Howard Hughes
- Listed as
- authorized agent-others, contractor
- Firm
- H T H Construction
- Based in
- Novato
- On San Francisco permits
- Feb 2008 to Jan 2022
89 permits since 2000 (contractor on 89 permits, authorized agent-others on 1 permit): 65 completed, 13 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2022 | Completed final sign-off Oct 2023 | 226 Twin Peaks Bl | H T H Construction | expansion of 1/f by 335sf. no change to demolished area. reference permit 201902062206-s2. (n) media room and laundry at 1st fl (n) bathroom added to 2nd fl with revised layout.Details
expansion of 1/f by 335sf. no change to demolished area. reference permit 201902062206-s2. (n) media room and laundry at 1st fl (n) bathroom added to 2nd fl with revised layout. | $60,000 |
| Sep 15, 2021 | Completed final sign-off Oct 2023 | 226 Twin Peaks Bl | H T H Construction | rev to pa 201902062206 demo and replacement of one 12" concrete wall basement level along north property line. permit is being filed in response to complaint # 202181494 (to comply with complaint).Details
rev to pa 201902062206 demo and replacement of one 12" concrete wall basement level along north property line. permit is being filed in response to complaint # 202181494 (to comply with complaint). | $15,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2023 | 226 Twin Peaks Bl | H T H Construction | temporary shoring to facilitate excavation and construction of proposed foundation as approved under pa# 2018-1031-4602 & propossed garage as approved under pa# 2019-0206-2206Details
temporary shoring to facilitate excavation and construction of proposed foundation as approved under pa# 2018-1031-4602 & propossed garage as approved under pa# 2019-0206-2206 | $45,000 |
| Apr 30, 2021 | Completed final sign-off Mar 2023 | 2537 Greenwich St | H T H Construction | remove existing kitchen cabinets and replace in kind. remodel 2 existing bathrooms in kind. paint interior and exterior.Details
remove existing kitchen cabinets and replace in kind. remodel 2 existing bathrooms in kind. paint interior and exterior. | $20,000 |
| Apr 5, 2021 | Completed final sign-off May 2022 | 2729 Filbert St | H T H Construction | remove 16' failing block wall at rear property line. and replace with board formedconcrete wall. existing height is 4'6". new wall will be the same heightDetails
remove 16' failing block wall at rear property line. and replace with board formedconcrete wall. existing height is 4'6". new wall will be the same height | $5,000 |
| Jan 27, 2021 | Completed final sign-off Aug 2022 | 54 Homestead St | H T H Construction | remodel kitchen & bathroom on 2/f. remodel bathroom & add new bathroom on 3/f. infill of north side lightwell at 3/f.Details
remodel kitchen & bathroom on 2/f. remodel bathroom & add new bathroom on 3/f. infill of north side lightwell at 3/f. | $150,000 |
| Jan 26, 2021 | Expired or cancelled expired Jul 2024 | 453 Buena Vista East Av | H T H Construction | revision to app#201706149321, update demo calcs. to abate planning complaint 2020006009 enfDetails
revision to app#201706149321, update demo calcs. to abate planning complaint 2020006009 enf | |
| Dec 17, 2020 | Expired or cancelled expired May 2025 | 833 Rockdale Dr | H T H Construction | new deck and stair in rear yard; remove side kitchen door & stair to gradeDetails
new deck and stair in rear yard; remove side kitchen door & stair to grade | $15,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4430 24th St | H T H Construction | new stairs & landscape walls at the rear yard.Details
new stairs & landscape walls at the rear yard. | $90,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2023 | 10 Hillway Av | H T H Construction | horizontal expansion of deck at second floor. horizontal expansion of new laundry room (unconditioned)/storage at first floor.Details
horizontal expansion of deck at second floor. horizontal expansion of new laundry room (unconditioned)/storage at first floor. | $60,000 |
| Oct 27, 2020 | Expired or cancelled expired Nov 2024 | 46 Calhoun Tr | H T H Construction | remodel bathroom in kind. replace window on internal walkway.Details
remodel bathroom in kind. replace window on internal walkway. | $1,500 |
| Sep 19, 2020 | Completed final sign-off May 2025 | 833 Rockdale Dr | S A Baxter Inc., H T H Construction | to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit.Details
to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit. | $20,000 |
| Jun 16, 2020 | Completed final sign-off Nov 2021 | 38 Calhoun Tr | H T H Construction | replace existing window with in kind window. repair wood framing around the window and repair stucco after install of new in kind window.Details
replace existing window with in kind window. repair wood framing around the window and repair stucco after install of new in kind window. | $500 |
| Mar 4, 2020 | Completed final sign-off Jul 2020 | 339 18th Av | H T H Construction | add window to 2nd floor front stairs. add mechanical chase to 3rd floor hallway & remove closet. add access door to rear roof on top floor. add window fixed at top deck stairs. add railing on rear roof to bring up to 42".Details
add window to 2nd floor front stairs. add mechanical chase to 3rd floor hallway & remove closet. add access door to rear roof on top floor. add window fixed at top deck stairs. add railing on rear roof to bring up to 42". | $1,000 |
| Feb 3, 2020 | Expired or cancelled expired May 2026 | 225 Vasquez Av | Bergquist Builders, H T H Construction | additional dwelling unit at ground floor per ordinance 162-17. reference #201706018092-s.Details
additional dwelling unit at ground floor per ordinance 162-17. reference #201706018092-s. | $3,600 |
| Jan 17, 2020 | Completed final sign-off May 2024 | 229 Downey St | H T H Construction | renovation & expansion of an (e) 2-bedroom single family dwelling & garage structure into a 4-bedroom single family dwellingDetails
renovation & expansion of an (e) 2-bedroom single family dwelling & garage structure into a 4-bedroom single family dwelling | $702,000 |
| Nov 7, 2019 | Expired or cancelled expired Jul 2024 | 453 Buena Vista East Av | H T H Construction | exploratory demo to deermine (e) conditions @ interior front facade @ 3 levels, approximatelyk 150 sq. ft. repair dryrot under separate permit if required.Details
exploratory demo to deermine (e) conditions @ interior front facade @ 3 levels, approximatelyk 150 sq. ft. repair dryrot under separate permit if required. | $5,000 |
| May 21, 2019 | Completed final sign-off Jun 2019 | 451 Sanchez St | H T H Construction | to obtain final inspection for work approved under pa#2014-01-06-5570 and 2014-06-13-8326. all work is completeDetails
to obtain final inspection for work approved under pa#2014-01-06-5570 and 2014-06-13-8326. all work is complete | |
| May 2, 2019 | Completed final sign-off May 2019 | 1099 Dolores St | H T H Construction | for administrative purposes to document the legal use & occupancy of building as a 2-story building single family residence. this is based on reviews of city records incl water dept records, assesor building card & sanborn map. this permit corrects the numb of dwelling units on pa 200004106795.Details
for administrative purposes to document the legal use & occupancy of building as a 2-story building single family residence. this is based on reviews of city records incl water dept records, assesor building card & sanborn map. this permit corrects the numb of dwelling units on pa 200004106795. | |
| Mar 1, 2019 | Completed final sign-off Jan 2020 | 552 Douglass St | H T H Construction | add (n) master bedrm to rear at 3rd flr, interior renovations to create (n) bathroom & closets, replace (e) living rm windows within (e) openings (same site & operation); fill in corner at (e) deck at 2nd flr lvl & replace guardrail at (n) & (e) deck.Details
add (n) master bedrm to rear at 3rd flr, interior renovations to create (n) bathroom & closets, replace (e) living rm windows within (e) openings (same site & operation); fill in corner at (e) deck at 2nd flr lvl & replace guardrail at (n) & (e) deck. | $100,000 |
| Feb 6, 2019 | Completed final sign-off Oct 2023 | 226 Twin Peaks Bl | H T H Construction | partial demolition to (e) 4-story & basement single family house for vertical & rear addition to expand 4-story & basement single family houseDetails
partial demolition to (e) 4-story & basement single family house for vertical & rear addition to expand 4-story & basement single family house | $745,500 |
| Dec 13, 2018 | Completed final sign-off Jan 2020 | 552 Douglass St | H T H Construction | interior renovation to ground floor unit, includes new windows and door at rear. replace extg interior stair to upper unit, renovate kitchen at upper unit with new windows & door at rear. replacement of 2 front doors in kind. partial replacement of (e)rear property line foundation.Details
interior renovation to ground floor unit, includes new windows and door at rear. replace extg interior stair to upper unit, renovate kitchen at upper unit with new windows & door at rear. replacement of 2 front doors in kind. partial replacement of (e)rear property line foundation. | $300,000 |
| May 24, 2018 | Completed final sign-off Oct 2018 | 10 Hillway Av | H T H Construction | install new 5'x3'3" fire rated fixed window at north property line. replacedoor and window casing per plan. no work visible from right of way.Details
install new 5'x3'3" fire rated fixed window at north property line. replacedoor and window casing per plan. no work visible from right of way. | $10,000 |
| Jan 19, 2018 | Completed final sign-off Oct 2018 | 635 20th Av | H T H Construction | remove and replace 1 kitchen in each unit. remove & replace 1 bath in unit 637. no change on wall.Details
remove and replace 1 kitchen in each unit. remove & replace 1 bath in unit 637. no change on wall. | $40,000 |
| Dec 14, 2017 | Completed final sign-off Jan 2018 | 335 18th Av | H T H Construction | provide permeating grout underneath footing at south wall for a length of approximately 86 linear feetDetails
provide permeating grout underneath footing at south wall for a length of approximately 86 linear feet | $3,000 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 541 Noe St | H T H Construction | kitchen and bath remodelDetails
kitchen and bath remodel | $80,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2025 | 2758 Filbert St | H T H Construction | renovation of an existing single family house. the new addition inlcludes one new story 3 additional beds and 2.5 baths and a rear year additionDetails
renovation of an existing single family house. the new addition inlcludes one new story 3 additional beds and 2.5 baths and a rear year addition | $890,850 |
| Jun 14, 2017 | Completed final sign-off Jul 2024 | 453 Buena Vista East Av | H T H Construction, Singh Construction | renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r.Details
renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r. | $890,500 |
| Jun 1, 2017 | Expired or cancelled expired Feb 2025 | 225 Vasquez Av | Bergquist Builders, H T H Construction | horizontal & vertical addition. renovation of an (e) single family residence. expansion from 1550 sf + 3910 sf w/ garage @ grade, (n) story for kitchen, dining, living w/ bedrooms belowDetails
horizontal & vertical addition. renovation of an (e) single family residence. expansion from 1550 sf + 3910 sf w/ garage @ grade, (n) story for kitchen, dining, living w/ bedrooms below | $975,000 |
| May 31, 2017 | Never finaled issued Jul 2017, no final | 88 Clairview Ct | H T H Construction | remodel & relocate kitchen, living, dining & bathroom at 2nd floor to ground floor. conversion of (e) 2nd floor kitchen into home office. creation of laundry/linen at 2nd floor. remov (e) substandard internal stair & replace with new code compliant stair.Details
remodel & relocate kitchen, living, dining & bathroom at 2nd floor to ground floor. conversion of (e) 2nd floor kitchen into home office. creation of laundry/linen at 2nd floor. remov (e) substandard internal stair & replace with new code compliant stair. | $100,000 |
| May 23, 2017 | Completed final sign-off Nov 2019 | 48 Clifford Tr | Clonduff Construction Inc., H T H Construction | new roof top deck & access stair @ (e) roof.Details
new roof top deck & access stair @ (e) roof. | $50,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 35 Lottie Bennett Ln | H T H Construction | rem0del kitchen, new cabinets, new fixtures, new appliances, remodel bath, new fixtures, tile. remove only necesary drywall. new recessed lighting approx 12 cans, new carpet throughout and painting. new subpanel, 3 new elec circuits in kitchenDetails
rem0del kitchen, new cabinets, new fixtures, new appliances, remodel bath, new fixtures, tile. remove only necesary drywall. new recessed lighting approx 12 cans, new carpet throughout and painting. new subpanel, 3 new elec circuits in kitchen | $40,000 |
| Nov 7, 2016 | Never finaled issued Nov 2016, no final | 610 Haight St | H T H Construction | exploratory demolition. remove lath & plaster at top 2 feet of walls and 2 feet of ceiling & patch back, in kind.Details
exploratory demolition. remove lath & plaster at top 2 feet of walls and 2 feet of ceiling & patch back, in kind. | $3,000 |
| Nov 3, 2016 | Completed final sign-off Apr 2018 | 610 Haight St | H T H Construction | project consists of a remodle of lower unit. remodel (e) bedroom & bath , new den & laundry at garage floor. remodel (e) bath & kithcen, new bath @ 2nd floor.Details
project consists of a remodle of lower unit. remodel (e) bedroom & bath , new den & laundry at garage floor. remodel (e) bath & kithcen, new bath @ 2nd floor. | $236,416 |
| Jul 22, 2016 | Completed final sign-off Sep 2020 | 1649 Beach St | H T H Construction | remodel extg kitchen, including replacing 4 windows in extg and modified openings. paint extg cabinets at master bath, replace counter tops and decorative lighting. no work visible from street.Details
remodel extg kitchen, including replacing 4 windows in extg and modified openings. paint extg cabinets at master bath, replace counter tops and decorative lighting. no work visible from street. | $40,000 |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 355 Clipper St | H T H Construction | exploratory demo for future constructoin: 2in at top & bottom of walls throughout & ceiling.Details
exploratory demo for future constructoin: 2in at top & bottom of walls throughout & ceiling. | $5,000 |
| May 13, 2016 | Completed final sign-off Sep 2016 | 10 Hillway Av | H T H Construction | construct new master bathroom and master closet. install 2 rated property line windows on north elevation. no work at street facade.Details
construct new master bathroom and master closet. install 2 rated property line windows on north elevation. no work at street facade. | $25,000 |
| Jan 14, 2016 | Never finaled issued Jul 2017, no final | 959 Chenery St | H T H Construction | addition of new third story to (e) two story house for 3 new bedrooms & 2 bathrooms. interior remodel to (e) second floor & first floor.Details
addition of new third story to (e) two story house for 3 new bedrooms & 2 bathrooms. interior remodel to (e) second floor & first floor. | $450,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | revision to previously issued to pa#2014-0820-4281 & 2015-0902-5912. addition of new roof terrace above third fl. addition of new exterior stair to roof terrace within already permitted building envelope. no increase in bldg envelope, height or footprint.Details
revision to previously issued to pa#2014-0820-4281 & 2015-0902-5912. addition of new roof terrace above third fl. addition of new exterior stair to roof terrace within already permitted building envelope. no increase in bldg envelope, height or footprint. | $30,000 |
| Dec 4, 2015 | Completed final sign-off May 2016 | 1880 Mission St | H T H Construction | new office space in the existing portion of type 1 podium level of a type 1/va building including a new ada compliant bathroom and kitchenette. design build mechanical systemDetails
new office space in the existing portion of type 1 podium level of a type 1/va building including a new ada compliant bathroom and kitchenette. design build mechanical system | $35,000 |
| Sep 2, 2015 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | revision to 201408204261. revisions to interior floor plans at basement, 1st and 2nd fls. replacement of proposed rear landscape stair with new inclined ladder from basement terrace to rear yard. evision to increase excavation and lower floor levelsDetails
revision to 201408204261. revisions to interior floor plans at basement, 1st and 2nd fls. replacement of proposed rear landscape stair with new inclined ladder from basement terrace to rear yard. evision to increase excavation and lower floor levels | $50,000 |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 2152 Bay St | H T H Construction | infill existing lightwell at 2nd fl. remodel existing bathroom. install new skylight. compliance with maher ordinance no 155-13 not required.Details
infill existing lightwell at 2nd fl. remodel existing bathroom. install new skylight. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Jun 24, 2015 | Never finaled issued Jun 2015, no final | 45 Prosper St | H T H Construction | non structural demo of wall & ceiling finishes to evaluate existing framing, replace sheetrock in kind approx. 1200 sq.ft.Details
non structural demo of wall & ceiling finishes to evaluate existing framing, replace sheetrock in kind approx. 1200 sq.ft. | $8,000 |
| Jun 19, 2015 | Expired or cancelled cancelled Dec 2015 | 2741 Greenwich St | H T H Construction | provide temporary shoring to facilitate excavation and contruction of the proposed bldg addition per approved app#201408204261.Details
provide temporary shoring to facilitate excavation and contruction of the proposed bldg addition per approved app#201408204261. | $10,000 |
| May 14, 2015 | Completed final sign-off May 2016 | 7601 Geary Bl | H T H Construction | soft story retrofit per sfbc chapter 34b, other rational design.Details
soft story retrofit per sfbc chapter 34b, other rational design. | $20,000 |
| Apr 10, 2015 | Completed final sign-off Oct 2015 | 1735 27th Av | H T H Construction | interior remodel of 1st floor. remove 1 extg exterior door, replace 2 extg exterior doors. at rear relocate one extg windows at rear. 350 sq ft conditioned space added.Details
interior remodel of 1st floor. remove 1 extg exterior door, replace 2 extg exterior doors. at rear relocate one extg windows at rear. 350 sq ft conditioned space added. | $60,000 |
| Jan 8, 2015 | Completed final sign-off Jan 2015 | 531 45th Av | H T H Construction | construction revision to permit application # 2013-07-16-1959. remove second garage stairs. no exterior or other changes on floor plans. comply with nov # 201478901Details
construction revision to permit application # 2013-07-16-1959. remove second garage stairs. no exterior or other changes on floor plans. comply with nov # 201478901 | $100 |
| Oct 24, 2014 | Completed final sign-off Jan 2015 | 527 45th Av | H T H Construction | geo-grout permentation grouting along rear 19 ft of existing southside concrete foundation @2'-0"o.c. spacing along adjacent concrete footing replacement for rear addition construction permitted for 531-45th av, per plans 10/14 to comply with outstanding nov 201478951 attached.Details
geo-grout permentation grouting along rear 19 ft of existing southside concrete foundation @2'-0"o.c. spacing along adjacent concrete footing replacement for rear addition construction permitted for 531-45th av, per plans 10/14 to comply with outstanding nov 201478951 attached. | $1,500 |
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 65 Prosper St | H T H Construction | revision to appl #2013.0618.9877 to install railing @ north side of 2nd & 3rd floor roof decks. all work to be with (e) boundry of bldg.Details
revision to appl #2013.0618.9877 to install railing @ north side of 2nd & 3rd floor roof decks. all work to be with (e) boundry of bldg. | |
| Sep 24, 2014 | Completed final sign-off Jan 2015 | 531 45th Av | H T H Construction | revision to appl #2013.0716.1959 - changing sprinkler system from 13r system to 13d system. meets exiting requirement.Details
revision to appl #2013.0716.1959 - changing sprinkler system from 13r system to 13d system. meets exiting requirement. | |
| Aug 20, 2014 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | new partial third fl for rec room, new rear addition at 1st fl for master bedroom and 2nd fl for family room, relocate lower unit to basement level, new elevator, design/build sprinkler system under separate permit.2/11/15: green priority permit per ab-004 per j. romaidis. byan.Details
new partial third fl for rec room, new rear addition at 1st fl for master bedroom and 2nd fl for family room, relocate lower unit to basement level, new elevator, design/build sprinkler system under separate permit.2/11/15: green priority permit per ab-004 per j. romaidis. byan. | $600,000 |
| Jun 18, 2014 | Completed final sign-off Jan 2015 | 531 45th Av | H T H Construction | construction revision to pa #2013.0716.1959 for compliance to site condition & correct nov #201478901 for foundation level works. no change to other levels.Details
construction revision to pa #2013.0716.1959 for compliance to site condition & correct nov #201478901 for foundation level works. no change to other levels. | $1,500 |
| Jun 13, 2014 | Expired or cancelled expired Jun 2019 | 451 Sanchez St | H T H Construction | remove (e) stair + deck, replace w/code complying decks + stairs within allowed rear set back + height req'ments. no alteration to facade no change to bldg height. no increase in enclosed floor area.Details
remove (e) stair + deck, replace w/code complying decks + stairs within allowed rear set back + height req'ments. no alteration to facade no change to bldg height. no increase in enclosed floor area. | $42,300 |
| May 20, 2014 | Completed final sign-off Jul 2014 | 2466 33rd Av | H T H Construction | to obtain final inspection for work approved under pa # 200802124543. al work is complete.Details
to obtain final inspection for work approved under pa # 200802124543. al work is complete. | |
| May 20, 2014 | Completed final sign-off Jul 2014 | 2466 33rd Av | H T H Construction | to obtain final inspection for work approved under pa # 200703125928. al work is complete.Details
to obtain final inspection for work approved under pa # 200703125928. al work is complete. | |
| Mar 14, 2014 | Completed final sign-off Oct 2016 | 45 Prosper St | H T H Construction | horizontal & vertical addition. 920 sf addition. family room expansion at 1st floor. remodel kitchen & bath at 2nd floor. new bedroom & 2 baths at 3rd floor.Details
horizontal & vertical addition. 920 sf addition. family room expansion at 1st floor. remodel kitchen & bath at 2nd floor. new bedroom & 2 baths at 3rd floor. | $350,000 |
| Jan 6, 2014 | Expired or cancelled expired Jun 2019 | 451 Sanchez St | H T H Construction | remodel entire unit. add one new bathroom and one laundry. add new electric and plmbg throughout the unit. add new furnace. replace 7 windows. voluntary structural upgrades.Details
remodel entire unit. add one new bathroom and one laundry. add new electric and plmbg throughout the unit. add new furnace. replace 7 windows. voluntary structural upgrades. | $60,000 |
| Oct 7, 2013 | Completed final sign-off Dec 2013 | 1814 Fell St | H T H Construction | remodel existing kitchen & bathroom update electric to code, add new u lv lights, in the kitchen add new bathroom fan & light, comply with cec 150 (k) lighting requirements, replace existing fan.Details
remodel existing kitchen & bathroom update electric to code, add new u lv lights, in the kitchen add new bathroom fan & light, comply with cec 150 (k) lighting requirements, replace existing fan. | $15,000 |
| Aug 7, 2013 | Expired or cancelled expired Nov 2014 | 1669 17th Av | H T H Construction | remodel (e) rooms down, relocate laundry room, removal of half bath to create full bath with sauna.enlarge rear window.Details
remodel (e) rooms down, relocate laundry room, removal of half bath to create full bath with sauna.enlarge rear window. | $20,000 |
| Jul 16, 2013 | Completed final sign-off Jan 2015 | 531 45th Av | H T H Construction | add new rear addition & house remodel per plans. w (n) expanded kitchen/dining & longer bedrooms plus new guest room. full bath & half bath. rear roof decks.Details
add new rear addition & house remodel per plans. w (n) expanded kitchen/dining & longer bedrooms plus new guest room. full bath & half bath. rear roof decks. | $200,000 |
| Mar 27, 2013 | Completed final sign-off Oct 2013 | 463 Waller St | H T H Construction | remodel kitchen & bathrooms in unit #463 & 467-open wall between kitchen & living in units #463 & 467. add fottings at basement storage to support new beams. converting closets in units #463 & 467 to full bathroomsDetails
remodel kitchen & bathrooms in unit #463 & 467-open wall between kitchen & living in units #463 & 467. add fottings at basement storage to support new beams. converting closets in units #463 & 467 to full bathrooms | $38,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1816 Fell St | H T H Construction | unit #2:remove portion of bearing wall and install new beam. remove portion of non bearing wall and install new doors. construct new wall between living room and bedroom. revision to pa#201301319190Details
unit #2:remove portion of bearing wall and install new beam. remove portion of non bearing wall and install new doors. construct new wall between living room and bedroom. revision to pa#201301319190 | $1,500 |
| Jan 31, 2013 | Never finaled issued Jan 2013, no final | 1378 Rhode Island St | H T H Construction | replace existing rear yard retaining wall. 25" in lengthDetails
replace existing rear yard retaining wall. 25" in length | $19,500 |
| Jan 17, 2013 | Never finaled issued Jan 2013, no final | 2200 Sacramento St | H T H Construction | remodel kitchen & bathrooms. remove non bearing wall between bedroom & living room.Details
remodel kitchen & bathrooms. remove non bearing wall between bedroom & living room. | $3,800 |
| Aug 24, 2012 | Completed final sign-off Nov 2012 | 601 Van Ness Av | H T H Construction | remodel kitchen & bath, move entry walls to bath & bedroom.Details
remodel kitchen & bath, move entry walls to bath & bedroom. | $75,000 |
| Aug 23, 2012 | Completed final sign-off Sep 2013 | 16 Addison St | H T H Construction | 2-story addition at rear of house.Details
2-story addition at rear of house. | $40,000 |
| Aug 1, 2012 | Completed final sign-off Oct 2012 | 2935 16th St | H T H Construction | remodel kitchen,remove non-bearing wall between kitchen and dining, remove old flue chase at kitchen.Details
remodel kitchen,remove non-bearing wall between kitchen and dining, remove old flue chase at kitchen. | $18,400 |
| Jul 13, 2012 | Completed final sign-off Sep 2012 | 541 Chestnut St | H T H Construction | remodel existing bath room. add closets in front bedrooms.Details
remodel existing bath room. add closets in front bedrooms. | $12,000 |
| Jul 2, 2012 | Completed final sign-off Oct 2012 | 2611 25th Av | H T H Construction | 1st fl: remodel 648 sf storage and study behind garage to new bedroom,bath,storage room. enclose e laundry area at garage (n) windows/door & stairs @ rear elevation. 2nd fl: install skylight at stairs. cut 2/6 x 3/6 opending in non bearing wall at stair landingDetails
1st fl: remodel 648 sf storage and study behind garage to new bedroom,bath,storage room. enclose e laundry area at garage (n) windows/door & stairs @ rear elevation. 2nd fl: install skylight at stairs. cut 2/6 x 3/6 opending in non bearing wall at stair landing | $65,000 |
| May 23, 2012 | Completed final sign-off Jun 2012 | 1480 Fulton St | H T H Construction | remove existing plywood, set new slopes on existing joist. install new 5/8 exterior weather plywood with 100 nails 4"on edge and 8" on fieldDetails
remove existing plywood, set new slopes on existing joist. install new 5/8 exterior weather plywood with 100 nails 4"on edge and 8" on field | $2,000 |
| Jan 19, 2012 | Never finaled issued Jul 2012, no final | 1076 Guerrero St | H T H Construction | add 2 story addition w/roof deck @ rear yard. additon to include (n) master bedroom & bath & study @ 1st fl and (n) bedroom & bath @ second floor. remodel kitchen.Details
add 2 story addition w/roof deck @ rear yard. additon to include (n) master bedroom & bath & study @ 1st fl and (n) bedroom & bath @ second floor. remodel kitchen. | $185,000 |
| Dec 13, 2011 | Completed final sign-off Mar 2012 | 44 Lundy's Ln | H T H Construction | kitchen renovation of upper unit in a 2 unit residential building. no change to the height or footprint.Details
kitchen renovation of upper unit in a 2 unit residential building. no change to the height or footprint. | $40,000 |
| Nov 9, 2011 | Completed final sign-off Jan 2012 | 88 Surrey St | H T H Construction | remove & replace 12 bay windows & repaint house, visable from street, u max 0.40. cec151-cDetails
remove & replace 12 bay windows & repaint house, visable from street, u max 0.40. cec151-c | $4,200 |
| Oct 13, 2011 | Completed final sign-off Nov 2011 | 34 Britton St | H T H Construction | take off stucco and re-stucco at the front of the house. all work in kind. approx. 220 sf.Details
take off stucco and re-stucco at the front of the house. all work in kind. approx. 220 sf. | $2,800 |
| Oct 6, 2011 | Completed final sign-off Nov 2011 | 269 Parnassus Av | H T H Construction | convert laundry room into 1/2 bathroom on the 2nd floor.Details
convert laundry room into 1/2 bathroom on the 2nd floor. | $4,500 |
| Sep 22, 2011 | Completed final sign-off Apr 2012 | 60 Grand View Tr | H T H Construction | remove & replace deck boards & guard rails on 4 decks, p.t. or redwood, exterior grade.Details
remove & replace deck boards & guard rails on 4 decks, p.t. or redwood, exterior grade. | $4,600 |
| Aug 10, 2011 | Completed final sign-off Sep 2011 | 222 28th Av | H T H Construction | remove corner stucco repair dryrot and restucco at north east front corner approx. 150 sq ft of wall.Details
remove corner stucco repair dryrot and restucco at north east front corner approx. 150 sq ft of wall. | $2,000 |
| Aug 1, 2011 | Expired or cancelled cancelled Aug 2011 | 222 28th St | H T H Construction | remove corner stucco repair dry rot & restuccoDetails
remove corner stucco repair dry rot & restucco | $2,000 |
| Jul 8, 2011 | Never finaled issued Jul 2012, no final | 55 Aptos Av | H T H Construction | patrial 2nd story addition. kitchen remodel at 1st story.Details
patrial 2nd story addition. kitchen remodel at 1st story. | $160,000 |
| Jun 27, 2011 | Never finaled issued Jun 2011, no final | 2026 Clement St | H T H Construction | remove and replace dryrot on exterior plywood.Details
remove and replace dryrot on exterior plywood. | $2,000 |
| Jun 2, 2011 | Never finaled issued Jun 2011, no final | 849 Sanchez St | H T H Construction | remodel closet & laundry room. remove fireplace & add new windowDetails
remodel closet & laundry room. remove fireplace & add new window | $18,000 |
| May 31, 2011 | Completed final sign-off Aug 2011 | 60 Grand View Tr | H T H Construction | provide handrails & repair exterior stairs that are in violation complaint #201128361 (less than 50% repair on stairs).Details
provide handrails & repair exterior stairs that are in violation complaint #201128361 (less than 50% repair on stairs). | $400 |
| Apr 8, 2011 | Completed final sign-off May 2014 | 506 Mississippi St | H T H Construction | extend rear deck @ 1st floor. add 350 sq. ft. rear addition @ 2nd floor. new deck @ 2nd floor.Details
extend rear deck @ 1st floor. add 350 sq. ft. rear addition @ 2nd floor. new deck @ 2nd floor. | $30,000 |
| Dec 2, 2010 | Completed final sign-off May 2013 | 3139 Gough St | H T H Construction | vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom.Details
vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom. | $550,000 |
| Aug 3, 2010 | Completed final sign-off Jun 2011 | 1530 08th Av | H T H Construction | addition at the rear with bedroom and bathroom at basement level and family room at 1st floor.Details
addition at the rear with bedroom and bathroom at basement level and family room at 1st floor. | $55,000 |
| Jun 21, 2010 | Completed final sign-off Jun 2013 | 3037 Wawona St | H T H Construction | remove front section of stucco, replace stucco in kind area = 12'x12'. no structural changes.Details
remove front section of stucco, replace stucco in kind area = 12'x12'. no structural changes. | $2,000 |
| May 25, 2010 | Never finaled issued Jun 2010, no final | 77 Delano Av | H T H Construction | replace foundation and crawl space slab, lower crawl space slab 16". replace (e) deck and stairs ar rear yard in -kind. plumbing line for future w/d at crawl spaceDetails
replace foundation and crawl space slab, lower crawl space slab 16". replace (e) deck and stairs ar rear yard in -kind. plumbing line for future w/d at crawl space | $130,000 |
| May 1, 2008 | Completed final sign-off Aug 2008 | 1 Upland Dr | H T H Construction | proch work, remove and replace cracked stucco same area. from left side of building. replace in kind.Details
proch work, remove and replace cracked stucco same area. from left side of building. replace in kind. | $3,000 |
| Feb 29, 2008 | Completed final sign-off Nov 2010 | 659 41st Av | Alsterlind Construction Inc., H T H Construction | renovation of (e) top floor and ground floor and horizontal extension of the bedrooms on the unit at top. remove a closet in unit on ground floor. a-1 sheet scope of work for planning review. this includes new bedroom deck at westDetails
renovation of (e) top floor and ground floor and horizontal extension of the bedrooms on the unit at top. remove a closet in unit on ground floor. a-1 sheet scope of work for planning review. this includes new bedroom deck at west | $410,000 |