Block 5992A, lot 071
309 Yale St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
84 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 345 Yale St | Tri Pointe Homes Inc | plan revision to as-built field condition in which the framing for unit# 23 sits upon retaining wall instead of inside retaining wall as show in the approved plans pa# 201012227237Details
plan revision to as-built field condition in which the framing for unit# 23 sits upon retaining wall instead of inside retaining wall as show in the approved plans pa# 201012227237 | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 304 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227239-s.Details
alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227239-s. | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 333 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227234-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227234-s) | |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 337 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227235-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227235-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 336 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227243-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227243-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 341 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227236-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227236-s) | |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 327 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227232-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227232-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 308 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227240-s.Details
alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227240-s. | |
| Mar 13, 2023 | Completed final sign-off Sep 2023 | 345 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227237-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227237-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 334 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227242-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227242-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 319 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227230-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227230-s) | |
| Mar 13, 2023 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227238-s.Details
alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227238-s. | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 323 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227231-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227231-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 331 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227233-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227233-s) | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 330 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227241-s.Details
alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref permit 201012227241-s. | |
| Mar 13, 2023 | Completed final sign-off Jun 2023 | 340 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227244-s)Details
alteration to hallway width - minimum 3 ft clear in the hallway areas w/ the wingwalls. (reference pa #201012227244-s) | |
| Mar 10, 2023 | Completed final sign-off Mar 2023 | 311 Yale St | Tri Pointe Homes Inc | unit #6 and #7: alteration to hallway width-minimum 3ft. clear in the hallway areas with the wingwalls. ref pa# 2010-1222-7228Details
unit #6 and #7: alteration to hallway width-minimum 3ft. clear in the hallway areas with the wingwalls. ref pa# 2010-1222-7228 | |
| Mar 10, 2023 | Completed final sign-off Mar 2023 | 303 Yale St | Tri Pointe Homes Inc | revision to pa# 201012227226, alteration to hallway width- minimum 3ft clear in the hallway areas with the wingwalls.Details
revision to pa# 201012227226, alteration to hallway width- minimum 3ft clear in the hallway areas with the wingwalls. | |
| Mar 10, 2023 | Completed final sign-off Mar 2023 | 301 Yale St | Tri Pointe Homes Inc | revision to pa# 201012227225, alteration to hallway width- minimum 3ft clear in the hallway areas with the wingwalls.Details
revision to pa# 201012227225, alteration to hallway width- minimum 3ft clear in the hallway areas with the wingwalls. | |
| Mar 10, 2023 | Completed final sign-off Mar 2023 | 315 Yale St | Tri Pointe Homes Inc | alteration to hallway width-minimum 3ft. clear in the hallway areas with the wingwalls. ref pa# 2010-1222-7229Details
alteration to hallway width-minimum 3ft. clear in the hallway areas with the wingwalls. ref pa# 2010-1222-7229 | |
| Jan 30, 2023 | Completed final sign-off Mar 2023 | 307 Yale St | Tri Pointe Homes Inc | alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref pa# 201012227227.Details
alteration to hallway width - minimum 3ft clear in the hallway areas with the wingwalls. ref pa# 201012227227. | |
| Nov 29, 2022 | Never finaled issued Nov 2022, no final | 321 Yale St | Tri Pointe Homes Inc | private fire hydrant #2 - hydraulic calcs to demonstrate that the sffd code-required fire flow are met. ref# 2022-09-15-2498.Details
private fire hydrant #2 - hydraulic calcs to demonstrate that the sffd code-required fire flow are met. ref# 2022-09-15-2498. | |
| Nov 29, 2022 | Never finaled issued Nov 2022, no final | 301 Yale St | Tri Pointe Homes Inc | private fire hydrant #1 - hydraulic calcs to demonstrate that the sffd code-required fire flow are met. ref# 2022-09-15-2498.Details
private fire hydrant #1 - hydraulic calcs to demonstrate that the sffd code-required fire flow are met. ref# 2022-09-15-2498. | |
| Sep 26, 2022 | Never finaled issued Sep 2022, no final | 298 Yale St | per request & dt approval, 298 yale st created for pg&e common meter for project at yale st, 298 yale will link to apn 5992a/071.Details
per request & dt approval, 298 yale st created for pg&e common meter for project at yale st, 298 yale will link to apn 5992a/071. | ||
| Sep 15, 2022 | Never finaled issued Sep 2022, no final | 499 Cambridge St | Tri Pointe Homes Inc | rev to pa 201911137165:remove portion of (e) 4 inch private fire-water main/replace w/new 6 inch private fire-water main from point of connection @ public water main on yale street to private fire hydrant #2. remove (e) private fire hydrant #3. replace proposed synthetic turf on airpave cellsDetails
rev to pa 201911137165:remove portion of (e) 4 inch private fire-water main/replace w/new 6 inch private fire-water main from point of connection @ public water main on yale street to private fire hydrant #2. remove (e) private fire hydrant #3. replace proposed synthetic turf on airpave cells | |
| Feb 17, 2022 | Completed final sign-off May 2024 | 351 Yale St | Thorpe Design Inc | rev pa201012227257-s3,pa201911137165 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply.Details
rev pa201012227257-s3,pa201911137165 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 357 Yale St | Thorpe Design Inc | rev pa201012227254-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow permit will be submitted sepatately.Details
rev pa201012227254-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow permit will be submitted sepatately. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 349 Yale St | Thorpe Design Inc | rev pa201012227258-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply.revised fire flow permit will be submitted separately.Details
rev pa201012227258-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply.revised fire flow permit will be submitted separately. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 353 Yale St | Thorpe Design Inc | rev pa201012227256-s3, revised fire flow will be submitted under separate permit - new hydraulic calcs using the flow calcs from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply.Details
rev pa201012227256-s3, revised fire flow will be submitted under separate permit - new hydraulic calcs using the flow calcs from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 355 Yale St | Thorpe Design Inc | rev pa201012227255-s3,pa201911137165 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply.Details
rev pa201012227255-s3,pa201911137165 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 347 Yale St | Thorpe Design Inc | rev pa201012227259-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow will be submitted under a separate permit.Details
rev pa201012227259-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow will be submitted under a separate permit. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 363 Yale St | Thorpe Design Inc | sffd only: revision to fire sprinkler addendum pa 202112227251-s3, revised fire plan will be submitted under separate permi. new hydraulic calcs using the flow calcs from the 4" public main on yale st, right before the entrance of the project lot, to show that the proposed sprinkler demand will meetDetails
sffd only: revision to fire sprinkler addendum pa 202112227251-s3, revised fire plan will be submitted under separate permi. new hydraulic calcs using the flow calcs from the 4" public main on yale st, right before the entrance of the project lot, to show that the proposed sprinkler demand will meet | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 361 Yale St | Thorpe Design Inc | sffd only: revision to fire sprinkler addendum pa 202112227252-s3. new hydraulic calcs using the flow calcs from the 4" public main on yale st, right before the entrance of the project lot, to show that the proposed sprinkler demand will meet the revised available water supply.Details
sffd only: revision to fire sprinkler addendum pa 202112227252-s3. new hydraulic calcs using the flow calcs from the 4" public main on yale st, right before the entrance of the project lot, to show that the proposed sprinkler demand will meet the revised available water supply. | |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 359 Yale St | Thorpe Design Inc | rev pa201012227253-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow permit will be submitted separately.Details
rev pa201012227253-s3 - new hydraulic calcs using the flow cabls from 4in main on yale st before entrance of project lot to show that proposed f/s demand will meet the revised avail water supply. revised fire flow permit will be submitted separately. | |
| Nov 23, 2020 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc | fire department access only; for community/communal infrastructure. revision to pa #2018-0801-6154, to fulfill the requirments established in sffd administrative bulletin 2.16.Details
fire department access only; for community/communal infrastructure. revision to pa #2018-0801-6154, to fulfill the requirments established in sffd administrative bulletin 2.16. | |
| Aug 13, 2020 | Never finaled issued May 2021, no final | 489 Cambridge St | Tri Pointe Homes Inc | temporary sales office in future unit# 52. ref pa# 201012227257-s.Details
temporary sales office in future unit# 52. ref pa# 201012227257-s. | $15,000 |
| Aug 13, 2020 | Never finaled issued May 2021, no final | 493 Cambridge St | Tri Pointe Homes Inc | temporary sales office. restroom in future. unit# 53. ref pa# 201012227258-sDetails
temporary sales office. restroom in future. unit# 53. ref pa# 201012227258-s | $15,000 |
| Jul 6, 2020 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc | pid to review only. the civil plans that show the pipes from the bldg roof through the roof liters & into the stormwater system. no "pluymbing" in the houses relative to the scp design. the 20 buildings roofs impacted by the rwh system are the a,b & c units.Details
pid to review only. the civil plans that show the pipes from the bldg roof through the roof liters & into the stormwater system. no "pluymbing" in the houses relative to the scp design. the 20 buildings roofs impacted by the rwh system are the a,b & c units. | |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 351 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 355 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 353 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 361 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 357 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 359 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 363 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 347 Yale St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 349 Yale St | street spaceDetails
street space | ||
| Jan 17, 2020 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc | rev to approved pa# 201910184908; incorporate shoring into the approved retaining wall designDetails
rev to approved pa# 201910184908; incorporate shoring into the approved retaining wall design | |
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 451 Cambridge St | new building project on cambridge st, add address 451, 457, 463, 473 cambridge to block 5992a, lot 011.Details
new building project on cambridge st, add address 451, 457, 463, 473 cambridge to block 5992a, lot 011. | ||
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 483 Cambridge St | new building project on cambridge st, add address 483, 489, 493, 499 cambridge to block 5992a, lot 011.Details
new building project on cambridge st, add address 483, 489, 493, 499 cambridge to block 5992a, lot 011. | ||
| Nov 13, 2019 | Completed final sign-off Jul 2023 | 300 Yale St | Tri Pointe Homes Inc | in-tract fire water improvement plan & details to comply with nfpa-24 & sffd ab-2.09 to proceed with water service tie-in request with sfpucDetails
in-tract fire water improvement plan & details to comply with nfpa-24 & sffd ab-2.09 to proceed with water service tie-in request with sfpuc | |
| Oct 18, 2019 | Completed final sign-off Jul 2023 | 301 Yale St | Tri Pointe Homes Inc | installation of cmu block retaining walls for the 495 cambridge site pemmeter & in tract project.Details
installation of cmu block retaining walls for the 495 cambridge site pemmeter & in tract project. | |
| Sep 21, 2018 | Never finaled issued Apr 2019, no final | 495 Cambridge St | Tri Pointe Homes Inc | installation of temp soil nail & shotcrete retaining wall along cambridge st & temp soldier pile & lagging retaining wall along northern property line. please note beams 20-30 on the plans & associated lagging are permanent. temp shoring on southern property line submitted under pa# 2018/09/21/1052.Details
installation of temp soil nail & shotcrete retaining wall along cambridge st & temp soldier pile & lagging retaining wall along northern property line. please note beams 20-30 on the plans & associated lagging are permanent. temp shoring on southern property line submitted under pa# 2018/09/21/1052. | $356,176 |
| Aug 9, 2018 | Never finaled issued Apr 2019, no final | 495 Cambridge St | Tri Pointe Homes Inc | excavation. installation of all in-tract (private) improvements including: water, sewer/stormdrain, streets, sidewalks & curb/gutter, in-tract gas/electric (private), common area landscaping & irrigationDetails
excavation. installation of all in-tract (private) improvements including: water, sewer/stormdrain, streets, sidewalks & curb/gutter, in-tract gas/electric (private), common area landscaping & irrigation | $2,319,000 |
| Aug 1, 2018 | Never finaled issued Apr 2019, no final | 495 Cambridge St | Tri Pointe Homes Inc, Ryan Engineering Inc | grading. remove (e) paving, utilities & allother infrastructure in preparation for new construction. bldgs demolished under separate permit. site will be rough graded to 9" below the finished grades. plans for streets, sidewalks, utilites & retaining walls will be submitted under separate permits orDetails
grading. remove (e) paving, utilities & allother infrastructure in preparation for new construction. bldgs demolished under separate permit. site will be rough graded to 9" below the finished grades. plans for streets, sidewalks, utilites & retaining walls will be submitted under separate permits or | $170,390 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 331 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const single family dwelling.Details
to erect 3 stories, type v const single family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Feb 2023 | 363 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type 5 const two family dwelling.Details
to erect 3 stories, 1 basement, type 5 const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 319 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 340 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type 5 const two family dwelling.Details
to erect 3 stories, type 5 const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 341 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 307 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jul 2023 | 327 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off May 2023 | 353 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, two family dwelling.Details
to erect 3 stories, 1 basement, two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 330 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling. /;...................................................................' /]Details
to erect 3 stories, type v const two family dwelling. /;...................................................................' /] | $200,000 |
| Dec 22, 2010 | Completed final sign-off May 2024 | 351 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type v const two family dwelling.Details
to erect 3 stories, 1 basement, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Oct 2023 | 300 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, no basement, type v-b, two family dwelling units.Details
to erect 3 stories, no basement, type v-b, two family dwelling units. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 349 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type v const two family dwelling.Details
to erect 3 stories, 1 basement, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Sep 2023 | 345 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const single family dwelling.Details
to erect 3 stories, type v const single family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 301 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type 5 const single family dwelling.Details
to erect 3 stories, type 5 const single family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 359 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type v const two family dwelling.Details
to erect 3 stories, 1 basement, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 304 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 311 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 355 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type 5 const two family dwelling.Details
to erect 3 stories, 1 basement, type 5 const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 336 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 308 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type 5 const two family dwelling.Details
to erect 3 stories, type 5 const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 315 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 347 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type v const two family dwelling.Details
to erect 3 stories, 1 basement, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 334 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const single family dwelling. sprinklers and solar under sep permits.Details
to erect 3 stories, type v const single family dwelling. sprinklers and solar under sep permits. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jul 2023 | 337 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 303 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Mar 2023 | 357 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type 5 const two family dwelling.Details
to erect 3 stories, 1 basement, type 5 const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Apr 2023 | 361 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, 1 basement, type v const two family dwelling.Details
to erect 3 stories, 1 basement, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 333 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |
| Dec 22, 2010 | Completed final sign-off Jun 2023 | 323 Yale St | Tri Pointe Homes Inc, Mike Joyce Construction | to erect 3 stories, type v const two family dwelling.Details
to erect 3 stories, type v const two family dwelling. | $200,000 |