Peter Bekey
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Kca Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Aug 2024
34 permits since 2000 (engineer on 29 permits, authorized agent-others on 4 permits, architect on 2 permits): 24 completed, 3 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2024 | In progress filed Aug 2024, not yet issued | 645 Chestnut St | to comply with abe ord 51-16 abe 201912109598 replace threshold w/new max 1/2" high; new sidewalk less than 1/2" lower than floor, provide door lever: provide power door operator to keep existing pair of 30" doors (11b-404.3.1: doorways shall provideDetails
to comply with abe ord 51-16 abe 201912109598 replace threshold w/new max 1/2" high; new sidewalk less than 1/2" lower than floor, provide door lever: provide power door operator to keep existing pair of 30" doors (11b-404.3.1: doorways shall provide | $11,225 | |
| Jul 17, 2024 | In progress issued Oct 2024 | 222 Napoleon St | Tico Construction Company Incorporated | relocate curb cut. administrative pa to document sidewalk curb cut associated with dpw streetscape (bureau of street use/street improvement) permit 24ie-00065 as req by dcp.Details
relocate curb cut. administrative pa to document sidewalk curb cut associated with dpw streetscape (bureau of street use/street improvement) permit 24ie-00065 as req by dcp. | $10,000 |
| Mar 5, 2024 | In progress filed Mar 2024, not yet issued | 6283 03rd St | 1st floor: accessible building entrance and sidewalk upgrade. abe #201812183114 ordinance 51-16; new accessibel door to extg ground floor commercial space, new window to extg ground fl. commiercial. provide new raised paving in front of te extg ground fl commercial space.Details
1st floor: accessible building entrance and sidewalk upgrade. abe #201812183114 ordinance 51-16; new accessibel door to extg ground floor commercial space, new window to extg ground fl. commiercial. provide new raised paving in front of te extg ground fl commercial space. | $17,391 | |
| Oct 11, 2023 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope.Details
revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope. | |
| Sep 15, 2022 | Never finaled issued Sep 2022, no final | 499 Cambridge St | Tri Pointe Homes Inc | rev to pa 201911137165:remove portion of (e) 4 inch private fire-water main/replace w/new 6 inch private fire-water main from point of connection @ public water main on yale street to private fire hydrant #2. remove (e) private fire hydrant #3. replace proposed synthetic turf on airpave cellsDetails
rev to pa 201911137165:remove portion of (e) 4 inch private fire-water main/replace w/new 6 inch private fire-water main from point of connection @ public water main on yale street to private fire hydrant #2. remove (e) private fire hydrant #3. replace proposed synthetic turf on airpave cells | |
| Jul 12, 2022 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut.Details
to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut. | $178,000 |
| Jan 18, 2022 | Completed final sign-off Sep 2022 | 2100 Chestnut St | Paradigm General Contractors | tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargoDetails
tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo | $561,470 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 201 Mission St | Field Construction Inc. | parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.Details
parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting. | $260,000 |
| Jul 6, 2020 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc | pid to review only. the civil plans that show the pipes from the bldg roof through the roof liters & into the stormwater system. no "pluymbing" in the houses relative to the scp design. the 20 buildings roofs impacted by the rwh system are the a,b & c units.Details
pid to review only. the civil plans that show the pipes from the bldg roof through the roof liters & into the stormwater system. no "pluymbing" in the houses relative to the scp design. the 20 buildings roofs impacted by the rwh system are the a,b & c units. | |
| Nov 13, 2019 | Completed final sign-off Jul 2023 | 300 Yale St | Tri Pointe Homes Inc | in-tract fire water improvement plan & details to comply with nfpa-24 & sffd ab-2.09 to proceed with water service tie-in request with sfpucDetails
in-tract fire water improvement plan & details to comply with nfpa-24 & sffd ab-2.09 to proceed with water service tie-in request with sfpuc | |
| Oct 17, 2018 | Completed final sign-off Feb 2019 | 1855 Alabama St | 415 Design+Build | to comply with nov 201850811 to provide proper drainage system per geotech reportDetails
to comply with nov 201850811 to provide proper drainage system per geotech report | $15,000 |
| Aug 1, 2018 | Never finaled issued Apr 2019, no final | 495 Cambridge St | Tri Pointe Homes Inc, Ryan Engineering Inc | grading. remove (e) paving, utilities & allother infrastructure in preparation for new construction. bldgs demolished under separate permit. site will be rough graded to 9" below the finished grades. plans for streets, sidewalks, utilites & retaining walls will be submitted under separate permits orDetails
grading. remove (e) paving, utilities & allother infrastructure in preparation for new construction. bldgs demolished under separate permit. site will be rough graded to 9" below the finished grades. plans for streets, sidewalks, utilites & retaining walls will be submitted under separate permits or | $170,390 |
| Jun 13, 2017 | Completed final sign-off Dec 2017 | 750 Brannan St | Oliver & Company Inc. | revision to 2016111072146, scope includes new door to close off 1 area from another and addition of civil drawuings with site grading, drainage & sidewalkDetails
revision to 2016111072146, scope includes new door to close off 1 area from another and addition of civil drawuings with site grading, drainage & sidewalk | $1,500 |
| Feb 13, 2017 | Completed final sign-off May 2022 | 100 Channel | Hathaway Dinwiddie Co. | ground improvement work to be performed in accordance with geo tech report. work includes the installation and cordination of stone columns under the observation of geo-tech engineer of record. ** maher: n/a **Details
ground improvement work to be performed in accordance with geo tech report. work includes the installation and cordination of stone columns under the observation of geo-tech engineer of record. ** maher: n/a ** | $20,000 |
| Sep 28, 2016 | Completed final sign-off Jan 2018 | 101 Northridge Rd | Mitchell Engineering | south poc for westbrook - install 2067' of 4" pvc fire underground piping for buildings 714-734. building 729 to have fire pump, under separate permit. most demanding sprinkler demand is 170 gpm @ 77 psi.Details
south poc for westbrook - install 2067' of 4" pvc fire underground piping for buildings 714-734. building 729 to have fire pump, under separate permit. most demanding sprinkler demand is 170 gpm @ 77 psi. | $350,000 |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 233 Maple St | Johnstone - Mc Auliffe Const. Inc. | revision to pa #201605238151: revising egress access routes, revising site drainage at sandbox.Details
revision to pa #201605238151: revising egress access routes, revising site drainage at sandbox. | |
| Sep 15, 2016 | Never finaled issued Oct 2016, no final | 3839 Washington St | Johnstone - Mc Auliffe Const. Inc. | revision to pa #201605117189 - revisoin to drainage an sandbox on civil site plan, revision to interior classroom scope. no change to existing gate on site plan.Details
revision to pa #201605117189 - revisoin to drainage an sandbox on civil site plan, revision to interior classroom scope. no change to existing gate on site plan. | |
| Nov 26, 2013 | Completed final sign-off Dec 2014 | 535 Mission St | Swinerton Builders | off-site improvements along mission st, minna st and in shaw alley.Details
off-site improvements along mission st, minna st and in shaw alley. | $40,000 |
| Oct 7, 2013 | Completed final sign-off Feb 2014 | 500 Terry A. Francois Bl | Gci, Inc | 2nd floor: demolition of non-load bearing partitions, doors, and finishes on 2nd floor. floor to remain vacant under ab-017 and all ada requirements will be addressed under future ti permit sprinklers and egress elevator lobby to be maintained.Details
2nd floor: demolition of non-load bearing partitions, doors, and finishes on 2nd floor. floor to remain vacant under ab-017 and all ada requirements will be addressed under future ti permit sprinklers and egress elevator lobby to be maintained. | $45,000 |
| Mar 29, 2013 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction | construction of temporary egress ramp & wheelchair lift for egress from building to trenton street. remp & lift are temporary and will be removed upon the completion of construction of the chinese hospital to be complete 2016.Details
construction of temporary egress ramp & wheelchair lift for egress from building to trenton street. remp & lift are temporary and will be removed upon the completion of construction of the chinese hospital to be complete 2016. | $20,000 |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 50 Trenton St | Dpr Construction | tie back for 835 jackson street, excavation shoring (primary excavation & shoring under permit app #201303111902)Details
tie back for 835 jackson street, excavation shoring (primary excavation & shoring under permit app #201303111902) | |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction | tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902)Details
tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902) | |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 20 Trenton St | Dpr Construction | tie back for 835 jackson street, excavation shoring (primary excavation & shoring under permit app #201303111902)Details
tie back for 835 jackson street, excavation shoring (primary excavation & shoring under permit app #201303111902) | |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 835 Jackson St | Dpr Construction | grading - excavation for bldg foundation basement and utility vaults per civil plans including grading shoring for adjacent bldg and properties per shoring plans. underpinning of 845 jackson st (hospital) is under oshpd permit bp-2012-02125Details
grading - excavation for bldg foundation basement and utility vaults per civil plans including grading shoring for adjacent bldg and properties per shoring plans. underpinning of 845 jackson st (hospital) is under oshpd permit bp-2012-02125 | $1,447,000 |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 801 Jackson St | Dpr Construction | tie back for 835 jackson st. excavation shoring (primary shoring under permit app #201303111902)Details
tie back for 835 jackson st. excavation shoring (primary shoring under permit app #201303111902) | |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 821 Jackson St | Dpr Construction | tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902)Details
tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902) | |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 475 Sansome St | Source Planning And Construction Inc | revision to pa #2012.02.27.4930 - (8th floor) to change proposed demising wall from 1-hr rating to non-rated per discussions with field inspectors.Details
revision to pa #2012.02.27.4930 - (8th floor) to change proposed demising wall from 1-hr rating to non-rated per discussions with field inspectors. | |
| Aug 25, 2011 | Completed final sign-off Jun 2013 | 1000 Evans Av | Pivox Corporation | revision to appl #201107281212 to show french drain being added to grading & paving work under existing permit.Details
revision to appl #201107281212 to show french drain being added to grading & paving work under existing permit. | $6,000 |
| Jul 28, 2011 | Completed final sign-off Jun 2013 | 1000 Evans Av | Pivox Corporation | revision to pa# 2010-0625-5335-include area a details for grading plan. this will be the 1st phase of grading details. all others areas to follow on seperate permit; details will also include pavingDetails
revision to pa# 2010-0625-5335-include area a details for grading plan. this will be the 1st phase of grading details. all others areas to follow on seperate permit; details will also include paving | $150 |
| Oct 3, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | install underground fire water service to the building sprinkler system under 200208154137s.complaint #200667155.Details
install underground fire water service to the building sprinkler system under 200208154137s.complaint #200667155. | $6,000 | |
| Nov 17, 2005 | Expired or cancelled expired Feb 2009 | 1300 Eddy St | grading of site to accomodate residential subdivision with street & utility improvements.Details
grading of site to accomodate residential subdivision with street & utility improvements. | $30,000 | |
| Aug 3, 2005 | Completed final sign-off Oct 2007 | 420 Berry St | provide grading per plan. ref: pa#2005051121087s new building.Details
provide grading per plan. ref: pa#2005051121087s new building. | $18,000 | |
| Oct 19, 2004 | Completed final sign-off Feb 2005 | 1275 Fell St | re-grading & re striping for temporary parking for new bankDetails
re-grading & re striping for temporary parking for new bank | ||
| Jun 21, 2001 | Expired or cancelled cancelled May 2002 | 377 Liberty St | demolish 3 story single family unitDetails
demolish 3 story single family unit |