Be Pro Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2020 to May 2026
- Last 24 months
- 4 permits filed
11 permits since 2000: 7 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 88 Lobos St | in kind kitchen remodel. no wall moving or demo.Details
in kind kitchen remodel. no wall moving or demo. | $10,000 |
| May 2, 2025 | In progress issued May 2025 | 841 44th Av | bathroom remodel in kind - replace bathroom vanity and fixture, minor tile work as needed for floor and wall. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel in kind - replace bathroom vanity and fixture, minor tile work as needed for floor and wall. no change to floor layout. no change to wall layout. no structural work. | $800 |
| Apr 25, 2025 | In progress issued Jul 2025 | 841 44th Av | convert 682 sf garage area to habitable space on ground fl: 1 bedrm, bathrm family rm, mud rm; new door to public way; deck and stair extending approx 6' into the rear yard; construct 2nd new bath on 2nd fl; new recessed lighting in bedroom 1 and bedroom 2Details
convert 682 sf garage area to habitable space on ground fl: 1 bedrm, bathrm family rm, mud rm; new door to public way; deck and stair extending approx 6' into the rear yard; construct 2nd new bath on 2nd fl; new recessed lighting in bedroom 1 and bedroom 2 | $40,000 |
| Dec 24, 2024 | Completed final sign-off Feb 2025 | 3723 Mission St | replace the windows at the back of the house (two windows) repair the damaged sidingDetails
replace the windows at the back of the house (two windows) repair the damaged siding | $1,200 |
| Jan 23, 2024 | Completed final sign-off May 2024 | 300 Bridgeview Dr | replace broken window (rear), repair and patch cracks on exterior stucco walls, repaint exterior walls same colorDetails
replace broken window (rear), repair and patch cracks on exterior stucco walls, repaint exterior walls same color | $1,500 |
| Aug 4, 2023 | Completed final sign-off Dec 2023 | 1926 09th Av | revision to pa202011179111 to include added language for a new stair at rear of building.Details
revision to pa202011179111 to include added language for a new stair at rear of building. | |
| Jul 12, 2023 | In progress issued Sep 2025 | 2322 41st Av | 2 story horizontal and vertical addition including: add a new playroom on the first floor (designated childcare unit) upgrade bathroom to ada and to add new master bedroom and bath on the second floor. rear yard modification per pa 202504184808 by adding steel rear deck and stairs to grade.Details
2 story horizontal and vertical addition including: add a new playroom on the first floor (designated childcare unit) upgrade bathroom to ada and to add new master bedroom and bath on the second floor. rear yard modification per pa 202504184808 by adding steel rear deck and stairs to grade. | $200,000 |
| Mar 1, 2023 | Completed final sign-off May 2023 | 210 Rolph St | g/f: construct fire rated unconditioned hallway with new 20-min rated self closing door to garage. no structural, electrical, mechanical, or plumbing work.Details
g/f: construct fire rated unconditioned hallway with new 20-min rated self closing door to garage. no structural, electrical, mechanical, or plumbing work. | $1,000 |
| Jul 26, 2022 | Completed final sign-off Mar 2023 | 1496 45th Av | ground fl alteration: approx 692 sqft: 2 bedrooms, bathroom, media room. new side door opening at rear yard to public way. replace in-kind wood window (32x36) on south facing wall. 2 new vinyl windows of ground fl facing rear yard.Details
ground fl alteration: approx 692 sqft: 2 bedrooms, bathroom, media room. new side door opening at rear yard to public way. replace in-kind wood window (32x36) on south facing wall. 2 new vinyl windows of ground fl facing rear yard. | $30,000 |
| May 17, 2021 | Completed final sign-off Mar 2024 | 324 Elsie St | create dedicated entrance to new adu. new gas wall heaterfor adu, existing ducts from proposed adu to (e) furnace to be removed. relocate existing water heater and furnace. install new sink, range, and range hood for new kitchen. hook up to existing utilities.Details
create dedicated entrance to new adu. new gas wall heaterfor adu, existing ducts from proposed adu to (e) furnace to be removed. relocate existing water heater and furnace. install new sink, range, and range hood for new kitchen. hook up to existing utilities. | $3,500 |
| Nov 17, 2020 | Completed final sign-off Dec 2023 | 1926 09th Av | to comply with (nov) #202061911, #202061901, #202061101. legalize accessory dwelling unit added on ground floor approx. 600 sf per state law and city ordinance #162-16. two (n) bedrooms, (n) kitchen, and (n) walk-way to front of house & two new furnaces.Details
to comply with (nov) #202061911, #202061901, #202061101. legalize accessory dwelling unit added on ground floor approx. 600 sf per state law and city ordinance #162-16. two (n) bedrooms, (n) kitchen, and (n) walk-way to front of house & two new furnaces. | $20,000 |