Daniel Garcia Vitale
- Listed as
- contractor, designer
- Firm
- Del Plata Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Oct 2026
25 permits since 2000 (contractor on 25 permits, designer on 1 permit): 18 completed, 4 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 46 Wilmot St | Del Plata Builders Inc | relocate powder room. 3rd flr electrical. stair railing, new dining room.Details
relocate powder room. 3rd flr electrical. stair railing, new dining room. | $150,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 138 Arguello Bl | Del Plata Builders Inc | replace stairs ballusters in kind, replace windows sashes in-kind paintDetails
replace stairs ballusters in kind, replace windows sashes in-kind paint | $30,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 325 Lawton St | Del Plata Builders Inc | rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding.Details
rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding. | $55,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 2113 Broderick St | Del Plata Builders Inc | basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction.Details
basement level flooded. replace all finishes @ bathroom - living - tv room. replace cabinets + vanity + tile flooring and wall. replace can lights. all work in kind. no wall stud demolition or construction. | $80,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 138 Arguello Bl | Del Plata Builders Inc | replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylightsDetails
replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylights | $60,000 |
| Jun 20, 2025 | Completed final sign-off Oct 2025 | 131 10th Av | Del Plata Builders Inc | bathroom remodel on 2nd floor with wall demolition and construction.Details
bathroom remodel on 2nd floor with wall demolition and construction. | $40,000 |
| Apr 28, 2025 | Completed final sign-off May 2025 | 41 05th Av | Del Plata Builders Inc | to obtain final inspection for work approved under pa# 202105251020 + 202107275189. all work is complete.Details
to obtain final inspection for work approved under pa# 202105251020 + 202107275189. all work is complete. | |
| Mar 12, 2025 | Completed final sign-off Aug 2025 | 321 Lake St | Del Plata Builders Inc | replace 9 windows in the back in-kindDetails
replace 9 windows in the back in-kind | $8,000 |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 28 Hillway Av | Del Plata Builders Inc | infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight.Details
infill lightwell (12 sq ft) including new roof and wall framing, remodel 2nd floor bathroom, install (n) skylight. | $150,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 301 Mission St | Del Plata Builders Inc | replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder roomDetails
replace in kind bath tile(3 bathrooms) plumbing fixtures and finishes, cabinets face and counter tops, elec finishes, remove dry wall bed #1, convert bath into powder room | $100,000 |
| Apr 11, 2023 | Completed final sign-off May 2025 | 41 05th Av | Del Plata Builders Inc | remove drywall for exploratory demo to view current condition. demo limited to walls and ceilings. limit to 100 sqft of demo per story. repairs to be done under permit# 202104219055.Details
remove drywall for exploratory demo to view current condition. demo limited to walls and ceilings. limit to 100 sqft of demo per story. repairs to be done under permit# 202104219055. | $10,000 |
| Jun 2, 2022 | Completed final sign-off Jun 2025 | 525 10th Av | Del Plata Builders Inc | infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldgDetails
infill under living space. kitchen and family room remodel. partial window reconfiguration. reconfigure rear stairs and landing all work in rear of bldg | $200,000 |
| Jan 20, 2022 | Completed final sign-off Feb 2022 | 3145 23rd St | Del Plata Builders Inc | revision to permit 202107124198. decrease footing size.Details
revision to permit 202107124198. decrease footing size. | |
| Oct 29, 2021 | Completed final sign-off Nov 2023 | 2113 Broderick St | Del Plata Builders Inc | general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellarDetails
general kitchen remodel @ the (e) 2nd fl including: replacement of (e) rear patio pocket slider in-kind. remove & replace (e) south kitchen windows. provide (n) concrete patio w/ 1-hr fire wall at rear. relocate (e) rear yard egress stair at (e) exterior passageway. remove (e) sub-grade wine cellar | $15,000 |
| Oct 26, 2021 | Completed final sign-off May 2025 | 41 05th Av | Del Plata Builders Inc | lateral interior upgrade only. no wall changes.Details
lateral interior upgrade only. no wall changes. | $387,000 |
| Jul 12, 2021 | Completed final sign-off Feb 2022 | 3145 23rd St | Del Plata Builders Inc | replace fence in-kind. visible from street. wood material, metal post. 8' total height.Details
replace fence in-kind. visible from street. wood material, metal post. 8' total height. | $10,000 |
| Apr 21, 2021 | Completed final sign-off May 2025 | 41 05th Av | Del Plata Builders Inc | install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath,Details
install residential elevator from basement to 3/f. reshingle exterior. enlarge garage door in-kind & partially re-brick entry steps & planter. 1/f remodel kitchen, add family room at rear. 2/f add 72 sf to rear bedroom. 3/f add gable roof to integrate previous roof remodels, enlarge & remodel bath, | $427,065 |
| Mar 30, 2021 | Never finaled issued Jun 2021, no final | 1518 Guerrero St | Del Plata Builders Inc | the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1.Details
the scope of work is the remodel of an extg home office at level1 and the remodel of an extg bathroom at level 2. the addition of a spiral stair connectting the office to the unit above. the addition of a bathroom at level 1. | $50,000 |
| Dec 21, 2020 | Completed final sign-off Feb 2023 | 935 Shotwell St | Del Plata Builders Inc | remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair.Details
remodel (e) 2nd fl, (n) raised roof @ rear. (n) exterior doors & windows, (n) skylight. (n) rear 2nd fl deck & stair. | $120,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 1584 08th Av | Del Plata Builders Inc | street spaceDetails
street space | |
| Dec 18, 2019 | Never finaled issued Jan 2020, no final | 1584 08th Av | Del Plata Builders Inc | revision to pa# 2019-0802-7755: install new window & new interior cased openingDetails
revision to pa# 2019-0802-7755: install new window & new interior cased opening | $2,000 |
| Sep 30, 2019 | Completed final sign-off Jul 2020 | 20 Caselli Av | Del Plata Builders Inc | remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior.Details
remodel (e) bathroom, add one half bathroom @ 3rd level. no changes to exterior. | $50,000 |
| Aug 6, 2019 | Completed final sign-off Feb 2020 | 1584 08th Av | Del Plata Builders Inc | to obtain final inspection for work approved under pa # 201108011398. all work is complete.Details
to obtain final inspection for work approved under pa # 201108011398. all work is complete. | |
| Aug 2, 2019 | Completed final sign-off Jun 2020 | 1584 08th Av | Del Plata Builders Inc | interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from streetDetails
interior remodel to 2nd fl. reconfigure and remodel e bath. water closet same location. no horiz vert additions, no work visible from street | $30,000 |
| Jun 20, 2019 | Completed final sign-off Sep 2022 | 2548 Mission St | Del Plata Builders Inc | tenant build out of a (n) ground level cafe & 2nd fl. design suiteDetails
tenant build out of a (n) ground level cafe & 2nd fl. design suite | $30,000 |