Back to bathroom remodel contractors
J R M Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Sep 2026
- Last 24 months
- 2 permits filed
24 permits since 2000: 14 completed, 1 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled. Typically 7 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 431 Sawyer St | to comply w/nov 202659538 legalized unpermitted bedrm w/walk-in closet @ rear area of ground level; update electrical code; legalized unpermitted storage @ ground level, update electrical codes & legalized full bathroom @ garage level; demo unpermitted bedrm @ right middle of garageDetails
to comply w/nov 202659538 legalized unpermitted bedrm w/walk-in closet @ rear area of ground level; update electrical code; legalized unpermitted storage @ ground level, update electrical codes & legalized full bathroom @ garage level; demo unpermitted bedrm @ right middle of garage | $40,000 |
| Oct 18, 2021 | Completed final sign-off Feb 2023 | 474 05th Av | lower unit: remodel (e) flat. provode new closet in bedroom. remodel kitchen and bathroom. electrical and plumbing. repace (e) kitchen window w/ new smaller window @ rear. replace door to deck w/ french door @ rear.Details
lower unit: remodel (e) flat. provode new closet in bedroom. remodel kitchen and bathroom. electrical and plumbing. repace (e) kitchen window w/ new smaller window @ rear. replace door to deck w/ french door @ rear. | $50,000 |
| Oct 2, 2020 | Completed final sign-off Dec 2020 | 2722 15th Av | remodel master bathroom onlyDetails
remodel master bathroom only | $20,776 |
| Oct 28, 2019 | Completed final sign-off Jun 2020 | 143 Hamerton Av | kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house)Details
kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house) | $48,307 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 430 Beach St | install new accessible bathroom in vacant retail at ground floor. n/a maher ordinanceDetails
install new accessible bathroom in vacant retail at ground floor. n/a maher ordinance | $5,000 |
| Apr 4, 2017 | Completed final sign-off Jan 2019 | 79 Bradford St | remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%.Details
remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%. | $150,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 79 Cassandra Ct | home renovation on second floor with plans/replace exterior w/ hardy plank: remodel kitchen, bathroom, upgrade electrical wiring and lightings, replace all interior wall, front stucco work. replace all windows on first floor.Details
home renovation on second floor with plans/replace exterior w/ hardy plank: remodel kitchen, bathroom, upgrade electrical wiring and lightings, replace all interior wall, front stucco work. replace all windows on first floor. | $80,000 |
| Jul 7, 2015 | Never finaled issued Sep 2015, no final | 632 London St | comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft.Details
comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft. | $40,000 |