Adriano Silva
- Listed as
- authorized agent-others, contractor
- Firm
- Fog City Roofiing Llc
- Based in
- Alameda
- On San Francisco permits
- Jan 2022 to May 2026
115 permits since 2000 (contractor on 115 permits, authorized agent-others on 3 permits): 104 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2026 | In progress issued Jul 2026 | 7630 Geary Bl | Fog City Roofiing Llc | unit 201: interior renovation. convert (e) powder room to new full bathroom. install new washer/dryer. extend kitchen cabinets, new kitchen appliances. relocate electrical sub-panel.Details
unit 201: interior renovation. convert (e) powder room to new full bathroom. install new washer/dryer. extend kitchen cabinets, new kitchen appliances. relocate electrical sub-panel. | $9,000 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 210 Church St | Fog City Roofiing Llc | reroofing: hot worksDetails
reroofing: hot works | $35,900 |
| Apr 9, 2026 | Completed final sign-off Jun 2026 | 261 Dolores St | Fog City Roofiing Llc | tear off existing roofing. install layer of underlayment paper. install layer of shingles. no hot works.Details
tear off existing roofing. install layer of underlayment paper. install layer of shingles. no hot works. | $30,000 |
| Apr 9, 2026 | Completed final sign-off May 2026 | 1052 Filbert St | Fog City Roofiing Llc | as an additional to permit bldg-26-332 iuused for siding replacement in the lightwell. we will also reinforce and repair setions of the framing where rot wood is present, less than 50%, not visible sfrom street.Details
as an additional to permit bldg-26-332 iuused for siding replacement in the lightwell. we will also reinforce and repair setions of the framing where rot wood is present, less than 50%, not visible sfrom street. | $12,700 |
| Mar 17, 2026 | Completed final sign-off Apr 2026 | 280 Fair Oaks St | Fog City Roofiing Llc | reroofing no hot worksDetails
reroofing no hot works | $31,100 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 173 Gambier St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,900 |
| Feb 13, 2026 | Completed final sign-off Mar 2026 | 1160 Pine St | Fog City Roofiing Llc | remove and replace skylight in-kind.Details
remove and replace skylight in-kind. | $9,900 |
| Feb 13, 2026 | Completed final sign-off Jul 2026 | 1326 Larkin St | Fog City Roofiing Llc | reroofing hotworks: t/o (e) roof, install 1 layer of underlayment, install 1 layer modified bitumen. hot works.Details
reroofing hotworks: t/o (e) roof, install 1 layer of underlayment, install 1 layer modified bitumen. hot works. | $23,800 |
| Feb 4, 2026 | In progress issued Feb 2026 | 817 Clement St | Fog City Roofiing Llc | 4 vinyl windows, replacement rear side (south west side) window will be the same size as existing ones. repair rear stais rotten wood will be replaced. stair will be repair like for like (less then 50%) no alteration to its design. we are only replacing the rotten wood to make it safe.Details
4 vinyl windows, replacement rear side (south west side) window will be the same size as existing ones. repair rear stais rotten wood will be replaced. stair will be repair like for like (less then 50%) no alteration to its design. we are only replacing the rotten wood to make it safe. | $30,000 |
| Jan 20, 2026 | Completed final sign-off Feb 2026 | 2512 Sacramento St | Fog City Roofiing Llc | reroof, no hot work.Details
reroof, no hot work. | $35,900 |
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 631 Chenery St | Fog City Roofiing Llc | reroof, no hot work.Details
reroof, no hot work. | $25,000 |
| Jan 6, 2026 | Completed final sign-off Jun 2026 | 817 Clement St | Fog City Roofiing Llc | south west side. remove existing siding, isntall new siding in kind, not visible from streetDetails
south west side. remove existing siding, isntall new siding in kind, not visible from street | $69,900 |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 200 04th Av | Fog City Roofiing Llc | re-roofing ( overlaying composition chingles.) no hot works.Details
re-roofing ( overlaying composition chingles.) no hot works. | $73,900 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 706 Kearny St | Fog City Roofiing Llc | reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works.Details
reroofing: roof coating application over entire roof w/associated repairs to deteriorated wood and (e) polycarbonate panels. silicone primer will be applied to the entire roof surface, flashings will be extra sealed & the silicone coating will be applied at 3gal rate per square. no hot works. | $79,900 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 2635 Mcallister St | Fog City Roofiing Llc | to comply with nov 202544414 items 2 & 3: wood repair to staircase back of bldg. common stairs less than 50% repair.Details
to comply with nov 202544414 items 2 & 3: wood repair to staircase back of bldg. common stairs less than 50% repair. | $6,900 |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 420 Congo St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,500 |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 706 Kearny St | Fog City Roofiing Llc | re roofing in light well, no torch down.Details
re roofing in light well, no torch down. | $21,000 |
| Nov 21, 2025 | Completed final sign-off Dec 2025 | 86 Ellington Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,250 |
| Nov 6, 2025 | In progress issued Nov 2025 | 6705 California St | Fog City Roofiing Llc | partial siding replacement south west side. remove the existing siding. install a new one in kind. not visible from street.Details
partial siding replacement south west side. remove the existing siding. install a new one in kind. not visible from street. | $25,120 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 6705 California St | Fog City Roofiing Llc | reroof. hot works.Details
reroof. hot works. | $19,000 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 2640 Greenwich St | Fog City Roofiing Llc | clean the roof surface. apply primer & silicone coating. roof repair.Details
clean the roof surface. apply primer & silicone coating. roof repair. | $64,300 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 2 Seymour St | Fog City Roofiing Llc | reroofing: tear-off (e) roof. install (1) layer of underlayment papaer. install 1 layer of composition shingles. no hot works.Details
reroofing: tear-off (e) roof. install (1) layer of underlayment papaer. install 1 layer of composition shingles. no hot works. | $15,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 1813 Polk St | Fog City Roofiing Llc | re-roofing with hot worksDetails
re-roofing with hot works | $69,500 |
| Oct 22, 2025 | Completed final sign-off Jan 2026 | 2 Seymour St | Fog City Roofiing Llc | facade siding replacement: remove the (e) siding and replace for a new one in-kind. street facing.Details
facade siding replacement: remove the (e) siding and replace for a new one in-kind. street facing. | $35,000 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 1028 Sacramento St | Fog City Roofiing Llc | re-roofing with hot worksDetails
re-roofing with hot works | $29,800 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 2210 Jackson St | Fog City Roofiing Llc | facade repair: patch cracks on the stucco and around windows. street facing.Details
facade repair: patch cracks on the stucco and around windows. street facing. | $55,600 |
| Oct 21, 2025 | Completed final sign-off Nov 2025 | 1862 20th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,900 |
| Oct 9, 2025 | Completed final sign-off Nov 2025 | 2199 California St | Fog City Roofiing Llc | re roofing: tear off existing roof and haul away. instalo one layer of underlayment and paper, install 1 layer of modified bitumen (hot works).Details
re roofing: tear off existing roof and haul away. instalo one layer of underlayment and paper, install 1 layer of modified bitumen (hot works). | $56,000 |
| Oct 9, 2025 | In progress filed Oct 2025, not yet issued | 3571 16th St | Fog City Roofiing Llc | clean and repair sidewalk cracks. apply concrete crack fillerto all visible cracks. smooth the dummy dummyDetails
clean and repair sidewalk cracks. apply concrete crack fillerto all visible cracks. smooth the dummy dummy | |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 1821 Polk St | Fog City Roofiing Llc | unit 5: kitchen and bathroom renovation in kind. floor lvt installation. paint whole unit.Details
unit 5: kitchen and bathroom renovation in kind. floor lvt installation. paint whole unit. | $43,800 |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 668 Clay St | Fog City Roofiing Llc | clean the roof and drains, apply primer on the roofing surface, apply silicone coating, no hot worksDetails
clean the roof and drains, apply primer on the roofing surface, apply silicone coating, no hot works | $58,500 |
| Sep 23, 2025 | Completed final sign-off Oct 2025 | 3324 Broderick St | Fog City Roofiing Llc | re-roofing: tear off existing roofing, install 1 layer of underlayment paper, install 1 layer of modified bitumen, hot worksDetails
re-roofing: tear off existing roofing, install 1 layer of underlayment paper, install 1 layer of modified bitumen, hot works | $19,800 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 1700 Octavia St | Fog City Roofiing Llc | facade repair (only front part of the building) patch cracks around the windows and on the concrete to match existing. install sidewalk canopy.Details
facade repair (only front part of the building) patch cracks around the windows and on the concrete to match existing. install sidewalk canopy. | $28,100 |
| Sep 8, 2025 | Completed final sign-off Oct 2025 | 2129 Wawona St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,900 |
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 101 Steiner St | Fog City Roofiing Llc | reroofing: tear off the (e) roof and haul away. install 1 layer of underlayment paper. install 1 layer of modified bitumen (flat area). install 1 layer of shingles (steep roof). hot works.Details
reroofing: tear off the (e) roof and haul away. install 1 layer of underlayment paper. install 1 layer of modified bitumen (flat area). install 1 layer of shingles (steep roof). hot works. | $26,400 |
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 730 Montgomery St | Fog City Roofiing Llc | replace skylight in existing opening. u<=0.30Details
replace skylight in existing opening. u<=0.30 | $5,900 |
| Aug 26, 2025 | Completed final sign-off Sep 2025 | 1944 Anza St | Fog City Roofiing Llc | reroof. hot worksDetails
reroof. hot works | $23,700 |
| Aug 26, 2025 | Completed final sign-off Sep 2025 | 1130 Mason St | Fog City Roofiing Llc | reroof. hot worksDetails
reroof. hot works | $15,900 |
| Aug 20, 2025 | Completed final sign-off Nov 2025 | 2207 Fillmore St | Fog City Roofiing Llc | re-roofing (w/ hotworks). to comply to partially abate with nov 202535892 items 6 and 7. to comply to partially abate with nov 20254302 items 2 and 3.Details
re-roofing (w/ hotworks). to comply to partially abate with nov 202535892 items 6 and 7. to comply to partially abate with nov 20254302 items 2 and 3. | $23,900 |
| Aug 15, 2025 | Completed final sign-off Sep 2025 | 112 Columbus Av | Fog City Roofiing Llc | reroofing with hot work.Details
reroofing with hot work. | $175,000 |
| Aug 11, 2025 | Completed final sign-off Aug 2025 | 749 Jackson St | Fog City Roofiing Llc | re-roof. hot work. tear off existing roofing and haul away. install (1) layer of underlayment paper. install (1) layer of modified bitumen.Details
re-roof. hot work. tear off existing roofing and haul away. install (1) layer of underlayment paper. install (1) layer of modified bitumen. | $42,000 |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 1522 Waller St | Fog City Roofiing Llc | re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen.Details
re-roof. hot work. overlay. install (1) layer of underlayment paper. install (1) layer of modified bitumen. | $19,800 |
| Jul 31, 2025 | Completed final sign-off Oct 2025 | 844 Folsom St | Fog City Roofiing Llc | re-roof. hot work. tear off (e) roofinf and haul away. install 1 layere of underlayment paper. install tpo membane.Details
re-roof. hot work. tear off (e) roofinf and haul away. install 1 layere of underlayment paper. install tpo membane. | $33,600 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 3735 Anza St | Fog City Roofiing Llc | re-roof. hot work. remove existing roof. install (1) layer of underlayment paper. install (1) layer of modified butimen.Details
re-roof. hot work. remove existing roof. install (1) layer of underlayment paper. install (1) layer of modified butimen. | $27,500 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 2258 Market St | Fog City Roofiing Llc | remove existing skylight on flat roof and haul away. install new skylight in kind.Details
remove existing skylight on flat roof and haul away. install new skylight in kind. | $1,790 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 477 14th St | Fog City Roofiing Llc | reroofing with hot works.Details
reroofing with hot works. | $24,900 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 19 Rausch St | Fog City Roofiing Llc | reroofing with hot worksDetails
reroofing with hot works | $64,300 |
| Jul 15, 2025 | Completed final sign-off Aug 2025 | 1938 Jefferson St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,800 |
| Jul 1, 2025 | Completed final sign-off Jul 2025 | 3140 Octavia St | Fog City Roofiing Llc | re roofing: tear off existing roofing. install 1 layer of underlayment paper, install 1 layer of modified bitumen. (hot work).Details
re roofing: tear off existing roofing. install 1 layer of underlayment paper, install 1 layer of modified bitumen. (hot work). | $31,000 |
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 625 Guerrero St | Fog City Roofiing Llc | reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works"Details
reroofing: apply primer on top of the existing roofing.install new modified bitumen membrane on top of the existing one. "hot works" | $18,700 |
| Jun 3, 2025 | Completed final sign-off Jun 2025 | 477 Oak St | Fog City Roofiing Llc | re-roofing. no hot works.Details
re-roofing. no hot works. | $12,000 |
| Jun 3, 2025 | Completed final sign-off Jul 2025 | 367 Ivy St | Fog City Roofiing Llc | re-roofing. hot works.Details
re-roofing. hot works. | $49,500 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 534 Pacific Av | Fog City Roofiing Llc | re-roofing w/ hot works.Details
re-roofing w/ hot works. | $27,600 |
| Apr 25, 2025 | Completed final sign-off May 2025 | 1821 Polk St | Fog City Roofiing Llc | repair existing guardrail in kind, less than 50%. not street visible.Details
repair existing guardrail in kind, less than 50%. not street visible. | $2,450 |
| Apr 14, 2025 | Completed final sign-off May 2025 | 1651 Oak St | Fog City Roofiing Llc | re-roofing with hot works. comply w/ item , nov #202313905.Details
re-roofing with hot works. comply w/ item , nov #202313905. | $24,200 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 2015 Sacramento St | Fog City Roofiing Llc | reroofing with hot works.Details
reroofing with hot works. | $28,500 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 1140 Hyde St | Fog City Roofiing Llc | reroofing with hot works.Details
reroofing with hot works. | $24,200 |
| Mar 31, 2025 | Completed final sign-off Apr 2025 | 860 Geary St | Fog City Roofiing Llc | re-roofing with hot worksDetails
re-roofing with hot works | $51,000 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 5540 California St | Fog City Roofiing Llc | re-roofing witth hot worksDetails
re-roofing witth hot works | $18,900 |
| Mar 10, 2025 | Completed final sign-off Mar 2025 | 775 27th St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,500 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 200 Green St | Fog City Roofiing Llc | reroof flat roof, modified bitumen, hot works.Details
reroof flat roof, modified bitumen, hot works. | $119,600 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 30 Glover St | Fog City Roofiing Llc | reroof with hot works.Details
reroof with hot works. | $12,100 |
| Feb 26, 2025 | Completed final sign-off May 2025 | 716 28th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,900 |
| Feb 20, 2025 | In progress issued Feb 2025 | 486 Grove St | Fog City Roofiing Llc | partial siding replacement at front. remove existing siding ad haul away, install 1 layer of underlayment, new siding in kind.Details
partial siding replacement at front. remove existing siding ad haul away, install 1 layer of underlayment, new siding in kind. | $26,400 |
| Feb 20, 2025 | Completed final sign-off Apr 2025 | 486 Grove St | Fog City Roofiing Llc | reroofing. hot worksDetails
reroofing. hot works | $19,800 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 1054 Filbert St | Fog City Roofiing Llc | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $18,500 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1052 Filbert St | Fog City Roofiing Llc | reroofing (w/ hotworks)Details
reroofing (w/ hotworks) | $16,500 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1321 Columbus Av | Fog City Roofiing Llc | reroofing (w/ hotworks)Details
reroofing (w/ hotworks) | $25,000 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 640 Douglass St | Fog City Roofiing Llc | reroofing - remove (e) roof instll underlayment install shinglesDetails
reroofing - remove (e) roof instll underlayment install shingles | $16,500 |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 448 Grove St | Fog City Roofiing Llc | reroofing torch downDetails
reroofing torch down | $57,600 |
| Dec 6, 2024 | Completed final sign-off Mar 2025 | 817 Clement St | Fog City Roofiing Llc | re-roof: no torch down or hot worksDetails
re-roof: no torch down or hot works | $42,000 |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 33 Hemway Tr | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| Nov 4, 2024 | Expired or cancelled cancelled Mar 2025 | 775 27th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,500 |
| Oct 11, 2024 | Completed final sign-off Oct 2024 | 1550 33rd Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Sep 30, 2024 | In progress filed Sep 2024, not yet issued | 693 Sutter St | Fog City Roofiing Llc | reroofing. torch downDetails
reroofing. torch down | $124,000 |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 4201 Geary Bl | Fog City Roofiing Llc | reroofing.Details
reroofing. | $59,500 |
| Sep 5, 2024 | Completed final sign-off Nov 2024 | 102 Baker St | Fog City Roofiing Llc | reroofing. to comply with items 2 & 3 for complaint 202290668.Details
reroofing. to comply with items 2 & 3 for complaint 202290668. | $63,600 |
| Aug 6, 2024 | Completed final sign-off Sep 2024 | 2 Foerster St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,350 |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 2190 42nd Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,900 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 174 Schwerin St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| Jun 3, 2024 | Completed final sign-off Jun 2024 | 510 Parker Av | Fog City Roofiing Llc | reroofingDetails
reroofing | $29,900 |
| May 20, 2024 | Completed final sign-off Jul 2025 | 205 Collins St | Fog City Roofiing Llc | reroofingDetails
reroofing | $89,500 |
| Apr 8, 2024 | Completed final sign-off Dec 2024 | 521 Waller St | Fog City Roofiing Llc | reroofingDetails
reroofing | $39,900 |
| Apr 3, 2024 | Completed final sign-off Apr 2024 | 1930 Powell St | Fog City Roofiing Llc | silicon coating application on the roofDetails
silicon coating application on the roof | $15,300 |
| Mar 15, 2024 | Completed final sign-off Apr 2024 | 147 Varennes St | Fog City Roofiing Llc | reroofingDetails
reroofing | $7,900 |
| Mar 15, 2024 | Completed final sign-off Mar 2024 | 79 Madrone Av | Fog City Roofiing Llc | reroofingDetails
reroofing | $11,900 |
| Feb 13, 2024 | Completed final sign-off Apr 2024 | 3927 Clay St | Fog City Roofiing Llc | re-roofing.Details
re-roofing. | $34,050 |
| Feb 13, 2024 | Completed final sign-off Mar 2024 | 1665 Chestnut St | Fog City Roofiing Llc | reroofingDetails
reroofing | $32,500 |
| Feb 8, 2024 | Completed final sign-off May 2025 | 1023 Kansas St | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $32,500 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 2187 39th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,000 |
| Jan 18, 2024 | Completed final sign-off May 2025 | 2126 20th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,200 |
| Dec 12, 2023 | Completed final sign-off Jan 2024 | 830 Lake St | Fog City Roofiing Llc | re-roofingDetails
re-roofing | $13,400 |
| Dec 12, 2023 | Completed final sign-off Jan 2024 | 160 Madrone Av | Fog City Roofiing Llc | re-roofingDetails
re-roofing | $18,200 |
| Nov 16, 2023 | Completed final sign-off Jan 2024 | 42 Castro St | Fog City Roofiing Llc | reroofingDetails
reroofing | $22,650 |
| Nov 8, 2023 | Completed final sign-off Jan 2024 | 2519 38th Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,000 |
| Nov 2, 2023 | Completed final sign-off Dec 2023 | 1299 Fitzgerald Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,800 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 1941 Cabrillo St | Fog City Roofiing Llc | reroofingDetails
reroofing | $17,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2023 | 2814 Polk St | Fog City Roofiing Llc | reroofing. certainteed flintastic integrity system, tear off (e)roof, install 1-layer bse sheet, 1-layer ultra sa, 1-layer flintastic gtaDetails
reroofing. certainteed flintastic integrity system, tear off (e)roof, install 1-layer bse sheet, 1-layer ultra sa, 1-layer flintastic gta | $10,500 |
| Jul 10, 2023 | Completed final sign-off Aug 2023 | 1570 21st Av | Fog City Roofiing Llc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,900 |
| Jun 22, 2023 | Completed final sign-off Oct 2023 | 43 Jordan Av | Fog City Roofiing Llc | reroofingDetails
reroofing | $18,000 |