Wing Construction Co.
- Based in
- San Ramon
- On San Francisco permits
- Apr 2003 to Aug 2026
- Last 24 months
- 15 permits filed
161 permits since 2000: 122 completed, 8 in progress, 17 never finaled, 14 expired or cancelled.
Of the 17 never-finaled permits, 8 are 5 to 10 years old, 9 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 161.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 639 04th Av | revision to 202505015597, revise kitchen openingDetails
revision to 202505015597, revise kitchen opening | |
| Jul 1, 2026 | In progress issued Jul 2026 | 641 04th Av | revision of 202505015597: interior revisions: door height and size, kitchen & living space swap, outlets and lighting adjustment, garage door update: change existing slab to new. exterior revisions: l3 2 light well windows combining into 1. skylight change and rear yard step change.Details
revision of 202505015597: interior revisions: door height and size, kitchen & living space swap, outlets and lighting adjustment, garage door update: change existing slab to new. exterior revisions: l3 2 light well windows combining into 1. skylight change and rear yard step change. | $5,000 |
| May 7, 2026 | In progress issued Jun 2026 | 867 34th Av | 1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening.Details
1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening. | $45,000 |
| May 4, 2026 | In progress issued Sep 2026 | 23 Valparaiso St | construct partition wall at garage level. remodel e kitchen, e bath 2nd fl and 1st fl. construct new 1/2 bath, new hvac at 2nd fl and 1st fl. replace all windows in kind except are windoww at both kitchens. new electrical throughout.Details
construct partition wall at garage level. remodel e kitchen, e bath 2nd fl and 1st fl. construct new 1/2 bath, new hvac at 2nd fl and 1st fl. replace all windows in kind except are windoww at both kitchens. new electrical throughout. | $200,000 |
| Feb 24, 2026 | In progress issued Mar 2026 | 1651 25th Av | legalize ground flr bar to 2 burners. 2/f: demo existing kitchen and convert to 3rd bedroom. remodel bathroom and new kitchen at existing dinning room.Details
legalize ground flr bar to 2 burners. 2/f: demo existing kitchen and convert to 3rd bedroom. remodel bathroom and new kitchen at existing dinning room. | $30,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 5 Bird St | resolve nov 202419131 for clarification of unwarrented unit & non-permitted work, updated back to storage use. remove stove, demo bathroom. provide new bathroom, update finishes, casework & sink, new walls on 1st/f (garage level)Details
resolve nov 202419131 for clarification of unwarrented unit & non-permitted work, updated back to storage use. remove stove, demo bathroom. provide new bathroom, update finishes, casework & sink, new walls on 1st/f (garage level) | $5,000 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 550 Holyoke St | to obtain final inspection for work approved under pa #201903226025. all work is complete.Details
to obtain final inspection for work approved under pa #201903226025. all work is complete. | |
| Oct 6, 2025 | Completed final sign-off Apr 2026 | 153 Country Club Dr | kitchen remodel: change new cabinet and countertop in-kind.floor replacement about 140square feet electrical upgrade.Details
kitchen remodel: change new cabinet and countertop in-kind.floor replacement about 140square feet electrical upgrade. | $15,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 1583 17th Av | kitchen remodel replace new cabinet and countertop, update new eletric, remodel 1-1/2 bahroom, new tile and new fixture, bath tub new fan, same location, like for like.Details
kitchen remodel replace new cabinet and countertop, update new eletric, remodel 1-1/2 bahroom, new tile and new fixture, bath tub new fan, same location, like for like. | $50,000 |
| Sep 2, 2025 | In progress filed Sep 2025, not yet issued | 1871 Alemany Bl | convert part of g/f to living space 720 sq ft. new 1 bedroom, 2 bath, & mini kitchen.Details
convert part of g/f to living space 720 sq ft. new 1 bedroom, 2 bath, & mini kitchen. | $80,000 |
| Jun 7, 2025 | In progress issued Nov 2025 | 639 04th Av | interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear.Details
interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear. | $500,000 |
| Feb 28, 2025 | Completed final sign-off Aug 2025 | 2147 Golden Gate Av | level 2: replace all 10 existing windows in kind in same openings. renovate kitchen, change kitchen into bedroom and change family room into kitchen. add 1 new bath and remodel existing bath. new lighting throughout.Details
level 2: replace all 10 existing windows in kind in same openings. renovate kitchen, change kitchen into bedroom and change family room into kitchen. add 1 new bath and remodel existing bath. new lighting throughout. | $110,000 |
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 3284 Folsom St | bathroom remodel: 1) change toilet, bathtub and sink for second floor. same location and 42 sqft.Details
bathroom remodel: 1) change toilet, bathtub and sink for second floor. same location and 42 sqft. | $15,000 |
| Jan 15, 2025 | Completed final sign-off Jul 2025 | 3284 Folsom St | kitchen remodel in kind. change new cabinet and countertop. no wall changes. fixtures to remain in the same location. approx. 130 sq ft.Details
kitchen remodel in kind. change new cabinet and countertop. no wall changes. fixtures to remain in the same location. approx. 130 sq ft. | $15,000 |
| Nov 15, 2024 | Completed final sign-off Feb 2025 | 1393 32nd Av | fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floorDetails
fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floor | $40,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 175 09th Av | revision to bpa#: 202306099735. revise detail 10/s3.1 to remove pull torque special inspection itemDetails
revision to bpa#: 202306099735. revise detail 10/s3.1 to remove pull torque special inspection item | |
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 385 Mangels Av | revision to pa# 202312283223. add door to access to lightwell.Details
revision to pa# 202312283223. add door to access to lightwell. | $100 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 136 Mount Vernon Av | main fl. kitchen and bathroom remodel, replace kitchen cabinet and counter top, upgrade electric outlet, bathroom replace toilet and vanity, new shower, new electric wiring no wall alterationDetails
main fl. kitchen and bathroom remodel, replace kitchen cabinet and counter top, upgrade electric outlet, bathroom replace toilet and vanity, new shower, new electric wiring no wall alteration | $35,000 |
| Jan 10, 2024 | Completed final sign-off Sep 2024 | 175 09th Av | revision to bpa# 202306093735: 1st fl- reconfigure bathroom and laundry layout. add (1) powder room. add (n) patio at rear.Details
revision to bpa# 202306093735: 1st fl- reconfigure bathroom and laundry layout. add (1) powder room. add (n) patio at rear. | $15,000 |
| Dec 28, 2023 | Completed final sign-off Sep 2024 | 385 Mangels Av | 1/f: change recreation room to family room. relocate laundry and add 1 full bath. 2/f: kitchen and bathroom remodel.Details
1/f: change recreation room to family room. relocate laundry and add 1 full bath. 2/f: kitchen and bathroom remodel. | $75,000 |
| Sep 8, 2023 | Completed final sign-off Oct 2023 | 934 Oak St | front stair landing change fungus wood new wood membrane. new waterproof and re-tile. front stair land repair in-kind. less than 50%.Details
front stair landing change fungus wood new wood membrane. new waterproof and re-tile. front stair land repair in-kind. less than 50%. | $5,000 |
| Jul 12, 2023 | Completed final sign-off Sep 2023 | 381 Allison St | kitchen refurbishment: new cabinets, countertop, rewire electrical. remodel bathroom.Details
kitchen refurbishment: new cabinets, countertop, rewire electrical. remodel bathroom. | $35,000 |
| Jun 9, 2023 | Completed final sign-off Sep 2024 | 175 09th Av | new stucco finished at front. 1/f: add 1 bedroom, 1 full bath, family and laundry. 2/f: remodel kitchen and bath, add 1 bedroom and 1 full bath. 3/f: remodel kitchen and bath, add 1 bedroom, 1 full bath and laundry, add roof deck.Details
new stucco finished at front. 1/f: add 1 bedroom, 1 full bath, family and laundry. 2/f: remodel kitchen and bath, add 1 bedroom and 1 full bath. 3/f: remodel kitchen and bath, add 1 bedroom, 1 full bath and laundry, add roof deck. | $250,000 |
| May 19, 2023 | Completed final sign-off Aug 2023 | 619 33rd Av | bathroom remodel. re-tile and change new fixture. one tub. one shower. all in kind. no structural work - no wall/framing modification.Details
bathroom remodel. re-tile and change new fixture. one tub. one shower. all in kind. no structural work - no wall/framing modification. | $10,000 |
| May 16, 2023 | Completed final sign-off Aug 2023 | 619 33rd Av | kitchen remodel: replace cabinets and countertop. upgrade electrical outlets of kitchen area.Details
kitchen remodel: replace cabinets and countertop. upgrade electrical outlets of kitchen area. | $10,000 |
| Feb 2, 2023 | Completed final sign-off Jul 2023 | 1678 41st Av | 2/f: reconfigure kitchen and bedrooms. remodel (e) bathroom and add 1 full bath.Details
2/f: reconfigure kitchen and bedrooms. remodel (e) bathroom and add 1 full bath. | $40,000 |
| Jan 19, 2023 | In progress issued Jun 2025 | 908 Paris St | change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office.Details
change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office. | $60,000 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 146 11th Av | kitchen remodel in kind at 2/f, remodel bath in kind (bathtub and shower remodel in kind) at 3/f and upgrade 100 amp main service. no structural work. no floor layout changes. no wall layout changes.Details
kitchen remodel in kind at 2/f, remodel bath in kind (bathtub and shower remodel in kind) at 3/f and upgrade 100 amp main service. no structural work. no floor layout changes. no wall layout changes. | $18,000 |
| Dec 7, 2022 | Completed final sign-off Apr 2023 | 575 Noe St | in kind kitchen remodel. replace cabinet, sink, countertop, faucet, non working range to comply w/ complaints 202299033, 202299043, 202299045. no floor layout or floor plan changes. no structural work.Details
in kind kitchen remodel. replace cabinet, sink, countertop, faucet, non working range to comply w/ complaints 202299033, 202299043, 202299045. no floor layout or floor plan changes. no structural work. | $15,000 |
| Oct 5, 2022 | Completed final sign-off Jul 2024 | 56 Williams Av | to construct a type-vb, 2-story, adu structure.Details
to construct a type-vb, 2-story, adu structure. | $150,000 |
| Sep 1, 2022 | Completed final sign-off Apr 2023 | 256 Madison St | replace etg front stair with new wood frames stair and solid stucco guardrail.Details
replace etg front stair with new wood frames stair and solid stucco guardrail. | $18,000 |
| Mar 25, 2022 | Completed final sign-off Feb 2023 | 238 Mangels Av | 1st fl: add full bath & entertainment room with wetbar.Details
1st fl: add full bath & entertainment room with wetbar. | $40,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2022 | 975 Plymouth Av | revision to pa# 202202047389. reconfigure layouts. add 1 full bath. powder room to full bathroom, hallway bathroom shower to tub, dinning room opening re-located.Details
revision to pa# 202202047389. reconfigure layouts. add 1 full bath. powder room to full bathroom, hallway bathroom shower to tub, dinning room opening re-located. | $10,000 |
| Feb 4, 2022 | Completed final sign-off Jun 2022 | 975 Plymouth Av | 2nd floor: add full bath, walk in closet and laundry. widen openings at dining room. 3 new skylights, u factor is 0.50 maxDetails
2nd floor: add full bath, walk in closet and laundry. widen openings at dining room. 3 new skylights, u factor is 0.50 max | $15,000 |
| Nov 9, 2021 | Completed final sign-off Mar 2022 | 185 Naglee Av | remodel kitchen and update electrical for kitchen. non structural.Details
remodel kitchen and update electrical for kitchen. non structural. | $7,500 |
| Oct 26, 2021 | Completed final sign-off Feb 2022 | 1670 08th Av | 1st floor: new powder room. 2nd floor: bathroom remodel and add new full bath.Details
1st floor: new powder room. 2nd floor: bathroom remodel and add new full bath. | $30,000 |
| Sep 22, 2021 | Completed final sign-off Dec 2021 | 1459 46th Av | front of building - restucco and repair fungus wood. ~500 sf.Details
front of building - restucco and repair fungus wood. ~500 sf. | $12,000 |
| Sep 10, 2021 | Completed final sign-off Jun 2022 | 391 17th Av | revision to pa# 202107224908. 1st fl: reconfigure bathroom & laundry per layout. 2nd fl: reconfigure kitchen layout.Details
revision to pa# 202107224908. 1st fl: reconfigure bathroom & laundry per layout. 2nd fl: reconfigure kitchen layout. | |
| Jul 22, 2021 | Completed final sign-off Jul 2022 | 391 17th Av | 1st floor: add 1 bedroom, 1 full bath kand mud room. 2nd floor: remodel kitchen and bathroom and add bedroom. relocate interior stairs.Details
1st floor: add 1 bedroom, 1 full bath kand mud room. 2nd floor: remodel kitchen and bathroom and add bedroom. relocate interior stairs. | $80,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 529 04th Av | 3/f: remodel kitchen and bath. add dining roomDetails
3/f: remodel kitchen and bath. add dining room | $45,000 |
| Apr 13, 2021 | Completed final sign-off Nov 2021 | 1515 41st Av | kitchen and bathroom remodel in kind. no wall or layout change.Details
kitchen and bathroom remodel in kind. no wall or layout change. | $30,000 |
| Jan 21, 2021 | Completed final sign-off Mar 2023 | 256 Madison St | to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck.Details
to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck. | $120,000 |
| Dec 24, 2020 | Expired or cancelled cancelled Jul 2021 | 529 04th Av | 3rd floor: interior reconfigure. add 1 full bath & laundry. add skylights.Details
3rd floor: interior reconfigure. add 1 full bath & laundry. add skylights. | $50,000 |
| Dec 10, 2020 | Completed final sign-off May 2021 | 2736 41st Av | 2nd fl : kitchen remodel (124 sq ft), remove non-bearing partition wall & replace 3 rear windows in-kind.Details
2nd fl : kitchen remodel (124 sq ft), remove non-bearing partition wall & replace 3 rear windows in-kind. | $18,000 |
| Dec 3, 2020 | Completed final sign-off Dec 2020 | 833 Kearny St | replace vent hoods in kitchen areas only. 3 on 2nd fl. 2 on 3rd fl.Details
replace vent hoods in kitchen areas only. 3 on 2nd fl. 2 on 3rd fl. | $1,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2023 | 184 Bertita St | interior remodel. 1sf flr: add a bedroom, a family room, a full bathroom and an exercise room. 2nd flr: upgrade smoke and carbon monoxide alarms.Details
interior remodel. 1sf flr: add a bedroom, a family room, a full bathroom and an exercise room. 2nd flr: upgrade smoke and carbon monoxide alarms. | $68,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2023 | 256 Madison St | termite repair to 50% to rear of building.Details
termite repair to 50% to rear of building. | $800 |
| Oct 26, 2020 | Completed final sign-off Dec 2020 | 85 Idora Av | remodel kitchen in kind. 118sfDetails
remodel kitchen in kind. 118sf | $12,000 |
| Sep 11, 2020 | Completed final sign-off Oct 2021 | 1237 Silliman St | 1st fl: add 1 full bath. new den, office and media room. remove storage space at the rear.Details
1st fl: add 1 full bath. new den, office and media room. remove storage space at the rear. | $25,000 |
| Aug 5, 2020 | Never finaled issued Sep 2020, no final | 1001 Judah St | revision to bpa# 2020/0130/3156. 1st floor: reconfigure per plans. 2nd floor:change tub to shower.Details
revision to bpa# 2020/0130/3156. 1st floor: reconfigure per plans. 2nd floor:change tub to shower. | |
| Jan 30, 2020 | Completed final sign-off Sep 2020 | 1001 Judah St | 1st floor: total remodel of (e) office, (e) family room, (e) 1 full bathroom and laundry room. 2nd floor: remodel kitchen and 1.5 bathrooms. 3 floor: remodel 2 bathroom. allwindows to be replace with alum-clad (marvin ultimate).Details
1st floor: total remodel of (e) office, (e) family room, (e) 1 full bathroom and laundry room. 2nd floor: remodel kitchen and 1.5 bathrooms. 3 floor: remodel 2 bathroom. allwindows to be replace with alum-clad (marvin ultimate). | $90,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2020 | 4341 17th St | kitchen update in apt #1Details
kitchen update in apt #1 | $20,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2023 | 405 Naples St | interior remodel 1st fl: legalize kitchen to comply w/ nov #201968461, per ord #43-14, change (e) storage to media room, add a full bathroom, remove unpermitted entry enclosure to comply w/ nov #201968461Details
interior remodel 1st fl: legalize kitchen to comply w/ nov #201968461, per ord #43-14, change (e) storage to media room, add a full bathroom, remove unpermitted entry enclosure to comply w/ nov #201968461 | $62,800 |
| Aug 20, 2019 | Completed final sign-off Feb 2020 | 2777 35th Av | revision to 201906042471 reconfigure bathr and closet on 2nd flrDetails
revision to 201906042471 reconfigure bathr and closet on 2nd flr | |
| Aug 16, 2019 | Never finaled filed Aug 2019, never issued | 28 Liebig St | per ordinance 162-16 adu on ground floor. legalization on separate permit (3rd floor)Details
per ordinance 162-16 adu on ground floor. legalization on separate permit (3rd floor) | $30,000 |
| Aug 16, 2019 | Never finaled filed Aug 2019, never issued | 28 Liebig St | per ordinance 43-14 legalize 3rd floor space to unit. adu on separate permit.Details
per ordinance 43-14 legalize 3rd floor space to unit. adu on separate permit. | $30,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 346 Taraval St | re-stucco the front of the building in-kind.Details
re-stucco the front of the building in-kind. | $15,000 |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 146 Central Av | rear yard wood stairs repair (less than 50%)Details
rear yard wood stairs repair (less than 50%) | $5,000 |
| Jun 4, 2019 | Completed final sign-off Feb 2020 | 2777 35th Av | 2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear.Details
2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear. | $40,000 |
| Mar 22, 2019 | Expired or cancelled expired Mar 2026 | 550 Holyoke St | add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck.Details
add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck. | $80,000 |
| Mar 19, 2019 | Completed final sign-off Dec 2019 | 577 17th Av | as built revision to pa 2018-1010-2832. add kitchen, bedroom and bathroom on 1st floor and remove interior stairs connecting 1st and 2nd floorDetails
as built revision to pa 2018-1010-2832. add kitchen, bedroom and bathroom on 1st floor and remove interior stairs connecting 1st and 2nd floor | $30,000 |
| Nov 28, 2018 | Completed final sign-off Mar 2019 | 540 19th Av | kitchen remodel, new cabinet and counter top, add (8) recess light, add some plugs. about 120 sq ft.Details
kitchen remodel, new cabinet and counter top, add (8) recess light, add some plugs. about 120 sq ft. | $13,000 |
| Nov 9, 2018 | Expired or cancelled cancelled Nov 2024 | 275 Harvard St | legalize unpermitted ground floor. (2) bedrooms & (1) bath per ord# 43-14. add (n) spiral stair & landing.Details
legalize unpermitted ground floor. (2) bedrooms & (1) bath per ord# 43-14. add (n) spiral stair & landing. | $30,000 |
| Nov 9, 2018 | Never finaled filed Nov 2018, never issued | 26 Lucy St | comply w/ nov# 200342420. legalize unpermitted addition and illegal unit at ground flr per ord# 43-14. remove storage shed in back under separate permit.Details
comply w/ nov# 200342420. legalize unpermitted addition and illegal unit at ground flr per ord# 43-14. remove storage shed in back under separate permit. | $30,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2019 | 575 17th Av | add 1 bedroom and 1 and 3 and 1/2 baths. new 1 story deck at rearDetails
add 1 bedroom and 1 and 3 and 1/2 baths. new 1 story deck at rear | $165,000 |
| Aug 14, 2018 | Completed final sign-off Mar 2019 | 2219 Noriega St | remodeling (e) kitchen at 2/f. remove (e) bearing wall. rebuilt (e) interior stairs. convert (e) bathroom into two bathrooms at 2/f. add 2-skylights. change (e) windows to sliding door at 1/f.Details
remodeling (e) kitchen at 2/f. remove (e) bearing wall. rebuilt (e) interior stairs. convert (e) bathroom into two bathrooms at 2/f. add 2-skylights. change (e) windows to sliding door at 1/f. | $60,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2019 | 2232 16th Av | new 1.5 bath on 2nd flr., fire damage repair and structural stregtheningDetails
new 1.5 bath on 2nd flr., fire damage repair and structural stregthening | $42,000 |
| Jun 26, 2018 | Completed final sign-off May 2019 | 1443 Noriega St | change of use. convert (e) foot massage to body massage. (unit b)Details
change of use. convert (e) foot massage to body massage. (unit b) | $4,500 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 2524 Alemany Bl | remodel (e) bathroo and kitchen. same in-kind.Details
remodel (e) bathroo and kitchen. same in-kind. | $20,000 |
| May 14, 2018 | Completed final sign-off Nov 2018 | 120 Marview Wy | 2nd fl: add 1 (n) bathroom, remodel (e) bath & kitchen, 1st fl: add 2 (n) bathroom 1 (n) bedroom, 1 (n) home theater, replace furnace & water heater. exterior: add 3 (n) skylights on roof, replace 2 window & patio door at ground floor rear in-kindDetails
2nd fl: add 1 (n) bathroom, remodel (e) bath & kitchen, 1st fl: add 2 (n) bathroom 1 (n) bedroom, 1 (n) home theater, replace furnace & water heater. exterior: add 3 (n) skylights on roof, replace 2 window & patio door at ground floor rear in-kind | $95,000 |
| Apr 25, 2018 | Completed final sign-off Dec 2019 | 823 Pacific Av | legalize upper floor as residential unit per ordinance# 43-14. no record to confirm legalize it as 2 bedrooms, 2 offices, 2 baths residential unit.Details
legalize upper floor as residential unit per ordinance# 43-14. no record to confirm legalize it as 2 bedrooms, 2 offices, 2 baths residential unit. | $40,000 |
| Mar 23, 2018 | Expired or cancelled cancelled Jul 2025 | 158 Howth St | ordinance #162-16. addition of adu @ ground floor of main building (700 sq ft) (2)bedroos, (1)bath. addition of master rom in backyard @ 301 sq ft (unpermitted work). to comply w/ nov #20164785. ref #201803214269 legalization.Details
ordinance #162-16. addition of adu @ ground floor of main building (700 sq ft) (2)bedroos, (1)bath. addition of master rom in backyard @ 301 sq ft (unpermitted work). to comply w/ nov #20164785. ref #201803214269 legalization. | $4,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2019 | 726 11th Av | 1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcementDetails
1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcement | $80,000 |
| Mar 21, 2018 | Expired or cancelled cancelled Jul 2025 | 158 Howth St | to comply w/ nov #201647851. legalize rear yard units 536 sq ft, (2) bedrooms, (1) bath. unit legalizaiton ordinance 43-14.Details
to comply w/ nov #201647851. legalize rear yard units 536 sq ft, (2) bedrooms, (1) bath. unit legalizaiton ordinance 43-14. | $15,000 |
| Jan 18, 2018 | Completed final sign-off May 2019 | 325 Rolph St | 1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck.Details
1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck. | $68,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 2939 16th St | dry wall repair & new dry wall at rear room, 900 sq. ft.Details
dry wall repair & new dry wall at rear room, 900 sq. ft. | $8,000 |
| Dec 27, 2017 | Completed final sign-off May 2019 | 879 Capp St | rear deck stair repair less 50%, repair in kindDetails
rear deck stair repair less 50%, repair in kind | $3,000 |
| Dec 13, 2017 | Completed final sign-off Mar 2018 | 3589 21st St | kitchen remodel: replace cabinet and countertop in-kind. no structural change. about 10'x10' tile floor.Details
kitchen remodel: replace cabinet and countertop in-kind. no structural change. about 10'x10' tile floor. | $4,000 |
| Aug 21, 2017 | Expired or cancelled withdrawn Jul 2018 | 1125 Clement St | tenant improvement to use space as child care cente.r small pony wall to separate waitinbg area/care area. previous building permit #201408133718Details
tenant improvement to use space as child care cente.r small pony wall to separate waitinbg area/care area. previous building permit #201408133718 | $5,000 |
| Aug 21, 2017 | Expired or cancelled withdrawn Jul 2018 | 1125 Clement St | to paint sign on existing awningDetails
to paint sign on existing awning | $1,000 |
| Aug 7, 2017 | Completed final sign-off Nov 2017 | 2290 20th Av | replace existing vinyl windows at front and rear with aluminum clad wood windows within same openings. windows to be of single-hung and casement.Details
replace existing vinyl windows at front and rear with aluminum clad wood windows within same openings. windows to be of single-hung and casement. | $2,500 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 2290 20th Av | remove exterior stucco - replace fungus wood members - re stucco same as before - no changes to windows only re-sealing existing. no changes to windows. all work in kind.Details
remove exterior stucco - replace fungus wood members - re stucco same as before - no changes to windows only re-sealing existing. no changes to windows. all work in kind. | $25,000 |
| Jul 18, 2017 | Completed final sign-off Mar 2018 | 1686 24th Av | construct rear decl (10' ht max) with stairs at rear of (e) bldg per plan. add two bedrooms, one family room, two full bathrooms & laundry on (e) ground floor per plan. add two full bathrooms & remodel (e) kitchen & bathroom on 2nd floor per plan.Details
construct rear decl (10' ht max) with stairs at rear of (e) bldg per plan. add two bedrooms, one family room, two full bathrooms & laundry on (e) ground floor per plan. add two full bathrooms & remodel (e) kitchen & bathroom on 2nd floor per plan. | $120,000 |
| Jun 28, 2017 | Completed final sign-off Feb 2018 | 376 Bridgeview Dr | 2 bathroom remodel, one at main floor, one at ground floor.Details
2 bathroom remodel, one at main floor, one at ground floor. | $12,000 |
| Feb 21, 2017 | Never finaled issued Feb 2017, no final | 1165 Washington St | replace rear side siding and dryrot.Details
replace rear side siding and dryrot. | $30,000 |
| Jan 20, 2017 | Completed final sign-off Jun 2017 | 1778 28th Av | back yard deck addition 15' x 12' 12' extension from building.Details
back yard deck addition 15' x 12' 12' extension from building. | $5,000 |
| Dec 15, 2016 | Completed final sign-off Sep 2017 | 182 Carl St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $30,000 |
| Jul 29, 2016 | Completed final sign-off Jun 2017 | 1722 21st Av | provide foundation wall and retaining wall design for the corrective actions for the n.o.v. 201625631 dated 7/11/2016Details
provide foundation wall and retaining wall design for the corrective actions for the n.o.v. 201625631 dated 7/11/2016 | $15,000 |
| Jul 22, 2016 | Completed final sign-off Feb 2017 | 2066 18th Av | add two bedrooms, three bathrooms and a storage room on 1st floor.Details
add two bedrooms, three bathrooms and a storage room on 1st floor. | $25,000 |
| May 12, 2016 | Completed final sign-off Jun 2017 | 1722 21st Av | construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor.Details
construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor. | $110,000 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 1271 32nd Av | ground floor bathroom remodel, re-tile. replace (e) vinyl window- size for size - same location. replace fan. repaint. window not on street. like for like, no moving, removing or adding walls.Details
ground floor bathroom remodel, re-tile. replace (e) vinyl window- size for size - same location. replace fan. repaint. window not on street. like for like, no moving, removing or adding walls. | $7,000 |
| May 5, 2016 | Completed final sign-off Sep 2025 | 321 Ellington Av | to comply with complaint 201611925: @ 2nd floor - remodel kitchen and 2 bathrooms - same location. like for like, no change to wall locations or addition of walls.Details
to comply with complaint 201611925: @ 2nd floor - remodel kitchen and 2 bathrooms - same location. like for like, no change to wall locations or addition of walls. | $25,000 |
| Apr 25, 2016 | Completed final sign-off Oct 2019 | 70 Webster St | foundation replacement around perimeter of building with new slab.Details
foundation replacement around perimeter of building with new slab. | $80,000 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 512 27th Av | roof repair at rear sunroom area. replace 200 sq ft, flat roof membrane.Details
roof repair at rear sunroom area. replace 200 sq ft, flat roof membrane. | $500 |
| Mar 31, 2016 | Completed final sign-off Sep 2025 | 321 Ellington Av | 1st floor : add 2 bedrooms, 1 mudroom & storage rooms, relocate (e) powder room. 2nd floor: add deck at rear of bldg per plans. replace (e) bedroom windows w/patio doors per plan.Details
1st floor : add 2 bedrooms, 1 mudroom & storage rooms, relocate (e) powder room. 2nd floor: add deck at rear of bldg per plans. replace (e) bedroom windows w/patio doors per plan. | $40,000 |
| Mar 22, 2016 | Completed final sign-off Dec 2016 | 827 46th Av | construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan.Details
construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan. | $100,000 |
| Feb 26, 2016 | Completed final sign-off Sep 2016 | 638 Sawyer St | convert ground floor into habitable spaces. 2 bedroom, laundry room, and 2 bathrooms. add 1/2 bath & remodel kitchen @ 2nd floor. demo undocument structure on site. new fence 6' at site of property.Details
convert ground floor into habitable spaces. 2 bedroom, laundry room, and 2 bathrooms. add 1/2 bath & remodel kitchen @ 2nd floor. demo undocument structure on site. new fence 6' at site of property. | $80,000 |
| Feb 1, 2016 | Completed final sign-off Dec 2016 | 61 Waterville St | 1)to add 2 bedrooms, one full bath room and laundry room on extg ground floor per plan. 2)to add one full bathroom and remodel extg kitchen and bathroom on 2nd floor. 3)replace extg damaged sheetrock, plbmg, electrical on 2nd floor.Details
1)to add 2 bedrooms, one full bath room and laundry room on extg ground floor per plan. 2)to add one full bathroom and remodel extg kitchen and bathroom on 2nd floor. 3)replace extg damaged sheetrock, plbmg, electrical on 2nd floor. | $100,000 |
| Jan 14, 2016 | Never finaled issued Feb 2019, no final | 180 Vienna St | horizontal addition. basement:storage, full bath, bedroom, great rm,interior stairs. 1st flr: relocate stairs, 1 family rm,wet bar, powder rm, bedroom, utility rm. 2nd flr: relocate existing bath, add 1 bathroom, 2 bedrooms, walk in closet, 1 office, 1 pantryDetails
horizontal addition. basement:storage, full bath, bedroom, great rm,interior stairs. 1st flr: relocate stairs, 1 family rm,wet bar, powder rm, bedroom, utility rm. 2nd flr: relocate existing bath, add 1 bathroom, 2 bedrooms, walk in closet, 1 office, 1 pantry | $200,000 |
| Jan 13, 2016 | Completed final sign-off Dec 2018 | 111 Harold Av | convert garage space into habitable space incl 2 bedrooms, 1 bath, 1 game room, one car garage. remodel upstair kitchen & bath. addition 1 bathroom, enclose front entrance hall, create connection to upper & lower floor space.Details
convert garage space into habitable space incl 2 bedrooms, 1 bath, 1 game room, one car garage. remodel upstair kitchen & bath. addition 1 bathroom, enclose front entrance hall, create connection to upper & lower floor space. | $80,000 |