Richard Parker
- Listed as
- architect, authorized agent-others, designer
- Firm
- 450 Architects Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Nov 2025
79 permits since 2000 (architect on 75 permits, authorized agent-others on 3 permits, designer on 2 permits): 51 completed, 6 in progress, 10 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2025 | In progress filed Nov 2025, not yet issued | 1 Steuart Ln | provide 2 (n) fire pirts at (e) second floor event terrace. provide gas piping with required fittings, and accessories provide gas piping to (2) alternatvie locations with fitting and accessories. propvide (n) gfci recepticles.Details
provide 2 (n) fire pirts at (e) second floor event terrace. provide gas piping with required fittings, and accessories provide gas piping to (2) alternatvie locations with fitting and accessories. propvide (n) gfci recepticles. | $125,000 | |
| Jun 9, 2025 | Completed final sign-off Apr 2026 | 1435 Fairfax Av | Sunset Concrete | replace (e) chainlink fence with concerte block retaining wall. visible from street.Details
replace (e) chainlink fence with concerte block retaining wall. visible from street. | $25,000 |
| May 19, 2025 | In progress issued Oct 2025 | 1 Steuart Ln | S & H Renovations | installation of lobby door operator.Details
installation of lobby door operator. | $25,000 |
| Oct 24, 2024 | In progress filed Oct 2024, not yet issued | 460 West Portal Av | rev 201912240491- remove exterior rear stair from scope of workDetails
rev 201912240491- remove exterior rear stair from scope of work | ||
| Jul 8, 2024 | In progress issued Jul 2024 | 460 West Portal Av | Vought Construction Inc | referred mep for pa# 201912240491Details
referred mep for pa# 201912240491 | $15,000 |
| Oct 20, 2023 | In progress issued Oct 2023 | 1980 Oakdale Av | remove existing storage shed, new ada parking space at existing rear parking lotDetails
remove existing storage shed, new ada parking space at existing rear parking lot | $5,000 | |
| Aug 18, 2023 | Completed final sign-off Nov 2024 | 1479 28th Av | Rua Woods Construction Inc | construct playhouse in rear yard less than 100sf.Details
construct playhouse in rear yard less than 100sf. | $15,000 |
| May 11, 2023 | Completed final sign-off Dec 2023 | 1980 Oakdale Av | barrier removal: ada upgrade including demising partition @ mezzanine, ada restroom, addition of lift, ada restroom, ada restriping inside parking lot not public right away; accessory open office in reduced mezzanine approximately 3,000 sfDetails
barrier removal: ada upgrade including demising partition @ mezzanine, ada restroom, addition of lift, ada restroom, ada restriping inside parking lot not public right away; accessory open office in reduced mezzanine approximately 3,000 sf | $65,000 | |
| Nov 10, 2022 | Completed final sign-off Jan 2024 | 797 Bryant St | fire repair. 1) demo (e) fire damage alum & glass storefront. 2) install (n) alum & glass storefront to match (e). 3) repair fire damage to (e) ceiling/floor joists @ 1st fl (n) finishes.Details
fire repair. 1) demo (e) fire damage alum & glass storefront. 2) install (n) alum & glass storefront to match (e). 3) repair fire damage to (e) ceiling/floor joists @ 1st fl (n) finishes. | $15,000 | |
| Nov 10, 2022 | Never finaled issued Oct 2023, no final | 244 West Portal Av | All Best Buildrs.Inc./All Trusty Bldrs. | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe #202001160982Details
abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe #202001160982 | |
| Nov 10, 2022 | Never finaled issued Oct 2023, no final | 242 West Portal Av | All Best Buildrs.Inc./All Trusty Bldrs. | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe # 202001160981Details
abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe # 202001160981 | |
| Nov 10, 2022 | Never finaled issued Oct 2023, no final | 240 West Portal Av | All Best Buildrs.Inc./All Trusty Bldrs. | abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe# 202001160980Details
abe upgrade per ordinance 51-16 to (e) business entrances revisions to pa 202010106303. abe# 202001160980 | |
| Sep 26, 2022 | Completed final sign-off Aug 2023 | 2938 Washington St | Vought Construction Inc | garage door dryrot repair: removal of (e) roll up garage door & replace w/ folding one. (n) wall btwn storage & garage area w/single door for entry/exit. 20% accessible upgrade at main entry door and hardwares on washington street side.Details
garage door dryrot repair: removal of (e) roll up garage door & replace w/ folding one. (n) wall btwn storage & garage area w/single door for entry/exit. 20% accessible upgrade at main entry door and hardwares on washington street side. | $15,000 |
| May 26, 2022 | Completed final sign-off Jun 2022 | 351 Ulloa St | revision to pa 2021-0205-4156 change den room patio door from 90" single door & 2 windows to 70.5 wide double door w/opening to out into backyard; convert door 2 & 3 to have ventilation out through exterior windowDetails
revision to pa 2021-0205-4156 change den room patio door from 90" single door & 2 windows to 70.5 wide double door w/opening to out into backyard; convert door 2 & 3 to have ventilation out through exterior window | ||
| May 12, 2022 | Completed final sign-off May 2022 | 5401 Geary Bl | Angotti & Reilly Inc. | revision to pa# 202110130372 for health department review only.Details
revision to pa# 202110130372 for health department review only. | |
| May 3, 2022 | Completed final sign-off May 2025 | 112 Noe St | Rua Woods Construction Inc | replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts.Details
replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts. | $50,000 |
| Mar 30, 2022 | Never finaled filed Mar 2022, never issued | 1500 Cole St | rebuild (e) wood framed garage for dryrot repair & replace cracked & damaged finish concrete floor at (e) garage. all work is on detached garage behind single family residenceDetails
rebuild (e) wood framed garage for dryrot repair & replace cracked & damaged finish concrete floor at (e) garage. all work is on detached garage behind single family residence | $40,000 | |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 3919 22nd St | Rua Woods Construction Inc | remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street.Details
remodel to (e) kitchen including new finishes, fixtures & appliances. m.e.p. as required. remove wall between kitchen & dining. install (n) beam & posts. relocate (e) property line window. enlarge door to rear deck. no work visible from street. | $50,000 |
| Dec 10, 2021 | Never finaled issued Jan 2022, no final | 537 Valley St | Ronan O'dea Inc Dba O'dea Ronan Inc | fire rating upgrades to existing cottage in advance of planned lot split. removal of the rear deck and retaining wall. replace in kind 3 windows at west elevation u=.30maxDetails
fire rating upgrades to existing cottage in advance of planned lot split. removal of the rear deck and retaining wall. replace in kind 3 windows at west elevation u=.30max | $15,000 |
| Oct 13, 2021 | Completed final sign-off May 2022 | 5401 Geary Bl | Angotti & Reilly Inc. | repair dry rot floor in kitchen repair in kind. replace floor drain.Details
repair dry rot floor in kitchen repair in kind. replace floor drain. | $20,000 |
| Sep 22, 2021 | Completed final sign-off Feb 2022 | 1500 Cole St | Forsythe General Contractors | reframing of low roof, 400sf. no change of height or pitch/peak.Details
reframing of low roof, 400sf. no change of height or pitch/peak. | $6,000 |
| May 28, 2021 | Completed final sign-off Feb 2022 | 1500 Cole St | Forsythe General Contractors | bathroom renovation includes: removal of (e) full bath & closet, rebuild powder room off of hallway. rebuild bedroom closet, (n) full bath of off bedroom. all work is on the 2nd flr.Details
bathroom renovation includes: removal of (e) full bath & closet, rebuild powder room off of hallway. rebuild bedroom closet, (n) full bath of off bedroom. all work is on the 2nd flr. | $13,000 |
| Apr 7, 2021 | Completed final sign-off Feb 2024 | 84 Whitney St | All Best Buildrs.Inc./All Trusty Bldrs. | kitchen renovation, second floor addition, and dormer office space additionDetails
kitchen renovation, second floor addition, and dormer office space addition | $350,000 |
| Feb 5, 2021 | Completed final sign-off Jun 2022 | 351 Ulloa St | Hayasa Construction Inc | renovate garage to create new den. work not visible from street. replace (e) garage door with (n) door & window. (n) interior partition, (n) insulation per title 24.Details
renovate garage to create new den. work not visible from street. replace (e) garage door with (n) door & window. (n) interior partition, (n) insulation per title 24. | $8,000 |
| Dec 2, 2020 | Expired or cancelled cancelled Jan 2026 | 797 Bryant St | Angotti & Reilly Inc. | accessible business entrance program per ordinance 51-16. replace threshold & sidewalk at exterior lansing. (shared plans with pa# 202012020025, 501 06th st)Details
accessible business entrance program per ordinance 51-16. replace threshold & sidewalk at exterior lansing. (shared plans with pa# 202012020025, 501 06th st) | $5,000 |
| Dec 2, 2020 | Completed final sign-off Dec 2023 | 501 06th St | Angotti & Reilly Inc. | accessible business entrance program per ordinance 51-16. provide vertical actuation bar at exterior front door (due to 24" pull side maneuvering clearance not able to be met)Details
accessible business entrance program per ordinance 51-16. provide vertical actuation bar at exterior front door (due to 24" pull side maneuvering clearance not able to be met) | $2,000 |
| Dec 2, 2020 | Completed final sign-off Feb 2022 | 1500 Cole St | Forsythe General Contractors | kitchen remodel to include new millwork, finishes, existing appliances to remain, mep design. build, replace, relocate skylight, ceiling framing as required. roof patching as required.Details
kitchen remodel to include new millwork, finishes, existing appliances to remain, mep design. build, replace, relocate skylight, ceiling framing as required. roof patching as required. | $15,000 |
| Oct 21, 2020 | Expired or cancelled cancelled Jan 2026 | 248 West Portal Av | accessible business entrance program per ordinance 51-16. provide new storefront with accessible hardware & new power door operator with vertical activation bar at 248 due to architectural contraints.Details
accessible business entrance program per ordinance 51-16. provide new storefront with accessible hardware & new power door operator with vertical activation bar at 248 due to architectural contraints. | $2,500 | |
| Oct 21, 2020 | Expired or cancelled cancelled Jan 2026 | 250 West Portal Av | accessible business entrance program per ordinance 51-16. regrading sidewalk to meet accessible grades at entry. provide new storefront with accessible hardware and power door operatorDetails
accessible business entrance program per ordinance 51-16. regrading sidewalk to meet accessible grades at entry. provide new storefront with accessible hardware and power door operator | $2,500 | |
| Oct 20, 2020 | Completed final sign-off Dec 2025 | 415 18th Av | Angotti & Reilly Inc. | abe upgrades ti including regreading the s/w to meet ada grades at entry, new threshholds, door hardware and verticle actuation bar as equivelent facilitation. accessible business entrance program per oridinance 51-16Details
abe upgrades ti including regreading the s/w to meet ada grades at entry, new threshholds, door hardware and verticle actuation bar as equivelent facilitation. accessible business entrance program per oridinance 51-16 | $212,000 |
| Oct 9, 2020 | Completed final sign-off Apr 2021 | 1253 06th Av | Rua Woods Construction Inc | new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroomDetails
new bathroom with shower added to (e) interior space, (n) kitchen cabinets and relocate fridge, (n) interior door to connect garage with unit, re-classify living space as bedroom | $10,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 447 11th Av | Rua Woods Construction Inc | interior renovation of exiting sfd. renovate kitchen, window replacement, interior stair & powder room relocation/replacement.Details
interior renovation of exiting sfd. renovate kitchen, window replacement, interior stair & powder room relocation/replacement. | $50,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2020 | 3517 Sacramento St | Rua Woods Construction Inc | bathroom addition within exisitng residential condo unit. new interior partitions & doors, new plumbing fixtures & finishes, mep design buildDetails
bathroom addition within exisitng residential condo unit. new interior partitions & doors, new plumbing fixtures & finishes, mep design build | $15,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2024 | 807 Bosworth St | expand e sfr within the e building envelope using height in crawl space and attic to add a 2nd bath and 2nd bedroomDetails
expand e sfr within the e building envelope using height in crawl space and attic to add a 2nd bath and 2nd bedroom | $90,000 | |
| Dec 24, 2019 | Expired or cancelled cancelled Jul 2024 | 77 07th Av | add new interior stair to connect to existing basement. remodel of existing basement: add new bathroom & laundry at basement level crawl spaceDetails
add new interior stair to connect to existing basement. remodel of existing basement: add new bathroom & laundry at basement level crawl space | $50,000 | |
| Dec 24, 2019 | In progress issued Apr 2024 | 460 West Portal Av | Vought Construction Inc | path of travel upgrades and change of use per cua 2017-014374.Details
path of travel upgrades and change of use per cua 2017-014374. | $15,000 |
| Dec 24, 2019 | Expired or cancelled withdrawn Sep 2023 | 460 West Portal Av | administrative permit to memorialize 2017-014374 change of use. no work under this permit.Details
administrative permit to memorialize 2017-014374 change of use. no work under this permit. | ||
| Dec 17, 2019 | Completed final sign-off Apr 2021 | 447 11th Av | Rua Woods Construction Inc | dryrot repair of existing entry stair, portion of stucco facadae, new wood siding to match existing. replace front aluminum windows (dryrot).Details
dryrot repair of existing entry stair, portion of stucco facadae, new wood siding to match existing. replace front aluminum windows (dryrot). | $110,000 |
| Aug 27, 2019 | Completed final sign-off May 2020 | 81 Seal Rock Dr | Kingfish Construction Llc. | remove extg skylight. provide new skylight. patch roof as required.Details
remove extg skylight. provide new skylight. patch roof as required. | $2,000 |
| Aug 9, 2019 | Never finaled issued Jun 2020, no final | 780 Post St | Millard Tong Const Co Inc | to comply with nov issued by housing, elevator alteration: replace drive machine, overhead sheaves, governor, controller, etc. tie into/upgrade fire life safety system per code under separate permit. upgreade elec. service as req. under seperate permit.Details
to comply with nov issued by housing, elevator alteration: replace drive machine, overhead sheaves, governor, controller, etc. tie into/upgrade fire life safety system per code under separate permit. upgreade elec. service as req. under seperate permit. | $50,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2023 | 555 Ofarrell St | Five Star General Contractors, All Best Buildrs.Inc./All Trusty Bldrs. | revision to 2016012235814 revise layout in units 3 & 4. revise escape/rescue winodwn path to public way for units 4, 6, 7 per dbi information sheet eg-05.Details
revision to 2016012235814 revise layout in units 3 & 4. revise escape/rescue winodwn path to public way for units 4, 6, 7 per dbi information sheet eg-05. | |
| Jun 20, 2019 | Completed final sign-off Jul 2019 | 2210 19th St | Wildwood Builders | revision to pa 201711295074. removed window on intermediate floor ( not installed ). clarification that window on 2nd flr is fixed.Details
revision to pa 201711295074. removed window on intermediate floor ( not installed ). clarification that window on 2nd flr is fixed. | |
| Apr 30, 2019 | Never finaled issued Jul 2021, no final | 780 Post St | per unit legalization ordinance 43-14, legalize one dwelling unit to apartment building from 36-37 units, and 5 adu under separate permit #201806111486.Details
per unit legalization ordinance 43-14, legalize one dwelling unit to apartment building from 36-37 units, and 5 adu under separate permit #201806111486. | $69,250 | |
| Apr 29, 2019 | Completed final sign-off May 2022 | 490 West Portal Av | Oliver & Company Inc. | revision to 201612235805 s1. structural sheathing to non gravity load bearing walls to be fire retardant-treated plywood per cbc 603.1 ex 1.1.1.2, updated 4" max. recess in the strucutral slab at column locations, updated curb thickness. updated site wall due to e site conditions, maher not reqDetails
revision to 201612235805 s1. structural sheathing to non gravity load bearing walls to be fire retardant-treated plywood per cbc 603.1 ex 1.1.1.2, updated 4" max. recess in the strucutral slab at column locations, updated curb thickness. updated site wall due to e site conditions, maher not req | |
| Nov 28, 2018 | Completed final sign-off Mar 2019 | 2645 Gough St | Christopher Wells Construction Inc. | interior remodel of kitchenette; appliances, counter, backsplash flooring, painting cabinets, light fixtures, doorDetails
interior remodel of kitchenette; appliances, counter, backsplash flooring, painting cabinets, light fixtures, door | $13,000 |
| Jul 6, 2018 | Completed final sign-off Oct 2019 | 250 King St | Schmitt Heating Co Inc | unit 952: install 4 wall mount varible flow "nfr" cooling systems in (e) condo #952. patch interior finishes. no exterior workDetails
unit 952: install 4 wall mount varible flow "nfr" cooling systems in (e) condo #952. patch interior finishes. no exterior work | $25,000 |
| Jun 29, 2018 | Expired or cancelled expired Mar 2026 | 930 Sutter St | Astorga Construction Inc, Five Star General Contractors | add 1 new accessory dwelling units, per ord 162-16. add (n) walls @ground floor - non structural. elec, mech & plumb & structural upgrades per code. ground floor fire sprinkler work to be under seperate permit. maher n/a.Details
add 1 new accessory dwelling units, per ord 162-16. add (n) walls @ground floor - non structural. elec, mech & plumb & structural upgrades per code. ground floor fire sprinkler work to be under seperate permit. maher n/a. | $40,000 |
| Jun 11, 2018 | Never finaled issued Jul 2021, no final | 780 Post St | provide additional (4) new dwelling units per ordinance 162-16. fire line safety. structural, mechancial, electrical & plumbing work to be per code. one legalization unit under separate permit #201904309303s.Details
provide additional (4) new dwelling units per ordinance 162-16. fire line safety. structural, mechancial, electrical & plumbing work to be per code. one legalization unit under separate permit #201904309303s. | $125,000 | |
| May 10, 2018 | Completed final sign-off Feb 2019 | 345 Stockton St | Marchetti Group | interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #.Details
interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #. | $500,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2019 | 1201 Fulton St | Five Star General Contractors | interior remodel of extg attic into new family room, w/wet bar and bathroom. all mech, electrical, plumbing, and life safety work to be per code. no exterior alterationDetails
interior remodel of extg attic into new family room, w/wet bar and bathroom. all mech, electrical, plumbing, and life safety work to be per code. no exterior alteration | $25,000 |
| Feb 1, 2018 | Never finaled issued Mar 2019, no final | 2445 Hyde St | Cahill Contractors Llc. | rec & park dept owns this site of abandoned francisco park reservoir. project will convert the site to a public park of 195,300 sq ft. sf park conservancy will gift the completed project to rpd per (e) agreement. park consists of a restroom, rpd maint space, community garden, lawn & dog run.Details
rec & park dept owns this site of abandoned francisco park reservoir. project will convert the site to a public park of 195,300 sq ft. sf park conservancy will gift the completed project to rpd per (e) agreement. park consists of a restroom, rpd maint space, community garden, lawn & dog run. | $13,500,000 |
| Feb 3, 2017 | Completed final sign-off Oct 2018 | 543 Los Palmos Dr | All Best Buildrs.Inc./All Trusty Bldrs. | enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint.Details
enclose front porch, remodel entry hall, kitchen, stairs & master suite. add guest bath, laundry & storage, replace elec. wiring, paint. | $125,000 |
| Dec 23, 2016 | Completed final sign-off Nov 2023 | 555 Ofarrell St | Five Star General Contractors, All Best Buildrs.Inc./All Trusty Bldrs. | renovation of existing residential bldg ground floor, add 7 adu, struct reinf as required per code, mech, elect, plumb as required per code. seismic strengthing per application 2018-0316-3857.Details
renovation of existing residential bldg ground floor, add 7 adu, struct reinf as required per code, mech, elect, plumb as required per code. seismic strengthing per application 2018-0316-3857. | $150,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 135 Kiska Rd | All Best Buildrs.Inc./All Trusty Bldrs. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a ** | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 50 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 71 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.Details
voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 95 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a ** | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 10 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.Details
voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 26 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.Details
voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 145 Kiska Rd | All Best Buildrs.Inc./All Trusty Bldrs. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a **Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. ** maher: n/a ** | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2018 | 54 Reardon Rd | All Best Buildrs.Inc./All Trusty Bldrs. | voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a.Details
voluntary soft story retrofit. seismic upgrade to (e) tier ii soft-story structures, consisting of additional sheathing, nailing, blocking, anchor bolting, etc. as required by code. maher n/a. | $15,000 |
| Sep 6, 2016 | Never finaled filed Sep 2016, never issued | 851 Ofarrell St | 5 new residential dwelling units in grd flr of existing residential bldg. work incl new partitions, windows, fire sprinkler, electrical, mech, plumbing & upgrade (e) stair to current code. maher n/aDetails
5 new residential dwelling units in grd flr of existing residential bldg. work incl new partitions, windows, fire sprinkler, electrical, mech, plumbing & upgrade (e) stair to current code. maher n/a | $352,159 | |
| Sep 2, 2016 | Expired or cancelled cancelled Feb 2020 | 851 O'farrell St | mandatory soft story upgrade, tier 2 using criteria 2012 iebc appendix a-4; renovation of a residential building; infill partial ground floor light-well. maher n/aDetails
mandatory soft story upgrade, tier 2 using criteria 2012 iebc appendix a-4; renovation of a residential building; infill partial ground floor light-well. maher n/a | $100,000 | |
| May 11, 2016 | Expired or cancelled cancelled Jul 2023 | 2454 Hyde St | voluntary ada & seismic upgrade. horizontal addition @ basement & ground floor @ side yard. add stair penthouse & roof deck. install lula elevator, remove curb cut & garage. add curb cut & off street loading zone. interior remodel.Details
voluntary ada & seismic upgrade. horizontal addition @ basement & ground floor @ side yard. add stair penthouse & roof deck. install lula elevator, remove curb cut & garage. add curb cut & off street loading zone. interior remodel. | $800,000 | |
| Jan 28, 2016 | Expired or cancelled expired Apr 2026 | 930 Sutter St | to comply with complaint 201392231 - legalize 1 ground floor dwelling unit installed w/out a permit. replace/upgrade walls, plumbing, mechanical, electrical & sprinkler systems to legalize 1 ground floor unit. maher naDetails
to comply with complaint 201392231 - legalize 1 ground floor dwelling unit installed w/out a permit. replace/upgrade walls, plumbing, mechanical, electrical & sprinkler systems to legalize 1 ground floor unit. maher na | $35,000 | |
| Dec 21, 2015 | Completed final sign-off Jul 2018 | 3861 24th St | convert parking lot to park plaza. wood and metal trellis , wood and metal canopy structure, childrens play areaDetails
convert parking lot to park plaza. wood and metal trellis , wood and metal canopy structure, childrens play area | $250,000 | |
| Nov 3, 2015 | Completed final sign-off Sep 2016 | 260 Divisadero St | Prc Construction Inc., Reddington Construction | change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishesDetails
change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishes | $50,000 |
| Feb 12, 2015 | Expired or cancelled expired Jan 2017 | 4341 25th St | House To Home Remodeling | second floor rear addition of master suite over existing ground floor.Details
second floor rear addition of master suite over existing ground floor. | $85,000 |
| Jan 22, 2015 | Completed final sign-off Apr 2016 | 1329 Noe St | remodel front entry, landing & planters, infill porch. remodel 2nd floor bath. new built in millwork @ garage floor, remove trip & fall hazards @ sidewalk (minor sidewalk encroach).Details
remodel front entry, landing & planters, infill porch. remodel 2nd floor bath. new built in millwork @ garage floor, remove trip & fall hazards @ sidewalk (minor sidewalk encroach). | $105,000 | |
| Nov 13, 2014 | Expired or cancelled cancelled Nov 2024 | 1329 Noe St | remodel front entry landing and planters. remodel bath @ 2/f, new built in mill work @ garage floor. remove trip and fall hazards @ sidewalk (minor sidewalk encroach)Details
remodel front entry landing and planters. remodel bath @ 2/f, new built in mill work @ garage floor. remove trip and fall hazards @ sidewalk (minor sidewalk encroach) | $105,000 | |
| Nov 5, 2014 | Completed final sign-off Sep 2015 | 550 Magellan Av | 1st floor: remodel (e) kitchen, bathroom and interior stairway per plan. add new master bath. basement: relacation of washer and dryer. maher n/a.Details
1st floor: remodel (e) kitchen, bathroom and interior stairway per plan. add new master bath. basement: relacation of washer and dryer. maher n/a. | $105,000 | |
| Dec 16, 2013 | Expired or cancelled cancelled Jan 2020 | 14 Hill Point Av | horizontal addition of lower level family room within envelope of (e) deck. enclose (e) basement deck into storage. (e) deck joists & exterior stair to remain. mech, elect & struct work to be per code, typ.Details
horizontal addition of lower level family room within envelope of (e) deck. enclose (e) basement deck into storage. (e) deck joists & exterior stair to remain. mech, elect & struct work to be per code, typ. | $35,000 | |
| Jul 9, 2013 | Completed final sign-off Feb 2015 | 175 Clipper St | demolish(e) deck & trellis @ rear yard.new rear yard addition w/ sunroom & deck @ grade. repair (e) dry rot to match (e) details as req. new solar thermal panels on roof ofDetails
demolish(e) deck & trellis @ rear yard.new rear yard addition w/ sunroom & deck @ grade. repair (e) dry rot to match (e) details as req. new solar thermal panels on roof of | $75,000 | |
| Dec 15, 2010 | Completed final sign-off Oct 2014 | 461 Hoffman Av | demo existing rear yard addition. build new rear yard addition. add 2nd dwelling unit @ ground floor. variance from off-street parking. horizontal addition per plan.Details
demo existing rear yard addition. build new rear yard addition. add 2nd dwelling unit @ ground floor. variance from off-street parking. horizontal addition per plan. | $500,000 | |
| Aug 4, 2010 | Completed final sign-off Oct 2010 | 650 Florida St | H L S. Inc Dba Wolf General | unit a: interior tenant improvment. install new demising partition w door sidelite and transoms. install toilet room plumbing fixtures and finishes. install ceiling hung light fixturesDetails
unit a: interior tenant improvment. install new demising partition w door sidelite and transoms. install toilet room plumbing fixtures and finishes. install ceiling hung light fixtures | $30,000 |
| Jul 3, 2008 | Completed final sign-off Feb 2009 | 50 Reardon Rd | to erect a new one story office building.Details
to erect a new one story office building. | $150,000 | |
| Jul 17, 2006 | Completed final sign-off Nov 2006 | 1329 Noe St | H L S. Inc Dba Wolf General | replace stair from family room to 1/f in kind.upgrade interior finishes @family room existing.upgrade garage to 1 hr. rating,replace 2 dryrot windows & door @ family room,replace furnace,add laundry & bath,hydronic heating.no work visable to streetDetails
replace stair from family room to 1/f in kind.upgrade interior finishes @family room existing.upgrade garage to 1 hr. rating,replace 2 dryrot windows & door @ family room,replace furnace,add laundry & bath,hydronic heating.no work visable to street | $50,000 |
| Oct 5, 2004 | Completed final sign-off Mar 2006 | 1416 11th Av | demo (e) rear yard addition. provide new rear yard. addition including playroom , stairs, kitchen ,Details
demo (e) rear yard addition. provide new rear yard. addition including playroom , stairs, kitchen , | $200,000 | |
| Mar 1, 2001 | Completed final sign-off Jan 2002 | 415 Douglass St | legalize non conforming dryrot, rear yard addition. remove stair in rear yard. build playroom.Details
legalize non conforming dryrot, rear yard addition. remove stair in rear yard. build playroom. | $200,000 |