Back to bathroom remodel contractors
Bkn Construction Inc.
- Based in
- Hayward
- On San Francisco permits
- Sep 2019 to May 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 7 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off Nov 2025 | 1488 14th Av | unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnaceDetails
unit 1488 (2/f) - replace (e) furnace with heat pump, (e) water heater with shared electric water heater. unit 1490 (1/f) - expand living area into rear garage for new bed/bath. convert (e) kitche/eating/bath into new bedroom with bath. relocate kitchen into (e) front living area. replace (e)furnace | $60,000 |
| Sep 12, 2019 | Completed final sign-off Feb 2020 | 267 Naples St | bathroom remodel: remoe all lath & plaster (walls & ceilings), down to studs. install insualtion & water resistant sheetrock per cbc. mud (smooth finish) paint, installtile around (e0 tub/shower enclosure. replace shower faucet, toelt, 2 windows, vanity & fixtures. install handrails.medicine cabinetDetails
bathroom remodel: remoe all lath & plaster (walls & ceilings), down to studs. install insualtion & water resistant sheetrock per cbc. mud (smooth finish) paint, installtile around (e0 tub/shower enclosure. replace shower faucet, toelt, 2 windows, vanity & fixtures. install handrails.medicine cabinet | $9,200 |