James Li
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- J. Li & Associates
- Based in
- Redwood City
- On San Francisco permits
- Apr 2002 to Apr 2026
67 permits since 2000 (engineer on 53 permits, architect on 8 permits, authorized agent-others on 3 permits, designer on 3 permits): 42 completed, 11 in progress, 6 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2026 | In progress filed Apr 2026, not yet issued | 155 Hyde St | repair or replace sheetrock in e utility room with new 5/8 in type x gyp bd. repair and upgrade electrical serviceDetails
repair or replace sheetrock in e utility room with new 5/8 in type x gyp bd. repair and upgrade electrical service | $5,000 | |
| Feb 13, 2026 | In progress issued Apr 2026 | 1942 44th Av | revision to bpa# 201806071280 and 202603117387 restore existing bedroom closset at ground floor. 3/13/2026Details
revision to bpa# 201806071280 and 202603117387 restore existing bedroom closset at ground floor. 3/13/2026 | $4,000 | |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 2345 Wawona St | g/f:change of use and occupancy-convert (e) garage and living area to child care (3m to 5y) up to 23 kids facility.new dual meter panel (2x100a) w/ disconnect. new heat pump (heating and cooling system). 2/f: laundry relocated to 2/f bathroom.Details
g/f:change of use and occupancy-convert (e) garage and living area to child care (3m to 5y) up to 23 kids facility.new dual meter panel (2x100a) w/ disconnect. new heat pump (heating and cooling system). 2/f: laundry relocated to 2/f bathroom. | $200,000 | |
| Jan 4, 2026 | In progress issued Aug 2026 | 443 Campbell Av | two story addition to the rear. re-arrange top floor layout. add one full bathroom. re-arrange ground flr with one recreation room, bedroom, and one bath. new two level deck and stair to rear yard.Details
two story addition to the rear. re-arrange top floor layout. add one full bathroom. re-arrange ground flr with one recreation room, bedroom, and one bath. new two level deck and stair to rear yard. | $150,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 568 Shotwell St | revision to pa#202508203543. 1. remove existing lath sheathing at both side of the hallway. 2. new 2x6 partition with plywood at one side as shown on ground floor. 3. minor revision to the location of the new 6x6 beam at rear stairDetails
revision to pa#202508203543. 1. remove existing lath sheathing at both side of the hallway. 2. new 2x6 partition with plywood at one side as shown on ground floor. 3. minor revision to the location of the new 6x6 beam at rear stair | $2,000 | |
| Sep 24, 2025 | In progress filed Sep 2025, not yet issued | 6038 Geary Bl | demolition of rear year 1-story, type v-b shed.Details
demolition of rear year 1-story, type v-b shed. | $2,500 | |
| Sep 19, 2025 | In progress filed Sep 2025, not yet issued | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | revision to pa # 2023-1017-8770 & 2025-0414-4364. minor revisions to adu. adu area increased from 300 sf to 355 sf.Details
revision to pa # 2023-1017-8770 & 2025-0414-4364. minor revisions to adu. adu area increased from 300 sf to 355 sf. | $3,000 |
| Aug 20, 2025 | Expired or cancelled withdrawn Mar 2026 | 338 12th Av | convert part of the 1st floor garage into living space; convert existing 1st floor laundry room into a half bath; gas tankless water heater relocation from 1st floor garage to corridor; convert part of the existing 4th floor family rm into a new den; 4th fl. bedroom remodel with layout change.Details
convert part of the 1st floor garage into living space; convert existing 1st floor laundry room into a half bath; gas tankless water heater relocation from 1st floor garage to corridor; convert part of the existing 4th floor family rm into a new den; 4th fl. bedroom remodel with layout change. | $10,000 | |
| Apr 23, 2025 | Completed final sign-off Jul 2025 | 2654 31st Av | Bc United Construction Inc | revision to pa 202405152194 add new skylight above (e) dining room and bathroom; add a catch basin @ rear yardDetails
revision to pa 202405152194 add new skylight above (e) dining room and bathroom; add a catch basin @ rear yard | |
| Apr 23, 2025 | Completed final sign-off Dec 2025 | 239 Crestmont Dr | Bright Moon Construction | repair (e) exterior stair stringer w c8 x 13.75 steel chanelDetails
repair (e) exterior stair stringer w c8 x 13.75 steel chanel | $4,000 |
| Apr 14, 2025 | In progress issued May 2025 | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | revision to pa #2023-1017-8770 redesign the layout for 4th fl. expand the (e) deck in 2nd fl from 5'1" to 5'1" x 10-4". eliminate fire place on 2nd fl. update foundation plan, 1st fl framing plan & 2nd fl framing plan. new skylightsDetails
revision to pa #2023-1017-8770 redesign the layout for 4th fl. expand the (e) deck in 2nd fl from 5'1" to 5'1" x 10-4". eliminate fire place on 2nd fl. update foundation plan, 1st fl framing plan & 2nd fl framing plan. new skylights | |
| Apr 10, 2025 | In progress filed Apr 2025, not yet issued | 399 09th St | renovation to the existing vacant space including new store front. two ada restroomDetails
renovation to the existing vacant space including new store front. two ada restroom | $60,000 | |
| Mar 20, 2025 | Completed final sign-off Jun 2026 | 718 17th Av | Ray Foundation Construction Inc | comply with nov 202535073: underpinning of e footing next to neighbors lightwell at 722 17th aveDetails
comply with nov 202535073: underpinning of e footing next to neighbors lightwell at 722 17th ave | $500 |
| Feb 20, 2025 | Completed final sign-off Jan 2026 | 3101 Clement St | Giant Work Construction Corp | remove (e) non bearing wall and drywall for soft demo only (1st & 2nd floor per ab-017)Details
remove (e) non bearing wall and drywall for soft demo only (1st & 2nd floor per ab-017) | $2,000 |
| Oct 16, 2024 | Completed final sign-off Dec 2024 | 2317 35th Av | add a deck at the rear of the home. one level 21'-6 x 16'-7" with stairs to rear yardDetails
add a deck at the rear of the home. one level 21'-6 x 16'-7" with stairs to rear yard | $8,000 | |
| Oct 9, 2024 | Expired or cancelled withdrawn Jul 2025 | 2972 Bush St | revision pa # 2024-0320-8264 revised steel beam size from w10 x 30 to w8 x 48 revise detailsDetails
revision pa # 2024-0320-8264 revised steel beam size from w10 x 30 to w8 x 48 revise details | ||
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1359 Oak St | Sincere Construction Company Inc | revision to 202304206141. minor revision to foundation and location of shear wall. (n) fig under post near meter room. (e) slab wall to remain at rear (crawl space)Details
revision to 202304206141. minor revision to foundation and location of shear wall. (n) fig under post near meter room. (e) slab wall to remain at rear (crawl space) | |
| May 15, 2024 | Completed final sign-off Jul 2025 | 2654 31st Av | Bc United Construction Inc | alteration to e house. new stair from 2nd fl to rear yard, remodel entire house.increase lvng space gr fl from 317 to 748sf to include 2 bdrms,a bath,storage rm. infill e middle lightwell 2nd fl and rearrange the kitchen layout.Details
alteration to e house. new stair from 2nd fl to rear yard, remodel entire house.increase lvng space gr fl from 317 to 748sf to include 2 bdrms,a bath,storage rm. infill e middle lightwell 2nd fl and rearrange the kitchen layout. | $100,000 |
| Feb 5, 2024 | In progress issued Feb 2024 | 650 Presidio Av | Bc United Construction Inc | geo grout under the existing foundation next to the neighbor (ref pa#202309086180, 2972 bush st)Details
geo grout under the existing foundation next to the neighbor (ref pa#202309086180, 2972 bush st) | $10,000 |
| Feb 5, 2024 | Completed final sign-off Jan 2025 | 1604 Mcallister St | Bc United Construction Inc | revision to 202302162143 & 202308114266, correction of (4) missing windows on the west wall on the 2nd and 3rd floor (not facing street). revision to for foundation and framing details due to field condition.Details
revision to 202302162143 & 202308114266, correction of (4) missing windows on the west wall on the 2nd and 3rd floor (not facing street). revision to for foundation and framing details due to field condition. | |
| Oct 11, 2023 | Completed final sign-off Aug 2025 | 619 47th Av | W F Construction Co | renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f.Details
renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f. | $50,000 |
| Sep 8, 2023 | In progress issued Dec 2023 | 2972 Bush St | Bc United Construction Inc | alteration to (e) bldg. seismic upgrade to the entire bldg.Details
alteration to (e) bldg. seismic upgrade to the entire bldg. | $100,000 |
| Jul 14, 2023 | Completed final sign-off Nov 2023 | 4355 Anza St | new rear yard stairs to 2nd flr.Details
new rear yard stairs to 2nd flr. | $15,000 | |
| Jun 21, 2023 | Completed final sign-off Jul 2025 | 619 47th Av | new roof deckDetails
new roof deck | $120,000 | |
| Jun 2, 2023 | Completed final sign-off Oct 2023 | 338 12th Av | D Construction Inc | (n) rear yard stair to 2nd fl.Details
(n) rear yard stair to 2nd fl. | $6,000 |
| May 3, 2023 | Completed final sign-off Jul 2023 | 379 27th Av | D Construction Inc | revision to bpa#202206136214 and 202112073897, minor framing change @ 3/f, (1) beamDetails
revision to bpa#202206136214 and 202112073897, minor framing change @ 3/f, (1) beam | |
| Apr 13, 2023 | Completed final sign-off Apr 2023 | 5211 Geary Bl | Greatwall Building Construction Inc | revision to bpa#202303133596, remove opener from (e) doorDetails
revision to bpa#202303133596, remove opener from (e) door | |
| Feb 16, 2023 | Completed final sign-off Jan 2025 | 1604 Mcallister St | Bc United Construction Inc | repair fire damage to (e) bldg as per plans in-kind. repair exterior wall @ 2nd & 3rd fl. repair roof framing above unit 4. ground floor work under separate permit.Details
repair fire damage to (e) bldg as per plans in-kind. repair exterior wall @ 2nd & 3rd fl. repair roof framing above unit 4. ground floor work under separate permit. | $500,000 |
| Nov 17, 2022 | Completed final sign-off Oct 2023 | 142 Talbert St | Bc United Construction Inc | g/f: re-arrange floor layout in (e) family room to (2) bedrooms, two bathrooms & a family room.Details
g/f: re-arrange floor layout in (e) family room to (2) bedrooms, two bathrooms & a family room. | $40,000 |
| May 31, 2022 | Expired or cancelled cancelled Jan 2026 | 546 Monterey Bl | revision to pa# 202104017764. revised foundation plan with more new foundation & revise structural detail.Details
revision to pa# 202104017764. revised foundation plan with more new foundation & revise structural detail. | $500 | |
| Jul 16, 2021 | Completed final sign-off Oct 2024 | 556 Congo St | G B U Construction Development | convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof.Details
convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof. | $50,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2023 | 546 Monterey Bl | S & T Pro Construction And Design Inc | to comply with nov # 202173679. remove all (e) finish, re-arrange flr layout per plans.install 2 dormers on west side of (e) roof. remove and relocate (e) stair to rear yard. (n) deck less than 10' to gradeDetails
to comply with nov # 202173679. remove all (e) finish, re-arrange flr layout per plans.install 2 dormers on west side of (e) roof. remove and relocate (e) stair to rear yard. (n) deck less than 10' to grade | $150,000 |
| Aug 4, 2020 | Completed final sign-off Jun 2021 | 105 Foote Av | Alpha Construction Company | renovate(e) ground floor, including, 2 bedrooms, one full bath & a recreation room. remove (e) interior stair from 2nd fl to ground fl. remodel kitchen, bath on 2nd floor.Details
renovate(e) ground floor, including, 2 bedrooms, one full bath & a recreation room. remove (e) interior stair from 2nd fl to ground fl. remodel kitchen, bath on 2nd floor. | $60,000 |
| Aug 4, 2020 | Never finaled issued Oct 2020, no final | 1461 23rd Av | Alpha Construction Company | infill space under the (e) sunroom & incorporate into the ground fl space. ground floor renovation including 2 bedroom, one full bath, one storage room & one family roomDetails
infill space under the (e) sunroom & incorporate into the ground fl space. ground floor renovation including 2 bedroom, one full bath, one storage room & one family room | $60,000 |
| May 7, 2019 | Completed final sign-off Oct 2019 | 1112 Taraval St | Tsl Construction & Consultant Inc | ti- to (e) commercial space on grd flr. upgrade to (e)restroom, construct 3 new procedure rooms, install new service counter new light fixtures. change of use from office to beauty salonDetails
ti- to (e) commercial space on grd flr. upgrade to (e)restroom, construct 3 new procedure rooms, install new service counter new light fixtures. change of use from office to beauty salon | $30,000 |
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 380 Princeton St | Yao Star Construction | ground floor renovation including convert (e) space behind garage into 1 bedroom, a family room and 2 bathsDetails
ground floor renovation including convert (e) space behind garage into 1 bedroom, a family room and 2 baths | $20,000 |
| May 4, 2018 | Never finaled issued Jun 2018, no final | 477 Eucalyptus Dr | Daly Builders Group | interior revisionto floor plan layout. revise minor framing on 3rd flr & roof. revision to 201302281136Details
interior revisionto floor plan layout. revise minor framing on 3rd flr & roof. revision to 201302281136 | $10,000 |
| Aug 4, 2017 | Expired or cancelled expired Mar 2025 | 131 Chicago Wy | to remove exterior wall in rear of (e) porch and part of the roof done without permit. to abate nov 201625902.Details
to remove exterior wall in rear of (e) porch and part of the roof done without permit. to abate nov 201625902. | $500 | |
| Mar 23, 2017 | Expired or cancelled cancelled Jan 2019 | 1389 21st Av | adu unit per ordinance no 162-16. install (n) kitchen in (e) living room on ground floor convert (e) living space on ground floor into.Details
adu unit per ordinance no 162-16. install (n) kitchen in (e) living room on ground floor convert (e) living space on ground floor into. | $3,600 | |
| Mar 17, 2017 | Completed final sign-off Oct 2017 | 2829 Baker St | Achill Beg Construction Inc | minor structural revision to pa #201402188666 - replace damaged joist at ground floor above crawl space. additional details for the revision.Details
minor structural revision to pa #201402188666 - replace damaged joist at ground floor above crawl space. additional details for the revision. | $1,000 |
| Nov 14, 2016 | Never finaled issued Jan 2017, no final | 1389 21st Av | Rokit Construction Company | ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floorDetails
ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floor | $45,000 |
| Oct 11, 2016 | Completed final sign-off Apr 2017 | 1235 41st Av | Kevin Lin Construction Inc | remodeling ground floor including a family room, two bedrooms, two baths & a storage.Details
remodeling ground floor including a family room, two bedrooms, two baths & a storage. | $20,000 |
| Oct 11, 2016 | Completed final sign-off Apr 2018 | 541 21st Av | 369 Construction | convert the (e) ground floor (garage) to child-care 6 or less.Details
convert the (e) ground floor (garage) to child-care 6 or less. | $16,000 |
| Jul 22, 2016 | Completed final sign-off Nov 2017 | 5556 Mission St | Home C Construction Inc | to comply with wood frame seismic retrofit program - soft story upgrade the lower floor to comply with chapter 34bDetails
to comply with wood frame seismic retrofit program - soft story upgrade the lower floor to comply with chapter 34b | $20,000 |
| Jul 22, 2016 | Completed final sign-off May 2017 | 85 Palm Av | Home C Construction Inc | to comply with wood frame seismic retrofit program - soft story upgrade the lower floor to comply with chapter 34bDetails
to comply with wood frame seismic retrofit program - soft story upgrade the lower floor to comply with chapter 34b | $18,000 |
| Jun 21, 2016 | Completed final sign-off Oct 2017 | 5015 Geary Bl | J L M Construction Inc. | change of use. new tea shop in (e) vacant space including new restroom, new counter and new equipment. all interior work.Details
change of use. new tea shop in (e) vacant space including new restroom, new counter and new equipment. all interior work. | $20,000 |
| Jun 21, 2016 | Expired or cancelled cancelled Jan 2026 | 3698 17th St | remove & relocate (e) restroom. install new window facing church st. replace 9e) french door at 2nd floor with new window.Details
remove & relocate (e) restroom. install new window facing church st. replace 9e) french door at 2nd floor with new window. | $15,000 | |
| Feb 29, 2016 | Never finaled filed Feb 2016, never issued | 593 Jersey St | remove (e) roof at rear of 3rd flr,expand the ext wall to property line,remodel the 3rd flr, add a roof deck w/glass railing to rear of roof, remodel (e)kitchen & bath on 2nd flr.Details
remove (e) roof at rear of 3rd flr,expand the ext wall to property line,remodel the 3rd flr, add a roof deck w/glass railing to rear of roof, remodel (e)kitchen & bath on 2nd flr. | $150,000 | |
| Feb 29, 2016 | Completed final sign-off Sep 2016 | 544 Clement St | Wong Construction Inc | seismic retrofit to ground floor (soft story) per sfbc chapter 34b; 2012 iebc appendix a-4; apartment only.Details
seismic retrofit to ground floor (soft story) per sfbc chapter 34b; 2012 iebc appendix a-4; apartment only. | $6,000 |
| Feb 29, 2016 | Completed final sign-off Sep 2016 | 544 Clement St | Wong Construction Inc | seismic retrofit to ground floor (soft story) per sfbc chapter 34b; 2012 iebc appendix a-4; commercial only.Details
seismic retrofit to ground floor (soft story) per sfbc chapter 34b; 2012 iebc appendix a-4; commercial only. | $6,000 |
| Feb 29, 2016 | Completed final sign-off Oct 2017 | 767 Pine St | Kobuksan Construction | remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg.Details
remodeling to 2nd,3rd & 4th floor including kitchen & bathrooms, replace (e) windows with marvin integrity wood/ultrex, replace (e) foundation in front half of bldg. | $60,000 |
| Feb 4, 2016 | Expired or cancelled withdrawn Mar 2016 | 589 Texas St | addition to (e) residence. add two stories to top of (e) 2 story building. add one more unit to the new two floors.Details
addition to (e) residence. add two stories to top of (e) 2 story building. add one more unit to the new two floors. | $300,000 | |
| May 18, 2015 | Completed final sign-off Jan 2019 | 258 24th Av | New Improvement Construction | legalize unit in ground floor per ordinance 43-14. sprinklers (nfpa 13-r) on deferred submittal.**maher ord n/a**Details
legalize unit in ground floor per ordinance 43-14. sprinklers (nfpa 13-r) on deferred submittal.**maher ord n/a** | $8,000 |
| Mar 12, 2015 | Expired or cancelled cancelled Jan 2026 | 2955 20th Av | renovation of (e) ground floor. ocnvert (e) storage into living space including 4 bedrooms, 2 baths, 1 half bath, a family room & a game room.Details
renovation of (e) ground floor. ocnvert (e) storage into living space including 4 bedrooms, 2 baths, 1 half bath, a family room & a game room. | $60,000 | |
| Aug 21, 2014 | Completed final sign-off Aug 2018 | 568 Shotwell St | to comply with wood frame seismic retrofit program per sfbc chapter 34b (soft story). upgrade the (e) basement ot comply with sfbc chapter 34bDetails
to comply with wood frame seismic retrofit program per sfbc chapter 34b (soft story). upgrade the (e) basement ot comply with sfbc chapter 34b | $10,000 | |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 342 Monterey Bl | Bluefield Construction | minor revision to pa #2013.0703.1090 - one of the new beam to be relocatedDetails
minor revision to pa #2013.0703.1090 - one of the new beam to be relocated | $1,000 |
| Jun 27, 2013 | Completed final sign-off Sep 2013 | 451 Castro St | install new 3 compartment sink. install new counter with equipments. relocate (e) store front as per plan.Details
install new 3 compartment sink. install new counter with equipments. relocate (e) store front as per plan. | $20,000 | |
| Jan 27, 2012 | Completed final sign-off Aug 2012 | 230 Cresta Vista Dr | Worldwide Construction Inc | construct a new deck under the e house with new stair. connect to the sidewalk. deck area = 20'x 30'Details
construct a new deck under the e house with new stair. connect to the sidewalk. deck area = 20'x 30' | $5,000 |
| Jul 18, 2011 | Completed final sign-off Feb 2012 | 927 Plymouth Av | Excellent Construction | basement remodeling including new recreation room, (n) bath (n) study and (n) storage room with one car garage. repair dry rot damage rear stair.Details
basement remodeling including new recreation room, (n) bath (n) study and (n) storage room with one car garage. repair dry rot damage rear stair. | $15,000 |
| Nov 2, 2010 | Completed final sign-off Oct 2011 | 2618 16th Av | Giuliani Construction Incorp | revision to pa# 2010.09.20.1231 to foundation detailsDetails
revision to pa# 2010.09.20.1231 to foundation details | |
| Sep 20, 2010 | Completed final sign-off Oct 2011 | 2618 16th Av | Giuliani Construction Incorp | expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr.Details
expansion of (e) kitchen into lightwell. remodeling (e) kitchen. add new bathroom in basement create (n) hallway to connect basement rooms & stairs to 2nd. flr. | $30,000 |
| May 6, 2009 | Never finaled issued May 2009, no final | 2727 Gough St | Kalix Inc Dbalara Construction | legalize/remodel of (e) bathroom & study on ground floor. voluntary strengthening at ground and second floors of (e) building for future addition. new 10ft fence at south property line & 6ft at rear & north sidesDetails
legalize/remodel of (e) bathroom & study on ground floor. voluntary strengthening at ground and second floors of (e) building for future addition. new 10ft fence at south property line & 6ft at rear & north sides | $40,000 |
| Mar 12, 2009 | Completed final sign-off Apr 2009 | 895 Hayes St | Cabrillo Construction Co. Inc. | minor revision to appl #200703075692-s1 change interior layout including revision to stair & bathroom, eliminate two windows at rear right side & new skylight. no change in ext. no structural change.Details
minor revision to appl #200703075692-s1 change interior layout including revision to stair & bathroom, eliminate two windows at rear right side & new skylight. no change in ext. no structural change. | |
| Oct 23, 2008 | Completed final sign-off Aug 2009 | 489 Church St | install new kitchen equiments and a new type 1 hood next to (e) dinning area as per plansDetails
install new kitchen equiments and a new type 1 hood next to (e) dinning area as per plans | $30,000 | |
| Jan 19, 2006 | Completed final sign-off Feb 2008 | 150 Santa Marina St | project cons of a new foundation and seismic upgrade to the existing two levels. a new 3rd floor will be added consisting of a master bedroom, bathroom and office.Details
project cons of a new foundation and seismic upgrade to the existing two levels. a new 3rd floor will be added consisting of a master bedroom, bathroom and office. | $270,000 | |
| Dec 22, 2005 | Never finaled issued Aug 2008, no final | 6533 California St | 3 story horizontal addition to rear of existing building per planDetails
3 story horizontal addition to rear of existing building per plan | $150,000 | |
| Apr 9, 2002 | Completed final sign-off Feb 2006 | 34 Leland Av | erect a 3 stories bldg with 2 dwelling units and child careDetails
erect a 3 stories bldg with 2 dwelling units and child care | $300,000 |