Bkn Construction Inc.
- Based in
- Hayward
- On San Francisco permits
- Sep 2019 to May 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off Nov 2025 | 1488 14th Av | unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnaceDetails
unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnace | $60,000 |
| Sep 19, 2022 | Completed final sign-off Jun 2023 | 4 Foerster St | add new skylight, kitchen remodel. changes to entry (interior)Details
add new skylight, kitchen remodel. changes to entry (interior) | $55,000 |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 267 Naples St | street spaceDetails
street space | |
| Oct 29, 2019 | Completed final sign-off Aug 2020 | 425 Moscow St | remove e interior wall finish at north wall. install 2 new layers of type x gyp bd at north wall at both garage and living levels. upgrade or replace non code compliant electric and plumbing as discovered within area of workDetails
remove e interior wall finish at north wall. install 2 new layers of type x gyp bd at north wall at both garage and living levels. upgrade or replace non code compliant electric and plumbing as discovered within area of work | $9,500 |
| Oct 29, 2019 | Completed final sign-off Oct 2020 | 423 Moscow St | remove e interior wall finishes at south wall. install 2 new layers of type x gyp bd at south wall at both garage and living levels. upgrade or replace non code compliant elec and plumbing as discovered within area of workDetails
remove e interior wall finishes at south wall. install 2 new layers of type x gyp bd at south wall at both garage and living levels. upgrade or replace non code compliant elec and plumbing as discovered within area of work | $11,750 |
| Sep 17, 2019 | Completed final sign-off Nov 2019 | 2003 Oak St | apt #a: replace kitchen cabinets and countertopDetails
apt #a: replace kitchen cabinets and countertop | $14,900 |
| Sep 12, 2019 | Completed final sign-off Feb 2020 | 267 Naples St | bathroom remodel: remoe all lath & plaster (walls & ceilings), down to studs. install insualtion & water resistant sheetrock per cbc. mud (smooth finish) paint, installtile around (e0 tub/shower enclosure. replace shower faucet, toelt, 2 windows, vanity & fixtures. install handrails.medicine cabinetDetails
bathroom remodel: remoe all lath & plaster (walls & ceilings), down to studs. install insualtion & water resistant sheetrock per cbc. mud (smooth finish) paint, installtile around (e0 tub/shower enclosure. replace shower faucet, toelt, 2 windows, vanity & fixtures. install handrails.medicine cabinet | $9,200 |