Jenny Chan

License
E23580
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E23580 at the Board for Professional Engineers
Listed as
engineer
Firm
Dep. Of Public Work
Based in
Sf
On San Francisco permits
Dec 2022 to Sep 2026

9 permits since 2000 (engineer on 9 permits): 3 completed, 6 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Chiang C M Construction Inc., N B C Construction
Architects
Colin Mosher, Eunjoo Cho, Gabriel Lim, Irene U. Aquino, Ivan Romero, Nicolas Ancel
Engineers
Ricky Choi (2), Chung Linh, Jonathan Chang, Koa Pickering, Raymond Lui, Terry Wong

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 28, 2026In progress
filed Sep 2026, not yet issued
934 Brannan Strevision#: 202604089093, updated electrical symbos, lighting, and power forms. revising panel schedules, added panel 2d, and adjustments to lighting and power circuit fixtures.
Details
Permit
202609288736

revision#: 202604089093, updated electrical symbos, lighting, and power forms. revising panel schedules, added panel 2d, and adjustments to lighting and power circuit fixtures.

Open the permit page

Aug 26, 2026In progress
filed Aug 2026, not yet issued
1650 Mission Strenovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.
Details
Permit
202608267252

renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.

Open the permit page

$850,000
Apr 8, 2026In progress
issued May 2026
934 Brannan Strevisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust
Details
Permit
202604089093
Permit issued
May 4, 2026

revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust

Open the permit page

Oct 17, 2025In progress
issued Feb 2026
1828 Egbert Av3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control.
Details
Permit
202510177630
Permit issued
Feb 23, 2026

3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control.

Open the permit page

$2,000,000
Jun 23, 2025Completed
final sign-off Jun 2026
1011 Turk Strevision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage.
Details
Permit
202506239181
Permit issued
Nov 4, 2025
Final sign-off
Jun 22, 2026

revision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage.

Open the permit page

Mar 26, 2025In progress
issued Apr 2025
435 Martin Luther King Jr DrN B C Constructionmitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work
Details
Permit
202503263065
Permit issued
Apr 8, 2025

mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work

Open the permit page

$200,000
Aug 28, 2024Completed
final sign-off Jun 2026
1011 Turk Stremove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garage
Details
Permit
202408289678
Permit issued
Jun 18, 2025
Final sign-off
Jun 22, 2026

remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garage

Open the permit page

$202,000
May 2, 2024In progress
issued Jun 2025
2401 Keith StChiang C M Construction Inc.tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.
Details
Permit
202405021240
Permit issued
Jun 10, 2025

tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.

Open the permit page

$8,950,000
Dec 15, 2022Completed
final sign-off Mar 2025
1199 09th Avlandscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications.
Details
Permit
202212158417
Permit issued
Mar 6, 2023
Final sign-off
Mar 20, 2025

landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications.

Open the permit page

$800,000