127 permits since 2000 (architect on 119 permits, engineer on 6 permits, authorized agent-others on 1 permit, designer on 1 permit): 87 completed, 4 in progress, 18 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 127.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 530 Castro St | Top To Bottom Renovation | new guardrail in existing retail for new animal care facility. no structural work/no work in residential units. minor cosmetic improvementsDetails
new guardrail in existing retail for new animal care facility. no structural work/no work in residential units. minor cosmetic improvements | $1,000 |
| Dec 9, 2025 | Completed final sign-off Apr 2026 | 655 11th Av | Bay Build Design Inc | replace e) rear deck w/ew to match existing. replace in-kindDetails
replace e) rear deck w/ew to match existing. replace in-kind | $7,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 345 Day St | Bay Build Design Inc | revision 202506037788- (n) pier footing at hold down location with insufficient (e) foundation for hold down installation as seen on sheet a1 dated 8/7/25. replace 5 double hung windows front facing alumnium clad replace 1 fixed window front /side facing in living roomDetails
revision 202506037788- (n) pier footing at hold down location with insufficient (e) foundation for hold down installation as seen on sheet a1 dated 8/7/25. replace 5 double hung windows front facing alumnium clad replace 1 fixed window front /side facing in living room | $10,000 |
| Jul 17, 2025 | In progress issued Sep 2025 | 3239 Webster St | Bay Build Design Inc | convert (e) garage into new media room energy recovery ventilator and mini split heat pumpfor music room climate control modify (e) laundry room to provide acess to new media room relocate washer and dryer to new location in (e) laundry roomDetails
convert (e) garage into new media room energy recovery ventilator and mini split heat pumpfor music room climate control modify (e) laundry room to provide acess to new media room relocate washer and dryer to new location in (e) laundry room | $60,000 |
| Jul 17, 2025 | Completed final sign-off Oct 2025 | 30 Park St | Bay Build Design Inc | replace existing rear yard deck/yard access stairs with new wooden deck and yard access stairs.Details
replace existing rear yard deck/yard access stairs with new wooden deck and yard access stairs. | $20,000 |
| Jun 3, 2025 | Completed final sign-off Apr 2026 | 345 Day St | Bay Build Design Inc | kitchen remodel, bath remodel, second floor additional bath, reconfigure bedrooms, remove & replace windows facing rear of house(not facing street). add slider door in back bedroomDetails
kitchen remodel, bath remodel, second floor additional bath, reconfigure bedrooms, remove & replace windows facing rear of house(not facing street). add slider door in back bedroom | $80,000 |
| Jun 3, 2025 | In progress filed Jun 2025, not yet issued | 1350 29th Av | new state adu program - to comply with nov 202307638. relocate access & entry door from garage to breezeway, replace (e) wall sheathing of separation wall between garage & proposed adu w/ 5/8" gypsum board type x, replace (e) ceiling sheathing @ proposed adu w/ 5/8" gypsum board type x, add new..Details
new state adu program - to comply with nov 202307638. relocate access & entry door from garage to breezeway, replace (e) wall sheathing of separation wall between garage & proposed adu w/ 5/8" gypsum board type x, replace (e) ceiling sheathing @ proposed adu w/ 5/8" gypsum board type x, add new.. | $15,000 | |
| May 9, 2025 | Completed final sign-off Nov 2025 | 1488 14th Av | Bkn Construction Inc. | unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnaceDetails
unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnace | $60,000 |
| Mar 28, 2024 | Completed final sign-off Nov 2025 | 28 Woodland Av | legalize(e)non-permitted lower level living area as addition to 2nd fl unit 28a woodland ave.verify/upgrade as needed(e)wall & ceiling fire rating,wall & floor insulation.replace(e)electric heating with(n)mini-split heat pump,replace(e)windows w/ larger windows for compliant lighting/ventilation & bDetails
legalize(e)non-permitted lower level living area as addition to 2nd fl unit 28a woodland ave.verify/upgrade as needed(e)wall & ceiling fire rating,wall & floor insulation.replace(e)electric heating with(n)mini-split heat pump,replace(e)windows w/ larger windows for compliant lighting/ventilation & b | $25,000 | |
| Jan 27, 2023 | Never finaled filed Jan 2023, never issued | 2227 27th Av | to address nov legalize back yard improvements per bid nov#202292745, replace (e) deck, hot tub, replace (e) fence partially exceeding 6' height <10', new garden shedDetails
to address nov legalize back yard improvements per bid nov#202292745, replace (e) deck, hot tub, replace (e) fence partially exceeding 6' height <10', new garden shed | $5,000 | |
| Dec 30, 2022 | Completed final sign-off Oct 2025 | 31 Coleridge St | Owens Design Build Inc | revision to 202109077839 to comply with planning case 2021-010118enf, legalize widening garage door to 7'6, new brick planter, widen driveway, paint gate,facade stucco, work at site wall. legalize widening of garage dr to 7'6, brick planter widen drive way paint gate.Details
revision to 202109077839 to comply with planning case 2021-010118enf, legalize widening garage door to 7'6, new brick planter, widen driveway, paint gate,facade stucco, work at site wall. legalize widening of garage dr to 7'6, brick planter widen drive way paint gate. | $1,500 |
| Sep 8, 2022 | Completed final sign-off Apr 2024 | 1657 15th Av | Bay Build Design Inc | replace (e) entry/walkway roof w/flat roof, add new exterior (cement) steps on-grade in front yard from sidewalk to basement door.Details
replace (e) entry/walkway roof w/flat roof, add new exterior (cement) steps on-grade in front yard from sidewalk to basement door. | $12,000 |
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 37 Clipper St | Bay Build Design Inc | 2/f: sunroom doow/window replacement not visible from street, remove (e) patio door/replace with wider door, remove (e) window/replace w/new patiodoor in same openiing.Details
2/f: sunroom doow/window replacement not visible from street, remove (e) patio door/replace with wider door, remove (e) window/replace w/new patiodoor in same openiing. | $25,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 37 Clipper St | Bay Build Design Inc | 3/f: master bath remodel, non structural. modify closets, remove partition wall, reconfigure rooms to create a home office in existing master bedroom space. replace existing bathroom window with new enlarged window (not street facing)Details
3/f: master bath remodel, non structural. modify closets, remove partition wall, reconfigure rooms to create a home office in existing master bedroom space. replace existing bathroom window with new enlarged window (not street facing) | $75,000 |
| Feb 15, 2022 | Completed final sign-off May 2022 | 1979 Funston Av | revision to pa# 201804176519. reduce scope of work. remove skylight & roof hatch.Details
revision to pa# 201804176519. reduce scope of work. remove skylight & roof hatch. | ||
| Oct 19, 2021 | Completed final sign-off Oct 2025 | 31 Coleridge St | Owens Design Build Inc | restoration of rear shed in response to nov 202182671/202182672: new front facade and sistering of existing framing. fnd workDetails
restoration of rear shed in response to nov 202182671/202182672: new front facade and sistering of existing framing. fnd work | $50,000 |
| Sep 30, 2021 | Never finaled issued Mar 2022, no final | 41 Telegraph Pl | Wilkinson Preservation Fine Home Mainten | replace e built up roof with modified between roof. replace e roof deck framing, decking, roof deck stair w new. replace e roof deck. guard rail new. fill in rear corners for rectangular roof deckDetails
replace e built up roof with modified between roof. replace e roof deck framing, decking, roof deck stair w new. replace e roof deck. guard rail new. fill in rear corners for rectangular roof deck | $25,000 |
| Sep 20, 2021 | In progress issued Dec 2025 | 2020 Jennings St | alterations for code compliance at existing, non-permitted 1st floor dwelling unit. legalize ground floor unit per ordinance 43-14. add spiral staicase to 2nd floor unit.Details
alterations for code compliance at existing, non-permitted 1st floor dwelling unit. legalize ground floor unit per ordinance 43-14. add spiral staicase to 2nd floor unit. | $60,000 | |
| Jul 20, 2021 | Completed final sign-off May 2022 | 1979 Funston Av | revision to pa@ 201804176519. east facade change from siding to stucco.Details
revision to pa@ 201804176519. east facade change from siding to stucco. | $5,000 | |
| Jan 28, 2021 | Completed final sign-off Dec 2023 | 43 Molimo Dr | Barahona Brothers Construction Inc. | phase ii 375 sq.ft. rear addition with two 1st floor bedrooms and 2nd floor roof deck (phase i improvements to the existing structure per approved application 2019-1218-9834 is about to be completed)Details
phase ii 375 sq.ft. rear addition with two 1st floor bedrooms and 2nd floor roof deck (phase i improvements to the existing structure per approved application 2019-1218-9834 is about to be completed) | $120,000 |
| Dec 7, 2020 | Completed final sign-off Nov 2022 | 766 Duncan St | legalize (e) deck & stairs as is. c.f.c grandfather in. comply w/ n.o.v 202051806Details
legalize (e) deck & stairs as is. c.f.c grandfather in. comply w/ n.o.v 202051806 | $2,500 | |
| Sep 17, 2020 | Completed final sign-off Jan 2022 | 73 05th Av | Bay Build Design Inc | 1st fl - new bedroom under (e) deck; (e) 2nd fl - wood deck to be replaced w/waterproof deck; (e) deck to yard staris to be replaced with newDetails
1st fl - new bedroom under (e) deck; (e) 2nd fl - wood deck to be replaced w/waterproof deck; (e) deck to yard staris to be replaced with new | $80,000 |
| Aug 5, 2020 | Completed final sign-off Apr 2021 | 343 Bennington St | revision to bpa#202002033416: add powder room 1/f, add washer dryer kookups 2/f athroom, add hand sink 2/f, add (2) skylights 3/fDetails
revision to bpa#202002033416: add powder room 1/f, add washer dryer kookups 2/f athroom, add hand sink 2/f, add (2) skylights 3/f | $5,000 | |
| Feb 3, 2020 | Completed final sign-off Apr 2021 | 345 Bennington St | rev to pa# 201906032325; replace south fnd and east fnd illustrated on revised (n) sheets s1.1 and s2.1.Details
rev to pa# 201906032325; replace south fnd and east fnd illustrated on revised (n) sheets s1.1 and s2.1. | $40,000 | |
| Dec 18, 2019 | Completed final sign-off Jun 2025 | 2951 San Bruno Av | Hbm Construction Inc | convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu.Details
convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu. | $225,000 |
| Dec 18, 2019 | Expired or cancelled expired Dec 2023 | 43 Molimo Dr | Barahona Brothers Construction Inc. | new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards.Details
new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards. | $120,000 |
| Dec 11, 2019 | Completed final sign-off Mar 2020 | 10 Judah St | demo existing wall, add beam and footingDetails
demo existing wall, add beam and footing | $5,000 | |
| Nov 22, 2019 | Never finaled filed Nov 2019, never issued | 235 Greenwich St | replace upper balcony. repair lower framing as neededDetails
replace upper balcony. repair lower framing as needed | $6,500 | |
| Nov 19, 2019 | Completed final sign-off Feb 2022 | 73 05th Av | Bay Build Design Inc | revision to pa 2019-0626-4498 replace (e) yard facing window witn (n) patio door; excavate for (n) patio door access. rotate (e) access stairs from 2nd floor to rear yard. foundation & framing upgradesDetails
revision to pa 2019-0626-4498 replace (e) yard facing window witn (n) patio door; excavate for (n) patio door access. rotate (e) access stairs from 2nd floor to rear yard. foundation & framing upgrades | $20,000 |
| Jun 26, 2019 | Completed final sign-off Feb 2022 | 73 05th Av | Bay Build Design Inc | 1st flr bath remodel. (n) window on 2nd flr at south side. replace (e) patio door. replace siding at west and south side w/ (n) fiber cementDetails
1st flr bath remodel. (n) window on 2nd flr at south side. replace (e) patio door. replace siding at west and south side w/ (n) fiber cement | $50,000 |
| Jun 19, 2019 | Completed final sign-off Apr 2021 | 41 Telegraph Pl | replacement & alterations of windows at 1st & 2nd floor. street facing windows to be wood, painted.Details
replacement & alterations of windows at 1st & 2nd floor. street facing windows to be wood, painted. | $20,000 | |
| Jun 3, 2019 | Completed final sign-off Apr 2021 | 343 Bennington St | 1/f: create 2nd bedrm living area, replace bathrm & kitchen w/new. 2/f: replace kitchen & bathrm w/new, convert family rm into bedrm. replace floor in sitting rm & deck w/n lowered floor to conform with 3/f level. convert sitting rm into n bedrm, add bath, replace bath w/new,Details
1/f: create 2nd bedrm living area, replace bathrm & kitchen w/new. 2/f: replace kitchen & bathrm w/new, convert family rm into bedrm. replace floor in sitting rm & deck w/n lowered floor to conform with 3/f level. convert sitting rm into n bedrm, add bath, replace bath w/new, | $150,000 | |
| Nov 9, 2018 | Completed final sign-off Oct 2019 | 801 Russia Av | to comply with the accessible business entrance ordinance no. 51-16. install new automatic door opener with interior and exterior activation push plates at laundromat entry door.Details
to comply with the accessible business entrance ordinance no. 51-16. install new automatic door opener with interior and exterior activation push plates at laundromat entry door. | $4,000 | |
| May 16, 2018 | Completed final sign-off Nov 2018 | 430 Beach St | Ultra Construction | new food commisary to support food truck vendors operating on premise. combine rear 10' portion of two b/m - retail spaces into single b/m - food commisary with new accessible entry from rear of the bldg. install new commisary plumbing fixtures & appliances. new floor, wall & ceiling finishes, newDetails
new food commisary to support food truck vendors operating on premise. combine rear 10' portion of two b/m - retail spaces into single b/m - food commisary with new accessible entry from rear of the bldg. install new commisary plumbing fixtures & appliances. new floor, wall & ceiling finishes, new | $50,000 |
| Apr 17, 2018 | Completed final sign-off May 2022 | 1979 Funston Av | Mosvaler Construction Inc | vertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit.Details
vertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit. | $250,000 |
| Apr 9, 2018 | Completed final sign-off Apr 2019 | 590 Valencia St | K & R Builders Inc | ground floor - replace (e) restroom. convert existing restroom into utility room. replace restaurant seating. add type 2 hood in kitchen, new lighting in restroom; n/a maherDetails
ground floor - replace (e) restroom. convert existing restroom into utility room. replace restaurant seating. add type 2 hood in kitchen, new lighting in restroom; n/a maher | $40,000 |
| Mar 2, 2018 | Completed final sign-off Oct 2021 | 1922 23rd St | A Plus Builders | rear horizontal addition and interior improvements. back of house to be replaced with new bdrm, kitchen,bath. reconfigure existing bldg to add 1 bath and linen closet, front deck replaced/changed and roof deckDetails
rear horizontal addition and interior improvements. back of house to be replaced with new bdrm, kitchen,bath. reconfigure existing bldg to add 1 bath and linen closet, front deck replaced/changed and roof deck | $250,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 430 Beach St | Ultra Construction | move (3) comp sink, handwash sink, bathroom fan & various equipment upgrades. addition of restroom, change of frontage. maher naDetails
move (3) comp sink, handwash sink, bathroom fan & various equipment upgrades. addition of restroom, change of frontage. maher na | $100,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2023 | 10 Judah St | remove (e) parking lot & replace with garage. rear yard & deck attached to main building.Details
remove (e) parking lot & replace with garage. rear yard & deck attached to main building. | $100,000 | |
| Dec 26, 2017 | Completed final sign-off Apr 2018 | 430 Beach St | Ultra Construction | replace (e) roll up door with new storefront for accessible entrance, new accessible single-user restroom, new sales/food prep counter & cabinets to fit (e) appliances, new plumbing, fixtures in food prep areas, replace (e) lighting with new. maher naDetails
replace (e) roll up door with new storefront for accessible entrance, new accessible single-user restroom, new sales/food prep counter & cabinets to fit (e) appliances, new plumbing, fixtures in food prep areas, replace (e) lighting with new. maher na | $25,000 |
| Dec 12, 2017 | Completed final sign-off Dec 2017 | 568 Brannan St | Moroso Construction Inc | minor accessibility upgrades - remove kitchenette; add reception, add sink, cabinetry & fixtures. new finishes & partitions. n/a for maher.Details
minor accessibility upgrades - remove kitchenette; add reception, add sink, cabinetry & fixtures. new finishes & partitions. n/a for maher. | $87,000 |
| Dec 5, 2017 | Completed final sign-off Mar 2019 | 331 Vicente St | Bay Build Design Inc | expand existing kitchen, install new bathroom. no final inspection until complaint 201602271 is closedDetails
expand existing kitchen, install new bathroom. no final inspection until complaint 201602271 is closed | $50,000 |
| Oct 12, 2017 | Expired or cancelled cancelled Aug 2023 | 1446 Market St | Wesco Construction | "hazel restaurant" assembly permit per fire inspector request, to document the occupancy load. ref pa #2017-0119-7473. maher naDetails
"hazel restaurant" assembly permit per fire inspector request, to document the occupancy load. ref pa #2017-0119-7473. maher na | |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 430 Beach St | J R M Construction | install new accessible bathroom in vacant retail at ground floor. n/a maher ordinanceDetails
install new accessible bathroom in vacant retail at ground floor. n/a maher ordinance | $5,000 |
| May 24, 2017 | Completed final sign-off Nov 2017 | 1728 Jones St | Wong Construction Inc | add two (2) rated fire doors at path of travel to the public way at stairs, add one (2) fire doors to trash room. n/a ordinance #155-13Details
add two (2) rated fire doors at path of travel to the public way at stairs, add one (2) fire doors to trash room. n/a ordinance #155-13 | $1,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1446 Market St | Essa's Remodeling | install metal letters welded into new metal screen at front entry. n/a maher ordinanceDetails
install metal letters welded into new metal screen at front entry. n/a maher ordinance | $1,100 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1446 Market St | Essa's Remodeling | replace existing metal railing at secondary gront entry at market st w/new metal screen enclosure. signage under pa #201703201855. n/a maher ordinanceDetails
replace existing metal railing at secondary gront entry at market st w/new metal screen enclosure. signage under pa #201703201855. n/a maher ordinance | $6,900 |
| Mar 14, 2017 | Completed final sign-off Jul 2017 | 157 Ocean Av | replace kitchen cabinets, appliances, finishes with new, replace kitchen window with new, add new window header and flush floor beam at kitchenDetails
replace kitchen cabinets, appliances, finishes with new, replace kitchen window with new, add new window header and flush floor beam at kitchen | $30,000 | |
| Jan 19, 2017 | Never finaled issued Jan 2017, no final | 1446 Market St | Wesco Construction | new primary entry with entry ramp, new coat closet at (e) secondary entry, new raised ceiling at bar, screening panels at dining room, relocate (e) receptacles as needed, new coppeer drain line from new bar tap to (e) floor sink. (e) hvac & lighting to remain.Details
new primary entry with entry ramp, new coat closet at (e) secondary entry, new raised ceiling at bar, screening panels at dining room, relocate (e) receptacles as needed, new coppeer drain line from new bar tap to (e) floor sink. (e) hvac & lighting to remain. | $25,000 |
| Jan 19, 2017 | Expired or cancelled expired Dec 2019 | 40 Sycamore St | Life Is Good General Contractors Inc | 40-42 sycamore st: in-kind replacment of (e) rear stairs / 2nd means of egress. more than 50%. to comply with nov#201563761 item #2. no additional fire wallsDetails
40-42 sycamore st: in-kind replacment of (e) rear stairs / 2nd means of egress. more than 50%. to comply with nov#201563761 item #2. no additional fire walls | $8,500 |
| Dec 6, 2016 | Completed final sign-off Jun 2018 | 1728 Jones St | correct the record to show 1730d as a legal dwelling. no new workDetails
correct the record to show 1730d as a legal dwelling. no new work | ||
| Nov 7, 2016 | Expired or cancelled withdrawn Jan 2018 | 4517 18th St | Melo Willard Tabudlo Dba Dreamt Design | per ordinance# 162-16. build an adu in the bottome level. 2 bedrooms & 1 bath.Details
per ordinance# 162-16. build an adu in the bottome level. 2 bedrooms & 1 bath. | $150,000 |
| Sep 23, 2016 | Expired or cancelled withdrawn Dec 2019 | 40 Sycamore St | revision to 201510089193: rebuild existing stairwell due to dryrot damageDetails
revision to 201510089193: rebuild existing stairwell due to dryrot damage | $5,000 | |
| Jul 25, 2016 | Completed final sign-off Aug 2016 | 150 Parker Av | Zion Engineering | widen doorway and install pocket door - interiorDetails
widen doorway and install pocket door - interior | $28,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 2728 21st St | Creative Roots Builder | revision to appl #201507141399 - relocate furnace package unit to roof top.Details
revision to appl #201507141399 - relocate furnace package unit to roof top. | |
| Mar 16, 2016 | Expired or cancelled cancelled Sep 2022 | 2068 Vallejo St | new deck off of 3rd flr in back yard.Details
new deck off of 3rd flr in back yard. | $25,000 | |
| Feb 12, 2016 | Completed final sign-off Nov 2016 | 3781 Cesar Chavez St | change of use from r-3 (residential to e (daycare). add (n) set of stairs & sprinkler system. (n) easment.Details
change of use from r-3 (residential to e (daycare). add (n) set of stairs & sprinkler system. (n) easment. | $20,000 | |
| Jan 5, 2016 | Completed final sign-off Aug 2016 | 839 Leavenworth St | Nomellini Construction * Ask For Id * | replace windows at basement. one new window to comply with cbc 1029 for emergency escape and rescue. n/a for maher. replacement to be wood casement w/center rail.Details
replace windows at basement. one new window to comply with cbc 1029 for emergency escape and rescue. n/a for maher. replacement to be wood casement w/center rail. | $750 |
| Dec 7, 2015 | Completed final sign-off Dec 2016 | 839 Leavenworth St | Nomellini Construction * Ask For Id * | correct record to legalize (e) superintendents unit on g/f, lower fl, to achieve 7'6" min cieling. window under separate permit. new fixtures in kitchen &bathroom. respond to his #201412101- per mayors directive 13-01. sep. permit sprinkler n sprinkler monitoring. compliance maher ord #155-13 n/aDetails
correct record to legalize (e) superintendents unit on g/f, lower fl, to achieve 7'6" min cieling. window under separate permit. new fixtures in kitchen &bathroom. respond to his #201412101- per mayors directive 13-01. sep. permit sprinkler n sprinkler monitoring. compliance maher ord #155-13 n/a | $33,000 |
| Aug 7, 2015 | Never finaled issued Sep 2015, no final | 201 Duncan St | Bay Build Design Inc | resize unit #8 from 451 sq.ft to 354 sq.ft., resize unit #9 from 776 sq.ft. to 873 sq.ft.; upgrade kitchen and bath in both units. new laundry in unit #9.Details
resize unit #8 from 451 sq.ft to 354 sq.ft., resize unit #9 from 776 sq.ft. to 873 sq.ft.; upgrade kitchen and bath in both units. new laundry in unit #9. | $78,000 |
| Jul 21, 2015 | Completed final sign-off Aug 2015 | 839 Leavenworth St | correct the record only - no new work. show legal use as 50 units on 5 floors of occupancy include penthouse in unit count. (basement not subject to this application). no construction work.Details
correct the record only - no new work. show legal use as 50 units on 5 floors of occupancy include penthouse in unit count. (basement not subject to this application). no construction work. | ||
| Jul 14, 2015 | Completed final sign-off Aug 2016 | 2728 21st St | Creative Roots Builder | modify layout of e dwelling unit, replace e kitchen cabinets, appliances with new, replace e windows at 2nd floor with new, add e porch to living area of dwelling unit, install personal elevator, add new roof deck, roof deck stairsDetails
modify layout of e dwelling unit, replace e kitchen cabinets, appliances with new, replace e windows at 2nd floor with new, add e porch to living area of dwelling unit, install personal elevator, add new roof deck, roof deck stairs | $200,000 |
| Apr 14, 2015 | Completed final sign-off May 2015 | 260 Laussat St | to comply with physical inspection report # cc 7357 condo conversion. correct stair riser at rear yard. document use of existing attic and basement as non-habbitable space.Details
to comply with physical inspection report # cc 7357 condo conversion. correct stair riser at rear yard. document use of existing attic and basement as non-habbitable space. | $500 | |
| Apr 7, 2015 | Completed final sign-off Sep 2015 | 30 Fair Av | convert (e) laundry room into conditioned bathroom. replace (e) water heater & furnace with new one. reloate washer and dryer.Details
convert (e) laundry room into conditioned bathroom. replace (e) water heater & furnace with new one. reloate washer and dryer. | $17,500 | |
| Mar 20, 2015 | Expired or cancelled expired Jan 2024 | 3525 Broderick St | Bay Build Design Inc | replace (e) exterior stairwell w/(n) infill, addition to kitchen & garage. replace (e) kitchen cabinets & appliances w/(n). open kitchen to dining room, replace 1st flr bedroom pation door w/window, verify 3rd flr windows, replace as needed. maher - not req'dDetails
replace (e) exterior stairwell w/(n) infill, addition to kitchen & garage. replace (e) kitchen cabinets & appliances w/(n). open kitchen to dining room, replace 1st flr bedroom pation door w/window, verify 3rd flr windows, replace as needed. maher - not req'd | $70,000 |
| Jan 30, 2015 | Completed final sign-off May 2016 | 2806 Union St | #1- relocate kitchen into dining area, enlarge living/dining area opening, convert (e) kitchen into bedroomDetails
#1- relocate kitchen into dining area, enlarge living/dining area opening, convert (e) kitchen into bedroom | $22,000 | |
| Jan 26, 2015 | Completed final sign-off Jun 2015 | 180 Lower Tr | Sivestrini Construction | convert exterior entry/stairs into interior entry/stairs,replace gate with new door. add shower to (e) 1st flr, bath, update wall finishes in bedrm 3; relocate (e) laundry to new laundry rm, refinish (e) utility rm for new family den, replace (e) furnace with newDetails
convert exterior entry/stairs into interior entry/stairs,replace gate with new door. add shower to (e) 1st flr, bath, update wall finishes in bedrm 3; relocate (e) laundry to new laundry rm, refinish (e) utility rm for new family den, replace (e) furnace with new | $28,000 |
| Oct 28, 2014 | Completed final sign-off Jul 2015 | 766 Duncan St | Irwin Fisher Inc | build media room and bathroom in garage space.Details
build media room and bathroom in garage space. | $80,000 |
| Jun 30, 2014 | Completed final sign-off Dec 2014 | 2200 Market St | Melo Willard Tabudlo Dba Dreamt Design | t.i. for new drinking establishment with bar, seating, cbc compliant restrooms, walk in cooler and storage at ground floor.Details
t.i. for new drinking establishment with bar, seating, cbc compliant restrooms, walk in cooler and storage at ground floor. | $88,500 |
| Jun 3, 2014 | Completed final sign-off Apr 2015 | 739 12th Av | 4 And 5 Construction, Inc | remove ground level garage bay, install new 9'x'7' garage door, remove garage post & beam, add floor joist @ living room, repair living room windows, replace bedroom window sashes.Details
remove ground level garage bay, install new 9'x'7' garage door, remove garage post & beam, add floor joist @ living room, repair living room windows, replace bedroom window sashes. | $15,000 |
| Mar 3, 2014 | Completed final sign-off Sep 2014 | 3781 Cesar Chavez St | convert r-3 day care to (e) daycare. install 2 hr occupancy separatiion. install accessible unisex restroom, 2nd restroom, exterior ramp at rear door, new sound absorbing fence at rear.Details
convert r-3 day care to (e) daycare. install 2 hr occupancy separatiion. install accessible unisex restroom, 2nd restroom, exterior ramp at rear door, new sound absorbing fence at rear. | $55,000 | |
| Mar 3, 2014 | Completed final sign-off Aug 2014 | 3771 Cesar Chavez St | convert r-3 daycare to e daycare. install 2 hr occupancy separationDetails
convert r-3 daycare to e daycare. install 2 hr occupancy separation | $6,200 | |
| Aug 1, 2013 | Completed final sign-off Mar 2015 | 150 Broadway | Kuality Constructions | divide extg office into office with to-go- coffee sale. install accessible uni-sex rest room. install split heating and cooling system.Details
divide extg office into office with to-go- coffee sale. install accessible uni-sex rest room. install split heating and cooling system. | $25,000 |
| May 6, 2013 | Completed final sign-off Apr 2015 | 739 12th Av | revision to pa# 2004-1216-1639 s/r6-add yard access stairs at south property line. replace french double doors with slidersDetails
revision to pa# 2004-1216-1639 s/r6-add yard access stairs at south property line. replace french double doors with sliders | $5,000 | |
| Mar 29, 2013 | Completed final sign-off Oct 2013 | 703 Florida St | upgrade to property line wall, fire rating to 1-hour with application of fire free 88 intumescent. paint interiorDetails
upgrade to property line wall, fire rating to 1-hour with application of fire free 88 intumescent. paint interior | $1,000 | |
| Mar 29, 2013 | Completed final sign-off Oct 2013 | 701 Florida St | upgrade to property line wall, fire rating to 1-hour with application of fire free 88 intumescent. paint interiorDetails
upgrade to property line wall, fire rating to 1-hour with application of fire free 88 intumescent. paint interior | $1,000 | |
| Mar 21, 2013 | Completed final sign-off Jan 2014 | 599 Athens St | S Azzolino Construction Company | replace (e) rear stair with new or safe dimension in kind. repair dryrot at (e) fence and water heater closet with pt framing. add hardi plank siding over (e) wood siding at north and exposed east elevation.Details
replace (e) rear stair with new or safe dimension in kind. repair dryrot at (e) fence and water heater closet with pt framing. add hardi plank siding over (e) wood siding at north and exposed east elevation. | $8,500 |
| Jan 18, 2013 | Completed final sign-off Jun 2013 | 19 Elsie St | Fireplace Safety Service | replace (e) wood burning fireplace w/ a direct vent, natural gas green smart fireplace from fireplace extra ordinary the unit will be placed in the same location of (e) & will be vented horizontally. a gas line & 120 v currently exist.Details
replace (e) wood burning fireplace w/ a direct vent, natural gas green smart fireplace from fireplace extra ordinary the unit will be placed in the same location of (e) & will be vented horizontally. a gas line & 120 v currently exist. | $2,000 |
| Oct 31, 2012 | Completed final sign-off May 2013 | 599 Athens St | S Azzolino Construction Company | revision to appl #2012.0829.8528 to comply w/complaint #201264921- replace (e) bedroom window w/new egress-compliant window,replace (e) kitchen cabinet & appliances w/new, (e) bath fixtures w/new, (e) elec & lighting w/new, replace wall, floor & ceiling w/new, replace furnace, remove non-struct wallDetails
revision to appl #2012.0829.8528 to comply w/complaint #201264921- replace (e) bedroom window w/new egress-compliant window,replace (e) kitchen cabinet & appliances w/new, (e) bath fixtures w/new, (e) elec & lighting w/new, replace wall, floor & ceiling w/new, replace furnace, remove non-struct wall | $10,000 |
| Oct 9, 2012 | Completed final sign-off May 2013 | 456 Castro St | abatement removal for qbar: shown unpermitted electrical conduit instllation & sump pump, show occupant limit = 72 per sffd. request final inspection for approved restroom per pa #200203201949 & 200111213678. shown new concrete pad at rear patio, installed w/sump pump.Details
abatement removal for qbar: shown unpermitted electrical conduit instllation & sump pump, show occupant limit = 72 per sffd. request final inspection for approved restroom per pa #200203201949 & 200111213678. shown new concrete pad at rear patio, installed w/sump pump. | $2,500 | |
| Oct 5, 2012 | Never finaled issued Jan 2014, no final | 205 Frederick St | Mcmahon Construction | new limited restaurant use accessory to market in (e) deli location. install new odor abatement system at (e) kitchen exhaust system. new counter.Details
new limited restaurant use accessory to market in (e) deli location. install new odor abatement system at (e) kitchen exhaust system. new counter. | $350 |
| Jun 25, 2012 | Never finaled issued Nov 2012, no final | 1167 Green St | Christopher's Construction Inc | extend (e) 1st floor dining room at rear with infill under (e) waterproof deck of 2nd floor above. new footing floor and walks.Details
extend (e) 1st floor dining room at rear with infill under (e) waterproof deck of 2nd floor above. new footing floor and walks. | $55,000 |
| Jun 19, 2012 | Completed final sign-off Mar 2013 | 150 Broadway | Melo Willard Tabudlo Dba Dreamt Design | 1st floor-fisrt time t.i-add gyp board to (e) insulated metal framing, add storage room, relocate electrical & plumbing panel. install fixtures & receptaclesDetails
1st floor-fisrt time t.i-add gyp board to (e) insulated metal framing, add storage room, relocate electrical & plumbing panel. install fixtures & receptacles | $9,600 |
| Apr 19, 2012 | Never finaled issued Dec 2012, no final | 4067 18th St | Melo Willard Tabudlo Dba Dreamt Design | modify non-accessible front entry to comply accessible entryway. remove non-accessible restrms @ front & replace w/ fully accessible restrms (n) 1st fl addition @ the rear. install additional soundproofing along eastern wall. modify front elevation by adding (n) windows & replacing metal siding @ stDetails
modify non-accessible front entry to comply accessible entryway. remove non-accessible restrms @ front & replace w/ fully accessible restrms (n) 1st fl addition @ the rear. install additional soundproofing along eastern wall. modify front elevation by adding (n) windows & replacing metal siding @ st | $141,000 |
| Feb 28, 2012 | Completed final sign-off Jul 2013 | 233 Prospect Av | to comply w/his nov #201164807 dated 12.8.2011 - remove kitchen from basement, convert to laundry/home office, legalize (e) bathroom.Details
to comply w/his nov #201164807 dated 12.8.2011 - remove kitchen from basement, convert to laundry/home office, legalize (e) bathroom. | $5,000 | |
| Sep 8, 2011 | Completed final sign-off Feb 2012 | 4149 18th St | Melo Willard Tabudlo Dba Dreamt Design | revision to appl #201107150301: per fire dept add 3 doors & a wall to provide 1-hr separation between bar & mezanine storage w/area >100 sq ft.Details
revision to appl #201107150301: per fire dept add 3 doors & a wall to provide 1-hr separation between bar & mezanine storage w/area >100 sq ft. | $1,000 |
| Mar 18, 2011 | Completed final sign-off Nov 2012 | 305 Bennington St | M D Construction | exterior work at front of home: remove exterior facade & replace with hardiplank siding. relocate (e) lower unit entrance & (n) lower unit patio. exterior work at back of home: repair stairs & siding, widen garage. seismic upgrade & foundation 1st floorDetails
exterior work at front of home: remove exterior facade & replace with hardiplank siding. relocate (e) lower unit entrance & (n) lower unit patio. exterior work at back of home: repair stairs & siding, widen garage. seismic upgrade & foundation 1st floor | $75,000 |
| Mar 11, 2011 | Completed final sign-off Oct 2015 | 1220 Sanchez St | M & L Construction | legalize existing 1 story deck at rear of building.Details
legalize existing 1 story deck at rear of building. | $10,000 |
| Feb 28, 2011 | Completed final sign-off Nov 2013 | 136 05th Av | Vonnegut Thoreau Construction | restore single family residence room addition on second floor. interior alteration and window alternations at rear.Details
restore single family residence room addition on second floor. interior alteration and window alternations at rear. | $137,000 |
| Dec 31, 2010 | Never finaled issued Aug 2011, no final | 331 Filbert St | Irwin Fisher Inc | enclose (e) entry porch (2 hr egressway in new const). new shingle siding at north and east elevation. replace 2/3 floor stairway door in kind.Details
enclose (e) entry porch (2 hr egressway in new const). new shingle siding at north and east elevation. replace 2/3 floor stairway door in kind. | $25,000 |
| Oct 21, 2010 | Completed final sign-off Oct 2010 | 3168 22nd St | Aire Mechanical | revision to pa# 2010-0128-5515-install exhaust hood with duct & blower for (e) over in kitchenDetails
revision to pa# 2010-0128-5515-install exhaust hood with duct & blower for (e) over in kitchen | $1,500 |
| Oct 21, 2010 | Completed final sign-off Jul 2022 | 3107 Fillmore St | to comply with approved conditional use #20100255c. no new work. show existing & historical uses on upper floors for record keeping. forward to sara vellve.Details
to comply with approved conditional use #20100255c. no new work. show existing & historical uses on upper floors for record keeping. forward to sara vellve. | ||
| Jun 22, 2010 | Never finaled issued Jul 2010, no final | 1650 Valencia St | Nordic Builders | modify front elevation, replace entry and install new windows. replace e entry with new entry to comply with accesibility requirements. replace e front stairs with new compliant stairs. install new lighting in lobby area.Details
modify front elevation, replace entry and install new windows. replace e entry with new entry to comply with accesibility requirements. replace e front stairs with new compliant stairs. install new lighting in lobby area. | $136,750 |
| Nov 17, 2009 | Never finaled issued Nov 2009, no final | 3168 22nd St | Ideal Tile | add new sinks to existing retail space at ground flr. & mezzanine; hand sink, utility sink & mop sink.Details
add new sinks to existing retail space at ground flr. & mezzanine; hand sink, utility sink & mop sink. | $2,500 |
| Nov 5, 2009 | Completed final sign-off Feb 2010 | 1195 Sanchez St | to correct the record as (2) units over commercial per board of appeals action 09-056. (no work).Details
to correct the record as (2) units over commercial per board of appeals action 09-056. (no work). | ||
| Aug 25, 2009 | Never finaled issued Aug 2009, no final | 862 28th Av | Bay Build Design Inc | remove (e) corridor wall. new wall & door to access class room. install tactile sign & stair stripping. add sprinkler head @ 2nd floor under separate permit.Details
remove (e) corridor wall. new wall & door to access class room. install tactile sign & stair stripping. add sprinkler head @ 2nd floor under separate permit. | $3,725 |
| Jun 15, 2009 | Expired or cancelled expired Sep 2010 | 2124 Market St | Creative Roots Builder | upgrade (e) restrooms to chapter 11b restrooms, upgrade (e) bar counter to chapter 11b bar counter, sound proof (e) ceiling, widen exit corridor at electrical panels for the 36" clearanceDetails
upgrade (e) restrooms to chapter 11b restrooms, upgrade (e) bar counter to chapter 11b bar counter, sound proof (e) ceiling, widen exit corridor at electrical panels for the 36" clearance | $24,000 |
| May 14, 2009 | Completed final sign-off Aug 2009 | 2417 Lake St | Bay Build Design Inc | replace (e) kitchen cab, appliances with new; replace (e) bath fixtures; relocate w/d nto new enclosure;relocate furnace into ceiling space, replace with new furnace at 3rd floor.Details
replace (e) kitchen cab, appliances with new; replace (e) bath fixtures; relocate w/d nto new enclosure;relocate furnace into ceiling space, replace with new furnace at 3rd floor. | $20,000 |
| May 13, 2009 | Completed final sign-off Jul 2009 | 1909 Vallejo St | remodel kitchen & 3 bathrooms, remove & replace cabinets, doors, fixtures, etc. in garage: remove inclinator, shelving & new paint.Details
remodel kitchen & 3 bathrooms, remove & replace cabinets, doors, fixtures, etc. in garage: remove inclinator, shelving & new paint. | $89,000 | |
| Mar 25, 2009 | Completed final sign-off Oct 2009 | 954 Carolina St | correct record for legal occupancy of a two family dwelling.Details
correct record for legal occupancy of a two family dwelling. |