J. Gordon Turnbull
- Listed as
- architect
- Firm
- Page & Turnbull
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Aug 2019
17 permits since 2000 (architect on 17 permits): 9 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2019 | Never finaled issued Sep 2019, no final | 2101 Mission St | A M Rocca Inc. | structural & cosmetic repair ofc 1915 marque, new marque lighting, new roofing, drainage repairDetails
structural & cosmetic repair ofc 1915 marque, new marque lighting, new roofing, drainage repair | $30,000 |
| Mar 14, 2018 | Never finaled filed Mar 2018, never issued | 350 Bush St | install wall mounted single faced sign - historic plaqueDetails
install wall mounted single faced sign - historic plaque | $250 | |
| Jun 1, 2015 | Completed final sign-off Mar 2017 | 685 Market St | C C I Commercial Construction & Improv | removal (e) infill aluminum storefronts, store front awnings, flooring & slab at the immediate vicinity of store front entrance. n/a ordinance #155-13Details
removal (e) infill aluminum storefronts, store front awnings, flooring & slab at the immediate vicinity of store front entrance. n/a ordinance #155-13 | $20,000 |
| Apr 29, 2013 | Completed final sign-off Nov 2014 | 800 Chestnut St | exterior handrail rehabilitationDetails
exterior handrail rehabilitation | $300,000 | |
| Aug 24, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | 2nd floor window replacement. tenth floor and eleventh floor ribbon window replacement.Details
2nd floor window replacement. tenth floor and eleventh floor ribbon window replacement. | $550,000 |
| Oct 18, 2011 | Completed final sign-off Jun 2013 | 101 Spear St | Golden Gate Sign Company Inc. | erect electrical projecting double faced wall sign.Details
erect electrical projecting double faced wall sign. | $15,000 |
| Oct 18, 2011 | Expired or cancelled cancelled Jan 2020 | 101 Spear St | erect non electric projecting, double face wall sign.Details
erect non electric projecting, double face wall sign. | $4,000 | |
| Sep 23, 2011 | Completed final sign-off Nov 2012 | 2637 Clay St | Cove Construction | complete demolition & refurbish of kitchen, and 2 bathrooms, deck & railing work, change window at rear, not visible from street. replace existing roof at bay.Details
complete demolition & refurbish of kitchen, and 2 bathrooms, deck & railing work, change window at rear, not visible from street. replace existing roof at bay. | $175,000 |
| Jul 12, 2011 | Expired or cancelled expired Jun 2014 | 1000 Francisco St | Clay Young, Gen'l Contractor | new parapet roof for sun room @ 2nd floor. new custom wood windows for sunroom that will be similar to (e) 2nd floor. structural upgrades to sunroom @ 2nd floor.Details
new parapet roof for sun room @ 2nd floor. new custom wood windows for sunroom that will be similar to (e) 2nd floor. structural upgrades to sunroom @ 2nd floor. | $56,000 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 23 Geary St | Gci, Inc | 11th floor - construction of interior walls ceiling & finishes. mep under separate permit.Details
11th floor - construction of interior walls ceiling & finishes. mep under separate permit. | $500,000 |
| Aug 23, 2010 | Never finaled issued Feb 2011, no final | 785 Market St | remodel of (e) historic lobby on grond floor.Details
remodel of (e) historic lobby on grond floor. | $30,000 | |
| Aug 18, 2010 | Never finaled issued Sep 2010, no final | 1 Kearny St | Gci, Inc | remodel of 2 rooms on south portion of 11th floor of existing office bldg. existing condition of 2 rooms are finished shell. rooms will be conference room and warming kitchen for meetings. ref 200607136416s,s-3. tco has been issued but final pending.Details
remodel of 2 rooms on south portion of 11th floor of existing office bldg. existing condition of 2 rooms are finished shell. rooms will be conference room and warming kitchen for meetings. ref 200607136416s,s-3. tco has been issued but final pending. | $250,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 785 Market St | interior non structural demo of ground floor. all work to comply with sfbc ab-017Details
interior non structural demo of ground floor. all work to comply with sfbc ab-017 | $15,500 | |
| Feb 20, 2008 | Completed final sign-off Jan 2009 | 4 Presidio Tr | Plath & Company Inc | rev. to p/a #200705252307. removal & restoration of (e) door at front entry. demo door frame and adjacent portion of wall and decorative wood ceiling above. construction of new doorway with sidelights and new decorative ceiling, and terra cotta tile overlay at porch over brick tile.Details
rev. to p/a #200705252307. removal & restoration of (e) door at front entry. demo door frame and adjacent portion of wall and decorative wood ceiling above. construction of new doorway with sidelights and new decorative ceiling, and terra cotta tile overlay at porch over brick tile. | $28,000 |
| Dec 11, 2007 | Completed final sign-off Sep 2012 | 1 Dr. Carlton B. Goodlett Pl | barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais.Details
barrier removal. all work to be done will occur in board of supervisor's chamber. (president's dab to be lowered 18" clover 3 steps to be removed. platform upon which clerk's desk sits will be removed. clerk's desk to be lowered 6" to level of main finished fl. new ramp will be built to access dais. | $300,000 | |
| Nov 1, 2007 | Completed final sign-off Mar 2008 | 1310 Junipero Serra Bl | Plant Construction Company Lp | revision to app.# 200705181766, to revise layout of uni-sex restroom with the addition of a mop sink into a closet area.Details
revision to app.# 200705181766, to revise layout of uni-sex restroom with the addition of a mop sink into a closet area. | $10,000 |
| Dec 16, 2004 | Completed final sign-off Apr 2005 | 450 Sutter St | disabled access compliance status documentation (to be reviewed by ron tom)Details
disabled access compliance status documentation (to be reviewed by ron tom) |