J R M Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Dec 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 13 completed, 1 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2024 | In progress issued Sep 2025 | 120 Shakespeare St | to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground levelDetails
to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground level | $50,000 |
| Oct 18, 2021 | Completed final sign-off Feb 2023 | 474 05th Av | lower unit: remodel (e) flat. provode new closet in bedroom. remodel kitchen and bathroom. electrical and plumbing. repace (e) kitchen window w/ new smaller window @ rear. replace door to deck w/ french door @ rear.Details
lower unit: remodel (e) flat. provode new closet in bedroom. remodel kitchen and bathroom. electrical and plumbing. repace (e) kitchen window w/ new smaller window @ rear. replace door to deck w/ french door @ rear. | $50,000 |
| Oct 2, 2020 | Completed final sign-off Dec 2020 | 2722 15th Av | remodel master bathroom onlyDetails
remodel master bathroom only | $20,776 |
| Oct 28, 2019 | Completed final sign-off Jun 2020 | 143 Hamerton Av | kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house)Details
kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house) | $48,307 |
| Feb 14, 2018 | Never finaled issued Feb 2018, no final | 79 Bradford St | revision to pa #201704043181. title 24 sheets added for new electrical radiant heating throughout house, per inspector.Details
revision to pa #201704043181. title 24 sheets added for new electrical radiant heating throughout house, per inspector. | |
| Nov 17, 2017 | Completed final sign-off Feb 2018 | 430 Beach St | barrrier removal. replace existing roll up doos with new accessible store front, in existing opening. maher naDetails
barrrier removal. replace existing roll up doos with new accessible store front, in existing opening. maher na | $1,200 |
| Sep 18, 2017 | Completed final sign-off Sep 2017 | 632 London St | recommecement and completion of work approved under pa#2015/11/10/2308.Details
recommecement and completion of work approved under pa#2015/11/10/2308. | |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 632 London St | to obtain fnal inspection for work approved under pa#2015/07/07/0854. all work is complete.Details
to obtain fnal inspection for work approved under pa#2015/07/07/0854. all work is complete. | |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 430 Beach St | revision to app#201708013458 for moving sink and toilet. n/a for maherDetails
revision to app#201708013458 for moving sink and toilet. n/a for maher | |
| Aug 14, 2017 | Completed final sign-off Jan 2019 | 79 Bradford St | structural revisions to pa 2017-0404-3181Details
structural revisions to pa 2017-0404-3181 | $14,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 430 Beach St | install new accessible bathroom in vacant retail at ground floor. n/a maher ordinanceDetails
install new accessible bathroom in vacant retail at ground floor. n/a maher ordinance | $5,000 |
| Aug 1, 2017 | Never finaled issued Aug 2017, no final | 236 Ripley St | replacing 8 new windows. not visible from street on upper level. u<0.32Details
replacing 8 new windows. not visible from street on upper level. u<0.32 | $3,000 |
| Jul 17, 2017 | Never finaled issued Aug 2017, no final | 79 Bradford St | new fixed 3/4 hr fire-rated window on the 2nd floor along the southern property line. no work visible form st. previous work approved under permit applic. #2010704043181Details
new fixed 3/4 hr fire-rated window on the 2nd floor along the southern property line. no work visible form st. previous work approved under permit applic. #2010704043181 | $3,000 |
| May 1, 2017 | Expired or cancelled disapproved Jan 2019 | 2725 Clement St | legalize (e) dwelling unit. installed without permit on the ground floor. to build a new deck.Details
legalize (e) dwelling unit. installed without permit on the ground floor. to build a new deck. | $1,000 |
| Apr 4, 2017 | Completed final sign-off Jan 2019 | 79 Bradford St | remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%.Details
remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%. | $150,000 |
| Dec 9, 2016 | Expired or cancelled cancelled Apr 2021 | 2725 Clement St | deck addition on 2/f & 3/f, garage door added for building security.Details
deck addition on 2/f & 3/f, garage door added for building security. | $25,000 |
| Apr 26, 2016 | Completed final sign-off Jun 2016 | 998 Geneva Av | change of use from kickbox to barber school. tenant improvement of (e) space, new accessible toilet room.Details
change of use from kickbox to barber school. tenant improvement of (e) space, new accessible toilet room. | $10,700 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 632 London St | new deck per plan; concrete slab at backyard with proper drain; fence replacement max 6'4, repair or replace soil. retaining wall less than 3' on grade. catch basinDetails
new deck per plan; concrete slab at backyard with proper drain; fence replacement max 6'4, repair or replace soil. retaining wall less than 3' on grade. catch basin | $30,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 79 Cassandra Ct | home renovation on second floor with plans/replace exterior w/ hardy plank: remodel kitchen, bathroom, upgrade electrical wiring and lightings, replace all interior wall, front stucco work. replace all windows on first floor.Details
home renovation on second floor with plans/replace exterior w/ hardy plank: remodel kitchen, bathroom, upgrade electrical wiring and lightings, replace all interior wall, front stucco work. replace all windows on first floor. | $80,000 |
| Jul 7, 2015 | Never finaled issued Sep 2015, no final | 632 London St | comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft.Details
comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft. | $40,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 366 Granada Av | replace damage stairs with new stairs, same configuration per sfbc 1009.19 & construction.Details
replace damage stairs with new stairs, same configuration per sfbc 1009.19 & construction. | $18,000 |
| Aug 28, 2012 | Completed final sign-off Nov 2012 | 101 Bridgeview Dr | provide 5/8 thick type x gyp board on all garage walls & ceiling. provide r-19 insulation in garage ceiling, existing electrical service panel with meter combine, provide self closing 1 3/8 solid wood door 20mint. rating with smoke gasketDetails
provide 5/8 thick type x gyp board on all garage walls & ceiling. provide r-19 insulation in garage ceiling, existing electrical service panel with meter combine, provide self closing 1 3/8 solid wood door 20mint. rating with smoke gasket | $2,000 |
| Aug 24, 2012 | Completed final sign-off Dec 2012 | 625 Campbell Av | revision of pa# 201205180804- remove & replace (e) patio door with new glass window. voluntary strengthening rear exterior wall.Details
revision of pa# 201205180804- remove & replace (e) patio door with new glass window. voluntary strengthening rear exterior wall. |