Block 2618A, lot 019
48 Clifford Ter
- City’s use
- Single Family Residential
- Built
- 1917
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 4,043 sq ft
- Lot
- 2,147 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2017 | Completed final sign-off Nov 2019 | 48 Clifford Tr | Clonduff Construction Inc., H T H Construction | new roof top deck & access stair @ (e) roof.Details
new roof top deck & access stair @ (e) roof. | $50,000 |
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 48 Clifford Tr | Baycities Concrete | waterproofing the family room (west wall). 1. filling key way joint with koster's nb1. this process shoudl stop water seapage 4 sq. 2. mix & apply koster's kd2 to the west wall's pebbled area, 16 sf.Details
waterproofing the family room (west wall). 1. filling key way joint with koster's nb1. this process shoudl stop water seapage 4 sq. 2. mix & apply koster's kd2 to the west wall's pebbled area, 16 sf. | $3,230 |
| May 11, 2012 | Completed final sign-off Jul 2012 | 48 Clifford Tr | Houseworks Enterprises Inc. | replace in kind (e) 6x6 post for dry rot repair at front porch, repair stucco, less than 50%.Details
replace in kind (e) 6x6 post for dry rot repair at front porch, repair stucco, less than 50%. | $5,000 |
| Jul 7, 2011 | Expired or cancelled cancelled Jan 2026 | 48 Clifford Tr | Engineered Soils Repairs | install drainage & waterproofing measures on ground level. work imvolves installation of waterproofing on (e) foundation wall, of a new stem wall & footing to stabilize (e) wall during construction, removal of concrete slab floor, installation of under-slab drainage & new concret slab floor.Details
install drainage & waterproofing measures on ground level. work imvolves installation of waterproofing on (e) foundation wall, of a new stem wall & footing to stabilize (e) wall during construction, removal of concrete slab floor, installation of under-slab drainage & new concret slab floor. | $170,000 |
| Jul 29, 2009 | Completed final sign-off Aug 2009 | 48 Clifford Tr | install 7ft. fence at rear yard at adjacent lot 29 & 29 (same owner). 48 lineal feet total.Details
install 7ft. fence at rear yard at adjacent lot 29 & 29 (same owner). 48 lineal feet total. | $600 | |
| Jan 30, 2008 | Completed final sign-off Jul 2009 | 48 Clifford Tr | Gavin Painting & Cont* See 934867* | non conforming structure. rear yard remodel. fill in lightwell, interior upgrades, replacment of windows, voluntary seismic upgrade 1st floor: add 1 bedroom, 1 bath, laundry, familyroom. 2nd flr: stairs, enlarge kitchen, 1/2 back, deck, 3rd fl: new bath, remove 1 bedroomDetails
non conforming structure. rear yard remodel. fill in lightwell, interior upgrades, replacment of windows, voluntary seismic upgrade 1st floor: add 1 bedroom, 1 bath, laundry, familyroom. 2nd flr: stairs, enlarge kitchen, 1/2 back, deck, 3rd fl: new bath, remove 1 bedroom | $200,000 |
| May 4, 2001 | Expired or cancelled expired Nov 2001 | 48 Clifford Tr | underpinning foundation with 3 underpinning pits for construction to adjacent neighbor at 40 clifforDetails
underpinning foundation with 3 underpinning pits for construction to adjacent neighbor at 40 cliffor | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Baycities Concrete, Clonduff Construction Inc., Engineered Soils Repairs, Gavin Painting & Cont* See 934867*, H T H Construction, Houseworks Enterprises Inc.
- Architects
- David Yama
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.