Horon Lee
- Listed as
- architect, designer, engineer
- Firm
- Horn Lee
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Sep 2026
278 permits since 2000 (engineer on 259 permits, architect on 17 permits, designer on 2 permits): 177 completed, 46 in progress, 30 never finaled, 25 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 278.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 236 King St | Jdl Build Group Dba Jdl Construction | interior t.i. for new fitness center. demolition of non-load partitions. new non-load bearing partitions, new mep and finishesDetails
interior t.i. for new fitness center. demolition of non-load partitions. new non-load bearing partitions, new mep and finishes | $300,000 |
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 1839 Cabrillo St | Yong And Zhuo Construction Inc | revision to pa 202607145036 revise structural framing and detailDetails
revision to pa 202607145036 revise structural framing and detail | |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 2800 Leavenworth St | demo of skylight & replacement with standing seam metal roofDetails
demo of skylight & replacement with standing seam metal roof | $205,000 | |
| Jul 14, 2026 | In progress issued Jul 2026 | 1839 Cabrillo St | Yong And Zhuo Construction Inc | unit 1/ 2nd fl: convert e) bath into 2 baths, relocate e) kitchen, construct new bedroom, install new washer/dryer, relocate windows at rear facade. relocate window @ rear.Details
unit 1/ 2nd fl: convert e) bath into 2 baths, relocate e) kitchen, construct new bedroom, install new washer/dryer, relocate windows at rear facade. relocate window @ rear. | $26,000 |
| Jun 30, 2026 | In progress issued Oct 2026 | 2652 California St | Tip Managers Inc | remodel: basement: convert storage space into parking.1/f: convert bedroom and bathroom into kitchen. 2/f: remodel bathroom.no layout change. 3/f: convert (e) kitchen into bathroom. remove entire (e) wood deck and stair.Details
remodel: basement: convert storage space into parking.1/f: convert bedroom and bathroom into kitchen. 2/f: remodel bathroom.no layout change. 3/f: convert (e) kitchen into bathroom. remove entire (e) wood deck and stair. | $50,000 |
| May 29, 2026 | In progress issued Jun 2026 | 108 Westwood Dr | R & D Construction Co Inc | structural revision to pa# 202511260562. replace foundation @ garage see cloud, remove wood beam to steel beam interiorDetails
structural revision to pa# 202511260562. replace foundation @ garage see cloud, remove wood beam to steel beam interior | $3,000 |
| May 22, 2026 | In progress issued Jun 2026 | 1350 23rd Av | Yao Star Construction | revision to 2025121115953, revise foundation detail. change master bath and closet layout at gr floor. no added space. revise rear patio.Details
revision to 2025121115953, revise foundation detail. change master bath and closet layout at gr floor. no added space. revise rear patio. | |
| Apr 16, 2026 | In progress issued Apr 2026 | 1758 44th Av | Tgi Builders Ca Inc | kitchen remodel, partial wall removal between dining rm/kitchen and living area, provide new flushed beam support, provide new skylight above kitchen. update plumbing and electrical up to code.Details
kitchen remodel, partial wall removal between dining rm/kitchen and living area, provide new flushed beam support, provide new skylight above kitchen. update plumbing and electrical up to code. | $45,000 |
| Mar 24, 2026 | In progress filed Mar 2026, not yet issued | 630 Kirkham St | Tri Line Construction Co | comply with planning enf# 2024-008516 enf. remove residential care facility oerating & group housing operating at residential buildig on 2nd & 3rd floors. revert to legal 2 units on 2nd & 3rd floors. legalize (e) unauthroized kitchen on 1st floor under ordinance # 43-14 as an adu. no excavation.Details
comply with planning enf# 2024-008516 enf. remove residential care facility oerating & group housing operating at residential buildig on 2nd & 3rd floors. revert to legal 2 units on 2nd & 3rd floors. legalize (e) unauthroized kitchen on 1st floor under ordinance # 43-14 as an adu. no excavation. | $6,000 |
| Mar 11, 2026 | Completed final sign-off Jul 2026 | 3409 Irving St | Kaifa Construction Inc | revision to pa 202601063308 - replace (e) front facing windows, replace (e) rear windows and (e) stairway rear in-kind, like in likeDetails
revision to pa 202601063308 - replace (e) front facing windows, replace (e) rear windows and (e) stairway rear in-kind, like in like | $15,000 |
| Mar 6, 2026 | In progress issued Mar 2026 | 1029 Jackson St | Tip Managers Inc | roof deckDetails
roof deck | $20,000 |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 1904 Golden Gate Av | Tip Managers Inc | expansion of conditioned living space from lower unit 1 to the existing 1st fl to include a new primary bedroom, bath, laundry; addition on new interior stairs, renovation of kitchen and bath at unit 1, addition of 2nd bath 3rd fl, renovate kitchen and baths upper unit 2 ref 202505277283Details
expansion of conditioned living space from lower unit 1 to the existing 1st fl to include a new primary bedroom, bath, laundry; addition on new interior stairs, renovation of kitchen and bath at unit 1, addition of 2nd bath 3rd fl, renovate kitchen and baths upper unit 2 ref 202505277283 | $100,000 |
| Feb 12, 2026 | In progress issued Sep 2026 | 527 Noe St | Tip Managers Inc | expansion of conditioned living space from lower unit 529 to the existing basement to include a new bedroom, bath, and guest room. addition of new interior stairs. renovation of kitchen and bath and add 2nd bath at 1/f. renovate kitchen and bath at upper unit 527.Details
expansion of conditioned living space from lower unit 529 to the existing basement to include a new bedroom, bath, and guest room. addition of new interior stairs. renovation of kitchen and bath and add 2nd bath at 1/f. renovate kitchen and bath at upper unit 527. | $300,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 470 25th Av | D & S Leong Associates | 3rd fl apt #3: reconfigure existing bedrooms.Details
3rd fl apt #3: reconfigure existing bedrooms. | $7,500 |
| Dec 26, 2025 | In progress issued Mar 2026 | 346 32nd Av | Green City Construction Inc | replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroomDetails
replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroom | $150,000 |
| Dec 15, 2025 | Completed final sign-off Jul 2026 | 280 Fair Oaks St | G M Building And Construction Inc | 2-story addition at rear. unit 280 (1st floor) - 150 sq.ft. addition for new dining area. unit 282 (2nd floor) - 150 sq.ft. addition for new living room.Details
2-story addition at rear. unit 280 (1st floor) - 150 sq.ft. addition for new dining area. unit 282 (2nd floor) - 150 sq.ft. addition for new living room. | $80,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 1350 23rd Av | Yao Star Construction | interior renovation: 1st fl - convert storage space into master bedroom, master bath & family room. total added habitable area: 480 sf. 2 new windows and 1 door at rear. no work on 2nd flDetails
interior renovation: 1st fl - convert storage space into master bedroom, master bath & family room. total added habitable area: 480 sf. 2 new windows and 1 door at rear. no work on 2nd fl | $100,000 |
| Dec 5, 2025 | In progress issued Jan 2026 | 1836 Broadway | Modern Builder Construction Inc | 4/f: kitchen remodel. 3/f: kitchen and bathroom remodel. 2/f: kitchen and bathroom remodel. g/f: see structural drawings. no change in building envelope and not adding sq.ft. no exterior work.Details
4/f: kitchen remodel. 3/f: kitchen and bathroom remodel. 2/f: kitchen and bathroom remodel. g/f: see structural drawings. no change in building envelope and not adding sq.ft. no exterior work. | $100,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 108 Westwood Dr | R & D Construction Co Inc | 1st flr:excavate 1'-5" to meet ceiling hgts & full slab replacement. construct 2 new master beds with suite bath; family room, laundry, powder room. install new existing windows at bath room, family room, bathroom. 2nd fl: remove existing interior walls between kitchen & dining/living rooms toDetails
1st flr:excavate 1'-5" to meet ceiling hgts & full slab replacement. construct 2 new master beds with suite bath; family room, laundry, powder room. install new existing windows at bath room, family room, bathroom. 2nd fl: remove existing interior walls between kitchen & dining/living rooms to | $300,000 |
| Nov 20, 2025 | In progress issued Dec 2025 | 255 Kalmanovitz St | remove non permitted storage at rear of the building. new wood deck with tile flooring at second floor rear side of building with new stairs.Details
remove non permitted storage at rear of the building. new wood deck with tile flooring at second floor rear side of building with new stairs. | $7,000 | |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 1460 Waller St | Tip Managers Inc | revision to 201901251261 to maintain existing 4th level with 3 beds and 2 baths. reconfigure kitchen and bath layout throughout. ref 202503071829.Details
revision to 201901251261 to maintain existing 4th level with 3 beds and 2 baths. reconfigure kitchen and bath layout throughout. ref 202503071829. | $75,000 |
| Oct 21, 2025 | Completed final sign-off Jan 2026 | 2147 Golden Gate Av | Kaifa Construction Inc | ground fl: replace wood beam and posts at garage. two spread footings. replace slab on grade in garage.Details
ground fl: replace wood beam and posts at garage. two spread footings. replace slab on grade in garage. | $20,000 |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 160 Liberty St | R & D Construction Co Inc | revision to permit 202504245181 to underpin corner of existing foundation and new footing at post.Details
revision to permit 202504245181 to underpin corner of existing foundation and new footing at post. | $4,000 |
| Sep 4, 2025 | Completed final sign-off Jun 2026 | 1460 Waller St | Tip Managers Inc | the replacement of (e) rear decks and stair at second and third floors.Details
the replacement of (e) rear decks and stair at second and third floors. | $75,000 |
| Aug 14, 2025 | In progress issued Aug 2025 | 527 Noe St | Tip Managers Inc | foundation replacement.Details
foundation replacement. | $50,000 |
| Jul 30, 2025 | Completed final sign-off Jul 2026 | 280 Fair Oaks St | G M Building And Construction Inc | 1/f: revision to 202503182432. convert laundry and living to master bedroom. convert hallway bathroom to master bathroom. new hallway bathroom. reconfigure (e) kitchen/dining layout, bedroom #2 to living room. new patio and replace windows on side of bldg. 2/f: revision to 202503182434.Details
1/f: revision to 202503182432. convert laundry and living to master bedroom. convert hallway bathroom to master bathroom. new hallway bathroom. reconfigure (e) kitchen/dining layout, bedroom #2 to living room. new patio and replace windows on side of bldg. 2/f: revision to 202503182434. | $160,000 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 3381 21st St | G M Building And Construction Inc | revision to 202406114239. unit 3381 2nd fl remove non bearing wall between bedroom 1 and bedroom 2 at 2nd fl. convert powder room into bathroom. convert hallway bath to master bath. 1st fl convert poweder room into closet. convert 2 bath into 1 bathroom.Details
revision to 202406114239. unit 3381 2nd fl remove non bearing wall between bedroom 1 and bedroom 2 at 2nd fl. convert powder room into bathroom. convert hallway bath to master bath. 1st fl convert poweder room into closet. convert 2 bath into 1 bathroom. | $3,600 |
| Jul 28, 2025 | In progress issued Aug 2025 | 1904 Golden Gate Av | Tip Managers Inc | 1904-1904 1/2 golden gate ave: foundation replacement.Details
1904-1904 1/2 golden gate ave: foundation replacement. | $50,000 |
| Jul 16, 2025 | In progress issued Aug 2025 | 5538 03rd St | built (n) low concrete wall barrier (curb) for overspill from water tank. add foundation for the low wall.Details
built (n) low concrete wall barrier (curb) for overspill from water tank. add foundation for the low wall. | $5,000 | |
| Jun 23, 2025 | In progress issued Apr 2026 | 663 San Jose Av | Topview Construction Group Inc | prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use)Details
prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use) | $150,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 108 Chattanooga St | Tip Managers Inc | foundation work revision to pa # 202504114251 & 202505136403: remove concrete.Details
foundation work revision to pa # 202504114251 & 202505136403: remove concrete. | |
| Jun 13, 2025 | In progress issued Jun 2025 | 2974 26th Av | R & D Construction Co Inc | revision to pa 202502059749 revise foundation details. see clouds s2.1 and s3.2Details
revision to pa 202502059749 revise foundation details. see clouds s2.1 and s3.2 | |
| Jun 7, 2025 | In progress issued Nov 2025 | 639 04th Av | Wing Construction Co. | interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear.Details
interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear. | $500,000 |
| May 23, 2025 | In progress issued Jun 2025 | 2660 California St | Tip Managers Inc | reinforcing foundation at 1st level basement comply with nov 202535013Details
reinforcing foundation at 1st level basement comply with nov 202535013 | $100,000 |
| May 16, 2025 | Completed final sign-off Apr 2026 | 3936 21st St | Ket Construction Inc. | ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windowsDetails
ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windows | $220,000 |
| May 16, 2025 | Completed final sign-off Jun 2025 | 764 Chestnut St | G M Building And Construction Inc | revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroomDetails
revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroom | |
| May 14, 2025 | In progress filed May 2025, not yet issued | 2147 Golden Gate Av | convert existing as-built udu at the rear of level 1 into adu. new rear deck and stair. no structural work at the interior of the building.Details
convert existing as-built udu at the rear of level 1 into adu. new rear deck and stair. no structural work at the interior of the building. | $30,000 | |
| May 13, 2025 | In progress issued May 2025 | 108 Chattanooga St | Tip Managers Inc | revision 202504114251- change structural detail for basement foundation. reinforncement to existing foundation.Details
revision 202504114251- change structural detail for basement foundation. reinforncement to existing foundation. | |
| Apr 14, 2025 | In progress issued Apr 2025 | 241 Scott St | Tip Managers Inc | revision 202408158794 to include rebuilding (e) rear stairs like for like in kindDetails
revision 202408158794 to include rebuilding (e) rear stairs like for like in kind | $5,000 |
| Apr 11, 2025 | In progress issued Apr 2025 | 108 Chattanooga St | Tip Managers Inc | reinforcing existing foundation at 1st floor basement. comply to nov#: 202536084.Details
reinforcing existing foundation at 1st floor basement. comply to nov#: 202536084. | $20,000 |
| Feb 24, 2025 | In progress issued Mar 2025 | 24 Orben Pl | reconfiguration of approved permit # 202310058140: (2) new bathrooms and bedroom cw closet on basement level.Details
reconfiguration of approved permit # 202310058140: (2) new bathrooms and bedroom cw closet on basement level. | ||
| Feb 5, 2025 | In progress issued Apr 2025 | 2974 26th Av | R & D Construction Co Inc | revision to pa# 202412066324. bsmt: convert storage to 3 bedrooms, 2 bath, provide escape patio well for bedroom. 1/f: convert storage to rec room and bath. replace deteriorated foudnation at n&s side of bldg. upper/lower 2/f: remodel and reconfig (e) kitchen, breakfast rooms, dining room, removeDetails
revision to pa# 202412066324. bsmt: convert storage to 3 bedrooms, 2 bath, provide escape patio well for bedroom. 1/f: convert storage to rec room and bath. replace deteriorated foudnation at n&s side of bldg. upper/lower 2/f: remodel and reconfig (e) kitchen, breakfast rooms, dining room, remove | |
| Jan 24, 2025 | In progress issued Apr 2025 | 2689 23rd Av | Sky River Builder Inc | revision 201509308493, ref 202212627597- to abate nov 202287963 and 2022003143enf for work to include partial 2nd fl kitchen and bathroom remodel, replace tub to shower at ground floor- straighten ground floor adu entry. replace selective windows at both 2nd and 3rd floor (facing street)Details
revision 201509308493, ref 202212627597- to abate nov 202287963 and 2022003143enf for work to include partial 2nd fl kitchen and bathroom remodel, replace tub to shower at ground floor- straighten ground floor adu entry. replace selective windows at both 2nd and 3rd floor (facing street) | |
| Jan 22, 2025 | Completed final sign-off Jul 2025 | 785 03rd Av | Green City Construction Inc | revision 202411014259- remodel family , addition of (n) bathroom and (n) laundry room located in basement and convert (e) laundry area into (n) office space and remodel garage area. to add (n) kitchenette on ground floorDetails
revision 202411014259- remodel family , addition of (n) bathroom and (n) laundry room located in basement and convert (e) laundry area into (n) office space and remodel garage area. to add (n) kitchenette on ground floor | $25,000 |
| Jan 17, 2025 | Completed final sign-off Aug 2025 | 161 Laura St | Kaifa Construction Inc | rev 202407166621: voluntary structural upgrade: provide plywood shearwall and anchor bolts , tie down to (e) foundation. replace plaster wall finish w/ gypsum board upgrade 1-hr rated wall along property lines.replace lathing plaster walls on 2/f.Details
rev 202407166621: voluntary structural upgrade: provide plywood shearwall and anchor bolts , tie down to (e) foundation. replace plaster wall finish w/ gypsum board upgrade 1-hr rated wall along property lines.replace lathing plaster walls on 2/f. | $5,000 |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 764 Chestnut St | revision to permit 202410183313 and 200904095976 (ref 202406184761): structural only - add footing below exterior wall along east property line crawl space area.Details
revision to permit 202410183313 and 200904095976 (ref 202406184761): structural only - add footing below exterior wall along east property line crawl space area. | ||
| Dec 20, 2024 | In progress issued Jan 2025 | 3076 23rd Av | R & D Construction Co Inc | 1st fl: add master bed/bath, bedrooms, bath, laundry rm, rec/gym,enclosure area under 2nd fl sunroom, reconfigure stairway, new terrace with hottub at rear yard. 2nd fl relcoate master bed/bath,new bedroom, new powder rm, new office, new family rm, remodel e dining, living rm, bedroom. add skylightsDetails
1st fl: add master bed/bath, bedrooms, bath, laundry rm, rec/gym,enclosure area under 2nd fl sunroom, reconfigure stairway, new terrace with hottub at rear yard. 2nd fl relcoate master bed/bath,new bedroom, new powder rm, new office, new family rm, remodel e dining, living rm, bedroom. add skylights | $16,000 |
| Dec 13, 2024 | Completed final sign-off Oct 2025 | 180 Saint Charles Av | Kaifa Construction Inc | to comply with nov #202430627 relocate & remodel (e) kitchen at 2nd fl & (n) bedroom at 2nd fl. remove walls at dining area, infill stairway interior, w/hallway bathroom.Details
to comply with nov #202430627 relocate & remodel (e) kitchen at 2nd fl & (n) bedroom at 2nd fl. remove walls at dining area, infill stairway interior, w/hallway bathroom. | $40,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 235 Flournoy St | 2/f: convert existing window to door to rear deck. add partition and sliding door at bedroom.Details
2/f: convert existing window to door to rear deck. add partition and sliding door at bedroom. | $2,000 | |
| Nov 14, 2024 | In progress issued Dec 2024 | 342 Vallejo St | rev 201807033707 & 202103126504 & 202405283071: 1/f: (n) p|l wall in corridor to support 39in partial infill above. units 342-348: relocate (e) kitchen/living room to frong of units. convert study rm to mastter bath, kitchen living toom to master bed.reconfig bath layout.remove powder rm.infill 39inDetails
rev 201807033707 & 202103126504 & 202405283071: 1/f: (n) p|l wall in corridor to support 39in partial infill above. units 342-348: relocate (e) kitchen/living room to frong of units. convert study rm to mastter bath, kitchen living toom to master bed.reconfig bath layout.remove powder rm.infill 39in | $60,000 | |
| Oct 18, 2024 | Completed final sign-off Jun 2025 | 764 Chestnut St | structural revision to approved permit pa #200904095976 and 202406184761. no change to original rear windows on 2nd and 3rd floor. replace moment frame with plywood shearwall at rear wall. add'l strengthening by adding walls ea side of interior stair. new grade beam and spread footings at line bDetails
structural revision to approved permit pa #200904095976 and 202406184761. no change to original rear windows on 2nd and 3rd floor. replace moment frame with plywood shearwall at rear wall. add'l strengthening by adding walls ea side of interior stair. new grade beam and spread footings at line b | ||
| Oct 11, 2024 | In progress issued Jan 2025 | 5 Cyrus Pl | 7 Hills Construction | p/a to infill in various locations small voids with concrete grout beneath existing slab created by water main breakage, non-structural, no excavation proposed or authorized.Details
p/a to infill in various locations small voids with concrete grout beneath existing slab created by water main breakage, non-structural, no excavation proposed or authorized. | $7,500 |
| Oct 11, 2024 | In progress issued Jan 2025 | 3 Cyrus Pl | 7 Hills Construction | replace garage slab on grade.Details
replace garage slab on grade. | $18,000 |
| Sep 30, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | Green City Construction Inc | ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) denDetails
ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) den | $250,000 |
| Sep 27, 2024 | In progress issued Dec 2024 | 2042 44th Av | A C Y Construction Llc | 2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulationDetails
2nd fl: remodel (e) kitchen & bathroom. remove walls btwn kitchen & living room. (n) beam btwn living & kitchen. replace 2 windows in the front and rear of the building. upgrade electrical at 2nd fl. (n) insulation | $70,000 |
| Aug 29, 2024 | Completed final sign-off Jan 2025 | 539 36th Av | revision to pa# 202103096195 and pa# 202210285465: revise framing details at lightwell.Details
revision to pa# 202103096195 and pa# 202210285465: revise framing details at lightwell. | ||
| Jun 21, 2024 | Completed final sign-off Oct 2024 | 648 16th Av | Chen Herman Construction | revision to pa# 202308114296: 2/f - (e) window to remain in dining room. 1/f - reconfigure (e) bathroom layout. (e) 2 x 10 ceiling joist to remain at family room.Details
revision to pa# 202308114296: 2/f - (e) window to remain in dining room. 1/f - reconfigure (e) bathroom layout. (e) 2 x 10 ceiling joist to remain at family room. | |
| Jun 11, 2024 | Completed final sign-off Aug 2025 | 3381 21st St | unit 3381: remove bearing wall btw kitchen & greate rm @ 2nd fl. remove bearing wall btw family rm & office to become bedroom #5, remove wall btw bedroom #4 & # 5 to become # 3 as per plan at 1st fl.Details
unit 3381: remove bearing wall btw kitchen & greate rm @ 2nd fl. remove bearing wall btw family rm & office to become bedroom #5, remove wall btw bedroom #4 & # 5 to become # 3 as per plan at 1st fl. | $20,000 | |
| Jun 11, 2024 | Completed final sign-off Jul 2025 | 160 Upland Dr | Sunmax Construction | 6/12/24: revision to pa# 202401294849. 1st fl - 2 bedroomss, full bathroom, fmly rm/bar sink. 2nd fl - 1 bedroom, reconfigure/relocate kitchen and bathroom, convert powder rm to full bathroom, add master bedrooom to #1 rebuild interior stairway to comply w/ bldg code. replace all bldg windows andDetails
6/12/24: revision to pa# 202401294849. 1st fl - 2 bedroomss, full bathroom, fmly rm/bar sink. 2nd fl - 1 bedroom, reconfigure/relocate kitchen and bathroom, convert powder rm to full bathroom, add master bedrooom to #1 rebuild interior stairway to comply w/ bldg code. replace all bldg windows and | $230,000 |
| Jun 4, 2024 | Completed final sign-off Nov 2024 | 4112 21st St | Beam Construction Enterprises Inc | add partition wall in kitchen. revision to permit 201705096079Details
add partition wall in kitchen. revision to permit 201705096079 | $1,000 |
| May 15, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | Green City Construction Inc | interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stairDetails
interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stair | $70,000 |
| Apr 26, 2024 | Completed final sign-off Sep 2024 | 1736 11th Av | Santillan Construction Inc | kitchen remove weight bearing wall to living room and install beam, change kitchen layout install new cabinets and floor. bathroom install new tile floor, vanity and toielt. build deck off both bedrooms, new door in both bedrooms existing onto deckDetails
kitchen remove weight bearing wall to living room and install beam, change kitchen layout install new cabinets and floor. bathroom install new tile floor, vanity and toielt. build deck off both bedrooms, new door in both bedrooms existing onto deck | $68,500 |
| Apr 23, 2024 | In progress filed Apr 2024, not yet issued | 1281 28th Av | horizontal addition. creating 3rd floor sunroom at 3/f roof deck.Details
horizontal addition. creating 3rd floor sunroom at 3/f roof deck. | $25,000 | |
| Feb 14, 2024 | In progress issued Apr 2026 | 129 Lobos St | Pulu Construction, Rainbow Construction Llc | rebuild interior stair to meet code. remodel (1) kitchen and bath, upgrade insulated and fire rated wall per code, no increase of habitable area. legalize 1st floor bedrooms and bathrooms.Details
rebuild interior stair to meet code. remodel (1) kitchen and bath, upgrade insulated and fire rated wall per code, no increase of habitable area. legalize 1st floor bedrooms and bathrooms. | $60,000 |
| Jan 23, 2024 | In progress issued Apr 2024 | 154 Liberty St | R & D Construction Co Inc | revision to pa# 202207057766: new concrete - patio at rear of building at ground level.Details
revision to pa# 202207057766: new concrete - patio at rear of building at ground level. | $10,000 |
| Oct 19, 2023 | Completed final sign-off Nov 2024 | 1544 45th Av | rev to pa201604134634 & 201612215588 & 201708225469: modify approved floor plans. 1/f: reconfigure entry door and window, relocate kitchen and laundry, new powder room. 2/f: new laundry area, reconfigure master bed/bathroom and bedroom #2. reduce size of deck at rear side of bldg. replace 2 frontDetails
rev to pa201604134634 & 201612215588 & 201708225469: modify approved floor plans. 1/f: reconfigure entry door and window, relocate kitchen and laundry, new powder room. 2/f: new laundry area, reconfigure master bed/bathroom and bedroom #2. reduce size of deck at rear side of bldg. replace 2 front | $20,000 | |
| Oct 17, 2023 | Completed final sign-off Dec 2024 | 243 Gennessee St | O'pro Construction Inc. | revision to approved permit #202301120134: remain (e) low roof at light court - new skylights.Details
revision to approved permit #202301120134: remain (e) low roof at light court - new skylights. | $4,800 |
| Sep 8, 2023 | Never finaled filed Sep 2023, never issued | 258 Pacheco St | to erect 2 stories, 1 basement, type v-a, 2 units residential.Details
to erect 2 stories, 1 basement, type v-a, 2 units residential. | $950,000 | |
| Aug 30, 2023 | In progress issued Aug 2025 | 154 Liberty St | R & D Construction Co Inc | modify planter at front to add garage below (e) bay. rear facade alterations & deck. new vertical addition at 3/f level & horizontal addition at rear of basement level. floor plan modification at all levels. sprinkler under separate permit.Details
modify planter at front to add garage below (e) bay. rear facade alterations & deck. new vertical addition at 3/f level & horizontal addition at rear of basement level. floor plan modification at all levels. sprinkler under separate permit. | $250,000 |
| Aug 28, 2023 | Completed final sign-off Feb 2024 | 115 Brazil Av | Kaifa Construction Inc | replace rear stair to yard in kindDetails
replace rear stair to yard in kind | $10,000 |
| Aug 25, 2023 | Completed final sign-off Apr 2024 | 1591 24th Av | Kaifa Construction Inc | add half bath @ 2nd flr, remodel kitchen & bath, replace front windows in-kind with alum-clad, replace front facade cement plaster in-kind.Details
add half bath @ 2nd flr, remodel kitchen & bath, replace front windows in-kind with alum-clad, replace front facade cement plaster in-kind. | $25,000 |
| Aug 14, 2023 | Never finaled issued Aug 2023, no final | 766 Cayuga Av | Ampex Engineering & Co | rooms down permit. expand extg 2nd floor down to ground level/garage/storage level. add 2 bedrooms and bathroomDetails
rooms down permit. expand extg 2nd floor down to ground level/garage/storage level. add 2 bedrooms and bathroom | $35,000 |
| Aug 11, 2023 | Completed final sign-off Oct 2024 | 648 16th Av | Chen Herman Construction | to comply with nov 202308445. replace fire damaged wood siding and remove wood (interior) stairway at lightwell south side of bldg. 1/f: remodel (e) bar area, 2 bathrooms, family room, and replace ceiling joists at family room, bar area and baths. 2/f: replace fire damaged plumbing pipes, gas pipeDetails
to comply with nov 202308445. replace fire damaged wood siding and remove wood (interior) stairway at lightwell south side of bldg. 1/f: remodel (e) bar area, 2 bathrooms, family room, and replace ceiling joists at family room, bar area and baths. 2/f: replace fire damaged plumbing pipes, gas pipe | $80,000 |
| May 11, 2023 | Completed final sign-off Apr 2024 | 2658 39th Av | interior renovation @ ground floor; add family room, bedroom and full bath. total added floor area 465 sq ftDetails
interior renovation @ ground floor; add family room, bedroom and full bath. total added floor area 465 sq ft | $90,000 | |
| Mar 6, 2023 | Never finaled filed Mar 2023, never issued | 2368 Fulton St | convert existing playroom,into a junior adu per ordinance 4314. bedroom and study,add kitchen,convert existing half bath into full bath,total area 498 sq ft,permitted ground floor per bpa #200609071613.Details
convert existing playroom,into a junior adu per ordinance 4314. bedroom and study,add kitchen,convert existing half bath into full bath,total area 498 sq ft,permitted ground floor per bpa #200609071613. | $20,000 | |
| Feb 10, 2023 | Completed final sign-off May 2023 | 1111 Green St | to comply w/ nov 201907281. provide guardrail detail to comply nov. repair wood decking as needed. (e) roof. deck contructed under 9115340 & cfc issued 12/11/1992.Details
to comply w/ nov 201907281. provide guardrail detail to comply nov. repair wood decking as needed. (e) roof. deck contructed under 9115340 & cfc issued 12/11/1992. | $3,000 | |
| Jan 24, 2023 | Never finaled filed Jan 2023, never issued | 235 Flournoy St | convert ground floor garage space into childcare facility. add ada restroom and wheelchair life. replace garage door with windows and entry door. remove curb cut.Details
convert ground floor garage space into childcare facility. add ada restroom and wheelchair life. replace garage door with windows and entry door. remove curb cut. | $500,000 | |
| Jan 12, 2023 | Completed final sign-off Dec 2024 | 243 Gennessee St | O'pro Construction Inc. | ground flr: add family room, 2 full baths, exercise room 2/flr: add 1 bath, new interior stairs to ground floor, add rear deck.Details
ground flr: add family room, 2 full baths, exercise room 2/flr: add 1 bath, new interior stairs to ground floor, add rear deck. | $50,000 |
| Dec 28, 2022 | Completed final sign-off Jun 2023 | 2236 Cayuga Av | Ecowave Inc | 1st floor - add new bedrooms, bathrooms and kitchenette/yoga. no excavation under this permit application.Details
1st floor - add new bedrooms, bathrooms and kitchenette/yoga. no excavation under this permit application. | $40,000 |
| Nov 15, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | Green City Construction Inc | replace garage foundation to replace brick foundation found during constrcutionDetails
replace garage foundation to replace brick foundation found during constrcution | $5,000 |
| Nov 9, 2022 | Completed final sign-off Apr 2023 | 520 Miramar Av | Green City Construction Inc | roof repair due to fire damage; voluntary strengthen (e) roof framing by adding strongbacks, collars ties, and sister (n) rafters at locations where neededDetails
roof repair due to fire damage; voluntary strengthen (e) roof framing by adding strongbacks, collars ties, and sister (n) rafters at locations where needed | $600 |
| Oct 31, 2022 | Completed final sign-off Apr 2023 | 3054 Market St | kitchen remodel at 3rd fl by replacing cabinets. replace 4 rearyard facing windows. bathroom remodel by replacing shower and sink. no increase in floor area.Details
kitchen remodel at 3rd fl by replacing cabinets. replace 4 rearyard facing windows. bathroom remodel by replacing shower and sink. no increase in floor area. | $8,000 | |
| Oct 24, 2022 | Completed final sign-off Dec 2024 | 243 Gennessee St | O'pro Construction Inc. | foundation upgrade. excavate ground floor to provide 8'6" ceiling htt. max excavation =25 cu yard.Details
foundation upgrade. excavate ground floor to provide 8'6" ceiling htt. max excavation =25 cu yard. | $35,000 |
| Oct 3, 2022 | Never finaled issued Nov 2022, no final | 154 Liberty St | R & D Construction Co Inc | comply with complaint #220296110 - revise pa 202206106070 shoring and additional excavation for additional ceiling height @ basement for future improvement - voluntary structural strengthening @ basement only add perimeter plywood sheathing and holdowns. no change at 1st and 2nd floor above.Details
comply with complaint #220296110 - revise pa 202206106070 shoring and additional excavation for additional ceiling height @ basement for future improvement - voluntary structural strengthening @ basement only add perimeter plywood sheathing and holdowns. no change at 1st and 2nd floor above. | $80,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 3283 22nd St | L C Builders Inc. | unit 1107: kitchen and bathroom remodelDetails
unit 1107: kitchen and bathroom remodel | $90,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | Planart Construction Corp | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Sep 14, 2022 | Never finaled issued May 2023, no final | 53 Martha Av | Planart Construction Corp | excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining &Details
excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining & | $100,000 |
| Sep 9, 2022 | Completed final sign-off May 2023 | 1335 32nd Av | to comply with bid nov#202292046. install cable wire railing & legalize slider doors. revision to bpa#202206226844Details
to comply with bid nov#202292046. install cable wire railing & legalize slider doors. revision to bpa#202206226844 | $2,500 | |
| Sep 6, 2022 | Expired or cancelled expired Jul 2025 | 2100 Alemany Bl | Parkson Construction Company | revision to pa# 202202047328, relocate skylight and stairs to roof. revise shearwall layout.Details
revision to pa# 202202047328, relocate skylight and stairs to roof. revise shearwall layout. | |
| Aug 30, 2022 | Completed final sign-off Dec 2023 | 2324 Cabrillo St | Yong And Zhuo Construction Inc | new bedrooms bathrooms and office at 1st floor. new retaining wall at rear yard less than 48"Details
new bedrooms bathrooms and office at 1st floor. new retaining wall at rear yard less than 48" | $60,000 |
| Aug 17, 2022 | Completed final sign-off Nov 2022 | 1591 24th Av | New Star Construction | add 1 hr exit passageway at ground floor no increase in floor area.Details
add 1 hr exit passageway at ground floor no increase in floor area. | $6,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2025 | 531 Kansas St | Planart Construction Corp | 1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door.Details
1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door. | $35,000 |
| Jul 5, 2022 | Completed final sign-off Mar 2024 | 266 Pacheco St | O'pro Construction Inc. | remodel extg single family dwelling, 2 story over a basement. the scope of the work is to remodel the first and second levels. no exterior work. basement 202203150044 and 202205194561.Details
remodel extg single family dwelling, 2 story over a basement. the scope of the work is to remodel the first and second levels. no exterior work. basement 202203150044 and 202205194561. | $100,000 |
| Jun 29, 2022 | Completed final sign-off Mar 2024 | 2123 27th Av | revision to 202205164317 revise framingDetails
revision to 202205164317 revise framing | ||
| Jun 17, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | Green City Construction Inc | replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% lessDetails
replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% less | $200,000 |
| Jun 16, 2022 | In progress issued Jun 2024 | 5139 Geary Bl | Success Construction ***See Notes*** | convert extg first floor to restaurant. remove rear yard storageDetails
convert extg first floor to restaurant. remove rear yard storage | $100,000 |
| Jun 14, 2022 | In progress issued Mar 2024 | 2888 Harrison St | Target Construction Llc | interior remodel to (e) 2-family dwelling. relocate & remodel (e) kitchens and bathrooms to create new bedrooms, bathrooms, and washer/dryer machines in both units. replace windows at rear and lightwell, not visible from street.Details
interior remodel to (e) 2-family dwelling. relocate & remodel (e) kitchens and bathrooms to create new bedrooms, bathrooms, and washer/dryer machines in both units. replace windows at rear and lightwell, not visible from street. | $200,000 |
| Jun 10, 2022 | Never finaled issued Jun 2022, no final | 154 Liberty St | Ace Drilling & Excavation | replace all brick foundation and slab on grade.Details
replace all brick foundation and slab on grade. | $150,000 |
| Jun 9, 2022 | Completed final sign-off Oct 2022 | 1606 34th Av | Zhuo Zhang Construction Inc | kitchen remodel - no envelope changes - new cabinets, replace sink, faucet, lighting, new electrical, new wood header and new 8 foot wide opening in load bearing wall.Details
kitchen remodel - no envelope changes - new cabinets, replace sink, faucet, lighting, new electrical, new wood header and new 8 foot wide opening in load bearing wall. | $42,000 |
| May 19, 2022 | Completed final sign-off Mar 2024 | 266 Pacheco St | O'pro Construction Inc. | basement level: interior renovation. relocate one bath, add one bath, add study and bedroom. remodel bath at 2nd story & turn bedroom to closet.Details
basement level: interior renovation. relocate one bath, add one bath, add study and bedroom. remodel bath at 2nd story & turn bedroom to closet. | $40,000 |