- Dec 2022 to Sep 2026
9 permits since 2000 (engineer on 9 permits): 3 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 934 Brannan St | revision#: 202604089093, updated electrical symbos, lighting, and power forms. revising panel schedules, added panel 2d, and adjustments to lighting and power circuit fixtures.Details
revision#: 202604089093, updated electrical symbos, lighting, and power forms. revising panel schedules, added panel 2d, and adjustments to lighting and power circuit fixtures. | ||
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 1650 Mission St | renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.Details
renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312. | $850,000 | |
| Apr 8, 2026 | In progress issued May 2026 | 934 Brannan St | revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaustDetails
revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms. 2/fl retain (e) restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust | ||
| Oct 17, 2025 | In progress issued Feb 2026 | 1828 Egbert Av | 3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control.Details
3/f and 4/f: tenant improvement to include new telecom closets, installation of new convenience power outlets, modifications to the fire alarm and sprinkler systems, ventilation and cooling for new telecom rooms, and distribution of surveillance cameras and access control. | $2,000,000 | |
| Jun 23, 2025 | Completed final sign-off Jun 2026 | 1011 Turk St | revision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage.Details
revision to 202408289678 - reduction of scope of work. remove ev charger load from (e) super critical panel "elscb" and relocate to non-critical panel. install (1) 75 kva transformer, (1) 400a panel, (2) ev chargers, and replace (5) existing ev chargers. all work performed in parking garage. | ||
| Mar 26, 2025 | In progress issued Apr 2025 | 435 Martin Luther King Jr Dr | N B C Construction | mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical workDetails
mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work | $200,000 |
| Aug 28, 2024 | Completed final sign-off Jun 2026 | 1011 Turk St | remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garageDetails
remove and relocate ev charger loads from super critical panel to non critical panel. install (1) 150 kva transformer, (1) 600a panel, (1) 225a panel, (10) new ev chargers & infrastructurw for future ev chargers. all work performed in parking garage | $202,000 | |
| May 2, 2024 | In progress issued Jun 2025 | 2401 Keith St | Chiang C M Construction Inc. | tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.Details
tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. | $8,950,000 |
| Dec 15, 2022 | Completed final sign-off Mar 2025 | 1199 09th Av | landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications.Details
landscape improvements on the north side of the intersection at 9th ave and lincoln way, including planting and irrigation, new paving, and accessibility improvements, curb ramps, lighting improvements and mta pole modifications. | $800,000 |