Block 2695, lot 041
4141 18th St
- City’s use
- Commercial Misc
- Built
- 1913
- Stories
- 3
- Units
- 15
- Rooms
- 16 bathrooms
- Building
- 9,750 sq ft
- Lot
- 3,750 sq ft
- Zoning
- CASTRO
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 4141 18th St | Shao Fat Construction Inc | tenant improvement. remodel (e) retail to massage office w/ (n) therapy rooms, reception, fixtures and finishes.Details
tenant improvement. remodel (e) retail to massage office w/ (n) therapy rooms, reception, fixtures and finishes. | $50,000 |
| Feb 24, 2020 | Never finaled issued Feb 2020, no final | 4141 18th St | Sft Construction Corp | street spaceDetails
street space | |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 4141 18th St | street spaceDetails
street space | ||
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 4141 18th St | street spaceDetails
street space | ||
| Dec 6, 2016 | Completed final sign-off Apr 2020 | 4141 18th St | Sft Construction Corp | soft story retrofit mandate - residential only commercial ref pa 201612064222Details
soft story retrofit mandate - residential only commercial ref pa 201612064222 | $50,000 |
| Dec 6, 2016 | Completed final sign-off Apr 2024 | 4141 18th St | Sft Construction Corp | soft story retrofit mandate 2016 cebc appendix a-4 - commercial only residential ref pa 201612064221Details
soft story retrofit mandate 2016 cebc appendix a-4 - commercial only residential ref pa 201612064221 | $32,000 |
| Sep 8, 2011 | Completed final sign-off Feb 2012 | 4149 18th St | Melo Willard Tabudlo Dba Dreamt Design | revision to appl #201107150301: per fire dept add 3 doors & a wall to provide 1-hr separation between bar & mezanine storage w/area >100 sq ft.Details
revision to appl #201107150301: per fire dept add 3 doors & a wall to provide 1-hr separation between bar & mezanine storage w/area >100 sq ft. | $1,000 |
| Jul 15, 2011 | Completed final sign-off Feb 2012 | 4149 18th St | Melo Willard Tabudlo Dba Dreamt Design | comply with nov# 201137361-drywall repair work & paint, replacement of (e) plumbing fixtures in bathrooms, soundproofing tectum applied to ceiling, replace (e) mezzanine vent fans, tile repair. install power operated entry door & accessibile signageDetails
comply with nov# 201137361-drywall repair work & paint, replacement of (e) plumbing fixtures in bathrooms, soundproofing tectum applied to ceiling, replace (e) mezzanine vent fans, tile repair. install power operated entry door & accessibile signage | $10,000 |
| May 24, 2004 | Never finaled issued May 2004, no final | 4141 18th St | sidewalk repairDetails
sidewalk repair | ||
| Mar 26, 2004 | Completed final sign-off Jun 2004 | 4141 18th St | Del Rey Construction Inc | 1/f- rev.appl#200402065813 substitute glu-lam beam with paralam beamDetails
1/f- rev.appl#200402065813 substitute glu-lam beam with paralam beam | |
| Feb 6, 2004 | Completed final sign-off Jun 2004 | 4141 18th St | Del Rey Construction Inc | (n)structural door,, sidelight & power open, ramp raised wood floor, structural beam , pos for new *Details
(n)structural door,, sidelight & power open, ramp raised wood floor, structural beam , pos for new * | $75,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sft Construction Corp (3), Del Rey Construction Inc (2), Melo Willard Tabudlo Dba Dreamt Design (2), Shao Fat Construction Inc
- Architects
- Bill Guan, Michael Froehlich
- Engineers
- Albert Urrutia (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.