Danielle Wyss
- License
- C34733
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C34733 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- The Shift Group
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Jun 2025
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clonduff Construction Inc. (2)
- Engineers
- Joe Igbur (2)
- Subcontractors
- Katherine Whyte
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2025 | In progress filed Jun 2025, not yet issued | 4200 23rd St | Clonduff Construction Inc. | revision 202201196239- (e) window number 10 at sunroom to be replaced in kind (was previously permitted as a (n) 45 min rated window unit). facing frontDetails
revision 202201196239- (e) window number 10 at sunroom to be replaced in kind (was previously permitted as a (n) 45 min rated window unit). facing front | |
| Apr 21, 2025 | In progress issued Apr 2025 | 4200 23rd St | Clonduff Construction Inc. | revision to 202201196239. changes at rear retaining walls.Details
revision to 202201196239. changes at rear retaining walls. | |
| Jan 19, 2022 | In progress issued May 2024 | 4200 23rd St | (n) 3-story horizontal addition @ rear of structure, 1-story vertical addition (penthouse) @ roof. (n) front entrance vestibule & stairs @ front yard.(n) garage door, planters @ sidewalk, interior remodel per plans. (n) hvac, electrical & plumbing.Details
(n) 3-story horizontal addition @ rear of structure, 1-story vertical addition (penthouse) @ roof. (n) front entrance vestibule & stairs @ front yard.(n) garage door, planters @ sidewalk, interior remodel per plans. (n) hvac, electrical & plumbing. | $500,000 |