Lsm
- Listed as
- architect, engineer
- Based in
- Washington
- On San Francisco permits
- May 2005 to Jan 2025
25 permits since 2000 (architect on 22 permits, engineer on 3 permits): 18 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2025 | Completed final sign-off Jan 2026 | 50 California St | Skyline Construction | 35th floor: arch revision to pa # 202406265293: change to door hardware at elevator lobby doors. adding mag locks.Details
35th floor: arch revision to pa # 202406265293: change to door hardware at elevator lobby doors. adding mag locks. | $4,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 50 California St | Skyline Construction | revision to previously approved architectural permit# 202406265293: (35th floor) clarification of partition detail d5 and e5 as non fire rated.Details
revision to previously approved architectural permit# 202406265293: (35th floor) clarification of partition detail d5 and e5 as non fire rated. | |
| Jun 26, 2024 | Completed final sign-off Jan 2026 | 50 California St | Skyline Construction | 35th fl. office t.i. includes installation of new finishes, floors, walls mep deffered on spearate applicationDetails
35th fl. office t.i. includes installation of new finishes, floors, walls mep deffered on spearate application | $5,000,000 |
| May 22, 2024 | Completed final sign-off Jan 2026 | 50 California St | Skyline Construction | 36th fl: office ti installation of new finishes, floors & walls. mep deffered on separate applicationDetails
36th fl: office ti installation of new finishes, floors & walls. mep deffered on separate application | $5,000,000 |
| Jan 12, 2022 | Completed final sign-off Aug 2022 | 4 Embarcadero Center | Gci, Inc | 12th fl: interior t.i. upgraded office area including restrooms & mep.Details
12th fl: interior t.i. upgraded office area including restrooms & mep. | $2,000,000 |
| Sep 5, 2020 | Never finaled filed Sep 2020, never issued | 415 Mission St | Gci, Inc | 51/f: t.i. new finishes, floors, walls & ceiling, mechanical & electricalDetails
51/f: t.i. new finishes, floors, walls & ceiling, mechanical & electrical | $150,000 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceilingDetails
51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceiling | $10,000 |
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | 53rd fl, rvision to pa 2018-0911-9774 for addition of 1 hr rated corridor and associated design changesDetails
53rd fl, rvision to pa 2018-0911-9774 for addition of 1 hr rated corridor and associated design changes | $10,000 |
| Jan 23, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | rev to pa# 201809119778; addition of elevation tags, revision of ceiling height & finish at core restrooms, clarification of card reader scopeDetails
rev to pa# 201809119778; addition of elevation tags, revision of ceiling height & finish at core restrooms, clarification of card reader scope | $1,000 |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | rev to pa# 201810112967; remove draft stops from scope-not required per cbc 7.12.1.9 - connects floors 53-54 only.Details
rev to pa# 201810112967; remove draft stops from scope-not required per cbc 7.12.1.9 - connects floors 53-54 only. | |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 415 Mission St | Gci, Inc | rev to pa# 201809119774 addition of elevations tags, sheet a2-30m revision of ceiling height & finish at rest room, clarification of card reader scopeDetails
rev to pa# 201809119774 addition of elevations tags, sheet a2-30m revision of ceiling height & finish at rest room, clarification of card reader scope | $1,000 |
| Oct 11, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | deferred conveince stairs to connect 53rd & 54th floors. ref 201809119774 (53rd) and 201809119778 (54th) and 201809140286/slab hole cutDetails
deferred conveince stairs to connect 53rd & 54th floors. ref 201809119774 (53rd) and 201809119778 (54th) and 201809140286/slab hole cut | $100,000 |
| Sep 11, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 53rd floor: t.i. for non-bearing partitions,new finishes, floors, walls, and ceiling. n/a for maherDetails
53rd floor: t.i. for non-bearing partitions,new finishes, floors, walls, and ceiling. n/a for maher | $2,586,000 |
| Sep 11, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 54th floor: t.i. includes new walls, floors, ceilings, and finishes. n/a for maherDetails
54th floor: t.i. includes new walls, floors, ceilings, and finishes. n/a for maher | $2,539,200 |
| Sep 11, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | Gci, Inc | 52nd floor. t.i office space, (n) walls, floors, ceilings and finishes. maher n/aDetails
52nd floor. t.i office space, (n) walls, floors, ceilings and finishes. maher n/a | $1,723,965 |
| Dec 20, 2016 | Never finaled issued Feb 2017, no final | 4 Embarcadero Center | Hathaway Dinwiddie Co. | construction of a common corridor between two tenant office spaces on a single floor with new light fixtures, fire sprinkler & hvac adjustmentsDetails
construction of a common corridor between two tenant office spaces on a single floor with new light fixtures, fire sprinkler & hvac adjustments | $199,000 |
| May 18, 2016 | Completed final sign-off Mar 2017 | 1 Maritime Pz | Hathaway Dinwiddie Co. | (n) non structural partitions, doors, glazing, lighting, millwork new bathroom and shower rooms. n/a ordinance #155-13Details
(n) non structural partitions, doors, glazing, lighting, millwork new bathroom and shower rooms. n/a ordinance #155-13 | $400,000 |
| Aug 15, 2008 | Completed final sign-off Sep 2008 | 525 Market St | Hathaway Dinwiddie Co. | 36th floor mechanical to support pa #200806124318. no new heating/cooling system added. existing system to be revised & rebalanced,Details
36th floor mechanical to support pa #200806124318. no new heating/cooling system added. existing system to be revised & rebalanced, | $8,000 |
| Jun 12, 2008 | Completed final sign-off Sep 2008 | 525 Market St | Hathaway Dinwiddie Co. | 36th floor-office tenant improvement-no change in occupancy or use. minor demo of (e) partitions, ceiling, lights, millwork and finishes. replace with new partitions & lighting. patch ceiling as required. mechanical & electrical under seperate permitDetails
36th floor-office tenant improvement-no change in occupancy or use. minor demo of (e) partitions, ceiling, lights, millwork and finishes. replace with new partitions & lighting. patch ceiling as required. mechanical & electrical under seperate permit | $250,000 |
| Aug 18, 2006 | Expired or cancelled withdrawn Jun 2007 | 4 Embarcadero Center | cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650.Details
cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650. | $524,641 | |
| Aug 16, 2006 | Expired or cancelled withdrawn Mar 2007 | 4 Embarcadero Center | oti-2 , 12th floor, el, me, ls, sp.Details
oti-2 , 12th floor, el, me, ls, sp. | $786,961 | |
| Aug 16, 2006 | Expired or cancelled withdrawn Mar 2007 | 4 Embarcadero Center | oti-2 13th floor el me ls spDetails
oti-2 13th floor el me ls sp | $521,371 | |
| Aug 16, 2006 | Expired or cancelled withdrawn Mar 2007 | 4 Embarcadero Center | oti-1, 13th floor, el, me, ls, sp.Details
oti-1, 13th floor, el, me, ls, sp. | $1,042,744 | |
| Sep 7, 2005 | Completed final sign-off Mar 2006 | 525 Market St | Hathaway Dinwiddie Co. | oti-1 el me ls sp 38th floorDetails
oti-1 el me ls sp 38th floor | $1,400,000 |
| May 19, 2005 | Completed final sign-off Aug 2005 | 525 Market St | Hathaway Dinwiddie Co. | demo to the 38th floor, all non-structuralDetails
demo to the 38th floor, all non-structural | $85,000 |