2nd floor. n/a for maherDetails
voluntary disconnection of illegal kitchen and removal at 2nd floor. n/a for maher | $3,000 |
| Nov 9, 2015 | Completed final sign-off Apr 2016 | 54 Sharon St | Arcon Construction Corp | repair rear deck and stairs in kind not exceeding 50%Details
repair rear deck and stairs in kind not exceeding 50% | $21,000 |
| Nov 5, 2015 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | shoring work associated with app#201410179278.Details
shoring work associated with app#201410179278. | $10,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2019 | 953 Treat Av | Arcon Construction Corp | to demolish 1 story single family home. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 1 story single family home. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2021 | 949 Treat Av | Arcon Construction Corp | building# 2. to erect 4 stories, no basement, 3 units residential building. lot 027 & lot 028 going to merge. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
building# 2. to erect 4 stories, no basement, 3 units residential building. lot 027 & lot 028 going to merge. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $686,000 |
| Nov 4, 2015 | Completed final sign-off Oct 2021 | 941 Treat Av | Arcon Construction Corp | erect (n) 4-story multifamily dwelling unitsDetails
erect (n) 4-story multifamily dwelling units | $797,000 |
| Oct 9, 2015 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | remove and replace wall board in kitchen & bathroom, no other work, new wall board to be 5/8" type x approx 200 sq.ft.Details
remove and replace wall board in kitchen & bathroom, no other work, new wall board to be 5/8" type x approx 200 sq.ft. | $1,000 |
| Sep 18, 2015 | Expired or cancelled expired Jun 2019 | 3829 Clay St | Arcon Construction Corp, Colindres & Associates | new garage. maher naDetails
new garage. maher na | $40,000 |
| Jul 31, 2015 | Completed final sign-off Dec 2016 | 1218 South Van Ness Av | Arcon Construction Corp | change of occupancy,private elementary & secondary school to private elem school & child-care facility, accessibility upgrades: entrance ramp,restrooms & breakroom,mechanical,elec & sprinkler under separate permits. 10'0" fence under deferred submittalDetails
change of occupancy,private elementary & secondary school to private elem school & child-care facility, accessibility upgrades: entrance ramp,restrooms & breakroom,mechanical,elec & sprinkler under separate permits. 10'0" fence under deferred submittal | $200,000 |
| Jul 7, 2015 | Completed final sign-off May 2017 | 3902 24th St | Arcon Construction Corp | demolish 1-story commercial buildingDetails
demolish 1-story commercial building | $25,000 |
| Jun 1, 2015 | Completed final sign-off Nov 2016 | 259 Clara St | Arcon Construction Corp | concrete met slab modification to bpa #201305167075 r4. n/a maher ord. # 155-13Details
concrete met slab modification to bpa #201305167075 r4. n/a maher ord. # 155-13 | |
| May 29, 2015 | Completed final sign-off Aug 2019 | 3902 24th St | Arcon Construction Corp | construct 4-story, 1 basement type 3 over 1-a with 3 residential units & commercial building.Details
construct 4-story, 1 basement type 3 over 1-a with 3 residential units & commercial building. | $500,000 |
| May 19, 2015 | Completed final sign-off Jul 2015 | 54 Sharon St | Arcon Construction Corp | to obtain a final inspection for work approved under pa#201304265600. all work is complete.Details
to obtain a final inspection for work approved under pa#201304265600. all work is complete. | |
| Mar 9, 2015 | Completed final sign-off Nov 2015 | 270 Turk St | Arcon Construction Corp | unit 802: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491Details
unit 802: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491 | $18,000 |
| Mar 9, 2015 | Completed final sign-off Nov 2015 | 270 Turk St | Arcon Construction Corp | unit 702: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491Details
unit 702: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491 | $18,000 |
| Mar 9, 2015 | Completed final sign-off Oct 2015 | 270 Turk St | Arcon Construction Corp | unit 1007: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491Details
unit 1007: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491 | $18,000 |
| Mar 9, 2015 | Completed final sign-off Oct 2015 | 270 Turk St | Arcon Construction Corp | unit 701: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491Details
unit 701: remodel kitchen and bath. upgrade elec panel. comply with nov 201476491 | $18,000 |
| Mar 9, 2015 | Completed final sign-off Oct 2015 | 270 Turk St | Arcon Construction Corp | unit 1004:remodel kitchen and bath. upgrade elec panel. comply with nov 201476491Details
unit 1004:remodel kitchen and bath. upgrade elec panel. comply with nov 201476491 | $18,000 |
| Mar 2, 2015 | Completed final sign-off Jun 2016 | 2377 Francisco St | Arcon Construction Corp | revision to 2010 0318 8454 move stairs from rear spiral to staircase in the middle of the building. reinstate a 40' view deck consistent w.the original plans submitted. maher - not req'dDetails
revision to 2010 0318 8454 move stairs from rear spiral to staircase in the middle of the building. reinstate a 40' view deck consistent w.the original plans submitted. maher - not req'd | $10,000 |
| Feb 20, 2015 | Completed final sign-off Jun 2019 | 3829 Clay St | Arcon Construction Corp, Colindres & Associates | horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel.Details
horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel. | $700,000 |
| Jan 23, 2015 | Completed final sign-off May 2015 | 1980 Golden Gate Av | Arcon Construction Corp | unit 1998: unit interior remodeling (1) bathroom, (1) kitchen, painting, no alterations to framing or layoutDetails
unit 1998: unit interior remodeling (1) bathroom, (1) kitchen, painting, no alterations to framing or layout | $15,000 |
| Dec 11, 2014 | Completed final sign-off May 2015 | 1980 Golden Gate Av | Arcon Construction Corp | replace 107 (e) windows: 53 visible from the street, 54 not visible. all visible windows to be replaced in-kind as wood, double-hung with ogee lugs. all 8 double-hung in roof gables to include archtiectural, 3-d divided lites (w/4x4 or 5x5 lites on upper sash). new siding to be wood lap 5000sf.Details
replace 107 (e) windows: 53 visible from the street, 54 not visible. all visible windows to be replaced in-kind as wood, double-hung with ogee lugs. all 8 double-hung in roof gables to include archtiectural, 3-d divided lites (w/4x4 or 5x5 lites on upper sash). new siding to be wood lap 5000sf. | $100,000 |
| Oct 23, 2014 | Completed final sign-off Jan 2015 | 1980 Golden Gate Av | Arcon Construction Corp | revision appl. 2013.0516.7130. structural revision - foundation work.Details
revision appl. 2013.0516.7130. structural revision - foundation work. | $35,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | 1 story vertical addition on (e) 2 story house over basement & horizontal addition extending into rear yard. remodel living areas. kitchen, bedrooms, bathrooms. add 1 bedroom.Details
1 story vertical addition on (e) 2 story house over basement & horizontal addition extending into rear yard. remodel living areas. kitchen, bedrooms, bathrooms. add 1 bedroom. | $500,000 |
| May 20, 2014 | Completed final sign-off Jul 2014 | 583 19th Av | Arcon Construction Corp | to obtain final inspection for work approved under pa# 200809101218. all work is complete.Details
to obtain final inspection for work approved under pa# 200809101218. all work is complete. | |
| May 20, 2014 | Completed final sign-off Jul 2014 | 583 19th Av | Arcon Construction Corp | to obtain final inspection for work approved under pa# 200603106485. all work is complete.Details
to obtain final inspection for work approved under pa# 200603106485. all work is complete. | |
| Mar 19, 2014 | Expired or cancelled expired Mar 2026 | 960 Harrison St | Arcon Construction Corp | new screen wall at rear deck. n/a for the maher ordinance #155-13Details
new screen wall at rear deck. n/a for the maher ordinance #155-13 | $15,000 |
| Feb 4, 2014 | Completed final sign-off Apr 2017 | 1980 Golden Gate Av | Arcon Construction Corp | board of appeals decision 13-108, provide seismic strengthening with plywood shear walls at the basement/lower level to bring the building into compliance with the sf mandatory seismic retrofit program.Details
board of appeals decision 13-108, provide seismic strengthening with plywood shear walls at the basement/lower level to bring the building into compliance with the sf mandatory seismic retrofit program. | $25,000 |
| Jan 6, 2014 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | Granite Excavation & Demolition Inc, Arcon Construction Corp, Singh Construction | erect a 6-story, 1 basement, 7 units condo building. compliance with maher ordinance no. 155-13 required. route to dph.Details
erect a 6-story, 1 basement, 7 units condo building. compliance with maher ordinance no. 155-13 required. route to dph. | $1,800,000 |
| Jan 6, 2014 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | Granite Excavation & Demolition Inc, Arcon Construction Corp, Singh Construction | demo two story single family dwelling. compliance with ordinance no. 155-13 not required. excacavation <50 cu.yd.Details
demo two story single family dwelling. compliance with ordinance no. 155-13 not required. excacavation <50 cu.yd. | $10,000 |
| Dec 16, 2013 | Never finaled issued Jan 2014, no final | 400 Alabama St | Arcon Construction Corp | infill of ramp from alabama street to second level of bldg. two rull-up doors and guardrail to be installed along alabama street. revision to bldg. permit # 201307091433.Details
infill of ramp from alabama street to second level of bldg. two rull-up doors and guardrail to be installed along alabama street. revision to bldg. permit # 201307091433. | $8,600 |
| Dec 3, 2013 | Completed final sign-off Mar 2016 | 50 Oakwood St | Arcon Construction Corp | renovation, addition & facade improvements to an (e) 3 story, 2 units residential building. project will include a horizontal addition into the rear of the property. a small horizontal addition @ front & vertical addition of a 4th floor that is set back from the front & rear of the project.Details
renovation, addition & facade improvements to an (e) 3 story, 2 units residential building. project will include a horizontal addition into the rear of the property. a small horizontal addition @ front & vertical addition of a 4th floor that is set back from the front & rear of the project. | $1,300,000 |
| Oct 29, 2013 | Expired or cancelled expired Aug 2015 | 1998 Broadway | Arcon Construction Corp | full interior remodeling: (2) bedrooms and two bathrooms, and kitchen remodel. non-structural.Details
full interior remodeling: (2) bedrooms and two bathrooms, and kitchen remodel. non-structural. | $30,000 |
| Oct 8, 2013 | Completed final sign-off Mar 2021 | 34 Langton St | Arcon Construction Corp, Pk Construction Inc | to erect 4 stories, no basement, 5 units apartment, type v-a building.Details
to erect 4 stories, no basement, 5 units apartment, type v-a building. | $950,000 |
| Oct 4, 2013 | Completed final sign-off Oct 2013 | 250 Beach St | Arcon Construction Corp | revision to appl #2013.04.30.5749 - modify previously permit to request hardship for (e) sanitary facilities.Details
revision to appl #2013.04.30.5749 - modify previously permit to request hardship for (e) sanitary facilities. | |
| Sep 13, 2013 | Completed final sign-off Jan 2014 | 2130 Harrison St | Arcon Construction Corp | unit 21- install new kitchen counter top and appliances, install new hardwood flooring with 5 mm rubber underlayement, remodel 2nd fl bath, new closet, add recessed lights, paint unitsDetails
unit 21- install new kitchen counter top and appliances, install new hardwood flooring with 5 mm rubber underlayement, remodel 2nd fl bath, new closet, add recessed lights, paint units | $10,000 |
| Aug 30, 2013 | Completed final sign-off Oct 2013 | 136 09th Av | Arcon Construction Corp | remove stucco and replace it with new stucco. no work in front of bldg.Details
remove stucco and replace it with new stucco. no work in front of bldg. | $5,000 |
| Aug 9, 2013 | Never finaled issued Sep 2013, no final | 400 Alabama St | Arcon Construction Corp | voluntary accessibility, exiting and life safety upgrades to the penthouse of an existing office/industrial building. work includes work to satirs elevator. d.a. checklist from pa#2013-0709-1433 is refernced.Details
voluntary accessibility, exiting and life safety upgrades to the penthouse of an existing office/industrial building. work includes work to satirs elevator. d.a. checklist from pa#2013-0709-1433 is refernced. | $85,000 |
| Jul 26, 2013 | Completed final sign-off Oct 2013 | 1260 Broadway | Arcon Construction Corp | unit #305-relocate & remodel kitchen & bathroom, add laundry room, add bedroom. no structural wallsDetails
unit #305-relocate & remodel kitchen & bathroom, add laundry room, add bedroom. no structural walls | $18,000 |
| Jul 17, 2013 | Completed final sign-off Jul 2013 | 1540 Jones St | Arcon Construction Corp | to obtain a final inspection for work already approved under pa# 201102029496, all work is complete.Details
to obtain a final inspection for work already approved under pa# 201102029496, all work is complete. | |
| Jul 9, 2013 | Completed final sign-off Aug 2015 | 400 Alabama St | Arcon Construction Corp | voluntary disabled access, exiting & fire life safety upgrades to 2 stories of a 3 story building-includes elevator, stairs, walls, restrooms, addition of level 1 mezzanine. install entry canopy & roll-up doors. mep and life safety on a separate permitDetails
voluntary disabled access, exiting & fire life safety upgrades to 2 stories of a 3 story building-includes elevator, stairs, walls, restrooms, addition of level 1 mezzanine. install entry canopy & roll-up doors. mep and life safety on a separate permit | $485,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 400 Alabama St | Arcon Construction Corp | construction of walls, hung ceiling, finishes and removal of extg high pile carpet for t.i. m.e.p. under separate permit.Details
construction of walls, hung ceiling, finishes and removal of extg high pile carpet for t.i. m.e.p. under separate permit. | $98,000 |
| Jun 28, 2013 | Completed final sign-off Nov 2013 | 1520 Gough St | Arcon Construction Corp | unit #402: remodeling extg bathroom, relocate kitchen and reorganize bedroom. no structural walls to be removed. no external works.Details
unit #402: remodeling extg bathroom, relocate kitchen and reorganize bedroom. no structural walls to be removed. no external works. | $18,000 |
| Jun 28, 2013 | Completed final sign-off Aug 2013 | 136 09th Av | Arcon Construction Corp | siding repalcement, not visible from street, right side of the building 800 sq.ft.Details
siding repalcement, not visible from street, right side of the building 800 sq.ft. | $5,000 |
| Jun 19, 2013 | Never finaled issued Jun 2013, no final | 400 Alabama St | Arcon Construction Corp | interior demo of non-structural wall partitions, floors and misc. items. ab-017.Details
interior demo of non-structural wall partitions, floors and misc. items. ab-017. | $15,000 |
| May 30, 2013 | Completed final sign-off Sep 2013 | 1700 California St | Arcon Construction Corp | 4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit.Details
4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit. | $27,000 |
| May 29, 2013 | Completed final sign-off Sep 2013 | 1700 California St | Arcon Construction Corp | relocate sink 3'-5', no structrual work, remove & install carpeting.Details
relocate sink 3'-5', no structrual work, remove & install carpeting. | $53,000 |
| May 16, 2013 | Completed final sign-off Nov 2016 | 259 Clara St | Arcon Construction Corp | demolish 2-story, type 1, 1 basement, industrial/photo studio building.Details
demolish 2-story, type 1, 1 basement, industrial/photo studio building. | $10,000 |
| May 16, 2013 | Completed final sign-off Oct 2016 | 259 Clara St | Arcon Construction Corp | erect a new 5-story, type 5, over type 1 building, 8 units dwelling over s-2 garage.Details
erect a new 5-story, type 5, over type 1 building, 8 units dwelling over s-2 garage. | $1,000,000 |
| May 16, 2013 | Completed final sign-off Aug 2016 | 1980 Golden Gate Av | Arcon Construction Corp | revision to permit 201210292977. cost revision - unit 1998 need to replace entire slab and replace with structural slab. units 800-1, 802a, 804, 806a, 808 will need to replace floor joists under kitchens. all as per original plans.Details
revision to permit 201210292977. cost revision - unit 1998 need to replace entire slab and replace with structural slab. units 800-1, 802a, 804, 806a, 808 will need to replace floor joists under kitchens. all as per original plans. | $56,861 |
| Apr 30, 2013 | Completed final sign-off Jun 2013 | 355 Fulton St | Arcon Construction Corp | unit # 302: painting and cabinet workDetails
unit # 302: painting and cabinet work | $6,000 |
| Apr 30, 2013 | Completed final sign-off Oct 2013 | 250 Beach St | Arcon Construction Corp | the proposed work is the addition of a 651 sf fitness room within area of the extg parking garage. work includes a small amount of demolition and the construction of walls, a door within an extg wall, leveling the concrete floor and finishes. no loss in parking.Details
the proposed work is the addition of a 651 sf fitness room within area of the extg parking garage. work includes a small amount of demolition and the construction of walls, a door within an extg wall, leveling the concrete floor and finishes. no loss in parking. | $10,000 |
| Mar 27, 2013 | Never finaled filed Mar 2013, never issued | 411 15th Av | Arcon Construction Corp | to comply with nov#200558269 to legalize wall built without permit with encloses exisitng lightwells. this permit will also document the egress in kind, the stairs in the existing lightwell were without permit. the original were dryrotted and had to replaced.Details
to comply with nov#200558269 to legalize wall built without permit with encloses exisitng lightwells. this permit will also document the egress in kind, the stairs in the existing lightwell were without permit. the original were dryrotted and had to replaced. | $35,000 |
| Mar 4, 2013 | Completed final sign-off Aug 2013 | 1520 Gough St | Arcon Construction Corp | remodeling extg bathroom, relocate kitchen and reorganize bedroom. no structural wall sto be removed. no exterior work.Details
remodeling extg bathroom, relocate kitchen and reorganize bedroom. no structural wall sto be removed. no exterior work. | $18,000 |
| Jan 23, 2013 | Completed final sign-off May 2013 | 1690 North Point St | Arcon Construction Corp | remodel existing kitchen & bathroom. no structural wall to be removed, no exterior work.Details
remodel existing kitchen & bathroom. no structural wall to be removed, no exterior work. | $18,000 |