Back to kitchen remodel contractors
Wing Construction Co.
- Based in
- San Ramon
- On San Francisco permits
- Apr 2003 to Aug 2026
- Last 24 months
- 15 permits filed
161 permits since 2000: 122 completed, 8 in progress, 17 never finaled, 14 expired or cancelled.
Of the 17 never-finaled permits, 8 are 5 to 10 years old, 9 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
60 kitchen remodel permits: 50 completed, 6 in progress, 1 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 639 04th Av | revision to 202505015597, revise kitchen openingDetails
revision to 202505015597, revise kitchen opening | |
| Jul 1, 2026 | In progress issued Jul 2026 | 641 04th Av | revision of 202505015597: interior revisions: door height and size, kitchen & living space swap, outlets and lighting adjustment, garage door update: change existing slab to new. exterior revisions: l3 2 light well windows combining into 1. skylight change and rear yard step change.Details
revision of 202505015597: interior revisions: door height and size, kitchen & living space swap, outlets and lighting adjustment, garage door update: change existing slab to new. exterior revisions: l3 2 light well windows combining into 1. skylight change and rear yard step change. | $5,000 |
| May 7, 2026 | In progress issued Jun 2026 | 867 34th Av | 1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening.Details
1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening. | $45,000 |
| May 4, 2026 | In progress issued Sep 2026 | 23 Valparaiso St | construct partition wall at garage level. remodel e kitchen, e bath 2nd fl and 1st fl. construct new 1/2 bath, new hvac at 2nd fl and 1st fl. replace all windows in kind except are windoww at both kitchens. new electrical throughout.Details
construct partition wall at garage level. remodel e kitchen, e bath 2nd fl and 1st fl. construct new 1/2 bath, new hvac at 2nd fl and 1st fl. replace all windows in kind except are windoww at both kitchens. new electrical throughout. | $200,000 |
| Feb 24, 2026 | In progress issued Mar 2026 | 1651 25th Av | legalize ground flr bar to 2 burners. 2/f: demo existing kitchen and convert to 3rd bedroom. remodel bathroom and new kitchen at existing dinning room.Details
legalize ground flr bar to 2 burners. 2/f: demo existing kitchen and convert to 3rd bedroom. remodel bathroom and new kitchen at existing dinning room. | $30,000 |
| Oct 6, 2025 | Completed final sign-off Apr 2026 | 153 Country Club Dr | kitchen remodel: change new cabinet and countertop in-kind.floor replacement about 140square feet electrical upgrade.Details
kitchen remodel: change new cabinet and countertop in-kind.floor replacement about 140square feet electrical upgrade. | $15,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 1583 17th Av | kitchen remodel replace new cabinet and countertop, update new eletric, remodel 1-1/2 bahroom, new tile and new fixture, bath tub new fan, same location, like for like.Details
kitchen remodel replace new cabinet and countertop, update new eletric, remodel 1-1/2 bahroom, new tile and new fixture, bath tub new fan, same location, like for like. | $50,000 |
| Sep 2, 2025 | In progress filed Sep 2025, not yet issued | 1871 Alemany Bl | convert part of g/f to living space 720 sq ft. new 1 bedroom, 2 bath, & mini kitchen.Details
convert part of g/f to living space 720 sq ft. new 1 bedroom, 2 bath, & mini kitchen. | $80,000 |
| Feb 28, 2025 | Completed final sign-off Aug 2025 | 2147 Golden Gate Av | level 2: replace all 10 existing windows in kind in same openings. renovate kitchen, change kitchen into bedroom and change family room into kitchen. add 1 new bath and remodel existing bath. new lighting throughout.Details
level 2: replace all 10 existing windows in kind in same openings. renovate kitchen, change kitchen into bedroom and change family room into kitchen. add 1 new bath and remodel existing bath. new lighting throughout. | $110,000 |
| Jan 15, 2025 | Completed final sign-off Jul 2025 | 3284 Folsom St | kitchen remodel in kind. change new cabinet and countertop. no wall changes. fixtures to remain in the same location. approx. 130 sq ft.Details
kitchen remodel in kind. change new cabinet and countertop. no wall changes. fixtures to remain in the same location. approx. 130 sq ft. | $15,000 |
| Nov 15, 2024 | Completed final sign-off Feb 2025 | 1393 32nd Av | fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floorDetails
fire damage @ kitchen & dining room at second flr. repair in-kind. replace hvac @ ground floor | $40,000 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 136 Mount Vernon Av | main fl. kitchen and bathroom remodel, replace kitchen cabinet and counter top, upgrade electric outlet, bathroom replace toilet and vanity, new shower, new electric wiring no wall alterationDetails
main fl. kitchen and bathroom remodel, replace kitchen cabinet and counter top, upgrade electric outlet, bathroom replace toilet and vanity, new shower, new electric wiring no wall alteration | $35,000 |
| Dec 28, 2023 | Completed final sign-off Sep 2024 | 385 Mangels Av | 1/f: change recreation room to family room. relocate laundry and add 1 full bath. 2/f: kitchen and bathroom remodel.Details
1/f: change recreation room to family room. relocate laundry and add 1 full bath. 2/f: kitchen and bathroom remodel. | $75,000 |
| Jul 12, 2023 | Completed final sign-off Sep 2023 | 381 Allison St | kitchen refurbishment: new cabinets, countertop, rewire electrical. remodel bathroom.Details
kitchen refurbishment: new cabinets, countertop, rewire electrical. remodel bathroom. | $35,000 |
| Jun 9, 2023 | Completed final sign-off Sep 2024 | 175 09th Av | new stucco finished at front. 1/f: add 1 bedroom, 1 full bath, family and laundry. 2/f: remodel kitchen and bath, add 1 bedroom and 1 full bath. 3/f: remodel kitchen and bath, add 1 bedroom, 1 full bath and laundry, add roof deck.Details
new stucco finished at front. 1/f: add 1 bedroom, 1 full bath, family and laundry. 2/f: remodel kitchen and bath, add 1 bedroom and 1 full bath. 3/f: remodel kitchen and bath, add 1 bedroom, 1 full bath and laundry, add roof deck. | $250,000 |
| May 16, 2023 | Completed final sign-off Aug 2023 | 619 33rd Av | kitchen remodel: replace cabinets and countertop. upgrade electrical outlets of kitchen area.Details
kitchen remodel: replace cabinets and countertop. upgrade electrical outlets of kitchen area. | $10,000 |
| Feb 2, 2023 | Completed final sign-off Jul 2023 | 1678 41st Av | 2/f: reconfigure kitchen and bedrooms. remodel (e) bathroom and add 1 full bath.Details
2/f: reconfigure kitchen and bedrooms. remodel (e) bathroom and add 1 full bath. | $40,000 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 146 11th Av | kitchen remodel in kind at 2/f, remodel bath in kind (bathtub and shower remodel in kind) at 3/f and upgrade 100 amp main service. no structural work. no floor layout changes. no wall layout changes.Details
kitchen remodel in kind at 2/f, remodel bath in kind (bathtub and shower remodel in kind) at 3/f and upgrade 100 amp main service. no structural work. no floor layout changes. no wall layout changes. | $18,000 |
| Dec 7, 2022 | Completed final sign-off Apr 2023 | 575 Noe St | in kind kitchen remodel. replace cabinet, sink, countertop, faucet, non working range to comply w/ complaints 202299033, 202299043, 202299045. no floor layout or floor plan changes. no structural work.Details
in kind kitchen remodel. replace cabinet, sink, countertop, faucet, non working range to comply w/ complaints 202299033, 202299043, 202299045. no floor layout or floor plan changes. no structural work. | $15,000 |
| Nov 9, 2021 | Completed final sign-off Mar 2022 | 185 Naglee Av | remodel kitchen and update electrical for kitchen. non structural.Details
remodel kitchen and update electrical for kitchen. non structural. | $7,500 |
| Sep 10, 2021 | Completed final sign-off Jun 2022 | 391 17th Av | revision to pa# 202107224908. 1st fl: reconfigure bathroom & laundry per layout. 2nd fl: reconfigure kitchen layout.Details
revision to pa# 202107224908. 1st fl: reconfigure bathroom & laundry per layout. 2nd fl: reconfigure kitchen layout. | |
| Jul 22, 2021 | Completed final sign-off Jul 2022 | 391 17th Av | 1st floor: add 1 bedroom, 1 full bath kand mud room. 2nd floor: remodel kitchen and bathroom and add bedroom. relocate interior stairs.Details
1st floor: add 1 bedroom, 1 full bath kand mud room. 2nd floor: remodel kitchen and bathroom and add bedroom. relocate interior stairs. | $80,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 529 04th Av | 3/f: remodel kitchen and bath. add dining roomDetails
3/f: remodel kitchen and bath. add dining room | $45,000 |
| Apr 13, 2021 | Completed final sign-off Nov 2021 | 1515 41st Av | kitchen and bathroom remodel in kind. no wall or layout change.Details
kitchen and bathroom remodel in kind. no wall or layout change. | $30,000 |
| Jan 21, 2021 | Completed final sign-off Mar 2023 | 256 Madison St | to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck.Details
to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck. | $120,000 |
| Dec 10, 2020 | Completed final sign-off May 2021 | 2736 41st Av | 2nd fl : kitchen remodel (124 sq ft), remove non-bearing partition wall & replace 3 rear windows in-kind.Details
2nd fl : kitchen remodel (124 sq ft), remove non-bearing partition wall & replace 3 rear windows in-kind. | $18,000 |
| Dec 3, 2020 | Completed final sign-off Dec 2020 | 833 Kearny St | replace vent hoods in kitchen areas only. 3 on 2nd fl. 2 on 3rd fl.Details
replace vent hoods in kitchen areas only. 3 on 2nd fl. 2 on 3rd fl. | $1,000 |
| Oct 26, 2020 | Completed final sign-off Dec 2020 | 85 Idora Av | remodel kitchen in kind. 118sfDetails
remodel kitchen in kind. 118sf | $12,000 |
| Jan 30, 2020 | Completed final sign-off Sep 2020 | 1001 Judah St | 1st floor: total remodel of (e) office, (e) family room, (e) 1 full bathroom and laundry room. 2nd floor: remodel kitchen and 1.5 bathrooms. 3 floor: remodel 2 bathroom. allwindows to be replace with alum-clad (marvin ultimate).Details
1st floor: total remodel of (e) office, (e) family room, (e) 1 full bathroom and laundry room. 2nd floor: remodel kitchen and 1.5 bathrooms. 3 floor: remodel 2 bathroom. allwindows to be replace with alum-clad (marvin ultimate). | $90,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2020 | 4341 17th St | kitchen update in apt #1Details
kitchen update in apt #1 | $20,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2023 | 405 Naples St | interior remodel 1st fl: legalize kitchen to comply w/ nov #201968461, per ord #43-14, change (e) storage to media room, add a full bathroom, remove unpermitted entry enclosure to comply w/ nov #201968461Details
interior remodel 1st fl: legalize kitchen to comply w/ nov #201968461, per ord #43-14, change (e) storage to media room, add a full bathroom, remove unpermitted entry enclosure to comply w/ nov #201968461 | $62,800 |
| Jun 4, 2019 | Completed final sign-off Feb 2020 | 2777 35th Av | 2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear.Details
2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear. | $40,000 |
| Mar 22, 2019 | Expired or cancelled expired Mar 2026 | 550 Holyoke St | add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck.Details
add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck. | $80,000 |
| Mar 19, 2019 | Completed final sign-off Dec 2019 | 577 17th Av | as built revision to pa 2018-1010-2832. add kitchen, bedroom and bathroom on 1st floor and remove interior stairs connecting 1st and 2nd floorDetails
as built revision to pa 2018-1010-2832. add kitchen, bedroom and bathroom on 1st floor and remove interior stairs connecting 1st and 2nd floor | $30,000 |
| Nov 28, 2018 | Completed final sign-off Mar 2019 | 540 19th Av | kitchen remodel, new cabinet and counter top, add (8) recess light, add some plugs. about 120 sq ft.Details
kitchen remodel, new cabinet and counter top, add (8) recess light, add some plugs. about 120 sq ft. | $13,000 |
| Aug 14, 2018 | Completed final sign-off Mar 2019 | 2219 Noriega St | remodeling (e) kitchen at 2/f. remove (e) bearing wall. rebuilt (e) interior stairs. convert (e) bathroom into two bathrooms at 2/f. add 2-skylights. change (e) windows to sliding door at 1/f.Details
remodeling (e) kitchen at 2/f. remove (e) bearing wall. rebuilt (e) interior stairs. convert (e) bathroom into two bathrooms at 2/f. add 2-skylights. change (e) windows to sliding door at 1/f. | $60,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 2524 Alemany Bl | remodel (e) bathroo and kitchen. same in-kind.Details
remodel (e) bathroo and kitchen. same in-kind. | $20,000 |
| May 14, 2018 | Completed final sign-off Nov 2018 | 120 Marview Wy | 2nd fl: add 1 (n) bathroom, remodel (e) bath & kitchen, 1st fl: add 2 (n) bathroom 1 (n) bedroom, 1 (n) home theater, replace furnace & water heater. exterior: add 3 (n) skylights on roof, replace 2 window & patio door at ground floor rear in-kindDetails
2nd fl: add 1 (n) bathroom, remodel (e) bath & kitchen, 1st fl: add 2 (n) bathroom 1 (n) bedroom, 1 (n) home theater, replace furnace & water heater. exterior: add 3 (n) skylights on roof, replace 2 window & patio door at ground floor rear in-kind | $95,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2019 | 726 11th Av | 1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcementDetails
1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcement | $80,000 |
| Jan 18, 2018 | Completed final sign-off May 2019 | 325 Rolph St | 1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck.Details
1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck. | $68,000 |
| Dec 13, 2017 | Completed final sign-off Mar 2018 | 3589 21st St | kitchen remodel: replace cabinet and countertop in-kind. no structural change. about 10'x10' tile floor.Details
kitchen remodel: replace cabinet and countertop in-kind. no structural change. about 10'x10' tile floor. | $4,000 |
| Jul 18, 2017 | Completed final sign-off Mar 2018 | 1686 24th Av | construct rear decl (10' ht max) with stairs at rear of (e) bldg per plan. add two bedrooms, one family room, two full bathrooms & laundry on (e) ground floor per plan. add two full bathrooms & remodel (e) kitchen & bathroom on 2nd floor per plan.Details
construct rear decl (10' ht max) with stairs at rear of (e) bldg per plan. add two bedrooms, one family room, two full bathrooms & laundry on (e) ground floor per plan. add two full bathrooms & remodel (e) kitchen & bathroom on 2nd floor per plan. | $120,000 |
| May 12, 2016 | Completed final sign-off Jun 2017 | 1722 21st Av | construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor.Details
construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor. | $110,000 |
| May 5, 2016 | Completed final sign-off Sep 2025 | 321 Ellington Av | to comply with complaint 201611925: @ 2nd floor - remodel kitchen and 2 bathrooms - same location. like for like, no change to wall locations or addition of walls.Details
to comply with complaint 201611925: @ 2nd floor - remodel kitchen and 2 bathrooms - same location. like for like, no change to wall locations or addition of walls. | $25,000 |
| Mar 22, 2016 | Completed final sign-off Dec 2016 | 827 46th Av | construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan.Details
construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan. | $100,000 |
| Feb 26, 2016 | Completed final sign-off Sep 2016 | 638 Sawyer St | convert ground floor into habitable spaces. 2 bedroom, laundry room, and 2 bathrooms. add 1/2 bath & remodel kitchen @ 2nd floor. demo undocument structure on site. new fence 6' at site of property.Details
convert ground floor into habitable spaces. 2 bedroom, laundry room, and 2 bathrooms. add 1/2 bath & remodel kitchen @ 2nd floor. demo undocument structure on site. new fence 6' at site of property. | $80,000 |
| Feb 1, 2016 | Completed final sign-off Dec 2016 | 61 Waterville St | 1)to add 2 bedrooms, one full bath room and laundry room on extg ground floor per plan. 2)to add one full bathroom and remodel extg kitchen and bathroom on 2nd floor. 3)replace extg damaged sheetrock, plbmg, electrical on 2nd floor.Details
1)to add 2 bedrooms, one full bath room and laundry room on extg ground floor per plan. 2)to add one full bathroom and remodel extg kitchen and bathroom on 2nd floor. 3)replace extg damaged sheetrock, plbmg, electrical on 2nd floor. | $100,000 |
| Jan 13, 2016 | Completed final sign-off Dec 2018 | 111 Harold Av | convert garage space into habitable space incl 2 bedrooms, 1 bath, 1 game room, one car garage. remodel upstair kitchen & bath. addition 1 bathroom, enclose front entrance hall, create connection to upper & lower floor space.Details
convert garage space into habitable space incl 2 bedrooms, 1 bath, 1 game room, one car garage. remodel upstair kitchen & bath. addition 1 bathroom, enclose front entrance hall, create connection to upper & lower floor space. | $80,000 |
| Oct 6, 2015 | Expired or cancelled expired Oct 2019 | 72 Webster St | 2nd floor alteration extg residence. remodel dining kitchen, living bedrooms, bath and add a bathroom along hallway. upgrade extg panel to 100 amp panel. work under separate permit: window relocation, new balcony, french doors at rearDetails
2nd floor alteration extg residence. remodel dining kitchen, living bedrooms, bath and add a bathroom along hallway. upgrade extg panel to 100 amp panel. work under separate permit: window relocation, new balcony, french doors at rear | $50,000 |
| Dec 29, 2014 | Completed final sign-off Oct 2015 | 214 Ashton Av | to add 2 bedrooms,1 full bathrm,one storage & one laundry room on existing groudn floor per plan, remodel existing kitchen & 2 full bathrms on 2nd flr per plan. no expansion on (e) bldg.Details
to add 2 bedrooms,1 full bathrm,one storage & one laundry room on existing groudn floor per plan, remodel existing kitchen & 2 full bathrms on 2nd flr per plan. no expansion on (e) bldg. | $70,000 |
| Sep 4, 2014 | Completed final sign-off Feb 2015 | 70 Webster St | convert closet to bathroom (n); kitchen remodel, bathroom remodel, replace 50 gal water heater, upgrade electrical panel to 100 ampsDetails
convert closet to bathroom (n); kitchen remodel, bathroom remodel, replace 50 gal water heater, upgrade electrical panel to 100 amps | $50,000 |
| Aug 15, 2014 | Completed final sign-off Jan 2015 | 2320 Ulloa St | remodel kitchen and bathroom, replace furnace at basement, paint inside and outside.Details
remodel kitchen and bathroom, replace furnace at basement, paint inside and outside. | $30,000 |
| Jul 11, 2014 | Never finaled issued Jan 2015, no final | 1831 31st Av | upgrade (e) ceiling with new ceiling joists & replace (e) sheetrock with (n) 5/8" type 'x' gyp. bd., with r-13, insulation at exterior wall, remodel (e) kitchen & bathroom at 2/f., legalize family room, construct one full bath room & relocate a wall at the entry at ground floor.Details
upgrade (e) ceiling with new ceiling joists & replace (e) sheetrock with (n) 5/8" type 'x' gyp. bd., with r-13, insulation at exterior wall, remodel (e) kitchen & bathroom at 2/f., legalize family room, construct one full bath room & relocate a wall at the entry at ground floor. | $42,000 |
| Sep 13, 2013 | Completed final sign-off Mar 2014 | 202 Ortega St | kitchen remodel recabinet and countertop. rewire electric and new sink, dishwasher, new hood.Details
kitchen remodel recabinet and countertop. rewire electric and new sink, dishwasher, new hood. | $12,000 |
| Sep 19, 2012 | Expired or cancelled withdrawn Oct 2012 | 708 Cole St | remodel (e) kitchen, remodel 2 (e) bathrooms, build a new stairs to attic level, add 2 bedrooms & one bathrooms in attic level, turn attic level into new living spaces with 2 bedrooms, 1 bath. add a new master bathroom in 3rd level & remodel new master bedroom. add new elec. outlet per code / plan.Details
remodel (e) kitchen, remodel 2 (e) bathrooms, build a new stairs to attic level, add 2 bedrooms & one bathrooms in attic level, turn attic level into new living spaces with 2 bedrooms, 1 bath. add a new master bathroom in 3rd level & remodel new master bedroom. add new elec. outlet per code / plan. | $150,000 |
| Jun 7, 2012 | Completed final sign-off Dec 2012 | 2010 Keith St | comply w/his nov his #200708550, hid 201018106, bid nov#201216569, 201229805 & 201231381 dated 6/19/07 dated 11/16/10 -remodel kitchen, 2 bathrooms, 3 bedrooms & living room at 2nd floor. -add laundry room, 2 bedrooms, 2 half bathrooms at ground floor. -voluntary strengthening (e) foundationDetails
comply w/his nov his #200708550, hid 201018106, bid nov#201216569, 201229805 & 201231381 dated 6/19/07 dated 11/16/10 -remodel kitchen, 2 bathrooms, 3 bedrooms & living room at 2nd floor. -add laundry room, 2 bedrooms, 2 half bathrooms at ground floor. -voluntary strengthening (e) foundation | $45,000 |
| Nov 30, 2011 | Completed final sign-off Mar 2013 | 223 Cherry St | kitchen in the 1st flr (only kitchen in the house) remodel kitchen and 3 baths on 2nd flr in place. fixtures to be replaced in kind, no structural work, (n) lighting comply with cec 150 kDetails
kitchen in the 1st flr (only kitchen in the house) remodel kitchen and 3 baths on 2nd flr in place. fixtures to be replaced in kind, no structural work, (n) lighting comply with cec 150 k | $12,500 |
| Aug 5, 2009 | Completed final sign-off Sep 2009 | 686 28th Av | add a 24"x60" skylight. 7' away from property line in (e) kitchen. all work on 2nd floor.Details
add a 24"x60" skylight. 7' away from property line in (e) kitchen. all work on 2nd floor. | $5,000 |
| Mar 11, 2009 | Completed final sign-off May 2009 | 4028 Ortega St | second floor kitchen and bathroom remodelingDetails
second floor kitchen and bathroom remodeling | $10,000 |
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 643 41st Av | remodel kitchen & bath room, repair front stairDetails
remodel kitchen & bath room, repair front stair | $13,000 |