J R M Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Sep 2026
- Last 24 months
- 2 permits filed
24 permits since 2000: 14 completed, 1 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Stairs permits
3 stairs permits: 3 completed. Typically 104 days from filing to permit and 433 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2024 | Completed final sign-off Nov 2026 | 120 Shakespeare St | to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground levelDetails
to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground level | $50,000 |
| Apr 4, 2017 | Completed final sign-off Jan 2019 | 79 Bradford St | remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%.Details
remodel of kitchen & bathrooms. all new plumbing, electrical, cabinetry & all new finishes. new steel stairs & new windows (non street facing) & doors. new wood front screen. repair existing deck. replace decking and railing in kind less than 50%. | $150,000 |
| Nov 18, 2014 | Completed final sign-off Feb 2015 | 366 Granada Av | replace damage stairs with new stairs, same configuration per sfbc 1009.19 & construction.Details
replace damage stairs with new stairs, same configuration per sfbc 1009.19 & construction. | $18,000 |