Joe Igber
- Listed as
- architect, engineer
- Firm
- Sedr Consulting
- Based in
- Oakland
- On San Francisco permits
- Aug 2008 to Oct 2026
57 permits since 2000 (engineer on 53 permits, architect on 4 permits): 27 completed, 14 in progress, 10 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 46 Wilmot St | Del Plata Builders Inc | relocate powder room. 3rd flr electrical. stair railing, new dining room.Details
relocate powder room. 3rd flr electrical. stair railing, new dining room. | $150,000 |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 1150 Pierce St | replace perimeter fence on pierce and turk street s with a like to like fenceDetails
replace perimeter fence on pierce and turk street s with a like to like fence | $100,000 | |
| Jun 2, 2026 | In progress issued Jun 2026 | 1735 28th Av | Together Home Remodeling | exterior changes: remove and replace e front window/same opening. remove and replace e front window. same header, new height.Details
exterior changes: remove and replace e front window/same opening. remove and replace e front window. same header, new height. | $10,000 |
| May 20, 2026 | In progress filed May 2026, not yet issued | 3829 25th St | revision to permit 202506077833: add covered entry over front door, add balcony @ 3rd flr bedroom,modify kitchen & entry layout, additional area of foundation replacement & detail clarification. rooftop hot tub.Details
revision to permit 202506077833: add covered entry over front door, add balcony @ 3rd flr bedroom,modify kitchen & entry layout, additional area of foundation replacement & detail clarification. rooftop hot tub. | $10,000 | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 540 Sutter St | interior tenant improvement. no exterior modifications.Details
interior tenant improvement. no exterior modifications. | $275,000 | |
| Mar 2, 2026 | In progress issued Mar 2026 | 365 Hill St | Egoodat Inc | remove (e) deck & stair to yard. replace with (n) deck & stair.Details
remove (e) deck & stair to yard. replace with (n) deck & stair. | $16,000 |
| Aug 28, 2025 | Completed final sign-off Mar 2026 | 41 Lake Forest Ct | Greenport Construction Inc | remove and replace existing exterior main-entry stairs.Details
remove and replace existing exterior main-entry stairs. | $19,000 |
| Aug 1, 2025 | Completed final sign-off Oct 2025 | 883 26th Av | Dennis Webb Construction | spot injection of non-shrink grout under back 18' of foundation at 883 26th ave. (injection from 879 26th ave). in-kind replacement of bottom step at stairs in back of house to back yard.Details
spot injection of non-shrink grout under back 18' of foundation at 883 26th ave. (injection from 879 26th ave). in-kind replacement of bottom step at stairs in back of house to back yard. | $7,500 |
| Jun 25, 2025 | Expired or cancelled suspend Sep 2026 | 3829 25th St | Clarity Construction Group | add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry.Details
add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry. | $995,900 |
| Jun 5, 2025 | Completed final sign-off Aug 2025 | 156 Putnam St | Marquez Builders | revision to pa 202502049643 cut concrete stem wall for two door openingDetails
revision to pa 202502049643 cut concrete stem wall for two door opening | $1,000 |
| May 20, 2025 | In progress issued May 2025 | 4200 23rd St | Clonduff Construction Inc. | temporary shoring wall for 202201196239Details
temporary shoring wall for 202201196239 | $2,000 |
| May 9, 2025 | In progress issued Nov 2025 | 333 Roosevelt Wy | extend stairway to roof, create stair penthouse, add roof terrace, modify fire escape to include an inclined ladder from roof to (e) rear fire escape. provide inclined ladder from fire escapre to ground.Details
extend stairway to roof, create stair penthouse, add roof terrace, modify fire escape to include an inclined ladder from roof to (e) rear fire escape. provide inclined ladder from fire escapre to ground. | $57,200 | |
| May 9, 2025 | In progress issued Nov 2025 | 333 Roosevelt Wy | legalize (e) dwelling unit as adu (under state program retaining r3 occupancy) @ 1/f and 2/f. general space improvements were completed under pa# 379136 including creating 1st story living room w/o kitchen, 2nd story bedroom and bath. work this permit will legalize a kitchen installed w/o permitDetails
legalize (e) dwelling unit as adu (under state program retaining r3 occupancy) @ 1/f and 2/f. general space improvements were completed under pa# 379136 including creating 1st story living room w/o kitchen, 2nd story bedroom and bath. work this permit will legalize a kitchen installed w/o permit | $25,000 | |
| Apr 21, 2025 | In progress issued Apr 2025 | 4200 23rd St | Clonduff Construction Inc. | revision to 202201196239. changes at rear retaining walls.Details
revision to 202201196239. changes at rear retaining walls. | |
| Mar 13, 2025 | Completed final sign-off Jan 2026 | 1239 Shafter Av | Method Design-Build, Llc | structural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirementsDetails
structural revision 201712055597- to include verification of (e) conditions under dbi reinstated permit 201712055597. verify if lateral load restraints/sheerwalls, diaphragms and life safety requirements | $12,000 |
| Feb 3, 2025 | Completed final sign-off Aug 2026 | 88 06th St | American Mechanical Inc | replace existing cooling system wit new split system. replace existing fluid cooler with new, same size capacityDetails
replace existing cooling system wit new split system. replace existing fluid cooler with new, same size capacity | $80,000 |
| Oct 28, 2024 | In progress issued May 2025 | 879 26th Av | Dennis Webb Construction | remodel of a single family residence into 2 units. one story vertical addition (3rd story). new windows ,exterior/interior doors, skylgihts, interior stairs, hvac, electrical, plumbing and lift.Details
remodel of a single family residence into 2 units. one story vertical addition (3rd story). new windows ,exterior/interior doors, skylgihts, interior stairs, hvac, electrical, plumbing and lift. | $275,000 |
| Oct 15, 2024 | In progress issued Nov 2024 | 770 Shotwell St | Golden Heights Remodeling Inc, Bay Building Structures Inc | remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post.Details
remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post. | $200,000 |
| May 21, 2024 | Completed final sign-off Apr 2026 | 249 Richland Av | R & D Construction Co Inc | remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard.Details
remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard. | $165,508 |
| May 16, 2024 | In progress issued Jun 2024 | 879 26th Av | Dennis Webb Construction | both flrs. of the house will be extended 6.5' tpward tje rear of the property, deck and exterior staris will be rebuilt adjacent to the additon will include roofing for the section and electrical work on both floorsDetails
both flrs. of the house will be extended 6.5' tpward tje rear of the property, deck and exterior staris will be rebuilt adjacent to the additon will include roofing for the section and electrical work on both floors | $110,000 |
| Jan 10, 2024 | Completed final sign-off Feb 2025 | 2253 15th St | Phase 2 Builders | interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor.Details
interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor. | $50,000 |
| Sep 7, 2023 | Completed final sign-off Dec 2024 | 1863 Pine St | to comply with boa's decision no. 22-075. ref to pa# 202206065684: show party wall as part of scope of work & add sheets a-111 & a-112Details
to comply with boa's decision no. 22-075. ref to pa# 202206065684: show party wall as part of scope of work & add sheets a-111 & a-112 | ||
| Apr 3, 2023 | Expired or cancelled cancelled Jan 2026 | 1344 Fell St | revision to permit 202106212875. as-built changes from bison to rubber deck supports.Details
revision to permit 202106212875. as-built changes from bison to rubber deck supports. | ||
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 2820 16th St | Amone Corp | new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.Details
new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac. | $264,600 |
| Jun 8, 2022 | Never finaled filed Jun 2022, never issued | 681 Lisbon St | new-build adu at rear of propertyDetails
new-build adu at rear of property | $20,000 | |
| Jun 2, 2022 | Completed final sign-off Jun 2025 | 525 10th Av | Del Plata Builders Inc | infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldgDetails
infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldg | $200,000 |
| Jan 19, 2022 | In progress issued May 2024 | 4200 23rd St | (n) 3-story horizontal addition @ rear of structure, 1-story vertical addition (penthouse) @ roof. (n) front entrance vestibule & stairs @ front yard.(n) garage door, planters @ sidewalk, interior remodel per plans. (n) hvac, electrical & plumbing.Details
(n) 3-story horizontal addition @ rear of structure, 1-story vertical addition (penthouse) @ roof. (n) front entrance vestibule & stairs @ front yard.(n) garage door, planters @ sidewalk, interior remodel per plans. (n) hvac, electrical & plumbing. | $500,000 | |
| Jan 18, 2022 | Completed final sign-off Sep 2023 | 1342 Fell St | backyard ground floor deck below 3 feet above grade.Details
backyard ground floor deck below 3 feet above grade. | $2,500 | |
| Dec 13, 2021 | Expired or cancelled expired Aug 2023 | 2741 Vallejo St | W N G S Construction | rev to pa202011058298: structural upgrade to stair stringers, structural upgrade and repair (e) balcony; structural upgrade to roof joists due to sklight relocation. change bathrooms layouts.Details
rev to pa202011058298: structural upgrade to stair stringers, structural upgrade and repair (e) balcony; structural upgrade to roof joists due to sklight relocation. change bathrooms layouts. | $100,000 |
| Sep 13, 2021 | Never finaled filed Sep 2021, never issued | 955 Post St | demolish a 2 story commercial garages.Details
demolish a 2 story commercial garages. | $100,000 | |
| Sep 13, 2021 | Never finaled filed Sep 2021, never issued | 955 Post St | erect a new 8 story,69 dwelling apartment building and retail with parking with 1 basement type 1-bDetails
erect a new 8 story,69 dwelling apartment building and retail with parking with 1 basement type 1-b | $15,000,000 | |
| Aug 31, 2021 | Never finaled filed Aug 2021, never issued | 246 Corbett Av | renovation of 285 sqft of the first floor outfoor front deck.Details
renovation of 285 sqft of the first floor outfoor front deck. | $75,000 | |
| Jun 24, 2021 | Completed final sign-off Sep 2023 | 1342 Fell St | Artisanov Construction Inc | modify/revise footing detail in mechanical room on first floor [sheet ssk] . revision to pa# 201901100062.Details
modify/revise footing detail in mechanical room on first floor [sheet ssk] . revision to pa# 201901100062. | |
| Jun 21, 2021 | Never finaled issued Dec 2021, no final | 1344 Fell St | add a roof deck & spiral staircase & fire wall for access as separate permit. ref pa #201901100062 & pa #201901241113Details
add a roof deck & spiral staircase & fire wall for access as separate permit. ref pa #201901100062 & pa #201901241113 | $10,000 | |
| May 13, 2021 | Completed final sign-off Dec 2024 | 775 26th Av | Bail Construction | addition of (n) unit on ground level per density; in-fill area under 2nd fl deck to create (n) dwelling unit at 1st fl conforming with allowable 2 unit density. unit to include 1 bedroom, 1 bathroom & kitchen.Details
addition of (n) unit on ground level per density; in-fill area under 2nd fl deck to create (n) dwelling unit at 1st fl conforming with allowable 2 unit density. unit to include 1 bedroom, 1 bathroom & kitchen. | $187,000 |
| Feb 8, 2021 | Completed final sign-off Dec 2024 | 1863 Pine St | structural work includes foundation replacement. excavation at garage. level floor by 2'-6" and addition of an exterior stair in rear yardDetails
structural work includes foundation replacement. excavation at garage. level floor by 2'-6" and addition of an exterior stair in rear yard | $8,000 | |
| Feb 8, 2021 | Completed final sign-off Dec 2024 | 1863 Pine St | interior remodel with no change t0 (e) floor area. exterior includes cosmetic improvements for front facade, re-cladding rear facade with additional flazing. replace all windows on remaining facades. cosmetic upgrades to rear yard. rebuild rear stairs. structural work as well to support changes.Details
interior remodel with no change t0 (e) floor area. exterior includes cosmetic improvements for front facade, re-cladding rear facade with additional flazing. replace all windows on remaining facades. cosmetic upgrades to rear yard. rebuild rear stairs. structural work as well to support changes. | $120,000 | |
| Nov 5, 2020 | Expired or cancelled expired Jan 2026 | 2741 Vallejo St | W N G S Construction | 1. renovation of interior spaces w/no addition of sq ft, number of rooms, nor bathrooms. 2. replacement of rear windows & doors. upgrade of electrical & replace drywall. 3. structural upgrade by double of joists at living room ceiling @ bedroom #3, #4.Details
1. renovation of interior spaces w/no addition of sq ft, number of rooms, nor bathrooms. 2. replacement of rear windows & doors. upgrade of electrical & replace drywall. 3. structural upgrade by double of joists at living room ceiling @ bedroom #3, #4. | $250,000 |
| Oct 14, 2020 | Never finaled issued Dec 2020, no final | 1526 44th Av | infill (e) lightwell at center of home, remodel kitchen, add skylightsDetails
infill (e) lightwell at center of home, remodel kitchen, add skylights | $43,000 | |
| Aug 25, 2020 | Completed final sign-off May 2024 | 439 Hill St | Force Development Company Inc | udu legalization for lower unit per ord# 43-14, as part of the residential remodel and addition for which a separate permit is currently under review (permit #201902213509).Details
udu legalization for lower unit per ord# 43-14, as part of the residential remodel and addition for which a separate permit is currently under review (permit #201902213509). | |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 3627 Ortega St | Castle Builder Co | foundation repair and upgrade to comply with nov 201980781: rpelace foundating at pl (east) from grib line j to h as shown on drawings (9'-2.5").Details
foundation repair and upgrade to comply with nov 201980781: rpelace foundating at pl (east) from grib line j to h as shown on drawings (9'-2.5"). | $5,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2021 | 163 28th St | Bgg Construction Inc | new living space at gr fl e envelope, 2 bedrooms, 2 baths, 1 office, laundry, mech 2nd fl. replace kitchen, remove full bath, add 1/2 bath. replace 2 windows at street facade, increase width of garage door due to 10' new doors and windows at rear yard. remove portion of e wood deck at rear yardDetails
new living space at gr fl e envelope, 2 bedrooms, 2 baths, 1 office, laundry, mech 2nd fl. replace kitchen, remove full bath, add 1/2 bath. replace 2 windows at street facade, increase width of garage door due to 10' new doors and windows at rear yard. remove portion of e wood deck at rear yard | $264,000 |
| May 14, 2019 | Completed final sign-off May 2020 | 408 Eureka St | Beyond The Horizon Construction | revision to previously approved permit #201601076572 - interior layout at2nd fl & 3rd fl.Details
revision to previously approved permit #201601076572 - interior layout at2nd fl & 3rd fl. | |
| Mar 8, 2019 | Completed final sign-off Mar 2019 | 3644 Market St | Kotas Construction Inc | revision to 201808278359 per inspector's request - structural work onlyDetails
revision to 201808278359 per inspector's request - structural work only | |
| Feb 27, 2019 | Never finaled issued Mar 2019, no final | 130 Bridgeview Dr | revision to permit # 2018-0413-6362 to reflect relocation of shearwall.Details
revision to permit # 2018-0413-6362 to reflect relocation of shearwall. | ||
| Jan 11, 2018 | Completed final sign-off Sep 2018 | 1104 Noe St | Darc Ventures Inc Dba Spl Construction S | connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall.Details
connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall. | $65,000 |
| Dec 7, 2017 | Expired or cancelled expired Sep 2019 | 39 Dolores Tr | Kanler Inc | temporary shoring for the 1st flr for 201707111584Details
temporary shoring for the 1st flr for 201707111584 | $8,000 |
| Aug 28, 2017 | Never finaled issued Oct 2017, no final | 338 27th St | Astorga Construction Inc | minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet.Details
minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet. | $53,000 |
| Jun 26, 2017 | Completed final sign-off Jun 2018 | 162 College Av | Darc Ventures Inc Dba Spl Construction S | foundation replacement and seismic strengthening of 1st fl storage area. area to remain as storageDetails
foundation replacement and seismic strengthening of 1st fl storage area. area to remain as storage | $50,000 |
| Jun 15, 2017 | Completed final sign-off Sep 2018 | 1526 44th Av | Donald Lewis Gen. Contr.Inc. | convert portion of (e) garage to habitable space; (2) new bedrooms, bath & laundry room, relocate interior stair connecting 1/f & 2/f, remodel bedroom, add new masterbath.skylights less than 12" above roof surfaceDetails
convert portion of (e) garage to habitable space; (2) new bedrooms, bath & laundry room, relocate interior stair connecting 1/f & 2/f, remodel bedroom, add new masterbath.skylights less than 12" above roof surface | $120,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 2255 Mariposa St | Darc Ventures Inc Dba Spl Construction S | remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation.Details
remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation. | $35,000 |
| Apr 17, 2017 | Expired or cancelled cancelled Jul 2024 | 238 Chenery St | rear addition that extends an (e) garage/basement and provides backyard access stair; a (n) kitchen/dining area @ back yard elevation; patio; (n) master suite w/ bath; roof stair & deck. renovation/replacement of (e) basement & entry stairs w/ single interior stair; (n) siding; (n) bathroom @ livingDetails
rear addition that extends an (e) garage/basement and provides backyard access stair; a (n) kitchen/dining area @ back yard elevation; patio; (n) master suite w/ bath; roof stair & deck. renovation/replacement of (e) basement & entry stairs w/ single interior stair; (n) siding; (n) bathroom @ living | $250,000 | |
| Mar 28, 2017 | Completed final sign-off Apr 2019 | 2825 Sacramento St | soft story seismic retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher n/a.Details
soft story seismic retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher n/a. | $75,000 | |
| Mar 13, 2017 | Completed final sign-off Apr 2018 | 373 Valley St | J P Petrie Associates Inc | new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferredDetails
new interior stair, new finishes at (e) bathroom & revision /addition of windows on the rear facade. mep permits deferred | $8,875 |
| Jul 11, 2016 | Completed final sign-off Aug 2017 | 737 Joost Av | Forum Renovation Co. Inc, Evra Construction | revision to 201605197840 to include additional foundation work under entry, add space to lower bedroom minor interior changes on field conditionsDetails
revision to 201605197840 to include additional foundation work under entry, add space to lower bedroom minor interior changes on field conditions | $5,000 |
| Mar 23, 2016 | Completed final sign-off Mar 2024 | 1579 Wallace Av | Pacific Craftsmen | change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher naDetails
change of use to non-retail nursery. horizontal addition. const of new 2500 sq ft second level within the (e) unit & new bearing walls & footings to support new 2nd level. additional mech, sprinkler, elect to be under separate permit. maher na | $120,000 |
| Aug 13, 2008 | Never finaled issued Aug 2023, no final | 3929 19th St | Dawson - Clinton Gen Contr Corp | to erect 4 stories, 1 basement, type v-b, single family dwelling.Details
to erect 4 stories, 1 basement, type v-b, single family dwelling. | $678,450 |