Matthew Stillwell
- Listed as
- engineer
- Firm
- Prevision Engineering
- Based in
- Oakland
- On San Francisco permits
- Aug 2023 to May 2026
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2026 | In progress issued Jun 2026 | 3443 Balboa St | Hawk Hill Construction Inc | g/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades.Details
g/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades. | $90,000 |
| May 21, 2026 | In progress issued Jun 2026 | 3439 Balboa St | Hawk Hill Construction Inc | residential: remove juliet balcony at 2/f. replace entry gate at residential entrance.Details
residential: remove juliet balcony at 2/f. replace entry gate at residential entrance. | $5,000 |
| Sep 10, 2025 | Completed final sign-off Jul 2026 | 285 Cumberland St | Blair Burke General Contractors Inc | interior kitchen and bath remodel. expanding opening between kitchen and dining.Details
interior kitchen and bath remodel. expanding opening between kitchen and dining. | $125,000 |
| Apr 8, 2024 | Completed final sign-off Sep 2025 | 4173 20th St | to comply w/ nov# 202316944: 1) demo (e) rotted entry stair; 2) replace three (e) stringers w/ (n) p.t. stringers; 3) add (n) painted redwood stair treads and risers to match (e) remaining stairs; existing non-conforming railings to remainDetails
to comply w/ nov# 202316944: 1) demo (e) rotted entry stair; 2) replace three (e) stringers w/ (n) p.t. stringers; 3) add (n) painted redwood stair treads and risers to match (e) remaining stairs; existing non-conforming railings to remain | $7,000 | |
| Aug 18, 2023 | Completed final sign-off Nov 2024 | 1479 28th Av | Rua Woods Construction Inc | construct playhouse in rear yard less than 100sf.Details
construct playhouse in rear yard less than 100sf. | $15,000 |