Michael Robert Bradford John Woodworth Gerber
- Listed as
- authorized agent-others, contractor
- Firm
- Bradford Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Aug 2026
183 permits since 2000 (contractor on 183 permits, authorized agent-others on 2 permits): 114 completed, 7 in progress, 21 never finaled, 41 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 183.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 1971 14th Av | Bradford Construction | revision to 202109299481 additional soil retention per geotech at recommendation at rear of propery, less then 50 cu.yd soil removalDetails
revision to 202109299481 additional soil retention per geotech at recommendation at rear of propery, less then 50 cu.yd soil removal | $20,000 |
| Jul 13, 2026 | Completed final sign-off Jul 2026 | 599 Castro St | Bradford Construction | install a wall mounted electric heater, comply with nov #202653250. to replace the existing electric heater that was removed.Details
install a wall mounted electric heater, comply with nov #202653250. to replace the existing electric heater that was removed. | $500 |
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 22 Beaver St | Bradford Construction | rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house.Details
rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; replacement @ existing locations of appliances in kitchen. bathroom remodel. all work occurs @ the carriage house. | $25,000 |
| Jan 28, 2026 | Completed final sign-off Feb 2026 | 217 Holly Park Cr | Bradford Construction | renew permits 202312263119, 202401043448, & 202408017782.Details
renew permits 202312263119, 202401043448, & 202408017782. | |
| Jan 28, 2026 | In progress issued Jan 2026 | 1971 14th Av | Bradford Construction | recommencement and completion of work approved under pa# 202109299481Details
recommencement and completion of work approved under pa# 202109299481 | $6,000 |
| Jan 15, 2026 | In progress issued Mar 2026 | 1358 South Van Ness Av | Bradford Construction | bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all...Details
bldg 1: facade refresh, new bay windows, lightwell infull, & interior renovation of van ness facing structure (structure 1). includes structural upgrades,new adu @ ground flr, new slab on grade & upgrades to perimeter footings. new plumbing, electrical wiring, mechanical systems. replace all... | $772,404 |
| Jan 14, 2026 | In progress issued Mar 2026 | 61 Cypress St | Bradford Construction | bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage...Details
bldg 2: exterior materials repair & replacement, & interior renovation of cypress facing structure(structure 2).includes structural upgrades, framing repairs. new slab on grade & replacement of perimeter footings. move (e) floor framing down 24"± to accommodate for new adu at level above garage... | $171,136 |
| Sep 15, 2025 | Completed final sign-off Feb 2026 | 1908 Broadway | Bradford Construction | proposed 6'0" tall fence at front facade. fence to be vertical open metal railing.Details
proposed 6'0" tall fence at front facade. fence to be vertical open metal railing. | $2,500 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | revision to 202502281303: modify shear wall layout on lower level and main levelDetails
revision to 202502281303: modify shear wall layout on lower level and main level | |
| Mar 24, 2025 | Completed final sign-off Oct 2025 | 3749 17th St | Bradford Construction | creat 3 codo residential units. section 188 alteration of (e) non conforming 1 story garage / residential storage structure to come a 2 story residential unit# 1. renovation of (e) 2nd floor residential unit# 2. additional 3rd floor expansion to create a residential unit# 3.Details
creat 3 codo residential units. section 188 alteration of (e) non conforming 1 story garage / residential storage structure to come a 2 story residential unit# 1. renovation of (e) 2nd floor residential unit# 2. additional 3rd floor expansion to create a residential unit# 3. | $7,500 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft.Details
entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft. | $210,000 |
| Aug 16, 2024 | In progress issued Aug 2024 | 1971 14th Av | Bradford Construction | revision to 202109299481 comply with nov #202032487 add additional ten angled helicals and grade beams at stairs. increase size of footingsDetails
revision to 202109299481 comply with nov #202032487 add additional ten angled helicals and grade beams at stairs. increase size of footings | $30,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | Bradford Construction, Steele Properties | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Jan 4, 2024 | Expired or cancelled expired Feb 2026 | 217 Holly Park Cr | Underpinning Specialist Inc., Bradford Construction | provide shoring for excavtion of basement area for construction under 202307172328.Details
provide shoring for excavtion of basement area for construction under 202307172328. | $30,000 |
| Jul 17, 2023 | Completed final sign-off Feb 2026 | 217 Holly Park Cr | Bradford Construction | interior renovation of 2-unit bldg. excavation at basement level for structural enhancements for (e) support (n) fixtures, finishes & windows. in-kind window + door replacement. excavation >50 y, does not exceed 8 vertical ft soil disturbance. no work outside exterior envelope. no work outside prow.Details
interior renovation of 2-unit bldg. excavation at basement level for structural enhancements for (e) support (n) fixtures, finishes & windows. in-kind window + door replacement. excavation >50 y, does not exceed 8 vertical ft soil disturbance. no work outside exterior envelope. no work outside prow. | $842,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 259 Eureka St | Bradford Construction | revision to pa 2020-0824-2495 unit 259a build out 65 sf storage room under entry stairs; unit 259 move laundry from 4th fl to 3rd fl; change to attic access hatch configuration; change to landing layout; replace builtin planter box w/free standing plantersDetails
revision to pa 2020-0824-2495 unit 259a build out 65 sf storage room under entry stairs; unit 259 move laundry from 4th fl to 3rd fl; change to attic access hatch configuration; change to landing layout; replace builtin planter box w/free standing planters | $10,000 |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 72 Harper St | Bradford Construction | rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump.Details
rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump. | $200,000 |
| Jul 20, 2022 | Completed final sign-off Jan 2023 | 2548 Mission St | Bradford Construction | to obtain final inspection for work approved under pa# 201708154915, 201806010746, 201809059127, all work is completeDetails
to obtain final inspection for work approved under pa# 201708154915, 201806010746, 201809059127, all work is complete | |
| Jul 1, 2022 | Completed final sign-off Oct 2023 | 3235 Webster St | Bradford Construction | infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel.Details
infill at existing central court to enlarge kitchen. project includes kitchen, bath, powder room, and interior stair remodel. | $148,604 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 72 Harper St | Bradford Construction | 1st floor: convert unfinished basement to living space, bathrom, and storage, replace foundation, replace extg stair to second floor. 2nd floor: remove walls per plans, new closet at bedroom 1, new bifold doors.Details
1st floor: convert unfinished basement to living space, bathrom, and storage, replace foundation, replace extg stair to second floor. 2nd floor: remove walls per plans, new closet at bedroom 1, new bifold doors. | $250,000 |
| Sep 29, 2021 | In progress issued Feb 2024 | 1971 14th Av | Bradford Construction | this permit is to resolve a notice of violation by sfdbi -nov# 202032487- replacement of cracked beam and deck framing at first floor, deck, exterior guard rail, deteriorated stairs and fence.Details
this permit is to resolve a notice of violation by sfdbi -nov# 202032487- replacement of cracked beam and deck framing at first floor, deck, exterior guard rail, deteriorated stairs and fence. | $30,000 |
| Sep 14, 2020 | Completed final sign-off Oct 2025 | 3747 17th St | Bradford Construction | sec. 188 alteration of (e) non conforming 1 story garage / residential storage structure to become a 3 story residential unit. renovation of existing 2nd floor residential unit. additional third floor expansion to create a residential unit. in total the existing single family home becomes 3 units.Details
sec. 188 alteration of (e) non conforming 1 story garage / residential storage structure to become a 3 story residential unit. renovation of existing 2nd floor residential unit. additional third floor expansion to create a residential unit. in total the existing single family home becomes 3 units. | $675,000 |
| Aug 24, 2020 | Completed final sign-off Jul 2023 | 259 Eureka St | Bradford Construction | remodel of 1/f into new master suite with horizontal additon.remodel of (e) attic into (n) 4th story including (n) internal stair and roof deck. replace (e) windows and doors on front facade, in-kind. (n) egress windows, below sidewalk level. the (e) street front character will be preserved.Details
remodel of 1/f into new master suite with horizontal additon.remodel of (e) attic into (n) 4th story including (n) internal stair and roof deck. replace (e) windows and doors on front facade, in-kind. (n) egress windows, below sidewalk level. the (e) street front character will be preserved. | $500,000 |
| Mar 12, 2020 | Completed final sign-off Jul 2023 | 259 Eureka St | Bradford Construction | demolition of past rear addition, interior remodel of 2nd & 3rd floors with minor additon within building envelope, new windows and doors in rear no change to front facadeDetails
demolition of past rear addition, interior remodel of 2nd & 3rd floors with minor additon within building envelope, new windows and doors in rear no change to front facade | $350,000 |
| Feb 27, 2020 | Completed final sign-off Dec 2021 | 3141 17th St | Bradford Construction | new ada compliant restroom. new employee training area, new floor sinks. no structural work. various interior upgrades & alterations, existing hvac system remainDetails
new ada compliant restroom. new employee training area, new floor sinks. no structural work. various interior upgrades & alterations, existing hvac system remain | $31,750 |
| Dec 23, 2019 | Completed final sign-off Mar 2021 | 470 Beacon St | Bradford Construction | dry rot repairs & resurfacing at entry. voluntary bracing under north side of driveway/entryway.Details
dry rot repairs & resurfacing at entry. voluntary bracing under north side of driveway/entryway. | $20,000 |
| Dec 6, 2019 | Completed final sign-off Dec 2019 | 3619 Balboa St | Bradford Construction | to obtain final inspection for pa 2014 0711 1025, 2013 0830 5700, & 2013 0627 0648. all work is completeDetails
to obtain final inspection for pa 2014 0711 1025, 2013 0830 5700, & 2013 0627 0648. all work is complete | |
| Dec 5, 2019 | Expired or cancelled cancelled Jan 2020 | 1515 16th Av | Bradford Construction | remodel of 2 (e) bathroom. upstairs bathroom: remodel bathroom - new fixtures; convert (e) shower to tub in same location. remodel downstairs bathroom in-kind. no walls modified or altered. layout remains unchanged.Details
remodel of 2 (e) bathroom. upstairs bathroom: remodel bathroom - new fixtures; convert (e) shower to tub in same location. remodel downstairs bathroom in-kind. no walls modified or altered. layout remains unchanged. | $32,500 |
| Nov 6, 2019 | Completed final sign-off Oct 2020 | 661 Alvarado St | Bradford Construction | rev to 201907256905. reconfig interior layout to e basement lvl to include a powder rm, workshop, new rear deck at basement lvl w/stairs down to rear yard, replace e concrete slab on grade in bsmt in kind. revised scope includes removal of prev approved replacement windows at front & int lightwell.Details
rev to 201907256905. reconfig interior layout to e basement lvl to include a powder rm, workshop, new rear deck at basement lvl w/stairs down to rear yard, replace e concrete slab on grade in bsmt in kind. revised scope includes removal of prev approved replacement windows at front & int lightwell. | $25,000 |
| Nov 1, 2019 | Completed final sign-off Sep 2020 | 147 04th Av | Blair Burke General Contractors Inc, Bradford Construction | foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existingDetails
foyer, bedroom , and living area at 1st fl. add windows to 1st fl. add full bathroom to 1st fl. add 1 hr rating at garage, new deck to replace existing | $122,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 930 Ashbury St | Bradford Construction | voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl.Details
voluntary seismic improvement at basement. new bedroom and multipurpose space at basement, add/enlarge and replace windows, replace gargae doors, add full baths to basement and 2nd fl. update kitchen on 1st fl. | $150,000 |
| Oct 15, 2019 | Expired or cancelled cancelled Jun 2021 | 2766 39th Av | Bradford Construction | horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath.Details
horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath. | $500,000 |
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 1660 Shrader St | Bradford Construction | minor structural changes to 2nd & 3rd flr. added shearwall revision to 201701127012 at front walls.Details
minor structural changes to 2nd & 3rd flr. added shearwall revision to 201701127012 at front walls. | |
| Jul 25, 2019 | Completed final sign-off Oct 2020 | 661 Alvarado St | Bradford Construction | (e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear ofDetails
(e) cabinetry & fixtures in all kitchens & bathrooms to be replaced. interior wall removal & garage to be leveled. ext work replace (e) roof and int'l shearwall & add a (n) operable skylight. (e) garage door to be enlarged, install (n) sliding door @ 2nd fl bedrm, (n) door and wood deck @ rear of | $250,000 |
| May 20, 2019 | Completed final sign-off Aug 2020 | 225 Clement St | Bradford Construction | install non electric projecting double faced sign (shu lin) 3'-0" x 2'-6"x x 5 x 2'-6"Details
install non electric projecting double faced sign (shu lin) 3'-0" x 2'-6"x x 5 x 2'-6" | $2,000 |
| Oct 26, 2018 | Expired or cancelled cancelled Jan 2026 | 2548 Mission St | Bradford Construction | title 24 approval for permits 201803305080, 201806010745 and 201806252798Details
title 24 approval for permits 201803305080, 201806010745 and 201806252798 | $17,000 |
| Oct 4, 2018 | Completed final sign-off Oct 2019 | 1660 Shrader St | Bradford Construction | revision to 201703151488 change 4th flr, roof & deck framing to wood from steel.Details
revision to 201703151488 change 4th flr, roof & deck framing to wood from steel. | |
| Sep 5, 2018 | Expired or cancelled expired Jan 2023 | 2548 Mission St | Bradford Construction | revision to pa# 2017-1222-7264. relocation of atrium stair. clarification of the stairs construction. no other work.Details
revision to pa# 2017-1222-7264. relocation of atrium stair. clarification of the stairs construction. no other work. | |
| Aug 2, 2018 | Completed final sign-off Sep 2019 | 2548 Mission St | Bradford Construction | revision to 201806010746 new partition type in basement, clearance on 2nd fl egress door, equivalent facilitation request and revised material and door schedule. n/a for maher.Details
revision to 201806010746 new partition type in basement, clearance on 2nd fl egress door, equivalent facilitation request and revised material and door schedule. n/a for maher. | |
| Jul 3, 2018 | Completed final sign-off Oct 2019 | 1142 Alabama St | Bradford Construction | ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steelDetails
ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steel | $20,000 |
| Jul 3, 2018 | Expired or cancelled expired Dec 2019 | 3619 Balboa St | Bradford Construction | to obtain a final inspection for work approved under pa#201308305700, 201306270649 & 201407111025. all work is complete.Details
to obtain a final inspection for work approved under pa#201308305700, 201306270649 & 201407111025. all work is complete. | |
| Jun 28, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | Bradford Construction | revision rear exit door for permit #201710040347. maher naDetails
revision rear exit door for permit #201710040347. maher na | $400 |
| Jun 1, 2018 | Expired or cancelled expired Jan 2023 | 2548 Mission St | Bradford Construction | revision to 201712227264-redesign of the (e) ground level storefront. replacement of windows at 2nd flr.Details
revision to 201712227264-redesign of the (e) ground level storefront. replacement of windows at 2nd flr. | $45,000 |
| Jun 1, 2018 | Completed final sign-off Sep 2019 | 2548 Mission St | Bradford Construction | revision to 201712227264- new moment frame at front & rear elevation. new stair openings & floor openings, new wall at rear elevationDetails
revision to 201712227264- new moment frame at front & rear elevation. new stair openings & floor openings, new wall at rear elevation | $5,000 |
| May 24, 2018 | Completed final sign-off Nov 2019 | 225 Holly Park Cr | Bradford Construction | recommencement & completion of work approved under pa#2015 1124 3489Details
recommencement & completion of work approved under pa#2015 1124 3489 | $250,000 |
| Mar 30, 2018 | Completed final sign-off Sep 2019 | 2548 Mission St | Bradford Construction | revision to app#201712227264: selective demo and construction of non-load bearing partition extg tenant spaces. n/a for maherDetails
revision to app#201712227264: selective demo and construction of non-load bearing partition extg tenant spaces. n/a for maher | |
| Mar 5, 2018 | Completed final sign-off Sep 2019 | 1111 California St | Bradford Construction | interior remodel of ground floor open assembly space. new improvements to include: event, social & supporting spaces. updated hvac, lighting and framing as indicated. fire protection under sep permit. no change to bld footprint or structure. no exterior work.Details
interior remodel of ground floor open assembly space. new improvements to include: event, social & supporting spaces. updated hvac, lighting and framing as indicated. fire protection under sep permit. no change to bld footprint or structure. no exterior work. | $557,400 |
| Dec 22, 2017 | Completed final sign-off Jan 2023 | 2548 Mission St | Bradford Construction | modification of existing tenant spaces to include selective demolition and consturction non-load bearing partitions, new accessible restrooms; and new finishes; information technology room at the server room. mep is deferred. n/a maherDetails
modification of existing tenant spaces to include selective demolition and consturction non-load bearing partitions, new accessible restrooms; and new finishes; information technology room at the server room. mep is deferred. n/a maher | $250,000 |
| Nov 8, 2017 | Completed final sign-off May 2018 | 71 Gates St | Bradford Construction | revision to pa 2016-1202-4013 scope of work is limited to the interior stair width approval per field inspector request. no other work proposedDetails
revision to pa 2016-1202-4013 scope of work is limited to the interior stair width approval per field inspector request. no other work proposed | |
| Oct 31, 2017 | Never finaled issued Jun 2021, no final | 1915 Diamond St | Bradford Construction | renovate (e) 2 unit residential building including new rear deck & new 4th floor over 9e) 3 story building. 3 new bedrooms & 2 new bathrooms.Details
renovate (e) 2 unit residential building including new rear deck & new 4th floor over 9e) 3 story building. 3 new bedrooms & 2 new bathrooms. | $545,828 |
| Oct 4, 2017 | Never finaled issued Nov 2017, no final | 71 03rd St | Bradford Construction | g/f -ti of restaurant w/non-structural walls, equipment, finishes w/associated plumbing, electrical, & mechanical. maher na. new address assignment: 91 third street.Details
g/f -ti of restaurant w/non-structural walls, equipment, finishes w/associated plumbing, electrical, & mechanical. maher na. new address assignment: 91 third street. | $215,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 1339 Mission St | Bradford Construction | revision to pa 2017-0907-7169, change location of interior door. show new non-habitable roof in the 2nd floor plan per inspector's requestDetails
revision to pa 2017-0907-7169, change location of interior door. show new non-habitable roof in the 2nd floor plan per inspector's request | |
| Sep 7, 2017 | Completed final sign-off Feb 2019 | 1339 Mission St | Bradford Construction | to comply with nov #201703811. tenant improvement: demolish interior partitions and build new partitions to creat new rooms. shared space retail sales showroom and service design professional at rearDetails
to comply with nov #201703811. tenant improvement: demolish interior partitions and build new partitions to creat new rooms. shared space retail sales showroom and service design professional at rear | $5,780 |
| Aug 29, 2017 | Completed final sign-off Sep 2019 | 2548 Mission St | Bradford Construction | revision to 201708154919 and 201010082585 to document land use of design professional service in partial 1st and 2nd fl with partial gr level retail on 1st flr as principally permitted by pc sec 750. no constructionDetails
revision to 201708154919 and 201010082585 to document land use of design professional service in partial 1st and 2nd fl with partial gr level retail on 1st flr as principally permitted by pc sec 750. no construction | |
| Aug 15, 2017 | Expired or cancelled expired Jan 2023 | 2548 Mission St | Bradford Construction | to continue work already approved under pa# 201010082585Details
to continue work already approved under pa# 201010082585 | $173,000 |
| Aug 15, 2017 | Expired or cancelled expired Jan 2023 | 2548 Mission St | Bradford Construction | to obtain a final inspection for work already approved uner pa# 201005213017 & 201005041721, all work is completeDetails
to obtain a final inspection for work already approved uner pa# 201005213017 & 201005041721, all work is complete | |
| Aug 1, 2017 | Completed final sign-off Aug 2017 | 344 Linden St | Bradford Construction | adminstrative permit to do a current correct story count of the building at 344 linden st 0817/023. permit applications: 201301188353, 201706028259, 201704275062, 201610210954 & 201212246832. this refers to a single story building. for both existing and proposed. no work.Details
adminstrative permit to do a current correct story count of the building at 344 linden st 0817/023. permit applications: 201301188353, 201706028259, 201704275062, 201610210954 & 201212246832. this refers to a single story building. for both existing and proposed. no work. | |
| Jul 24, 2017 | Completed final sign-off Jul 2018 | 1083 Mission St | Bradford Construction | renovation of (e) restaurant, work includes (n) fixtures, (n) furniture, (n) mep. (n) walls, ada restroom upgrade, (n) entry vestibule @ interior, floor infill @ stairs. n/a ordinance #155-13Details
renovation of (e) restaurant, work includes (n) fixtures, (n) furniture, (n) mep. (n) walls, ada restroom upgrade, (n) entry vestibule @ interior, floor infill @ stairs. n/a ordinance #155-13 | $156,162 |
| Jun 2, 2017 | Completed final sign-off Aug 2017 | 344 Linden St | Bradford Construction | tenant improvement work (1 story @ linden st- 2 bldgs in lot) - millwork, countertops, electrical. change of use (not work to be performed under pa #201610210954.Details
tenant improvement work (1 story @ linden st- 2 bldgs in lot) - millwork, countertops, electrical. change of use (not work to be performed under pa #201610210954. | $23,500 |
| Mar 15, 2017 | Completed final sign-off Oct 2019 | 1660 Shrader St | Bradford Construction | remodel of a sfd which includes replace the (e) sloping roof above the living & dining rooms @ the 4th floor roof with a new flat roof with the ceiling aligned @ the original high point. a kitchen remodl. replace a fire place. addition of new deck in the 4th floor. new sliding doors& replace windowsDetails
remodel of a sfd which includes replace the (e) sloping roof above the living & dining rooms @ the 4th floor roof with a new flat roof with the ceiling aligned @ the original high point. a kitchen remodl. replace a fire place. addition of new deck in the 4th floor. new sliding doors& replace windows | $147,278 |
| Jan 12, 2017 | Completed final sign-off Oct 2019 | 1660 Shrader St | Bradford Construction | interior remodel of single family residence which includes 1/2 bath 1st fl, new master bdrm, closet, 2 new baths, guest bdrm, lunday 2nd fl,pwder rm, storage, wetbar 3rd fl,new interior stairs, new exterior stairs at rear. no work in frontDetails
interior remodel of single family residence which includes 1/2 bath 1st fl, new master bdrm, closet, 2 new baths, guest bdrm, lunday 2nd fl,pwder rm, storage, wetbar 3rd fl,new interior stairs, new exterior stairs at rear. no work in front | $521,983 |
| Jan 9, 2017 | Completed final sign-off Jan 2017 | 833 Cortland Av | Bradford Construction | to obtain final inspection for work approved under pa#2919 9118 4913. all work is complete.Details
to obtain final inspection for work approved under pa#2919 9118 4913. all work is complete. | |
| Jan 5, 2017 | Completed final sign-off Jan 2017 | 833 Cortland Av | Bradford Construction | to obtain final inspection for work approved under pa #200710246344, 200804290872, 200908265567. all work is completeDetails
to obtain final inspection for work approved under pa #200710246344, 200804290872, 200908265567. all work is complete | |
| Dec 2, 2016 | Completed final sign-off May 2018 | 71 Gates St | Bradford Construction | no increase in bldg conditioned area. scope of exterior work includes new windows and doors and exterior finishes. interior work includes modification & infill of extg walls, new interior stairs, new partitions, doors, ceilings, lights, cabinetry, nw plmg fixtures & finishesDetails
no increase in bldg conditioned area. scope of exterior work includes new windows and doors and exterior finishes. interior work includes modification & infill of extg walls, new interior stairs, new partitions, doors, ceilings, lights, cabinetry, nw plmg fixtures & finishes | $235,000 |
| Oct 27, 2016 | Completed final sign-off Jan 2017 | 2223 Market St | Bradford Construction | ground fl: modify (e) exit door to provide 12" push side clearance, modify door at (e) walk-in cooler (ref. to 2016-0321-2586)Details
ground fl: modify (e) exit door to provide 12" push side clearance, modify door at (e) walk-in cooler (ref. to 2016-0321-2586) | $400 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 2223 Market St | Bradford Construction | egress and occupancy permit. fire only. ref to app#201603212586. n/a for maherDetails
egress and occupancy permit. fire only. ref to app#201603212586. n/a for maher | |
| Jul 26, 2016 | Completed final sign-off Oct 2021 | 835 Cortland Av | Bradford Construction | to comply with nov #201080466 - minor interior renovation to second floor residence with legalization of previously constructed bedroom. planning approval 2015-009249varDetails
to comply with nov #201080466 - minor interior renovation to second floor residence with legalization of previously constructed bedroom. planning approval 2015-009249var | $15,000 |
| May 6, 2016 | Completed final sign-off Oct 2019 | 1142 Alabama St | Bradford Construction | horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo.Details
horizontal expansion & interior renovation @ all 3 floors w/ (n) plumbing, electrical & mechanical work. 4 total bedrooms, 4 total bathrooms, 2 each per condo. | $275,340 |
| Apr 5, 2016 | Completed final sign-off Oct 2024 | 534 04th Av | Bradford Construction | replace (e) deteriorated front stair w/new stair.Details
replace (e) deteriorated front stair w/new stair. | $6,000 |
| Mar 21, 2016 | Completed final sign-off Aug 2016 | 2223 Market St | Bradford Construction | interior ti, remodel of existing restaurant space. existing restroom and storefront to remain. no work in basement. no mechanical or plumbing.Details
interior ti, remodel of existing restaurant space. existing restroom and storefront to remain. no work in basement. no mechanical or plumbing. | $195,000 |
| Oct 13, 2015 | Completed final sign-off Jun 2016 | 432 Octavia St | Bradford Construction | (e) awning to be enclosed to provide a screened in condition.Details
(e) awning to be enclosed to provide a screened in condition. | $10,000 |
| Jul 6, 2015 | Never finaled issued Jul 2015, no final | 18 Whitney St | Bradford Construction | to obtain final inspection for work approved under pa 201311081564; all work is complete.Details
to obtain final inspection for work approved under pa 201311081564; all work is complete. | |
| Jun 22, 2015 | Completed final sign-off May 2016 | 1300 Haight St | Bradford Construction | interior remodel:new plumbing, new electrical, paint, window, and ada restroom. ref to pa# 201411040608.Details
interior remodel:new plumbing, new electrical, paint, window, and ada restroom. ref to pa# 201411040608. | $150,000 |
| Apr 15, 2015 | Completed final sign-off Jul 2020 | 225 Clement St | Bradford Construction | restaurant interior t.i. existing restrooms and storefront to remain. includes mep work & structural at rooftop equipment.Details
restaurant interior t.i. existing restrooms and storefront to remain. includes mep work & structural at rooftop equipment. | $195,000 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 413 10th St | Bradford Construction | repair due to upgrade on an extg commercial kitchen. sheetrock repairs due to plumbing and electrical. concrete patching due to new underground plumbing with one hour ceiling in kitchen.Details
repair due to upgrade on an extg commercial kitchen. sheetrock repairs due to plumbing and electrical. concrete patching due to new underground plumbing with one hour ceiling in kitchen. | $30,000 |
| Nov 21, 2014 | Completed final sign-off Mar 2015 | 145 02nd Av | Bradford Construction | mechanical, plumbing & electrical work only, including addition of new type i & type ii hoods, related to interior t.i. pa#201409257368. no exterior work, no change of use. n/a ordinance #155-13Details
mechanical, plumbing & electrical work only, including addition of new type i & type ii hoods, related to interior t.i. pa#201409257368. no exterior work, no change of use. n/a ordinance #155-13 | $55,000 |
| Nov 4, 2014 | Completed final sign-off May 2016 | 1300 Haight St | Bradford Construction | change of use from laundry to coffee shop/cafe-no cooking. (e) cabinets / counters to be demo, new flooring, fixtures, lighting, counters, seating,(2) ada restrooms, storage, plumbing. replace windows in (e) openings.Details
change of use from laundry to coffee shop/cafe-no cooking. (e) cabinets / counters to be demo, new flooring, fixtures, lighting, counters, seating,(2) ada restrooms, storage, plumbing. replace windows in (e) openings. | $150,000 |
| Nov 3, 2014 | Expired or cancelled withdrawn Aug 2017 | 344 Linden St | Bradford Construction | exploratory demolition of existing finishes & removal of non-structural interior partitions per ab-017. no structural work.Details
exploratory demolition of existing finishes & removal of non-structural interior partitions per ab-017. no structural work. | $500 |
| Sep 25, 2014 | Completed final sign-off Mar 2015 | 145 02nd St | Bradford Construction | interior t.i. no change of use. no exterior work, alterations to non-bearing interior walls, new dining counter, alterations to extg soffits, new finishes, mep under seperate permit, alterations to extg restroom for accessibility. n/a for the maher ordinance #155-13Details
interior t.i. no change of use. no exterior work, alterations to non-bearing interior walls, new dining counter, alterations to extg soffits, new finishes, mep under seperate permit, alterations to extg restroom for accessibility. n/a for the maher ordinance #155-13 | $150,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2024 | 534 04th Av | Bradford Construction | replace (e) deteriorated front stair w/new stair. replace roof @ rear portion of house - add 2 bedrooms & 1 bath in former attic area.Details
replace (e) deteriorated front stair w/new stair. replace roof @ rear portion of house - add 2 bedrooms & 1 bath in former attic area. | $75,000 |
| Aug 7, 2014 | Completed final sign-off May 2018 | 71 Gates St | Bradford Construction | modify rear roof of 2nd story to flat roof to integrate consistent interior head height. roof to be converted to useable flat roof. no new building area proposed.Details
modify rear roof of 2nd story to flat roof to integrate consistent interior head height. roof to be converted to useable flat roof. no new building area proposed. | $44,135 |
| Jul 11, 2014 | Expired or cancelled expired Jan 2020 | 3619 Balboa St | Bradford Construction | one type 2 hood, for completion of permit app#201306270649 s-1Details
one type 2 hood, for completion of permit app#201306270649 s-1 | $2,000 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 3141 16th St | Bradford Construction | mep only. reference pa 2014/0613/8381, minor lighting installation and vent in restroom.Details
mep only. reference pa 2014/0613/8381, minor lighting installation and vent in restroom. | $5,000 |
| Jun 13, 2014 | Never finaled issued Jul 2014, no final | 3141 16th St | Bradford Construction | t.i. of full service restaurant, work includes removal interior door & partitions, counter and food service equipment, install of door in opening, interior door, interior partitions, food service equipment, fixtures, furnishing, equipment. mep separate permit.Details
t.i. of full service restaurant, work includes removal interior door & partitions, counter and food service equipment, install of door in opening, interior door, interior partitions, food service equipment, fixtures, furnishing, equipment. mep separate permit. | $139,500 |
| Jun 10, 2014 | Completed final sign-off Aug 2014 | 903 Cortland Av | Bradford Construction | comply w/nov 201453101 - modification/legalize of sound barrier walls @ roof.legalizeDetails
comply w/nov 201453101 - modification/legalize of sound barrier walls @ roof.legalize | $750 |
| Apr 15, 2014 | Completed final sign-off Aug 2014 | 1026 Valencia St | Bradford Construction | replace (3) existing windows & (1) existing door w/new window & door system. no change to existing facade or existing entry, cannot be seen from street in storage area.Details
replace (3) existing windows & (1) existing door w/new window & door system. no change to existing facade or existing entry, cannot be seen from street in storage area. | $5,000 |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 1026 Valencia St | Bradford Construction | demolition of existing interior finishes and non-load bearing partition walls, no work on exterior. ab-017.Details
demolition of existing interior finishes and non-load bearing partition walls, no work on exterior. ab-017. | $2,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2014 | 1026 Valencia St | Bradford Construction | remodel of (e) cafe serving espress drinks & pastries prepared off-site. work includes:demolition of (e) finishes & coffee bar, construct non-load bearing interior partitions, new coffee bar & finishes, new access stair to basement, demolition of (e) windows, (1) new window, no work on facade.Details
remodel of (e) cafe serving espress drinks & pastries prepared off-site. work includes:demolition of (e) finishes & coffee bar, construct non-load bearing interior partitions, new coffee bar & finishes, new access stair to basement, demolition of (e) windows, (1) new window, no work on facade. | $75,000 |
| Feb 12, 2014 | Completed final sign-off Oct 2014 | 2606 16th Av | Bradford Construction | project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans.Details
project proposes a removal and infill of an extg courtyard and an interior remodel of a extg kitchen, extg dining, extg bathroom and new powder room. comply with sf green building code table 4. install kitchen hood & two (2) bathroom fans. | $90,576 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 311 Valley St | Bradford Construction | project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit.Details
project proposes interior remodel of extg kitchen and extg bathroom at 2nd floor. scope of work includes finishes, cabinetry, plmg, and lighting fixtures. new replacement windows at side. mech, electrical, plmg under seperate permit. | $18,277 |
| Nov 26, 2013 | Completed final sign-off Jul 2016 | 104 Retiro Wy | Bradford Construction | 4th fl vertical addition (master bdrm, master bath, closets); stair penthouse to (n) roof terrace; rear yard conversion of part of ground fl to habitable den, bath & laundry; remodel 3rd fl bath. ** maher: compliance with ordinance no# 155-13 not required **Details
4th fl vertical addition (master bdrm, master bath, closets); stair penthouse to (n) roof terrace; rear yard conversion of part of ground fl to habitable den, bath & laundry; remodel 3rd fl bath. ** maher: compliance with ordinance no# 155-13 not required ** | $346,000 |
| Nov 13, 2013 | Completed final sign-off Nov 2013 | 275 Shipley St | Bradford Construction | to obtain final inspection for work approved under pa# 200510246396. all work is completed. cfc reqdDetails
to obtain final inspection for work approved under pa# 200510246396. all work is completed. cfc reqd | |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 18 Whitney St | Bradford Construction | prtial foundation replacement & new centerline steel beam in garage.Details
prtial foundation replacement & new centerline steel beam in garage. | $12,000 |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 985 Clayton St | Bradford Construction | remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor.Details
remodel kitchen including widening of opening between kitchen & dining room on 2nd floor. add ~kf21&bath on 3rd floor. | $36,500 |
| Aug 30, 2013 | Expired or cancelled expired Jan 2020 | 3619 Balboa St | Bradford Construction | voluntary seismic upgrade & deck addition. interior t.i under seperate permitDetails
voluntary seismic upgrade & deck addition. interior t.i under seperate permit | $50,000 |
| Aug 9, 2013 | Completed final sign-off Jul 2015 | 18 Whitney St | Bradford Construction | horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchenDetails
horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchen | $370,000 |
| Jun 27, 2013 | Expired or cancelled expired Jan 2020 | 3619 Balboa St | Bradford Construction | change in use. full restaurant build-out. store front replacement.Details
change in use. full restaurant build-out. store front replacement. | $95,000 |
| Jan 18, 2013 | Completed final sign-off Aug 2017 | 344 Linden St | Bradford Construction | (n) facade on rear of property (at 344 linden st. future address). changes of use from laudry to restaurant sumitted under separate pa# 2012-12-24-6832.Details
(n) facade on rear of property (at 344 linden st. future address). changes of use from laudry to restaurant sumitted under separate pa# 2012-12-24-6832. | $50,000 |
| Dec 24, 2012 | Completed final sign-off Aug 2017 | 344 Linden St | Bradford Construction | change of use from b-laundry to b-occupancy restaurant & minor alterations including (n) flooring wall finishes & kitchen equip. no change to existing. no structural work, under this permit.Details
change of use from b-laundry to b-occupancy restaurant & minor alterations including (n) flooring wall finishes & kitchen equip. no change to existing. no structural work, under this permit. | $27,000 |
| Sep 27, 2012 | Completed final sign-off Jun 2013 | 2617 Sutter St | Bradford Construction | remove & replace (e) kitchen cabinets and countertops with new. add one dishwasher and microwave, sheetrock & paint.Details
remove & replace (e) kitchen cabinets and countertops with new. add one dishwasher and microwave, sheetrock & paint. | $12,500 |