James Skelton
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Edit
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jun 2026
113 permits since 2000 (architect on 92 permits, authorized agent-others on 21 permits, engineer on 3 permits, designer on 1 permit): 66 completed, 10 in progress, 21 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 113.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2026 | In progress issued Jun 2026 | 2060 Grove St | K O D Construction | bathroom remodel to include new bathtub relocating toilet, replacing sink, adding closet to the existing entry hall.Details
bathroom remodel to include new bathtub relocating toilet, replacing sink, adding closet to the existing entry hall. | $40,000 |
| May 27, 2026 | In progress filed May 2026, not yet issued | 118 Andover St | addition and interior remodel with lightwell infill, horizontal expansion and new dormer. two bathrooms remodeled, sunroom expanded at rear.Details
addition and interior remodel with lightwell infill, horizontal expansion and new dormer. two bathrooms remodeled, sunroom expanded at rear. | $300,000 | |
| May 26, 2026 | Completed final sign-off Aug 2026 | 833 Cole St | Bonilla Construction | mandatory seismic retrofit per sfebc chapter 4d to comply with nov #201719661.Details
mandatory seismic retrofit per sfebc chapter 4d to comply with nov #201719661. | $10,000 |
| Mar 11, 2026 | Completed final sign-off Apr 2026 | 113 Valley St | K 2 Builders Inc | rev to pa 2024-0320-8226: add 24" cantilever metal balcony at 3rd fl. m.b. ref pa# 2020-0831-3026Details
rev to pa 2024-0320-8226: add 24" cantilever metal balcony at 3rd fl. m.b. ref pa# 2020-0831-3026 | $15,000 |
| Jan 27, 2026 | In progress filed Jan 2026, not yet issued | 664 44th Av | horizontal additional and remodel. extension under overhead structure. new kitchen and bathrooms.Details
horizontal additional and remodel. extension under overhead structure. new kitchen and bathrooms. | $573,000 | |
| Oct 14, 2025 | In progress issued Oct 2025 | 350 Lawton St | Sunset Builders Llc. | interior remodel: 1st flr restore original garage,relocate stair to 2nd flr. 2nd flr: remodel kitchen (n) wall opening to kitchen replace windows in-kind with vinyl. 3rd flr:remodel primary bathroom, and (e) bath, add (a) bath, replace windows with vinyl.Details
interior remodel: 1st flr restore original garage,relocate stair to 2nd flr. 2nd flr: remodel kitchen (n) wall opening to kitchen replace windows in-kind with vinyl. 3rd flr:remodel primary bathroom, and (e) bath, add (a) bath, replace windows with vinyl. | $300,000 |
| Aug 15, 2025 | In progress issued Sep 2025 | 3398 Washington St | (n) 8 foot fence at north and east side at rear of property.Details
(n) 8 foot fence at north and east side at rear of property. | $50,000 | |
| Jul 15, 2025 | In progress issued Aug 2025 | 672 Arguello Bl | Cardea Bldg Dba Dimension Design Group | interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work.Details
interior renovation - remodel all (e) bathrooms on all floors., remodel (e) kitchen (3/f) in kind. replace electrical lighting with led throughout whole house. no rewiring or demolition for electrical work. | $125,000 |
| Aug 23, 2024 | In progress issued Sep 2024 | 1466 Dolores St | rev 202202087548- reduction of scope to include remodel kitchen with addition of island, bathroom in kind and (n) master suite and removal of wall between (e) bedroom and dining room area. all work is on 2nd floorDetails
rev 202202087548- reduction of scope to include remodel kitchen with addition of island, bathroom in kind and (n) master suite and removal of wall between (e) bedroom and dining room area. all work is on 2nd floor | ||
| Mar 20, 2024 | Expired or cancelled expired Apr 2026 | 113 Valley St | K 2 Builders Inc | revision 202008313026- minor interior modification on all floors. 1/f: relocate laundry, mud room & wetbar. 2/f: enlarge wc add pocket door. 3/f: move wall between bd3 & 4, add laundry room, remove skylight, reduce mb envelope., reduce slider in bd4.Details
revision 202008313026- minor interior modification on all floors. 1/f: relocate laundry, mud room & wetbar. 2/f: enlarge wc add pocket door. 3/f: move wall between bd3 & 4, add laundry room, remove skylight, reduce mb envelope., reduce slider in bd4. | |
| Jan 17, 2024 | In progress filed Jan 2024, not yet issued | 1875 09th Av | lightwell infill, dormer expansion, rear deck reduction and interior remodel with a new bathroom added and kitchen remodel.Details
lightwell infill, dormer expansion, rear deck reduction and interior remodel with a new bathroom added and kitchen remodel. | $100,000 | |
| Aug 8, 2023 | Expired or cancelled withdrawn Sep 2026 | 467 Filbert St | revision to 2102307031402. replace approved 42" guardrail with 72" glass guardrail @ e roofdeckDetails
revision to 2102307031402. replace approved 42" guardrail with 72" glass guardrail @ e roofdeck | ||
| Jul 3, 2023 | Completed final sign-off Apr 2024 | 467 Filbert St | replace (e) 36" glass guard rail w/42" glass @ (e) roof deckDetails
replace (e) 36" glass guard rail w/42" glass @ (e) roof deck | $15,000 | |
| Nov 9, 2022 | Completed final sign-off Nov 2022 | 118 Eureka St | revision to bpa#202112083978 to correct ceiling height (typo) in media room on 1/f to reflect (e) 7'-6"Details
revision to bpa#202112083978 to correct ceiling height (typo) in media room on 1/f to reflect (e) 7'-6" | ||
| Sep 8, 2022 | Completed final sign-off Sep 2022 | 428 Liberty St | Cardea Bldg Dba Dimension Design Group | rev to pa 202008121624. as built condition for final signoff : removed window, replaced sliding door w/window in master bedroom @ rear facade.Details
rev to pa 202008121624. as built condition for final signoff : removed window, replaced sliding door w/window in master bedroom @ rear facade. | |
| Jun 21, 2022 | Completed final sign-off May 2025 | 626 Natoma St | Cbs Construction Inc. | revision to pa# 201908209289. reduction of sq.sf of additional adu. remove lightwell infill.Details
revision to pa# 201908209289. reduction of sq.sf of additional adu. remove lightwell infill. | |
| Jun 9, 2022 | Completed final sign-off Mar 2023 | 964 Kansas St | Twin Pinnacles Construction | new interior spiral stair to 1st fl.Details
new interior spiral stair to 1st fl. | $6,000 |
| Mar 31, 2022 | Completed final sign-off Apr 2024 | 80 Ventura Av | Darc Ventures Inc Dba Spl Construction S | revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location.Details
revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location. | |
| Mar 9, 2022 | Never finaled filed Mar 2022, never issued | 4122 17th St | existing 3 story 2-unit building being altered to a 4 story plus garage 3-unit building with a vertical and horizontal garage is being added underneath building, meets exception 136.26 for obstruction in setback. all floors are being renovated.Details
existing 3 story 2-unit building being altered to a 4 story plus garage 3-unit building with a vertical and horizontal garage is being added underneath building, meets exception 136.26 for obstruction in setback. all floors are being renovated. | $500,000 | |
| Feb 18, 2022 | In progress issued May 2024 | 2071 47th Av | Adib Construction & Engineering Svcs | revision to approved permit 201705035591: add bedroom #3, relocate bath #1, recess bedroom window at rear, add w/d on 2nd fl.Details
revision to approved permit 201705035591: add bedroom #3, relocate bath #1, recess bedroom window at rear, add w/d on 2nd fl. | |
| Feb 17, 2022 | Expired or cancelled cancelled Jan 2026 | 500 Russia Av | interior remodel: remove non-permitted stairs between units, bath remodel in upper unit.Details
interior remodel: remove non-permitted stairs between units, bath remodel in upper unit. | $20,000 | |
| Feb 8, 2022 | Never finaled issued Jun 2022, no final | 1466 Dolores St | interior remodel. add bedroom, bath & media room on 1st fl. remodel 2nd fl kitchen. relocate bath. add half bath. partial lightwell infill against blank wall. (n) stairs to 1st fl.Details
interior remodel. add bedroom, bath & media room on 1st fl. remodel 2nd fl kitchen. relocate bath. add half bath. partial lightwell infill against blank wall. (n) stairs to 1st fl. | $300,000 | |
| Feb 7, 2022 | Completed final sign-off May 2023 | 447 Teresita Bl | interior remodel at ground/1st floor: add new bedroom, bath and gym. add playroom and deck at basement.Details
interior remodel at ground/1st floor: add new bedroom, bath and gym. add playroom and deck at basement. | $120,000 | |
| Nov 12, 2021 | Completed final sign-off Dec 2021 | 292 02nd Av | C & N Construction | revision to permit 201908078171 for final sign off. remove sprinkler system requirement from scope of work. egress travel distance (74 feet)+ per info sheet fs-03 sprinklers not required for (e) attic conversion to habitable space over (e) 2 story bldg. to correct (e)story count from 3 to 2 storiesDetails
revision to permit 201908078171 for final sign off. remove sprinkler system requirement from scope of work. egress travel distance (74 feet)+ per info sheet fs-03 sprinklers not required for (e) attic conversion to habitable space over (e) 2 story bldg. to correct (e)story count from 3 to 2 stories | |
| Nov 2, 2021 | Completed final sign-off Dec 2024 | 22 Terra Vista Av | revision to pa# 2017-1115-4049; reduction in scope: no excavation. (n) deck, at grade 36" above grade.Details
revision to pa# 2017-1115-4049; reduction in scope: no excavation. (n) deck, at grade 36" above grade. | ||
| Oct 19, 2021 | Completed final sign-off May 2023 | 120 Eureka St | fire damage repair in kind at north, west side, interior code upgrade to windows, elec, lighting, insulation and fire rating to rooms where fire occured on 3/f and 4/f, new shear wallsDetails
fire damage repair in kind at north, west side, interior code upgrade to windows, elec, lighting, insulation and fire rating to rooms where fire occured on 3/f and 4/f, new shear walls | $250,000 | |
| Oct 19, 2021 | Completed final sign-off Feb 2023 | 118 Eureka St | water damage repair due to fire. repair in kind at north, west side, interior code upgrade to windows, elec, lighting, insulation and fire rating to rooms where fire occured on 1/f and 2/f, new shear wallsDetails
water damage repair due to fire. repair in kind at north, west side, interior code upgrade to windows, elec, lighting, insulation and fire rating to rooms where fire occured on 1/f and 2/f, new shear walls | $180,000 | |
| Oct 12, 2021 | Completed final sign-off Dec 2023 | 180 09th Av | Fay Construction & Restoration Inc | interior remodel at 2nd fl. enclose e lightwell at norths side, 1st and 2nd fl. replace e wood stair at rear with new metal spiral, seismic improvements on 1st flDetails
interior remodel at 2nd fl. enclose e lightwell at norths side, 1st and 2nd fl. replace e wood stair at rear with new metal spiral, seismic improvements on 1st fl | $250,000 |
| Jun 8, 2021 | Completed final sign-off Aug 2024 | 152 06th Av | replace in-kind (9) windows at front with wood windows.Details
replace in-kind (9) windows at front with wood windows. | $10,000 | |
| Nov 18, 2020 | Completed final sign-off Mar 2024 | 579 Miramar Av | addition of a streamlined adu within an (e) single-family dwelling. the project consists of updating electrical and plumbing to code and upgrading some walls and entry doors to comply with fire code. it also involves renovation of the cooking area and bathrooms. state adu per govt code sec 65852.2.Details
addition of a streamlined adu within an (e) single-family dwelling. the project consists of updating electrical and plumbing to code and upgrading some walls and entry doors to comply with fire code. it also involves renovation of the cooking area and bathrooms. state adu per govt code sec 65852.2. | $25,000 | |
| Sep 21, 2020 | Completed final sign-off Apr 2024 | 80 Ventura Av | Darc Ventures Inc Dba Spl Construction S | new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor.Details
new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor. | $150,000 |
| Aug 31, 2020 | Expired or cancelled expired Apr 2026 | 113 Valley St | vertical and horizontal addition at rear of building. 1st floor expansion to include a entertainment room, guest bedron and bath. 2nd floor expands the kitchen area and roof deck. 3rd floor being added to include a master bedroom, 2bedrooms and bath.Details
vertical and horizontal addition at rear of building. 1st floor expansion to include a entertainment room, guest bedron and bath. 2nd floor expands the kitchen area and roof deck. 3rd floor being added to include a master bedroom, 2bedrooms and bath. | $800,000 | |
| Jun 13, 2020 | Never finaled issued Oct 2020, no final | 41 Rosemont Pl | Cbs Construction Inc. | fire only. add sprinkler heads at windows in lieu of rated windows, pg&e box for (e) gas meters, only sprinkler ground floor. reference to approved bpa# 2017/0306/0745 for adu at ground floor.Details
fire only. add sprinkler heads at windows in lieu of rated windows, pg&e box for (e) gas meters, only sprinkler ground floor. reference to approved bpa# 2017/0306/0745 for adu at ground floor. | $100 |
| Feb 14, 2020 | Expired or cancelled revoked Sep 2022 | 428 Liberty St | Cardea Bldg Dba Dimension Design Group | revision to pa 3 20171024-2502. administrative permit to file more percise extg conditions under app#201710242502, and minor revision to bathroom location at level 4. revise to nfpa 13r sprinkler system.Details
revision to pa 3 20171024-2502. administrative permit to file more percise extg conditions under app#201710242502, and minor revision to bathroom location at level 4. revise to nfpa 13r sprinkler system. | |
| Feb 12, 2020 | Expired or cancelled expired Nov 2023 | 1735 Hyde St | Sassoon Construction | rev 201802201685 reduce scope at basement lvel. replace sliding doors with windows at rearDetails
rev 201802201685 reduce scope at basement lvel. replace sliding doors with windows at rear | |
| Nov 19, 2019 | In progress issued Jul 2026 | 97 Loomis St | Perez Construction Llc. | tenant improvement to existing building. ground lfoor is being brought up to code for egress, restrooms, and sprinklers. no work on 2nd floor. no change to facade.Details
tenant improvement to existing building. ground lfoor is being brought up to code for egress, restrooms, and sprinklers. no work on 2nd floor. no change to facade. | $60,000 |
| Nov 7, 2019 | Never finaled filed Nov 2019, never issued | 7 Hill Point Av | horizontal & vertical expansion @ rear all level. basement level added. interior reamodel on all 3 floors with new kitchen & bathrooms. 2nd unit added on 1st floor & mnew ground floor / basement.Details
horizontal & vertical expansion @ rear all level. basement level added. interior reamodel on all 3 floors with new kitchen & bathrooms. 2nd unit added on 1st floor & mnew ground floor / basement. | $500,000 | |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 1471 10th Av | Vector Construction Inc. | interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rmDetails
interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rm | $300,000 |
| Aug 20, 2019 | Completed final sign-off May 2025 | 626 Natoma St | Cbs Construction Inc. | adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16Details
adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16 | $150,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2021 | 292 02nd Av | C & N Construction | interior remodel. 1st floor: infill @ rear. add bedroom, bathrooms & play room. 2nd floor: interior alterations. 3rd floor (attic): add bedrooms, baths & new dormers. ** maher: n/a **Details
interior remodel. 1st floor: infill @ rear. add bedroom, bathrooms & play room. 2nd floor: interior alterations. 3rd floor (attic): add bedrooms, baths & new dormers. ** maher: n/a ** | $500,000 |
| May 14, 2019 | Completed final sign-off Oct 2020 | 1026 Castro St | Edenavow Construction & Design | rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell.Details
rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell. | $100,000 |
| Feb 14, 2019 | Completed final sign-off Aug 2023 | 626 Natoma St | Cbs Construction Inc. | mandatory seismic soft story retrofit to comply with 2016 sfebc ch 4d and ab107Details
mandatory seismic soft story retrofit to comply with 2016 sfebc ch 4d and ab107 | $50,000 |
| Feb 7, 2019 | Expired or cancelled cancelled May 2025 | 22 Terra Vista Av | (n) 8th adu in (e) garage bldg "e"- unit 8 per ord# 162-16. another 7th adu unit will be under seperate pa# 2019-0207-2407 s.Details
(n) 8th adu in (e) garage bldg "e"- unit 8 per ord# 162-16. another 7th adu unit will be under seperate pa# 2019-0207-2407 s. | $200,000 | |
| Feb 7, 2019 | Expired or cancelled cancelled May 2025 | 22 Terra Vista Av | (n) 7th adu in (e) garage bldg "e"- unit 7 per ord# 162-16. another 8th adu unit will be under seperate pa# 2019-0207-2409 s.Details
(n) 7th adu in (e) garage bldg "e"- unit 7 per ord# 162-16. another 8th adu unit will be under seperate pa# 2019-0207-2409 s. | $200,000 | |
| Nov 16, 2018 | Completed final sign-off Oct 2019 | 154 Bonview St | Sft Construction Corp | revision to 201806040900 facade alteration, replace e garage door with new metal sectional door with privacy glass. replace e cedar shingles with smooth finish stucco and cedar siding, replace front door with metal door and privacy glassDetails
revision to 201806040900 facade alteration, replace e garage door with new metal sectional door with privacy glass. replace e cedar shingles with smooth finish stucco and cedar siding, replace front door with metal door and privacy glass | $10,000 |
| Nov 7, 2018 | Completed final sign-off Nov 2021 | 162 11th Av | At6 Design Build | vertical & horizontal addition at rear. interior remodel throughout 2nd, 3rd floor & 4th floor. minor facade alteration. (n) dormer @ front.Details
vertical & horizontal addition at rear. interior remodel throughout 2nd, 3rd floor & 4th floor. minor facade alteration. (n) dormer @ front. | $500,000 |
| Aug 29, 2018 | Completed final sign-off May 2023 | 618 Edinburgh St | add new bed and bath at ground floor at rear. facade alteration, expose original roof line, new siding and windows. max excavation - 30 cu.yd. depth 24" max.Details
add new bed and bath at ground floor at rear. facade alteration, expose original roof line, new siding and windows. max excavation - 30 cu.yd. depth 24" max. | $120,000 | |
| Aug 20, 2018 | Completed final sign-off Feb 2022 | 630 Vermont St | 3rd floor deck. skylight added @ roof.Details
3rd floor deck. skylight added @ roof. | $10,000 | |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3938 Washington St | Cardea Bldg Dba Dimension Design Group | horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a **Details
horizontal addition to unit# 3938 @ rear ground floor with new bedroom & bath. infill @ 2nd floor @ rear. interior alteration to kitchen, bath @ 2nd floor. replace (e) wood shingles with wood siding. ** maher: n/a ** | $300,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2022 | 3940 Washington St | Cardea Bldg Dba Dimension Design Group | (upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a **Details
(upper unit). interior alteration - remodel kitchen & baths. replace (e) wood shingles with (n) wood siding. ** maher: n/a ** | $150,000 |
| Jun 6, 2018 | Never finaled issued Jul 2018, no final | 630 Vermont St | revision to pa 2018-0122-9177 1st floor front windows changed to casement. rear stairs & siding being repaired in kind. mechanical room door located to hallway. rear glass doors & window being addedDetails
revision to pa 2018-0122-9177 1st floor front windows changed to casement. rear stairs & siding being repaired in kind. mechanical room door located to hallway. rear glass doors & window being added | $2,000 | |
| Jun 4, 2018 | Completed final sign-off Oct 2019 | 154 Bonview St | Sft Construction Corp | revision to 201802060501 reduction in scope: remove media room @ basement, relocate stair to 1st flr. remove bath at 1st flr. remove skylight @ 2nd flrDetails
revision to 201802060501 reduction in scope: remove media room @ basement, relocate stair to 1st flr. remove bath at 1st flr. remove skylight @ 2nd flr | |
| May 2, 2018 | Completed final sign-off Jun 2018 | 117 Ellsworth St | Perez Construction Llc. | additional work to be performed on previously approved permit #201707050991. replace existing garage door with new metal sectional door. replace existing stucco siding at front with new cedar siding.Details
additional work to be performed on previously approved permit #201707050991. replace existing garage door with new metal sectional door. replace existing stucco siding at front with new cedar siding. | $10,000 |
| Apr 17, 2018 | Completed final sign-off Jan 2019 | 288 Randall St | Cardea Bldg Dba Dimension Design Group | interior remodel to 3 story, 2 unit residential bldg, new stairs added in unit 288 to 1st & basement floors. new family room & bath at basement, new front facade - altered bay windowsDetails
interior remodel to 3 story, 2 unit residential bldg, new stairs added in unit 288 to 1st & basement floors. new family room & bath at basement, new front facade - altered bay windows | $350,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 630 Vermont St | revision to 201801229177 improving structural plan. fire work at rear bldg wall area as shown only. delete omf from 2 & 3rd fls & keep (e) shear walls. modify ground fl frame details.Details
revision to 201801229177 improving structural plan. fire work at rear bldg wall area as shown only. delete omf from 2 & 3rd fls & keep (e) shear walls. modify ground fl frame details. | ||
| Feb 20, 2018 | Completed final sign-off Sep 2023 | 1735 Hyde St | Sassoon Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201712531. additional work under pa 201802201685Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201712531. additional work under pa 201802201685 | $100,000 |
| Feb 20, 2018 | Completed final sign-off Nov 2023 | 1735 Hyde St | Sassoon Construction | interior remodel throughout all floors - infill (e) two lightwells @ north side. expand (e) floor to basement. add bath and bedroom in basement and add bedroom @ 4th floor. soft story pa under 2018-0220-1679Details
interior remodel throughout all floors - infill (e) two lightwells @ north side. expand (e) floor to basement. add bath and bedroom in basement and add bedroom @ 4th floor. soft story pa under 2018-0220-1679 | $600,000 |
| Feb 13, 2018 | Expired or cancelled cancelled Nov 2022 | 123 Lyon St | interior remodel - unit 123 #1 (lower unit) is being relocated to 1st floor with a new kitchen & bathroom.Details
interior remodel - unit 123 #1 (lower unit) is being relocated to 1st floor with a new kitchen & bathroom. | $125,000 | |
| Jan 22, 2018 | Completed final sign-off Jan 2019 | 630 Vermont St | 2nd fl unit is being expanded into the 1st fl garage. open stair connection between the units along with bedrooms, bathrooms and a wetbar.Details
2nd fl unit is being expanded into the 1st fl garage. open stair connection between the units along with bedrooms, bathrooms and a wetbar. | $150,000 | |
| Nov 15, 2017 | Completed final sign-off Dec 2024 | 22 Terra Vista Av | new adu-under ordinance 162-16. convert (e) storage space at ground flor into dwelling into dwelling unit at bldg "a" voluntary seismic under permit #201207245599Details
new adu-under ordinance 162-16. convert (e) storage space at ground flor into dwelling into dwelling unit at bldg "a" voluntary seismic under permit #201207245599 | $150,000 | |
| Oct 27, 2017 | Never finaled issued Jun 2019, no final | 22 Terra Vista Av | adu under unit d8 at ground floor under unit d4 of bldg d per ordinance 162-16. legalization under pa# 2017/10/27/2493-s.Details
adu under unit d8 at ground floor under unit d4 of bldg d per ordinance 162-16. legalization under pa# 2017/10/27/2493-s. | $90,000 | |
| Oct 27, 2017 | Never finaled issued Jun 2019, no final | 22 Terra Vista Av | Speedy Construction Inc | to comply w/ nov #201771025, legalize (e) dwelling unit in bldg c, below unit c-1 per ordinance per ord 162-16.Details
to comply w/ nov #201771025, legalize (e) dwelling unit in bldg c, below unit c-1 per ordinance per ord 162-16. | $20,000 |
| Oct 27, 2017 | Completed final sign-off Sep 2022 | 428 Liberty St | Cardea Bldg Dba Dimension Design Group | vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bathDetails
vertical & horizontal additon at rear. 1st fl:(n)fam room, bath, playroom. 2nd fl:kitchen expansion. 3rd fl:(n)master bd, remodel (e)beds and 4th fl: (n) bed and 1/2 bath | $500,000 |
| Oct 27, 2017 | Completed final sign-off Apr 2019 | 22 Terra Vista Av | bldg d. legalize (e) dwelling unit d-1 in bldg d at ground floor below unit d-3 per ordinance 43-14. adu under pa# 2017/10/27/2492-s.Details
bldg d. legalize (e) dwelling unit d-1 in bldg d at ground floor below unit d-3 per ordinance 43-14. adu under pa# 2017/10/27/2492-s. | $30,000 | |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 1156 Florida St | Christopher Gate Construction Inc | revision to previously approved permit #201510068989. new window added, second fl, south wall outside of laundry closet.Details
revision to previously approved permit #201510068989. new window added, second fl, south wall outside of laundry closet. | $900 |
| Jul 27, 2017 | Never finaled issued Jul 2017, no final | 1156 Florida St | Christopher Gate Construction Inc | revision to pa #201510068989 - correction to draining showing roof line at south elevation. updated to show 6" height difference with the new roof over the master bedroom. new master bedroom roof drainage slope updated. to comply with nov 201774751Details
revision to pa #201510068989 - correction to draining showing roof line at south elevation. updated to show 6" height difference with the new roof over the master bedroom. new master bedroom roof drainage slope updated. to comply with nov 201774751 | $500 |
| Jul 13, 2017 | Never finaled issued Jul 2017, no final | 1156 Florida St | Christopher Gate Construction Inc | revision to previously approved permit #201510068989 and nov #20177451. sunroom walls replaced as neded, due to dry rot. new windows added to sunroom. less than 65% of all building walls replaced.Details
revision to previously approved permit #201510068989 and nov #20177451. sunroom walls replaced as neded, due to dry rot. new windows added to sunroom. less than 65% of all building walls replaced. | $12,000 |
| May 30, 2017 | Expired or cancelled withdrawn Mar 2022 | 4122 17th St | garage being added underground with garage door being placed at retaining wall. retaining wall to be recontructed, curb cut added. 1st floor to be lowered 2 feet. new east facing property line windows at first and thrid floors.Details
garage being added underground with garage door being placed at retaining wall. retaining wall to be recontructed, curb cut added. 1st floor to be lowered 2 feet. new east facing property line windows at first and thrid floors. | $150,000 | |
| May 3, 2017 | Never finaled issued Sep 2018, no final | 2071 47th Av | Adib Construction & Engineering Svcs | horizontal & vertical extension. interior remodel throughout, add master bedroom to 2nd flr, (n) master bedroom, family rm & media rm @ 3rd flr. add (n) unit to 1st flr.Details
horizontal & vertical extension. interior remodel throughout, add master bedroom to 2nd flr, (n) master bedroom, family rm & media rm @ 3rd flr. add (n) unit to 1st flr. | $700,000 |
| Apr 10, 2017 | Completed final sign-off Aug 2018 | 4037 25th St | S Mc Cann Construction Inc | unit 4037 - interior renovations (n) bath, relocate (e) washer/dryer & closet, remove ceiling drywall throughout unit, insulate & replace drywall. unit 4039 - (n) bath, relocate (e) closetDetails
unit 4037 - interior renovations (n) bath, relocate (e) washer/dryer & closet, remove ceiling drywall throughout unit, insulate & replace drywall. unit 4039 - (n) bath, relocate (e) closet | $20,000 |
| Apr 10, 2017 | Completed final sign-off Apr 2017 | 60 Laidley St | Cardea Bldg Dba Dimension Design Group | revision to pa 2017-0322-20106 & comply with nov 201770431 to remove (e) cantilevered bay @ south elevationDetails
revision to pa 2017-0322-20106 & comply with nov 201770431 to remove (e) cantilevered bay @ south elevation | |
| Mar 20, 2017 | Never finaled issued Nov 2018, no final | 51 Priest St | add unit per ord 162-16. new dwelling unit being added at ground floor under the city's adu program per ordinance 162-16. 1 bedroom, 1 bathroom and 1 kitchen being addedDetails
add unit per ord 162-16. new dwelling unit being added at ground floor under the city's adu program per ordinance 162-16. 1 bedroom, 1 bathroom and 1 kitchen being added | $90,000 | |
| Nov 7, 2016 | Completed final sign-off Jun 2018 | 1401 Monterey Bl | Pegasus Builders | under construction. revision to approved bpa #201412022874-s1. relocate sliding door & window @ ground fl, (n) posts under 2nd fl balcony, remove chimney @ 3rd fl south facade, minor interior changes to layout. ** maher: n/a **Details
under construction. revision to approved bpa #201412022874-s1. relocate sliding door & window @ ground fl, (n) posts under 2nd fl balcony, remove chimney @ 3rd fl south facade, minor interior changes to layout. ** maher: n/a ** | |
| Aug 4, 2016 | Completed final sign-off Feb 2020 | 392 San Jose Av | Domicile Construction | raise (e) sloped roof over rear 1 - story extension, appx. 5 ft. remodel (e) kitchen, replace dryrot at area of remodel. replace (e)deteriorate deck @ gradeDetails
raise (e) sloped roof over rear 1 - story extension, appx. 5 ft. remodel (e) kitchen, replace dryrot at area of remodel. replace (e)deteriorate deck @ grade | $110,000 |
| Apr 15, 2016 | Never finaled issued Feb 2018, no final | 625 Hyde St | comply nov 200561935. partial vertical addition @ 5/fl. add bath & roof deck to unit 5. add 2 bedroom & bath to unit 6 (rear). add bedroom to ground floor to unit 7. interior remodel throughout.Details
comply nov 200561935. partial vertical addition @ 5/fl. add bath & roof deck to unit 5. add 2 bedroom & bath to unit 6 (rear). add bedroom to ground floor to unit 7. interior remodel throughout. | $800,000 | |
| Apr 8, 2016 | Completed final sign-off Apr 2017 | 1310 10th Av | Gf Golden Foundation Co. | remodel (e) bath & add (n) bath @ 3/f, (n) laundry closet.Details
remodel (e) bath & add (n) bath @ 3/f, (n) laundry closet. | $20,000 |
| Apr 1, 2016 | Completed final sign-off Feb 2018 | 1310 10th Av | Gf Golden Foundation Co. | horizon addition & interior remodel. 1st floor: add family room, bath & bedroom, new stair to 2nd floor. replace (e) windows in kind. new spiral stair to grade. 2nd floor: remove (e) bath, add 1/2 bath, kitchen remodel.Details
horizon addition & interior remodel. 1st floor: add family room, bath & bedroom, new stair to 2nd floor. replace (e) windows in kind. new spiral stair to grade. 2nd floor: remove (e) bath, add 1/2 bath, kitchen remodel. | $190,000 |
| Jan 13, 2016 | Never finaled issued Mar 2016, no final | 94 Rockaway Av | interior remodel, 2nd fl remodel of existing bath, kitchen, new balcony. 1st fl remodel of existing bath, basement remodel adds new bath, ghym, rebuilt interior stairs, exterior door is added in place of window at subbasementDetails
interior remodel, 2nd fl remodel of existing bath, kitchen, new balcony. 1st fl remodel of existing bath, basement remodel adds new bath, ghym, rebuilt interior stairs, exterior door is added in place of window at subbasement | $120,000 | |
| Dec 23, 2015 | Completed final sign-off Mar 2024 | 336 Lathrop Av | vertical & horizontal addition @ rear of building. 2nd floor to include family room & garage. 3rd floor addition to include 3 bedrooms & 2 baths.Details
vertical & horizontal addition @ rear of building. 2nd floor to include family room & garage. 3rd floor addition to include 3 bedrooms & 2 baths. | $150,000 | |
| Dec 23, 2015 | Completed final sign-off Nov 2017 | 1573 10th Av | Alpha Construction & Engineering Inc. | revision to approved permit app #201510200217 includes rear horiz. addition at 1/f & 2/f. new deck at 2/f & 3/f; additional laundry being added at 1/f. addition allows for a larger kitchen at 2/f & bedrm & larger family rm at 1/f.Details
revision to approved permit app #201510200217 includes rear horiz. addition at 1/f & 2/f. new deck at 2/f & 3/f; additional laundry being added at 1/f. addition allows for a larger kitchen at 2/f & bedrm & larger family rm at 1/f. | $60,000 |
| Sep 18, 2015 | Expired or cancelled cancelled Jan 2026 | 712 Bryant St | #2- interior remodel to unit #2, kitchen & 2 bathroom remodel, relocate washer & dryer. no exterior work is being done. n/a ordinance #155-13Details
#2- interior remodel to unit #2, kitchen & 2 bathroom remodel, relocate washer & dryer. no exterior work is being done. n/a ordinance #155-13 | $20,000 | |
| Jul 17, 2015 | Completed final sign-off Jan 2016 | 863 Guerrero St | Loughran Construction Inc. | to comply/correct w/nov #201536811 - as-built plans to legalize (e) playroom & bath @ ground floor & (e) 6' fence @ south property line.Details
to comply/correct w/nov #201536811 - as-built plans to legalize (e) playroom & bath @ ground floor & (e) 6' fence @ south property line. | $15,000 |
| Jun 16, 2015 | Completed final sign-off Nov 2016 | 1164 De Haro St | E - 5 Construction Inc | horizontal addition, deck if being infilled at rear for new bedroom & cantilever's 4' out. (e)balcony is extended 1'-3" to also cantilever 4' out. support wall is added at property line, deck is added to roof above (n) bedroom.Details
horizontal addition, deck if being infilled at rear for new bedroom & cantilever's 4' out. (e)balcony is extended 1'-3" to also cantilever 4' out. support wall is added at property line, deck is added to roof above (n) bedroom. | $15,000 |
| Jun 12, 2015 | Completed final sign-off Nov 2017 | 642 Mississippi St | Hennessy Construciton | interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room.Details
interior remodel, new kitchen & added bathroom at 2nd and 3rd flrs: windows being replaced in kind with all clad at front & new windows at rear & side. in filling lightwell at 3rd flr, south side, access to 1st flr provided with new stair, laundry room. | $75,000 |
| Apr 20, 2015 | Never finaled issued Aug 2016, no final | 654 33rd Av | horizontal & vertical addition, interior remodel. add 2 bed & 2 bath @ ground floor, new spiral stair, new bath @ 2nd floor, new bath @ 3rd floor, new 4th floor addition of 2 bed, bath, family room, office & new roof decks.Details
horizontal & vertical addition, interior remodel. add 2 bed & 2 bath @ ground floor, new spiral stair, new bath @ 2nd floor, new bath @ 3rd floor, new 4th floor addition of 2 bed, bath, family room, office & new roof decks. | $380,000 | |
| Apr 16, 2015 | Completed final sign-off May 2017 | 295 Sanchez St | Pegasus Building/Castle Construction | revision to app#201304053901: enclose extg lightwell at 1st and 2nd floor at north p.l., add new elevator. replace extg brick veneer with stucco at ground floor, remove extg stair to roof at 4th floor, new interior stair between 1st and 2nd floor.Details
revision to app#201304053901: enclose extg lightwell at 1st and 2nd floor at north p.l., add new elevator. replace extg brick veneer with stucco at ground floor, remove extg stair to roof at 4th floor, new interior stair between 1st and 2nd floor. | $20,000 |
| Apr 13, 2015 | Expired or cancelled withdrawn Jun 2018 | 434 03rd Av | exterior/interior remodel of(e) 2-story,2-unit bldg into 4-story, 2-unit bldg.raise bldg to accomodate garage @ 1/f. horiz. & vert. addition @ south side of(e)bldg. no work to rear unit bldg.1/f: add 1 bedrm/1 bath;2/f:add 1 bedrm/2 baths;3/f:add 1 bedrm/1 bath/;4/f:add 2 bedrms/2 baths.Details
exterior/interior remodel of(e) 2-story,2-unit bldg into 4-story, 2-unit bldg.raise bldg to accomodate garage @ 1/f. horiz. & vert. addition @ south side of(e)bldg. no work to rear unit bldg.1/f: add 1 bedrm/1 bath;2/f:add 1 bedrm/2 baths;3/f:add 1 bedrm/1 bath/;4/f:add 2 bedrms/2 baths. | $500,000 | |
| Mar 23, 2015 | Completed final sign-off Apr 2016 | 1026 Diamond St | Jose Olmos General Contractor | interior remodel 1st floor include excavate to allow 8'-0" ceiling height with half bath, a new work studio and new utility area per plan. enlarge garage area and door per plan. no work on 2nd floor.Details
interior remodel 1st floor include excavate to allow 8'-0" ceiling height with half bath, a new work studio and new utility area per plan. enlarge garage area and door per plan. no work on 2nd floor. | $50,000 |
| Mar 10, 2015 | Completed final sign-off May 2016 | 630 Vermont St | Twin Pinnacles Construction | revisions to e(e) pa# 2015 0120 6071 window ar rear is being enlarged & vinyl windows at front are being replaced w/all clad windowsDetails
revisions to e(e) pa# 2015 0120 6071 window ar rear is being enlarged & vinyl windows at front are being replaced w/all clad windows | $1,000 |
| Feb 26, 2015 | Expired or cancelled expired Aug 2019 | 2411 Green St | Dan Gillies Construction Services Inc | replacement of garage door and removal of center posts. maher n/a.Details
replacement of garage door and removal of center posts. maher n/a. | $20,000 |
| Jan 20, 2015 | Completed final sign-off Jul 2016 | 19 Kenwood Wy | Alpha Construction & Engineering Inc. | interior remodel of all 2 floors, new kitchen (remodel), additinal 2 bathrooms & 2 bedrooms @ 1st floor.Details
interior remodel of all 2 floors, new kitchen (remodel), additinal 2 bathrooms & 2 bedrooms @ 1st floor. | $150,000 |
| Jan 20, 2015 | Completed final sign-off May 2016 | 630 Vermont St | Twin Pinnacles Construction | interior renovation to both units, remodeled kitchens, additional bathroom & new stair, enlarge windows at rear & lot infill at lightwell.Details
interior renovation to both units, remodeled kitchens, additional bathroom & new stair, enlarge windows at rear & lot infill at lightwell. | $90,000 |
| Dec 10, 2014 | Completed final sign-off Apr 2015 | 512 College Av | E - 5 Construction Inc | interior renovation of existing single family home that includes alteratio to the stairs at gg/f and creation of living room. 40 sf of garage space taken for laundry room and hallway; add 1 skylight.Details
interior renovation of existing single family home that includes alteratio to the stairs at gg/f and creation of living room. 40 sf of garage space taken for laundry room and hallway; add 1 skylight. | $25,000 |
| Nov 17, 2014 | Never finaled issued Mar 2017, no final | 438 29th St | Barrera & Associates Construction Inc, Envisage Construction | horizontal & vertical addition at rear. interior renovation to all floors of (e) single family home. included (n) kitchen, bedrooms & baths.Details
horizontal & vertical addition at rear. interior renovation to all floors of (e) single family home. included (n) kitchen, bedrooms & baths. | $700,000 |
| Sep 4, 2014 | Expired or cancelled withdrawn Jan 2015 | 176 Yerba Buena Av | horizontal addition with master bathroom, remodel kitchen. excavating garage for new family room & bathroom, new deck, romdel to all floors.Details
horizontal addition with master bathroom, remodel kitchen. excavating garage for new family room & bathroom, new deck, romdel to all floors. | $400,000 | |
| Feb 20, 2014 | Completed final sign-off Mar 2016 | 17 Costa St | Loughran Construction Inc. | repair & renovation to existing residence. increase in area from 1220 sq ft to 1600 sq ft. the addition will consist of a new bedroom below, and a sunroom above.Details
repair & renovation to existing residence. increase in area from 1220 sq ft to 1600 sq ft. the addition will consist of a new bedroom below, and a sunroom above. | $80,000 |
| Apr 17, 2013 | Completed final sign-off Jul 2013 | 200 Divisadero St | # 2 - comply with nov# 201058329-dry rot repair & structural strengthening to (e) deck at rearDetails
# 2 - comply with nov# 201058329-dry rot repair & structural strengthening to (e) deck at rear | $5,000 | |
| Apr 5, 2013 | Completed final sign-off May 2017 | 295 Sanchez St | Pegasus Builders | vertical addition - (n) 4th floor; interior remodel throughout; (n) deck @ rear. horizontal addition to ground floor. add 1 off street parking.Details
vertical addition - (n) 4th floor; interior remodel throughout; (n) deck @ rear. horizontal addition to ground floor. add 1 off street parking. | $265,000 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 422 Jersey St | Towey Construction Inc. | front stair repair & rebuildDetails
front stair repair & rebuild | $10,000 |
| Jun 20, 2011 | Completed final sign-off Nov 2011 | 346 27th St | S F Bay Construction Inc | interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west sideDetails
interior remodel-1st floor-add 1 bedroom, 1 bathroom, family room, laundry room. 2nd floor-remodel kitchen, new stairs to 1st floor, new deck at rear & west side | $110,000 |