John Kleman
- Listed as
- architect
- Firm
- Kleman Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Apr 2026
10 permits since 2000 (architect on 10 permits): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 295 Staples Av | replace west wall with hardie board siding & windows in like kind because of dry rot repair. replace framing.Details
replace west wall with hardie board siding & windows in like kind because of dry rot repair. replace framing. | $12,000 | |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 138 Arguello Bl | Del Plata Builders Inc | replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylightsDetails
replace (9) back windows in kind. install new insulation in upper level (ceiling only). replace lights in upper level (approx. 44). remove fireplace- chimney in two upper levels. new furnace upper level. replace (6)skylights | $60,000 |
| Nov 4, 2022 | Never finaled issued Feb 2023, no final | 800 Colby St | Grant Ian Hetherington | convert portion of 1/f to habitable space (1,178sq.ft.), add: (1)bedroom, (1)full bathroom, 1/2 bathroom, laundry, closet, family room, separate garage. voluntary seismic upgrade/partial fndtn replacement. new ext 1/f doors/windows pr0posed for non street facing.Details
convert portion of 1/f to habitable space (1,178sq.ft.), add: (1)bedroom, (1)full bathroom, 1/2 bathroom, laundry, closet, family room, separate garage. voluntary seismic upgrade/partial fndtn replacement. new ext 1/f doors/windows pr0posed for non street facing. | $471,200 |
| Oct 20, 2022 | Expired or cancelled cancelled Aug 2023 | 643 17th Av | V Mash Construction | a partial remodel of the 2nd floor-including the conversion of existing attic space to a new storage loft and the addition of two new dormers following the zoning administrator bulletin no.3.Details
a partial remodel of the 2nd floor-including the conversion of existing attic space to a new storage loft and the addition of two new dormers following the zoning administrator bulletin no.3. | $121,200 |
| Feb 28, 2022 | Completed final sign-off Aug 2025 | 7 Winfield St | Damar Construction And Remodeling Inc | interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck.Details
interior remodel of main (2nd) fl - inclding new kitchen, 1/2 bath, new windows & doors on non-street facing. vertical addition of a 3rd fl with additional bedrm, bathrm, office/guest space, & roof deck. | $437,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | Glc And Company | remove (e) bay window & skylight. (n) windows & expanded bay @ rear of building.Details
remove (e) bay window & skylight. (n) windows & expanded bay @ rear of building. | $10,000 |
| Jun 12, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | Glc And Company | remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place.Details
remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place. | $75,000 |
| Jun 13, 2018 | Never finaled issued May 2019, no final | 1867 Jefferson St | Larkspur Builders Inc., Dlw Construction Inc. | revision to application #201708033781. replace an existing building mounted guardrail with balcony (22" x 74.5"), and install new awning above balcony and exist adjacent windows on the 3rd fl rear elevation.Details
revision to application #201708033781. replace an existing building mounted guardrail with balcony (22" x 74.5"), and install new awning above balcony and exist adjacent windows on the 3rd fl rear elevation. | $20,000 |
| Sep 18, 2017 | Completed final sign-off Jan 2018 | 27 Talbert Ct | Bay City Builder | remodel kitchen & bath room on main level. upgrade (1) main electrical and (1) subpanel.Details
remodel kitchen & bath room on main level. upgrade (1) main electrical and (1) subpanel. | $32,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2021 | 1 Bemis St | (n) 3rd flr addition; bay window @ 2nd & 3rd flrs, (n) rear deck & stair to replace (e) interior remodel throughout. 1 new bedroom & 1 new bath. per adu ord# 95-17.Details
(n) 3rd flr addition; bay window @ 2nd & 3rd flrs, (n) rear deck & stair to replace (e) interior remodel throughout. 1 new bedroom & 1 new bath. per adu ord# 95-17. | $250,000 |