James Li
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- James Li P.E. Consulting Eng.
- Based in
- Millbrae
- On San Francisco permits
- Mar 2000 to Sep 2026
173 permits since 2000 (engineer on 136 permits, architect on 32 permits, authorized agent-others on 6 permits, attorney on 2 permits, designer on 1 permit): 113 completed, 9 in progress, 15 never finaled, 36 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 173.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 550 Monterey Bl | convert the rear portion of the ground floor living area into a jadu including: convert (e) bedroom into a kitchen by installing kitchen cabinets, a kitchen sink, a electric induction cooktop & a refridgerator. install a new partion and door to separate the new jadu.Details
convert the rear portion of the ground floor living area into a jadu including: convert (e) bedroom into a kitchen by installing kitchen cabinets, a kitchen sink, a electric induction cooktop & a refridgerator. install a new partion and door to separate the new jadu. | $3,000 | |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 2331 31st Av | g/f: change of use from garage/workshop to child care.upgrade meter to 200a.new heatpump; 2/f: add outdoor stairscase to 2/f, remodel master bed suite w/ layout changes. new deck on 2/f laundry relocated to 2/f.Details
g/f: change of use from garage/workshop to child care.upgrade meter to 200a.new heatpump; 2/f: add outdoor stairscase to 2/f, remodel master bed suite w/ layout changes. new deck on 2/f laundry relocated to 2/f. | $150,000 | |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 2654 31st Av | Bc United Construction Inc | install a secondary kitchenette on ground fl media roomDetails
install a secondary kitchenette on ground fl media room | $2,900 |
| Nov 7, 2025 | In progress filed Nov 2025, not yet issued | 6038 Geary Bl | convert the existing flower shop to a childcare center at the ground floor.ground floor serves for children aged 3 months to 5 years, 3.remove the existing ground floor shed at the rear of the lot, under separate permit. 4. expand the ground floor with a horizontal addition of 955 square feet.Details
convert the existing flower shop to a childcare center at the ground floor.ground floor serves for children aged 3 months to 5 years, 3.remove the existing ground floor shed at the rear of the lot, under separate permit. 4. expand the ground floor with a horizontal addition of 955 square feet. | $400,000 | |
| Sep 5, 2025 | In progress issued Nov 2025 | 901 Divisadero St | Bc United Construction Inc | unit a: re-direct the existing ada ramp, new bench near front wall, re-arrange the coffee preparation area, relocate the 3 compartment sink and dishwasher, replace existing furnace and ducting, alter & update lighting in dining room & kitchen.Details
unit a: re-direct the existing ada ramp, new bench near front wall, re-arrange the coffee preparation area, relocate the 3 compartment sink and dishwasher, replace existing furnace and ducting, alter & update lighting in dining room & kitchen. | $50,000 |
| Jul 23, 2025 | Completed final sign-off Dec 2025 | 3101 Clement St | Giant Work Construction Corp | revision to pa# 202308255335: structural reinforcement due to site condition. (structural only)update field conditionDetails
revision to pa# 202308255335: structural reinforcement due to site condition. (structural only)update field condition | |
| Jul 21, 2025 | In progress filed Jul 2025, not yet issued | 1227 Taraval St | change of use: convert (e) laundromat to (n) childcare (3 months-5 year old) center on the ground floor (30 kids).Details
change of use: convert (e) laundromat to (n) childcare (3 months-5 year old) center on the ground floor (30 kids). | $200,000 | |
| Jun 4, 2025 | Completed final sign-off Sep 2025 | 54 Carmelita St | Bc United Construction Inc | revision to permit 202402166099. remove (e) fireplace on 2nd floor.Details
revision to permit 202402166099. remove (e) fireplace on 2nd floor. | |
| Nov 27, 2024 | In progress issued Dec 2024 | 459 28th Av | enlarge garage door width for 459-461 28th aveDetails
enlarge garage door width for 459-461 28th ave | $3,000 | |
| Aug 28, 2024 | Completed final sign-off Jul 2025 | 619 47th Av | revision to pa# 202306210502: minor structural revison to detail e.f. and g/s-2 (roof deck guardrail details)Details
revision to pa# 202306210502: minor structural revison to detail e.f. and g/s-2 (roof deck guardrail details) | ||
| May 2, 2024 | In progress issued Jul 2025 | 2972 Bush St | Bc United Construction Inc | revision to 202309086180, 202403208264 enlarge e attic floor to have the 2 bedrooms and 2 baths. new roof deck at middle of house. infill lightwell (fl 1 and 2 remodel under 202403208264,seismic upgrade 202309086180)Details
revision to 202309086180, 202403208264 enlarge e attic floor to have the 2 bedrooms and 2 baths. new roof deck at middle of house. infill lightwell (fl 1 and 2 remodel under 202403208264,seismic upgrade 202309086180) | $100,000 |
| May 1, 2024 | Completed final sign-off Oct 2024 | 431 Monterey Bl | revision to pa#202211075990. changing the name from room to bedroom.Details
revision to pa#202211075990. changing the name from room to bedroom. | ||
| Mar 20, 2024 | In progress issued Mar 2024 | 2972 Bush St | Bc United Construction Inc | rev 202309086180: alt to (e) 2 units. layout changes to (e) floors. upgrade seismic to entire building.Details
rev 202309086180: alt to (e) 2 units. layout changes to (e) floors. upgrade seismic to entire building. | |
| Feb 16, 2024 | Completed final sign-off Sep 2025 | 54 Carmelita St | Bc United Construction Inc | comply w/ nov #202303636; fire repair and altertion repair fire damage to the north exterior wall, enlarge (e) opening between kitchen and dining room on 1st & 2nd fl. install a new skylight above (e) stairway remodel (e) bathrooms in kind at 1st & 2nd fl. install new radiant heating system.Details
comply w/ nov #202303636; fire repair and altertion repair fire damage to the north exterior wall, enlarge (e) opening between kitchen and dining room on 1st & 2nd fl. install a new skylight above (e) stairway remodel (e) bathrooms in kind at 1st & 2nd fl. install new radiant heating system. | $20,000 |
| Dec 26, 2023 | Completed final sign-off Jul 2024 | 231 Crestmont Dr | replace (e) stairs in kind at side of buildingDetails
replace (e) stairs in kind at side of building | $20,000 | |
| Dec 12, 2023 | Completed final sign-off Aug 2024 | 403 32nd Av | Bybon Construction | revision to pa 202304206159 relocate restroom and kitchenette; remove laundry & dishwasher (no exterior change)Details
revision to pa 202304206159 relocate restroom and kitchenette; remove laundry & dishwasher (no exterior change) | |
| Oct 3, 2023 | Completed final sign-off Oct 2024 | 556 Congo St | G B U Construction Development | revision to permit 202107164565. add a (2) new dormers to north-east roof above the new bedroom at attic floor. minor revision to structural details.Details
revision to permit 202107164565. add a (2) new dormers to north-east roof above the new bedroom at attic floor. minor revision to structural details. | $5,000 |
| Aug 15, 2023 | Never finaled filed Aug 2023, never issued | 1315 19th Av | remove 2nd fl fireplace. new exterior stair to 2nd fl. windows replacement like for like.Details
remove 2nd fl fireplace. new exterior stair to 2nd fl. windows replacement like for like. | $20,000 | |
| Aug 11, 2023 | Completed final sign-off Jan 2025 | 1604 Mcallister St | Bc United Construction Inc | revision to pa # 202302162143: seismic upgrade to (e) bldg. interior renovation to unit #1,2,3,6,7,8,9 & office. e heating sysem in each unit to remainDetails
revision to pa # 202302162143: seismic upgrade to (e) bldg. interior renovation to unit #1,2,3,6,7,8,9 & office. e heating sysem in each unit to remain | $60,000 |
| Jul 12, 2023 | In progress issued Sep 2025 | 2322 41st Av | Be Pro Construction Inc | 2 story horizontal and vertical addition including: add a new playroom on the first floor (designated childcare unit) upgrade bathroom to ada and to add new master bedroom and bath on the second floor. rear yard modification per pa 202504184808 by adding steel rear deck and stairs to grade.Details
2 story horizontal and vertical addition including: add a new playroom on the first floor (designated childcare unit) upgrade bathroom to ada and to add new master bedroom and bath on the second floor. rear yard modification per pa 202504184808 by adding steel rear deck and stairs to grade. | $200,000 |
| Jun 8, 2023 | Expired or cancelled cancelled Jan 2026 | 887 41st Av | change of use - convert 1st floor to daycare centerDetails
change of use - convert 1st floor to daycare center | $80,000 | |
| May 22, 2023 | Expired or cancelled expired Apr 2026 | 235 Crestmont Dr | house remodel including: repair and replace existing stairs in kind at side of building.Details
house remodel including: repair and replace existing stairs in kind at side of building. | $25,000 | |
| May 3, 2023 | Completed final sign-off Jul 2023 | 379 27th Av | D Construction Inc | revision to bpa#202206136214 and 202112073897, minor framing change @ 3/f, (1) beamDetails
revision to bpa#202206136214 and 202112073897, minor framing change @ 3/f, (1) beam | |
| Apr 20, 2023 | Completed final sign-off Aug 2024 | 403 32nd Av | Bybon Construction | change of use: change (e) dance studio (b) to (n) day care center (i-4)Details
change of use: change (e) dance studio (b) to (n) day care center (i-4) | $50,000 |
| Apr 20, 2023 | Completed final sign-off Nov 2023 | 2331 31st Av | 1 (n) partition wall in the garage, replace (e) window with (n) door on the (e) exterior wall window not facing the streetDetails
1 (n) partition wall in the garage, replace (e) window with (n) door on the (e) exterior wall window not facing the street | $2,000 | |
| Jan 6, 2023 | Completed final sign-off May 2023 | 460 36th Av | legalize/change of use, change (e) basement living space to small family day care (8 children).replace slab on grade in new hallway and replace (e) window for new sliding glass door.Details
legalize/change of use, change (e) basement living space to small family day care (8 children).replace slab on grade in new hallway and replace (e) window for new sliding glass door. | $10,000 | |
| Nov 7, 2022 | Completed final sign-off Oct 2024 | 431 Monterey Bl | to abate complaint 202290804, install new partition between kitchen and dining rm. install new door to new room. new header above opening to kitchen. new switches for new room and kitchen.Details
to abate complaint 202290804, install new partition between kitchen and dining rm. install new door to new room. new header above opening to kitchen. new switches for new room and kitchen. | $5,000 | |
| Nov 3, 2022 | Expired or cancelled expired Jan 2025 | 1604 Mcallister St | Bc United Construction Inc | install temporary cover for fire damaged roof @ southwest corner, remove partitions damaged by fireDetails
install temporary cover for fire damaged roof @ southwest corner, remove partitions damaged by fire | $5,000 |
| Aug 10, 2022 | Completed final sign-off Jan 2023 | 399 09th St | M And J Builder1141975 | to abate nov 202048631. install temp shoring to stabilize e posts. building to remain vacant per ab-017Details
to abate nov 202048631. install temp shoring to stabilize e posts. building to remain vacant per ab-017 | $10,000 |
| Jul 1, 2022 | Never finaled issued Aug 2022, no final | 115 Prospect Av | Reiz Builder And Constuction Inc | revision to permit 202201105682 and pa 202111051903. remove the wall between (e) bedroom and kitchen. rearrange the kitchen counter and island. convert (e) dining room into office. install two new beams with post.Details
revision to permit 202201105682 and pa 202111051903. remove the wall between (e) bedroom and kitchen. rearrange the kitchen counter and island. convert (e) dining room into office. install two new beams with post. | |
| Jun 13, 2022 | Completed final sign-off Jul 2023 | 379 27th Av | D Construction Inc | revision to pa# 202112073897 including revision to floor layout of bathrooms. minor revision to foundation, 2nd & 3rd floor framing.Details
revision to pa# 202112073897 including revision to floor layout of bathrooms. minor revision to foundation, 2nd & 3rd floor framing. | $1,000 |
| Apr 1, 2022 | Completed final sign-off Jun 2023 | 3169 Sacramento St | Daly Builders Group | revision to bpa 201905019415. revised floor layout. revised some foundation details.Details
revision to bpa 201905019415. revised floor layout. revised some foundation details. | |
| Feb 18, 2022 | Completed final sign-off Mar 2022 | 550 Monterey Bl | relocate the kitchen from the 2/f to 3/f by moving the range & hood. amend to pa202112214816.Details
relocate the kitchen from the 2/f to 3/f by moving the range & hood. amend to pa202112214816. | $1,500 | |
| Jan 31, 2022 | Completed final sign-off Mar 2023 | 1803 Judah St | Pro Plumbing & Fire Sprinkler Inc | fire sprinkler t.i at new adu & egress, relocate 1 & add 2 sprinklers. ref pa# 201907085301Details
fire sprinkler t.i at new adu & egress, relocate 1 & add 2 sprinklers. ref pa# 201907085301 | $1,638 |
| Dec 21, 2021 | Completed final sign-off Feb 2022 | 550 Monterey Bl | install a new closet to the existing bedroom in ground floor. (e) ground floor rooms were approved . rev. to 2021 1007 0086Details
install a new closet to the existing bedroom in ground floor. (e) ground floor rooms were approved . rev. to 2021 1007 0086 | $500 | |
| Dec 17, 2021 | Expired or cancelled cancelled Jan 2026 | 568 Shotwell St | remodeling of (e) unit 568 @ and floor including relocate rear door, remodel (e) bathroom and remove (e) fireplace.Details
remodeling of (e) unit 568 @ and floor including relocate rear door, remodel (e) bathroom and remove (e) fireplace. | $15,000 | |
| Dec 7, 2021 | Never finaled filed Dec 2021, never issued | 431 Monterey Bl | abate n.o.v 202181730.legalize(e)unpermitted 493 sq ft unit(431a monterey)on 1st floor.provice(n)dedicated entrance & enlarge(e)kitchen window.Details
abate n.o.v 202181730.legalize(e)unpermitted 493 sq ft unit(431a monterey)on 1st floor.provice(n)dedicated entrance & enlarge(e)kitchen window. | $1,000 | |
| Jun 7, 2021 | Never finaled issued Jun 2021, no final | 2538 Sacramento St | minor structural revision to 1st floor framing and foundagtion. revision to pa 200804079044Details
minor structural revision to 1st floor framing and foundagtion. revision to pa 200804079044 | ||
| Jun 7, 2021 | Completed final sign-off Jul 2022 | 783 Teresita Bl | Stroud Construction | rev to 202008312989 ground floor layout. create hallway between garage and living space.Details
rev to 202008312989 ground floor layout. create hallway between garage and living space. | $2,000 |
| Dec 14, 2020 | Completed final sign-off May 2021 | 546 Taraval St | S K Building Construction | lower (e) front entrance with a ramp inside to comply with ada requirement (to comply with mandatory disability access improvement program ordinance 51-16).Details
lower (e) front entrance with a ramp inside to comply with ada requirement (to comply with mandatory disability access improvement program ordinance 51-16). | $8,000 |
| Oct 2, 2020 | Completed final sign-off Jan 2022 | 2744 41st Av | R P Construction Inc. | to comply w/nov #202044791. non-structural fire repair to both floors. replace sheet rock, insulation, finish floor. reinstall plumbing & electrical fixtures. rebuilt rear deck and stair. re-arrange floor plans due to removal of work built without permit at north-east corner at rear.Details
to comply w/nov #202044791. non-structural fire repair to both floors. replace sheet rock, insulation, finish floor. reinstall plumbing & electrical fixtures. rebuilt rear deck and stair. re-arrange floor plans due to removal of work built without permit at north-east corner at rear. | $80,000 |
| Sep 30, 2020 | Completed final sign-off Jun 2023 | 1459 15th Av | Alpha Construction Company | g/f renovation: 2 bedrooms, 1 full bathroom, recreation room and a family room. infill space under (e) sunroom in rear and incorporate into the g/f space.Details
g/f renovation: 2 bedrooms, 1 full bathroom, recreation room and a family room. infill space under (e) sunroom in rear and incorporate into the g/f space. | $65,000 |
| Aug 5, 2020 | Completed final sign-off Feb 2021 | 431 Monterey Bl | Alpha Construction Company | repair fire damage in the 2/f of (e) bldg including: replace electrical wires, outlets, swithces, and lightings. install new r-3- insulation to roof, r-13 insulation to all exterior walls. install new 5/8" type x gpybd to property walls at within 3' from property line, 1/2" gpybd to the rest of wallDetails
repair fire damage in the 2/f of (e) bldg including: replace electrical wires, outlets, swithces, and lightings. install new r-3- insulation to roof, r-13 insulation to all exterior walls. install new 5/8" type x gpybd to property walls at within 3' from property line, 1/2" gpybd to the rest of wall | $50,000 |
| Mar 4, 2020 | Expired or cancelled cancelled Mar 2023 | 1266 Guerrero St | 1)install 4 new dormers: 3 at the southside and one at north side. 2)convert extg attic space into living space with one bedroom, one study room and 2 baths. total 498 sq ft.Details
1)install 4 new dormers: 3 at the southside and one at north side. 2)convert extg attic space into living space with one bedroom, one study room and 2 baths. total 498 sq ft. | $50,000 | |
| Jan 8, 2020 | Expired or cancelled cancelled Jan 2026 | 523 Judah St | remove wall at rear and partition in rear of garage done without permit. to abate the nov #2019999781. see plans per app#200006021562Details
remove wall at rear and partition in rear of garage done without permit. to abate the nov #2019999781. see plans per app#200006021562 | $1,000 | |
| Dec 6, 2019 | Expired or cancelled cancelled Jan 2026 | 1356 South Van Ness Av | seismic upgrade to ground floor. repair/replace partial foundation.Details
seismic upgrade to ground floor. repair/replace partial foundation. | $15,000 | |
| Aug 30, 2019 | Completed final sign-off Apr 2020 | 1245 Noriega St | Modern Construction Inc | lower (e) entrance to comply with ada requirements. renovate (e) restroom to comply with ada; to comply with accessible business entrance program per ordinance 51-16.Details
lower (e) entrance to comply with ada requirements. renovate (e) restroom to comply with ada; to comply with accessible business entrance program per ordinance 51-16. | $15,000 |
| Jul 8, 2019 | Completed final sign-off May 2023 | 1803 Judah St | Home C Construction Inc | convert e garage into a new studio adu no 162-16.Details
convert e garage into a new studio adu no 162-16. | $30,000 |
| Feb 4, 2019 | Completed final sign-off Dec 2020 | 2408 15th St | Tombay Construction | 1)renovation to extg unit #4 on top floor including remodeling of extg kitchen and bath. 2)install 3 new dormers, 2 at east side and one at west.Details
1)renovation to extg unit #4 on top floor including remodeling of extg kitchen and bath. 2)install 3 new dormers, 2 at east side and one at west. | $30,000 |
| Feb 4, 2019 | Completed final sign-off May 2019 | 173 Chestnut St | Ventana 76 | 1) remove extg partition between living room and bedroom. 2)install new beams, post and foundation at ground floor and 2nd floor.Details
1) remove extg partition between living room and bedroom. 2)install new beams, post and foundation at ground floor and 2nd floor. | $15,000 |
| Jun 19, 2018 | Completed final sign-off Jan 2023 | 534 Texas St | rev to pa# 201112301504; add door next to garage door, reduce front windowDetails
rev to pa# 201112301504; add door next to garage door, reduce front window | $300 | |
| Aug 14, 2017 | Completed final sign-off Nov 2017 | 2261 Washington St | rebuild (e) deck at rear as per plan in kind.Details
rebuild (e) deck at rear as per plan in kind. | $6,000 | |
| Aug 14, 2017 | Expired or cancelled withdrawn Jan 2020 | 1486 15th St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, upgrade the lower level. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, upgrade the lower level. n/a ordinance #155-13 | $15,000 | |
| Aug 29, 2016 | Completed final sign-off Oct 2017 | 767 Pine St | minor structural revision to foundation plan and detail to app#201602290805.Details
minor structural revision to foundation plan and detail to app#201602290805. | $2,000 | |
| Aug 19, 2016 | Completed final sign-off Jul 2021 | 462 34th Av | Kent Deng | legalize (e) units in ground floor per ordinance# 43-14. 2 bedrooms & 2 bath.Details
legalize (e) units in ground floor per ordinance# 43-14. 2 bedrooms & 2 bath. | $2,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2017 | 170 Eastwood Dr | Zhang's Building Co | remodel kitchen,3 baths,reconfig. bath & add closet,replace int.stair,repair ext.stair & dryrot per pest report #69086,remove shed & repair pavers, pavement & fence in backyard;relocate laundry washer/dryer to new laundry rm.,replace light fixturesDetails
remodel kitchen,3 baths,reconfig. bath & add closet,replace int.stair,repair ext.stair & dryrot per pest report #69086,remove shed & repair pavers, pavement & fence in backyard;relocate laundry washer/dryer to new laundry rm.,replace light fixtures | $75,000 |
| Jul 8, 2016 | Expired or cancelled cancelled Mar 2019 | 722 39th Av | build deck in rear of (e) 2nd flDetails
build deck in rear of (e) 2nd fl | $3,000 | |
| Apr 8, 2016 | Expired or cancelled cancelled Jan 2026 | 85 Palm Av | comply with wood frame seismic retrofit program soft story. ugrade lower floor to comply with sfbc ch 34 bDetails
comply with wood frame seismic retrofit program soft story. ugrade lower floor to comply with sfbc ch 34 b | $6,000 | |
| Mar 22, 2016 | Expired or cancelled cancelled Jul 2024 | 589 Texas St | to demolish 2 stories, single family buildling.Details
to demolish 2 stories, single family buildling. | $10,000 | |
| Mar 22, 2016 | Expired or cancelled cancelled Jul 2024 | 589 Texas St | to erect 4 stories, 1 basement, 2 units residential building.Details
to erect 4 stories, 1 basement, 2 units residential building. | $325,000 | |
| Sep 11, 2015 | Never finaled issued Sep 2015, no final | 3485 21st St | Tombay Construction | revision to pa #2014.0417.3524 - soft story retrofit 2012 iebc appendix a-4 - add foundaiton where none existing.Details
revision to pa #2014.0417.3524 - soft story retrofit 2012 iebc appendix a-4 - add foundaiton where none existing. | $2,500 |
| Jul 6, 2015 | Completed final sign-off Oct 2015 | 3151 Kamille Ct | Hoi's Construction | grd fl: interior renovation to (e) child-care. (n) partitions, enlarge (e) restroom, renovation of (e) playground. life safety deferred.Details
grd fl: interior renovation to (e) child-care. (n) partitions, enlarge (e) restroom, renovation of (e) playground. life safety deferred. | $20,000 |
| Jul 6, 2015 | Completed final sign-off Apr 2016 | 722 39th Av | New Star Construction | infill extg lightwell and remodel extg bath.Details
infill extg lightwell and remodel extg bath. | $6,000 |
| Jul 2, 2015 | Completed final sign-off Jul 2015 | 8 Napier Ln | Klep Construction Inc. | revision to app#201506017603. new joist framing and reposition access door to attic.Details
revision to app#201506017603. new joist framing and reposition access door to attic. | |
| Jun 25, 2015 | Completed final sign-off Aug 2015 | 571 17th Av | Lung Fung Const & Elec Co | replace 2 footing at rear of sunroom.Details
replace 2 footing at rear of sunroom. | $2,000 |
| Jun 25, 2015 | Completed final sign-off Jul 2015 | 300 28th Av | Cabrillo Construction Co. Inc. | revision to pa#201503120622 revise foundation, steel frame & details.Details
revision to pa#201503120622 revise foundation, steel frame & details. | $2,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2016 | 1225 Athens St | New Improvement Construction | legalize (e) unpermitted ground floor area to a new unit including 2 bedrooms, one full bath, one kitchen and living room.Details
legalize (e) unpermitted ground floor area to a new unit including 2 bedrooms, one full bath, one kitchen and living room. | $20,000 |
| Jun 9, 2015 | Completed final sign-off Dec 2016 | 2955 20th Av | New Improvement Construction | legalize and renovate extg unit on ground floor including 4 bedrooms, 2 bath, family room and living room per ordinance 43-14Details
legalize and renovate extg unit on ground floor including 4 bedrooms, 2 bath, family room and living room per ordinance 43-14 | $60,000 |
| Jun 1, 2015 | Completed final sign-off Jul 2015 | 8 Napier Ln | Klep Construction Inc. | install new furnace in attic. create new attic access & install trap door/step ladder unit, new joists for new plywood floor to make room for ductwork & clear (e) pipesDetails
install new furnace in attic. create new attic access & install trap door/step ladder unit, new joists for new plywood floor to make room for ductwork & clear (e) pipes | $20,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 300 28th Av | to comply with wood frame seismic retrofit program (soft story). retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. upgrade lower floor.Details
to comply with wood frame seismic retrofit program (soft story). retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. upgrade lower floor. | $20,000 | |
| Nov 21, 2014 | Completed final sign-off Jan 2016 | 1626 34th Av | G L Construction Company | relocate lightwell from center to northside. relayout e 2nd fl to include new study rm. remodel e gr fl to 2 bedrooms, 1 bath, 1 family roomDetails
relocate lightwell from center to northside. relayout e 2nd fl to include new study rm. remodel e gr fl to 2 bedrooms, 1 bath, 1 family room | $70,000 |
| Oct 31, 2014 | Completed final sign-off Oct 2015 | 2598 Folsom St | repair section of (e) foundation at south & east ext. wall. repair dry rot damage around windows & door opening.Details
repair section of (e) foundation at south & east ext. wall. repair dry rot damage around windows & door opening. | $6,000 | |
| Sep 25, 2014 | Completed final sign-off Oct 2015 | 1311 Guerrero St | work @ unit# 1 only. new deck & stair at 2nd floor to rear yard. rear of (e) building.Details
work @ unit# 1 only. new deck & stair at 2nd floor to rear yard. rear of (e) building. | $3,000 | |
| Aug 21, 2014 | Completed final sign-off Aug 2015 | 36 Meadowbrook Dr | G L Construction Company | relocate lightwell from center to close to north property line. relayout (e) 2nd floor to including a new study. convert (e) basement into living space including 2 bedrooms, one family room & one bath.Details
relocate lightwell from center to close to north property line. relayout (e) 2nd floor to including a new study. convert (e) basement into living space including 2 bedrooms, one family room & one bath. | $60,000 |
| Jun 11, 2014 | Completed final sign-off Feb 2015 | 490 Lisbon St | remove (e) closet relocate partition wall in (e) bedroom. replace kitchen cabinet, replace (e) bathroom fixture & tile.Details
remove (e) closet relocate partition wall in (e) bedroom. replace kitchen cabinet, replace (e) bathroom fixture & tile. | $9,000 | |
| May 1, 2014 | Completed final sign-off Sep 2015 | 2039 10th Av | G L Construction Company | 1)replace extg roof above family room, install roof deck. 2)re layout extg 2nd floor, including kitchen and bathrooms. 3)alteration ot 3rd floor front room and rear wall of 3rd floor. remodel ground floor, convert recreation room into new bathroom & recreation room.Details
1)replace extg roof above family room, install roof deck. 2)re layout extg 2nd floor, including kitchen and bathrooms. 3)alteration ot 3rd floor front room and rear wall of 3rd floor. remodel ground floor, convert recreation room into new bathroom & recreation room. | $60,000 |
| Apr 17, 2014 | Never finaled issued Apr 2014, no final | 3485 21st St | Tombay Construction | seismic retrofit to 1st fl to comply with sf soft story program. chapter 34 bDetails
seismic retrofit to 1st fl to comply with sf soft story program. chapter 34 b | $30,000 |
| Apr 10, 2014 | Completed final sign-off Feb 2015 | 1881 15th St | Bluefield Construction | interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind.Details
interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind. | $45,000 |
| Mar 11, 2014 | Completed final sign-off Sep 2015 | 94 Stanton St | Bai Yuan Li | new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath.Details
new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath. | $20,000 |
| Jan 14, 2014 | Completed final sign-off Jun 2014 | 2754 40th Av | Jian Lou Construction Co. | gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation roomDetails
gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation room | $18,000 |
| Nov 18, 2013 | Completed final sign-off Dec 2014 | 1176 York St | Bluefield Construction | repair dry-rot damage to the 3rd floor deck and landing in middle of bldg.Details
repair dry-rot damage to the 3rd floor deck and landing in middle of bldg. | $2,500 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 342 Monterey Bl | Bluefield Construction | install 3 new steel beams to repair exceeding deflection on floor.Details
install 3 new steel beams to repair exceeding deflection on floor. | $5,000 |
| Feb 11, 2013 | Completed final sign-off Sep 2015 | 1630 32nd Av | Peng Fei Tan, M & L Construction | construct a new deck at rear of 2nd floor of the (e) building.Details
construct a new deck at rear of 2nd floor of the (e) building. | $5,000 |
| Jan 22, 2013 | Completed final sign-off Apr 2014 | 3210 Jackson St | Cabrillo Construction Co. Inc. | minor revision to foundation detail d/s-1 & f/s-1 of pa#2011-04-01-3321 s-1Details
minor revision to foundation detail d/s-1 & f/s-1 of pa#2011-04-01-3321 s-1 | |
| Jul 31, 2012 | Completed final sign-off Jun 2026 | 570 Townsend St | Daly Builders Group | minor revision to the structural of interior wall construction of app#2011-07-15-0367Details
minor revision to the structural of interior wall construction of app#2011-07-15-0367 | |
| Jul 11, 2012 | Never finaled filed Jul 2012, never issued | 2830 24th St | horizontal & vertical addition to existing bldg. additional 3 units to the existing.Details
horizontal & vertical addition to existing bldg. additional 3 units to the existing. | $550,000 | |
| Jul 11, 2012 | Expired or cancelled cancelled Aug 2022 | 26 Church St | horizontal & vertical addition to existing bldg.Details
horizontal & vertical addition to existing bldg. | $450,000 | |
| Feb 2, 2012 | Completed final sign-off Dec 2012 | 533 Laidley St | Cabrillo Construction Co. Inc. | revision to app#201007015796 to foundation details.Details
revision to app#201007015796 to foundation details. | $3,000 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 3470 Scott St | Ignacio Camarillo Reyes | revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472.Details
revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472. | $105,000 |
| Jul 22, 2010 | Completed final sign-off Jan 2011 | 2570 23rd Av | basement remodel including 1 new family room, 1 full bath, 2 new bedrooms, 1 parking space will be remained.Details
basement remodel including 1 new family room, 1 full bath, 2 new bedrooms, 1 parking space will be remained. | $30,000 | |
| Aug 14, 2009 | Expired or cancelled withdrawn Nov 2009 | 2727 Gough St | add new dwelling unit/ new kitchen unit in (e) basement floor. all remodeling in basement floor approved under pa# 2009.05.06.7823. new furnace ( 70,000 btu) for 2nd unit.Details
add new dwelling unit/ new kitchen unit in (e) basement floor. all remodeling in basement floor approved under pa# 2009.05.06.7823. new furnace ( 70,000 btu) for 2nd unit. | $11,000 | |
| Jul 6, 2009 | Completed final sign-off Mar 2010 | 1509 Shrader St | Ashbury Gen Constructing & Eng | remodel (e) basement incl. new playroom/bederoom, workshop/office and new bathroom. replace (e) foundation in south, front, rear and middle. reduction and reshape the (e) rear deck and exit from house. new patio, fence, reatining wall in (e) rear yard.Details
remodel (e) basement incl. new playroom/bederoom, workshop/office and new bathroom. replace (e) foundation in south, front, rear and middle. reduction and reshape the (e) rear deck and exit from house. new patio, fence, reatining wall in (e) rear yard. | $138,000 |
| Feb 25, 2009 | Expired or cancelled cancelled Jan 2026 | 785 Corbett Av | Ashbury Gen Constructing & Eng | basement remodeling - convert existing basement into living space - loft + bedroom and oen bath, new stair from 2nd floor to basement.Details
basement remodeling - convert existing basement into living space - loft + bedroom and oen bath, new stair from 2nd floor to basement. | $50,000 |
| Jan 6, 2009 | Completed final sign-off May 2009 | 120 Maynard St | relocate bathrm from 2nd fl to 1st fl, convert master suite to family rm, convert family rm to bedrm, adding a bedroom w/ closet at 1st fl as perplan, revision to pa #200211222105s1.Details
relocate bathrm from 2nd fl to 1st fl, convert master suite to family rm, convert family rm to bedrm, adding a bedroom w/ closet at 1st fl as perplan, revision to pa #200211222105s1. | $3,000 | |
| Nov 18, 2008 | Completed final sign-off Aug 2009 | 489 Church St | revision to pa# 2008-1023-4944-relocate the cooking equipments as per plans. replace floor joist at dinning room and replace (e) front wall foundation.Details
revision to pa# 2008-1023-4944-relocate the cooking equipments as per plans. replace floor joist at dinning room and replace (e) front wall foundation. | ||
| Nov 3, 2008 | Expired or cancelled expired Apr 2010 | 833 Ashbury St | replace/rebuild rear retaining wall along rear property line as per plan.Details
replace/rebuild rear retaining wall along rear property line as per plan. | $20,000 | |
| Sep 17, 2008 | Completed final sign-off May 2009 | 897 Hayes St | revision to pa# 2008-0909-1051-replace (e) brick foundation, extend new concrete, underpinning to complete concrete foundation (revised underpinning details)Details
revision to pa# 2008-0909-1051-replace (e) brick foundation, extend new concrete, underpinning to complete concrete foundation (revised underpinning details) | $2,000 | |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 140 Steiner St | replace e foundation, dryrot repair to the south east corner of ext wall, plywood wood panel and holddownsDetails
replace e foundation, dryrot repair to the south east corner of ext wall, plywood wood panel and holddowns | $20,000 | |
| Sep 9, 2008 | Completed final sign-off May 2009 | 897 Hayes St | underpinning (e) foundation on east side of building due to new construction on 895 hayes street.Details
underpinning (e) foundation on east side of building due to new construction on 895 hayes street. | $3,000 | |
| Sep 8, 2008 | Never finaled issued Nov 2008, no final | 726 Sargent St | repair e foundation on west side of e garageDetails
repair e foundation on west side of e garage | $5,000 |