Jim Lau
- License
- C33402
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Apr 2016 to Nov 2026
7 permits since 2000 (architect on 7 permits): 1 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Green City Construction Inc (4), Cogent Llc, Cornerstone Construction, Rockland Construction Group Inc, S L Construction Co
- Engineers
- Horon Lee (2), Benson Balan, Evan Wan Hin Cheung, Sean Cheng
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress issued Nov 2026 | 350 Day St | Green City Construction Inc | revision to pa# 202103126513. remove rear stair, change the 2/f full bathroom to 1/2 bath, change the master closet and master bathroom design, remove the interior stair post on the structural plan. relocate one shearwall on level 3Details
revision to pa# 202103126513. remove rear stair, change the 2/f full bathroom to 1/2 bath, change the master closet and master bathroom design, remove the interior stair post on the structural plan. relocate one shearwall on level 3 | $10,000 |
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 346 32nd Av | Green City Construction Inc | 2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house forDetails
2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house for | $120,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 860 Moultrie St | Green City Construction Inc | to comply w/ nov# 20162001: 2nd floor remodel at kitchen, bathroom convert to master bath, new powder room, new window replacement at the back. attic floor lv remodel at bathroom, bedroom, convert new bedroom at front room space. new dormers at attic floor level.Details
to comply w/ nov# 20162001: 2nd floor remodel at kitchen, bathroom convert to master bath, new powder room, new window replacement at the back. attic floor lv remodel at bathroom, bedroom, convert new bedroom at front room space. new dormers at attic floor level. | $100,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 1273 Jackson St | Cogent Llc, S L Construction Co | to comply with nov 202423124 fire repair damaged 4 unit; upgrade to code where required build in kind; fire reapair @ laundromat storage and wash closet value @ 12kDetails
to comply with nov 202423124 fire repair damaged 4 unit; upgrade to code where required build in kind; fire reapair @ laundromat storage and wash closet value @ 12k | $850,000 |
| Dec 26, 2025 | In progress issued Mar 2026 | 346 32nd Av | Green City Construction Inc | replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroomDetails
replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroom | $150,000 |
| Aug 20, 2025 | Completed final sign-off Jan 2026 | 1388 09th Av | Cornerstone Construction | to comply with nov 202539875 repairing damage framing in kitchen; remodeling space, replacing damaged walk in cooler. new indian restaurant taking over (e) indian restaurant. new flooring @ new bar area; replace water heater; replace (n) walk-in freezer; repair kitchen wall; all other (e) appliancesDetails
to comply with nov 202539875 repairing damage framing in kitchen; remodeling space, replacing damaged walk in cooler. new indian restaurant taking over (e) indian restaurant. new flooring @ new bar area; replace water heater; replace (n) walk-in freezer; repair kitchen wall; all other (e) appliances | $30,000 |
| Apr 1, 2016 | Expired or cancelled expired Apr 2025 | 715 Brannan St | Rockland Construction Group Inc | provide full-service restaurant w/ commercial kitchen, (2) ada complied bathrooms, entry way, exit. no structural work - all (e) load bearing walls, columns, roof trusses to remain.Details
provide full-service restaurant w/ commercial kitchen, (2) ada complied bathrooms, entry way, exit. no structural work - all (e) load bearing walls, columns, roof trusses to remain. | $60,000 |