161 permits since 2000: 122 completed, 8 in progress, 17 never finaled, 14 expired or cancelled.
Of the 17 never-finaled permits, 8 are 5 to 10 years old, 9 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
20 deck permits: 15 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2026 | In progress issued Jun 2026 | 867 34th Av | 1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening.Details
1st floor - remodel (e) flr to laundry, full bath, (n) corridor & wet bar. 2nd floor - remodel (e) kitchen, new rear deck and (n) sliding door @ (e) opening. | $45,000 |
| Jun 7, 2025 | In progress issued Nov 2025 | 639 04th Av | interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear.Details
interior renovation of all floors, connect level 1 with garage level with new internal stair to add 446 sf of habitable space. level 2 and level 3: add 13 sf of area at rear wall by straighten rear walls. change extent and configuration of deck at rear. | $500,000 |
| Jan 21, 2021 | Completed final sign-off Mar 2023 | 256 Madison St | to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck.Details
to comply with nov# 202068871. 1st fl add (n) bedroom, family room, 2 bathrooms & interior stair. 2nd fl full remodel with (n) bath, kitchen & living. replace all windows. excavate earth at rear yard. (n) deck. | $120,000 |
| Jun 4, 2019 | Completed final sign-off Feb 2020 | 2777 35th Av | 2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear.Details
2nd flr -infill lightwell at southside. add 1 bedroom, 1 full bath. remodel kitchen and bath. new deck at rear. | $40,000 |
| Mar 22, 2019 | Expired or cancelled expired Mar 2026 | 550 Holyoke St | add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck.Details
add units per ordnance #95-17. 1st floor: add an adu w/ (2) bedrooms, (2)full baths, living/dinning area & kitchen, add rear wood deck. | $80,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2019 | 575 17th Av | add 1 bedroom and 1 and 3 and 1/2 baths. new 1 story deck at rearDetails
add 1 bedroom and 1 and 3 and 1/2 baths. new 1 story deck at rear | $165,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2019 | 726 11th Av | 1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcementDetails
1st flr - add 2 bedrooms, 1 full bath, family rm and mud room. 2nd flr - remodel kitchen and bath, add deck at rear. 3rd flr - remodel bath, add 1 full bath, and laundry, rear side window sliding doors repalcement | $80,000 |
| Jan 18, 2018 | Completed final sign-off May 2019 | 325 Rolph St | 1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck.Details
1/f: add 2 bedrooms, two full bathroom, a family room, a toilet, one storage. 2/f: remodel (e) kitchen, add a bathroom, a media room and add a rear deck. | $68,000 |
| Dec 27, 2017 | Completed final sign-off May 2019 | 879 Capp St | rear deck stair repair less 50%, repair in kindDetails
rear deck stair repair less 50%, repair in kind | $3,000 |
| Jan 20, 2017 | Completed final sign-off Jun 2017 | 1778 28th Av | back yard deck addition 15' x 12' 12' extension from building.Details
back yard deck addition 15' x 12' 12' extension from building. | $5,000 |
| May 12, 2016 | Completed final sign-off Jun 2017 | 1722 21st Av | construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor.Details
construct rear deck w/stairs at rear of (e) bldg per plan. to add two bedrooms, one full bathroom & laundry on (e) ground floor per plan. add one full bathroom & remodel (e) kitchen, bathroom on 2nd floor. replace (e) sheetrock, plumbing & electrical on 2nd floor. | $110,000 |
| Mar 31, 2016 | Completed final sign-off Sep 2025 | 321 Ellington Av | 1st floor : add 2 bedrooms, 1 mudroom & storage rooms, relocate (e) powder room. 2nd floor: add deck at rear of bldg per plans. replace (e) bedroom windows w/patio doors per plan.Details
1st floor : add 2 bedrooms, 1 mudroom & storage rooms, relocate (e) powder room. 2nd floor: add deck at rear of bldg per plans. replace (e) bedroom windows w/patio doors per plan. | $40,000 |
| Mar 22, 2016 | Completed final sign-off Dec 2016 | 827 46th Av | construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan.Details
construction rear deck w/stairs at rear of existing bldg per plan. to add two bedrooms, one family room, two full bathrooms & laundry on existing ground floor per plan. to add full bathroom & remodel exist kitchen & bathroom on 2nd floor per plan. | $100,000 |
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 214 Ashton Av | construct reat deck (9' ht.) with stairs down to rear yead per plan.Details
construct reat deck (9' ht.) with stairs down to rear yead per plan. | $5,000 |
| Feb 23, 2015 | Completed final sign-off Oct 2015 | 45 Harrington St | construct 17' x 8' rear deck (max 10' ht) with stairs down to rear yard per plan.Details
construct 17' x 8' rear deck (max 10' ht) with stairs down to rear yard per plan. | $5,000 |
| Mar 22, 2011 | Completed final sign-off May 2011 | 47 Forest View Dr | back yard-build new deck 12'x17' on 2nd floor to yard and open a new 5'-5" sliding door to deckDetails
back yard-build new deck 12'x17' on 2nd floor to yard and open a new 5'-5" sliding door to deck | $8,000 |
| May 18, 2010 | Never finaled issued May 2010, no final | 318 02nd Av | comply with nov # 201039078-replace 4' guard rails, post & hand rails @rear deck. dry rot work on stairwayDetails
comply with nov # 201039078-replace 4' guard rails, post & hand rails @rear deck. dry rot work on stairway | $600 |
| Sep 25, 2009 | Never finaled issued Sep 2009, no final | 600 Lakeview Av | repair fire damaged 3-story single fam. dwelling. replace 5/8" type "x" gyp. bd. @ property line wall & add insulation whenever open-up; repair stair from front door to side garage; add toilet in 2nd. flr. living rm.; add a rear 12'x8' deck.Details
repair fire damaged 3-story single fam. dwelling. replace 5/8" type "x" gyp. bd. @ property line wall & add insulation whenever open-up; repair stair from front door to side garage; add toilet in 2nd. flr. living rm.; add a rear 12'x8' deck. | $15,000 |
| Dec 11, 2008 | Completed final sign-off May 2009 | 4028 Ortega St | legalize (1) bedroom & storage, relocate (e) bathroom, add (n) bedroom at ground floor. replace foundation, dry rot repair @ rear deck on 2nd fl. open wall between living room & dining room in front portion of (e) 2nd fl.Details
legalize (1) bedroom & storage, relocate (e) bathroom, add (n) bedroom at ground floor. replace foundation, dry rot repair @ rear deck on 2nd fl. open wall between living room & dining room in front portion of (e) 2nd fl. | $50,000 |
| Aug 31, 2005 | Completed final sign-off Dec 2005 | 1378 Haight St | dryrot repair at rear exterior stairs and decks to comply with 200561300Details
dryrot repair at rear exterior stairs and decks to comply with 200561300 | $2,000 |