John S. Winder
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Winder Gibson Arch.
- Based in
- Sf
- On San Francisco permits
- Feb 2005 to Oct 2017
20 permits since 2000 (architect on 18 permits, engineer on 2 permits, authorized agent-others on 1 permit): 11 completed, 2 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 13, 2017 | Completed final sign-off Dec 2025 | 2758 Filbert St | H T H Construction | renovation of an existing single family house. the new addition inlcludes one new story 3 additional beds and 2.5 baths and a rear year additionDetails
renovation of an existing single family house. the new addition inlcludes one new story 3 additional beds and 2.5 baths and a rear year addition | $890,850 |
| Feb 1, 2017 | Completed final sign-off May 2019 | 792 Capp St | Eastwood Development Incorporated | demolish 2-story single family dwellingDetails
demolish 2-story single family dwelling | $15,000 |
| Sep 12, 2016 | Expired or cancelled cancelled Aug 2022 | 709 York St | vertical addition of 3rd flr to include (n) master bdrm, bath, laundry, 2 bdrms & bath. renovation of 2nd flr to include (n) kitchen, living room, powder room & study. renovation of 1st flr to include (n) bdrm & bath.Details
vertical addition of 3rd flr to include (n) master bdrm, bath, laundry, 2 bdrms & bath. renovation of 2nd flr to include (n) kitchen, living room, powder room & study. renovation of 1st flr to include (n) bdrm & bath. | $550,000 | |
| Feb 11, 2014 | Completed final sign-off Jul 2017 | 175 Downey St | Luke Gilligan Inc. | rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator.Details
rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator. | $430,000 |
| Oct 1, 2013 | Completed final sign-off Sep 2016 | 4184 25th St | interior renovation, rear addition and partial 4/f addition, new living room and master suite at rear addition, ne family/music room, study and powder room at partial 4/f addition at existing 3 story, two unit building, two units to remain, relocate lower unit to 1/f levelDetails
interior renovation, rear addition and partial 4/f addition, new living room and master suite at rear addition, ne family/music room, study and powder room at partial 4/f addition at existing 3 story, two unit building, two units to remain, relocate lower unit to 1/f level | $400,000 | |
| Jun 5, 2013 | Completed final sign-off Mar 2016 | 3772 21st St | J J Construction | removing of (e) deck, constructing horizontal addition of 150 sqft on 3rd flr. an interior remodeling of 3rd flr including adding new master bathroom, mezzanine and dormer above.Details
removing of (e) deck, constructing horizontal addition of 150 sqft on 3rd flr. an interior remodeling of 3rd flr including adding new master bathroom, mezzanine and dormer above. | $130,000 |
| Dec 7, 2012 | Completed final sign-off Nov 2013 | 140 Jordan Av | Brian Mac Namara Construction | foundation replacement & renovation of (e) basement, remodel of 2 (e) bathrooms at 2nd floor. no changes to building, no changes to front of facade. 610 sq ft of basement will be converted to habitable spaceDetails
foundation replacement & renovation of (e) basement, remodel of 2 (e) bathrooms at 2nd floor. no changes to building, no changes to front of facade. 610 sq ft of basement will be converted to habitable space | $160,000 |
| Jun 28, 2012 | Expired or cancelled cancelled Jan 2020 | 459 Broderick St | renovation of 4th fl of (e) 4-story bldg. rebuild (e) gable roof w/ dormers & small addition @ rear. relocate (e) stair between 3rd & 4th fl. enlarge (e) rear deck @ 3rd fl.Details
renovation of 4th fl of (e) 4-story bldg. rebuild (e) gable roof w/ dormers & small addition @ rear. relocate (e) stair between 3rd & 4th fl. enlarge (e) rear deck @ 3rd fl. | $110,000 | |
| Feb 6, 2012 | Expired or cancelled expired May 2017 | 865 El Camino Del Mar | Upscale Construction Inc. | demolition of the (e) solarium on the roof ,interior renovation, replace (e) windows same style as needed. 4th floor addition .repair & replace exerior shingles as necessary.Details
demolition of the (e) solarium on the roof ,interior renovation, replace (e) windows same style as needed. 4th floor addition .repair & replace exerior shingles as necessary. | $750,000 |
| Oct 13, 2009 | Never finaled issued Oct 2009, no final | 34 Mason St | convert (e) night club to social hall @ basement, first and second floors per sf planning code 790.50. no new work proposed.Details
convert (e) night club to social hall @ basement, first and second floors per sf planning code 790.50. no new work proposed. | ||
| Jun 13, 2007 | Never finaled issued Jun 2007, no final | 498 Broadway | addition of counter space and ada height counter on ground floor restaaurant space additional counter space not to increase occupancy loadDetails
addition of counter space and ada height counter on ground floor restaaurant space additional counter space not to increase occupancy load | $2,500 | |
| Mar 1, 2006 | Completed final sign-off Sep 2006 | 1919 Sacramento St | North Beach Const. | add bathroom on third floor level. remove extg kchnette and minor faming/new lighting at bthrm floruescent or occupnacy sensor manuel on new lighting at habitable space on dimmer switch or flourescentDetails
add bathroom on third floor level. remove extg kchnette and minor faming/new lighting at bthrm floruescent or occupnacy sensor manuel on new lighting at habitable space on dimmer switch or flourescent | $35,000 |
| Oct 12, 2005 | Expired or cancelled expired Oct 2008 | 599 02nd St | interior upgrade & barrier removal-amended new entry&exit(n)grd fl windows.accessible entry,toilet facility&stair to mezz per cbc1134b.2.1.accessible employee brkrm,janitor's rm,2nd means of egress exit stair&door more than half diagonal distance of space.submit seperate mech/elec permit.Details
interior upgrade & barrier removal-amended new entry&exit(n)grd fl windows.accessible entry,toilet facility&stair to mezz per cbc1134b.2.1.accessible employee brkrm,janitor's rm,2nd means of egress exit stair&door more than half diagonal distance of space.submit seperate mech/elec permit. | $38,000 | |
| Oct 12, 2005 | Expired or cancelled cancelled Mar 2007 | 599 02nd St | exterior window upgrade: replace existing fised single glazed windows with dual glazed wlinding windows use black anodized aluminum flames to match the rest of the building window frame materialDetails
exterior window upgrade: replace existing fised single glazed windows with dual glazed wlinding windows use black anodized aluminum flames to match the rest of the building window frame material | $31,000 | |
| Sep 19, 2005 | Completed final sign-off Dec 2007 | 1050 Dolores St | renovate ground floor. install new foundation,new exterior staircase,new interior staircase from 1st floor to 2nd floor. horizontal addition to 1st floor. sprinklerson separate application.Details
renovate ground floor. install new foundation,new exterior staircase,new interior staircase from 1st floor to 2nd floor. horizontal addition to 1st floor. sprinklerson separate application. | $350,000 | |
| Jun 21, 2005 | Completed final sign-off May 2006 | 1028 Natoma St | Angotti & Reilly Inc. | extend roof to enclose (e) balcony on 4th floor. (e) elevation will not be affected.Details
extend roof to enclose (e) balcony on 4th floor. (e) elevation will not be affected. | $3,000 |
| Jun 15, 2005 | Completed final sign-off Aug 2007 | 301 14th Av | C. Overaa & Co | demolish 2 stories, sanctuary.Details
demolish 2 stories, sanctuary. | |
| May 23, 2005 | Expired or cancelled expired Apr 2007 | 80 21st Av | Construction Concepts | remodel (e) interior spaces-remove toilet on 2/fl.add new toilet on 1st fl.add patio doors @bsmt fl.Details
remodel (e) interior spaces-remove toilet on 2/fl.add new toilet on 1st fl.add patio doors @bsmt fl. | $40,000 |
| Apr 14, 2005 | Completed final sign-off Oct 2007 | 1234 Howard St | to erect 5 stories, 18 dwelling residential units.Details
to erect 5 stories, 18 dwelling residential units. | $3,000,000 | |
| Feb 28, 2005 | Expired or cancelled cancelled Jul 2011 | 2555 Union St | modification of details approved under building paermit app. 200403088064 change in exteriorDetails
modification of details approved under building paermit app. 200403088064 change in exterior | $15,000 |