Dennis Cullinane
- Listed as
- authorized agent-others, contractor, engineer
- Firm
- Cullinane Plastering
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2022
188 permits since 2000 (contractor on 185 permits, authorized agent-others on 4 permits, engineer on 3 permits): 140 completed, 28 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 188.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2022 | Completed final sign-off Mar 2023 | 1321 De Haro St | Cullinane Plastering | revision to pa# 200804038738 s2. install fiber cement panel instead of previously approved perforated metal at north, south & west exterior facades.Details
revision to pa# 200804038738 s2. install fiber cement panel instead of previously approved perforated metal at north, south & west exterior facades. | |
| Apr 1, 2022 | Never finaled issued May 2022, no final | 1863 Mission St | Cullinane Plastering | ste# 103 & 104: 1,302 sqft tenant improvement at new ground floor space for non-profit cultural center. install new lighting, basic finishes & hvac system. kitchenette for employee use to store food, no outside catering will be provided.Details
ste# 103 & 104: 1,302 sqft tenant improvement at new ground floor space for non-profit cultural center. install new lighting, basic finishes & hvac system. kitchenette for employee use to store food, no outside catering will be provided. | $50,000 |
| Sep 30, 2021 | Never finaled issued Oct 2021, no final | 955 Wisconsin St | Cullinane Plastering | repair/replace stucco on front elevationDetails
repair/replace stucco on front elevation | $3,000 |
| Sep 10, 2021 | Never finaled issued Jul 2022, no final | 237 Ordway St | Cullinane Plastering | revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258270Details
revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258270 | $8,000 |
| Sep 10, 2021 | Expired or cancelled expired May 2025 | 239 Ordway St | Cullinane Plastering, Achill Beg Construction Inc | revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264Details
revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264 | $8,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 2520 Quint St | Cullinane Plastering | replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg.Details
replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg. | $35,000 |
| Mar 12, 2021 | Completed final sign-off Mar 2023 | 1321 De Haro St | Cullinane Plastering | recommencement and completion of work approved under permit application # 200804038738Details
recommencement and completion of work approved under permit application # 200804038738 | |
| Mar 9, 2021 | Never finaled issued Mar 2021, no final | 2207 25th St | Cullinane Plastering | permit extension: to obtain final inspection for work approved under permit# 201110267650-all work is completed. t obtain final inspection for work approved under permit application#201210091512-all work is completed. commencement of work not started under previously approved permit app#201603182477Details
permit extension: to obtain final inspection for work approved under permit# 201110267650-all work is completed. t obtain final inspection for work approved under permit application#201210091512-all work is completed. commencement of work not started under previously approved permit app#201603182477 | |
| Feb 12, 2021 | Completed final sign-off Jan 2024 | 5 Joy St | Cullinane Plastering | revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level.Details
revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level. | |
| Jan 6, 2021 | Completed final sign-off Sep 2024 | 21 Joy St | Cullinane Plastering | as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted)Details
as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted) | $10,000 |
| Dec 30, 2020 | Completed final sign-off Sep 2024 | 15 Joy St | Cullinane Plastering | as-built plans & add new roof deck above 3/f for pa201506229593.Details
as-built plans & add new roof deck above 3/f for pa201506229593. | $10,000 |
| Dec 30, 2020 | Never finaled issued Jun 2021, no final | 9 Joy St | Cullinane Plastering | to comply with nov 202071573. as-built plans & add new roof deck above 3/fDetails
to comply with nov 202071573. as-built plans & add new roof deck above 3/f | $10,000 |
| Dec 16, 2020 | Expired or cancelled expired May 2025 | 237 Ordway St | Cullinane Plastering | re 2016-0525-8270 test piers and temporary grading for site access rampDetails
re 2016-0525-8270 test piers and temporary grading for site access ramp | |
| Dec 16, 2020 | Expired or cancelled expired May 2025 | 239 Ordway St | Cullinane Plastering, Achill Beg Construction Inc | re 2016-0525-8264 test piers and temporary grading for site access rampDetails
re 2016-0525-8264 test piers and temporary grading for site access ramp | |
| Nov 19, 2020 | Completed final sign-off Jul 2024 | 21 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Never finaled issued Apr 2022, no final | 9 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Completed final sign-off Aug 2024 | 15 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 3, 2020 | Completed final sign-off Feb 2023 | 1863 Mission St | Cullinane Plastering | install storm water control plan features consisting of flow through planters.Details
install storm water control plan features consisting of flow through planters. | $35,000 |
| Oct 29, 2020 | Never finaled issued Oct 2020, no final | 2522 Quint St | Cullinane Plastering | kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windowsDetails
kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windows | $80,000 |
| Sep 3, 2020 | Completed final sign-off Jul 2021 | 1863 Mission St | Cullinane Plastering | installation of frequency responder radio coverage system.Details
installation of frequency responder radio coverage system. | $50,000 |
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 955 Wisconsin St | Cullinane Plastering | proposed new retaining wall at the backyard (soft story retrofit was performed under pa #201906072857)Details
proposed new retaining wall at the backyard (soft story retrofit was performed under pa #201906072857) | $10,000 |
| Jan 15, 2020 | Completed final sign-off Mar 2022 | 1242 43rd Av | Cullinane Plastering | to demolish 1 story rear shed.Details
to demolish 1 story rear shed. | $4,000 |
| Oct 29, 2019 | Completed final sign-off Sep 2020 | 1801 Mission St | Cullinane Plastering | revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement levelDetails
revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement level | |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 2470 Diamond St | Frank Walley Construction, Cullinane Plastering | revise previously approved permit 201909262790 for underpinning with crawl spaceDetails
revise previously approved permit 201909262790 for underpinning with crawl space | |
| Oct 16, 2019 | Never finaled filed Oct 2019, never issued | 2512 Quint St | Cullinane Plastering, Ace Drilling & Excavation | adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a**Details
adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a** | $75,000 |
| Oct 8, 2019 | Completed final sign-off Nov 2021 | 400 Lansdale Av | Cullinane Plastering | (n) wood lagging retaining walls @ rear yard only. no more than 16 cu yardDetails
(n) wood lagging retaining walls @ rear yard only. no more than 16 cu yard | $20,000 |
| Sep 6, 2019 | Never finaled issued Apr 2020, no final | 2512 Quint St | Cullinane Plastering | structurall soft story retrofit per sfebc chapter 4d. engineering criteria, 2016 cebc appendix a-4. ** maher: n/a **Details
structurall soft story retrofit per sfebc chapter 4d. engineering criteria, 2016 cebc appendix a-4. ** maher: n/a ** | $120,000 |
| Aug 1, 2019 | Completed final sign-off Apr 2021 | 856 Capp St | Cullinane Plastering | revision to pa 2017-1206-5684 foundation plan revision for rear yard site wallDetails
revision to pa 2017-1206-5684 foundation plan revision for rear yard site wall | $45,000 |
| Jul 10, 2019 | Completed final sign-off Jul 2021 | 1863 Mission St | Cullinane Plastering | new underground-4" x 8", new class 1 standpipe-17 valves-350', new fire sprinklers system-385 sprinklerDetails
new underground-4" x 8", new class 1 standpipe-17 valves-350', new fire sprinklers system-385 sprinkler | $75,000 |
| May 22, 2019 | Completed final sign-off May 2020 | 735 Thornton Av | Cullinane Plastering | demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies.Details
demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies. | $5,000 |
| Apr 25, 2019 | Completed final sign-off Sep 2020 | 1801 Mission St | Cullinane Plastering | as built office at mezzanine and as built revision to 2nd/3rd floor unit 3, unite 6 and unit 7. elevator access panel for smk det addedDetails
as built office at mezzanine and as built revision to 2nd/3rd floor unit 3, unite 6 and unit 7. elevator access panel for smk det added | $38,000 |
| Feb 27, 2019 | Never finaled issued Mar 2019, no final | 1855 Mission St | Cullinane Plastering | underpinning & lagging at south property line to facilitate proposed excavation at 1863 mission per pa #200603277584 & 201901140338.Details
underpinning & lagging at south property line to facilitate proposed excavation at 1863 mission per pa #200603277584 & 201901140338. | $50,000 |
| Jan 14, 2019 | Completed final sign-off Oct 2021 | 1863 Mission St | Cullinane Plastering | temporary lagging wall and soldier piers. ref app #200603277584 for building & 201902273933Details
temporary lagging wall and soldier piers. ref app #200603277584 for building & 201902273933 | $75,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2023 | 1259 Clay St | Cullinane Plastering, The Toboni Group, R Lowy Fire Protection Inc | to erect a type v-a, 4-story two family residence- no basement levels.Details
to erect a type v-a, 4-story two family residence- no basement levels. | $900,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2024 | 3641 California St | Cullinane Plastering | demolish a 2 story, type v, office bldg.Details
demolish a 2 story, type v, office bldg. | $20,000 |
| May 21, 2018 | Completed final sign-off Mar 2019 | 835 South Van Ness Av | Cullinane Plastering | revision to 201412113579 per architectural addenda changesDetails
revision to 201412113579 per architectural addenda changes | |
| Jan 23, 2018 | Completed final sign-off Dec 2021 | 2476 Diamond St | Frank Walley Construction, Cullinane Plastering | erect a 3 stories, no basement, type v-b, one family dwelling.Details
erect a 3 stories, no basement, type v-b, one family dwelling. | $800,000 |
| Dec 12, 2017 | Completed final sign-off Jul 2021 | 110 Beulah St | Cullinane Plastering | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with 201719255Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with 201719255 | $75,000 |
| Nov 16, 2017 | Completed final sign-off Jun 2018 | 276 Hartford St | Cullinane Plastering | revisions to previously submitted drawing. refer to bpa #2013-12-11-3907. pre-fabricated roof trusses.Details
revisions to previously submitted drawing. refer to bpa #2013-12-11-3907. pre-fabricated roof trusses. | $50,000 |
| Nov 8, 2017 | Completed final sign-off Nov 2019 | 53 States St | Cullinane Plastering | to comply with nov #201797352 - revision to pa #201401307472: rear yard site wall plan & detail. excavate rear yard approx. 3' (35 cubic yards)Details
to comply with nov #201797352 - revision to pa #201401307472: rear yard site wall plan & detail. excavate rear yard approx. 3' (35 cubic yards) | $10,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2018 | 3420 18th St | Cullinane Plastering | revision to pa#201311041054. removal of smoke guards. include radio test. add accessible hatch detail. back-up battery under separate addendum provide accessible hatch for elevator penthouse. maher naDetails
revision to pa#201311041054. removal of smoke guards. include radio test. add accessible hatch detail. back-up battery under separate addendum provide accessible hatch for elevator penthouse. maher na | $10,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 175 Brewster St | Cullinane Plastering | revision to pa 2013-0515-7021 - bathroom modification in 1st floor; 2nd floor - bedroom & bathroom modification; 3rd floor - kitchen/bathroom modification; 4th floor - bathroom renovationDetails
revision to pa 2013-0515-7021 - bathroom modification in 1st floor; 2nd floor - bedroom & bathroom modification; 3rd floor - kitchen/bathroom modification; 4th floor - bathroom renovation | |
| Aug 18, 2017 | Completed final sign-off Oct 2017 | 709 Lyon St | Cullinane Plastering | to demolish 2 story single family dwelling per emergeycy order# 108843-e.Details
to demolish 2 story single family dwelling per emergeycy order# 108843-e. | $20,000 |
| Aug 18, 2017 | Completed final sign-off Dec 2020 | 3248 22nd St | response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 201706098893. rev to 2016-0922-8483.Details
response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 201706098893. rev to 2016-0922-8483. | ||
| Aug 18, 2017 | Completed final sign-off Dec 2020 | 3234 22nd St | response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 201706098892. rev to 2016-0822-8481.Details
response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 201706098892. rev to 2016-0822-8481. | ||
| Aug 18, 2017 | Completed final sign-off Dec 2020 | 3224 22nd St | response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 20170609887. rev to 2016-0920-8196.Details
response to nov# 201620383 & 201625011, foudation replacement @basement level. strenghten (e) ground flr framing creat a non-occupied below sidewalk basement this is a revision to approved pa# 201606069153 ref pa# 20170609887. rev to 2016-0920-8196. | ||
| Aug 17, 2017 | Completed final sign-off Sep 2020 | 1801 Mission St | Cullinane Plastering | revision to app#201310038419 soldier piers, walers, and lagging. n/a for maherDetails
revision to app#201310038419 soldier piers, walers, and lagging. n/a for maher | |
| Jun 26, 2017 | Completed final sign-off Oct 2019 | 53 States St | Cullinane Plastering | revision to app#201401307472. revision to foundation plans and details.Details
revision to app#201401307472. revision to foundation plans and details. | $40,000 |
| Jun 5, 2017 | Completed final sign-off Jun 2018 | 276 Hartford St | Cullinane Plastering | change existing front facade from stucco to horizontal wood siding with "historic" trim. rebuild existing entry stairs and front planter in-kind. building alteration/addition under separate permit #201312113907.Details
change existing front facade from stucco to horizontal wood siding with "historic" trim. rebuild existing entry stairs and front planter in-kind. building alteration/addition under separate permit #201312113907. | $5,000 |
| Apr 11, 2017 | Expired or cancelled expired Nov 2019 | 53 States St | Cullinane Plastering | proposed temporary shoring plan for excavation. ref pa 2014-0131-7472Details
proposed temporary shoring plan for excavation. ref pa 2014-0131-7472 | $20,000 |
| Feb 27, 2017 | Completed final sign-off Jan 2024 | 5 Joy St | Cullinane Plastering | to erect 2 stories, 1 basement, type va, single family residence.Details
to erect 2 stories, 1 basement, type va, single family residence. | $900,000 |
| Feb 24, 2017 | Completed final sign-off Apr 2017 | 4308 21st St | Cullinane Plastering | revision to app#201305157001 set shows 2 fire place on the 1st floor.Details
revision to app#201305157001 set shows 2 fire place on the 1st floor. | $1,000 |
| Feb 24, 2017 | Completed final sign-off May 2017 | 492 Douglass St | Cullinane Plastering | new fire place on the 3rd floor per app#201305156968Details
new fire place on the 3rd floor per app#201305156968 | $1,000 |
| Dec 2, 2016 | Completed final sign-off Jun 2018 | 276 Hartford St | Cullinane Plastering | temporary shoring of vacant lotDetails
temporary shoring of vacant lot | $65,000 |
| Nov 8, 2016 | Completed final sign-off Jul 2017 | 837 South Van Ness Av | Cullinane Plastering | reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185.Details
reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185. | |
| Aug 19, 2016 | Completed final sign-off Feb 2017 | 1217 Sutter St | Cullinane Plastering | t24 ligthing compliance for pa 2015-0915-6982Details
t24 ligthing compliance for pa 2015-0915-6982 | $1,000 |
| Jul 22, 2016 | Completed final sign-off Sep 2016 | 856 Capp St | Cullinane Plastering | emergency order# 108174-e. to demolish 1 story, single family dwelling.Details
emergency order# 108174-e. to demolish 1 story, single family dwelling. | $10,000 |
| Jul 18, 2016 | Completed final sign-off Jan 2022 | 338 Duncan St | Cullinane Plastering, Achill Beg Construction Inc | horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway.Details
horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway. | $60,000 |
| Jun 30, 2016 | Completed final sign-off May 2017 | 2528 Union St | Cullinane Plastering, The Toboni Group | revision to 201401226857. reconfigure exercise, media, spa area to family rm and storage area in basement. remove column at dining rm at 1st fl. addition of retaining walls at rear and front property lineDetails
revision to 201401226857. reconfigure exercise, media, spa area to family rm and storage area in basement. remove column at dining rm at 1st fl. addition of retaining walls at rear and front property line | $5,000 |
| Jun 27, 2016 | Completed final sign-off Oct 2016 | 1217 Sutter St | Cullinane Plastering | install 3 new g/e rooftop package units. install 1 ef for restroom. including main duct runs and air outlets. kitchen ventilation equip vy others ref pa 2015-0915-6982. fire alarm deferred.Details
install 3 new g/e rooftop package units. install 1 ef for restroom. including main duct runs and air outlets. kitchen ventilation equip vy others ref pa 2015-0915-6982. fire alarm deferred. | $20,000 |
| May 25, 2016 | Expired or cancelled expired May 2025 | 239 Ordway St | Cullinane Plastering, Achill Beg Construction Inc | to erect 3 stories, no basement, single family dwelling.Details
to erect 3 stories, no basement, single family dwelling. | $250,000 |
| May 25, 2016 | Expired or cancelled expired May 2025 | 237 Ordway St | Cullinane Plastering | to erect 3 stories, no basement, signle family dwelling.Details
to erect 3 stories, no basement, signle family dwelling. | $250,000 |
| Apr 13, 2016 | Completed final sign-off Sep 2020 | 15 Guy Pl | Cullinane Plastering | construct new 6-story 2-dwelling residential building of type 1a construction at ground floor and type 3b construction at floors 2 to 6.Details
construct new 6-story 2-dwelling residential building of type 1a construction at ground floor and type 3b construction at floors 2 to 6. | $1,266,000 |
| Apr 13, 2016 | Completed final sign-off Sep 2018 | 15 Guy Pl | Cullinane Plastering | demolish single family dwellingDetails
demolish single family dwelling | $10,000 |
| Mar 18, 2016 | Expired or cancelled cancelled Sep 2026 | 2207 25th St | Cullinane Plastering | enclose entry porch, relocate (e) entry door and window.Details
enclose entry porch, relocate (e) entry door and window. | $10,000 |
| Mar 9, 2016 | Completed final sign-off Apr 2017 | 4306 21st St | Cullinane Plastering | revision to pa #201305157001. to revise address from 4308 to 4306 21st street for administrative purpose onlyDetails
revision to pa #201305157001. to revise address from 4308 to 4306 21st street for administrative purpose only | |
| Nov 23, 2015 | Completed final sign-off May 2017 | 492 Douglass St | Cullinane Plastering | revision to pa 2013-0515-6968 - bedroom #4 to become bathroom; relocate bathroom for bedroom 2; relocate washer/dryerDetails
revision to pa 2013-0515-6968 - bedroom #4 to become bathroom; relocate bathroom for bedroom 2; relocate washer/dryer | |
| Nov 23, 2015 | Completed final sign-off Apr 2017 | 4308 21st St | Cullinane Plastering | revision to pa 2013-0515-7001 2nd floor - create bathroom instead of bedroom, add new washer/dryer, relocate closet & bathroom; 3rd floor - create new closet in family room & re-arrange bathroom fixturesDetails
revision to pa 2013-0515-7001 2nd floor - create bathroom instead of bedroom, add new washer/dryer, relocate closet & bathroom; 3rd floor - create new closet in family room & re-arrange bathroom fixtures | |
| Oct 6, 2015 | Completed final sign-off Jun 2021 | 224 Laidley St | North Star Plumbing & Fire Protection, Cullinane Plastering | vertical & horizontal addition including (n) penthouse & (3) bathrooms & (1) vanity. remodel front elevation.Details
vertical & horizontal addition including (n) penthouse & (3) bathrooms & (1) vanity. remodel front elevation. | $650,000 |
| Sep 15, 2015 | Completed final sign-off Feb 2017 | 1217 Sutter St | Cullinane Plastering | remodel (e) bar/restaurant. change door location. remove one (e) bar, remodel one (e) bar; (n) multiple restroom, (n) mezzanine.Details
remodel (e) bar/restaurant. change door location. remove one (e) bar, remodel one (e) bar; (n) multiple restroom, (n) mezzanine. | $100,000 |
| Jul 29, 2015 | Completed final sign-off Nov 2015 | 127 Central Av | Cullinane Plastering | revision to 201401095946, as built: minor layout changes, window change at lightwell; no exterior work.Details
revision to 201401095946, as built: minor layout changes, window change at lightwell; no exterior work. | $1,000 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 561 Columbus Av | Cullinane Plastering | revision to permit 201505055358 & 201506189367-ada accessibility & health dept documentation of food service facility, to increase construction cost & replace water heater, bar equipments.Details
revision to permit 201505055358 & 201506189367-ada accessibility & health dept documentation of food service facility, to increase construction cost & replace water heater, bar equipments. | $70,000 |
| Jun 22, 2015 | Completed final sign-off Jul 2024 | 15 Joy St | Cullinane Plastering | construct (n) 2-story single family dwellingDetails
construct (n) 2-story single family dwelling | $471,333 |
| Jun 22, 2015 | Completed final sign-off Jul 2024 | 21 Joy St | Cullinane Plastering | construct (n) 2-story single family dwellingDetails
construct (n) 2-story single family dwelling | $471,333 |
| Jun 22, 2015 | Completed final sign-off Jun 2024 | 9 Joy St | Cullinane Plastering | construct (n) 2-story single family dwelling with 5a construction on a vacant lot.Details
construct (n) 2-story single family dwelling with 5a construction on a vacant lot. | $471,333 |
| Jun 18, 2015 | Never finaled issued Jul 2015, no final | 561 Columbus Av | Cullinane Plastering | health department documentation of food service facility. ada t.i pa#201505055358Details
health department documentation of food service facility. ada t.i pa#201505055358 | $1,000 |
| May 14, 2015 | Completed final sign-off Oct 2017 | 310 Walnut St | Cullinane Plastering, Dromhus Inc. | revision to pa 2014 1024 9795: minor changes to foundation based on field conditions. alteration to skylightDetails
revision to pa 2014 1024 9795: minor changes to foundation based on field conditions. alteration to skylight | |
| May 5, 2015 | Never finaled issued May 2015, no final | 561 Columbus Av | Cullinane Plastering | barrier removal- new 2 ada bathrooms, power door operated main entry, provide accessible bar counter for adaDetails
barrier removal- new 2 ada bathrooms, power door operated main entry, provide accessible bar counter for ada | $25,000 |
| Apr 23, 2015 | Completed final sign-off Aug 2018 | 2755 Mcallister St | Cullinane Plastering | erect 4 stories of 3 dwelling units. building to be fully sprinklered per nfpa 13.Details
erect 4 stories of 3 dwelling units. building to be fully sprinklered per nfpa 13. | $1,200,000 |
| Apr 23, 2015 | Completed final sign-off Dec 2016 | 2755 Mcallister St | Cullinane Plastering | demolish 2-story single family dwellingDetails
demolish 2-story single family dwelling | $10,000 |
| Apr 2, 2015 | Completed final sign-off Dec 2015 | 66 Landers St | Cullinane Plastering | rear bldg - revision to appl #201501297013 to include demo calculations.Details
rear bldg - revision to appl #201501297013 to include demo calculations. | |
| Apr 2, 2015 | Completed final sign-off Dec 2015 | 68 Landers St | Cullinane Plastering | front bldg - revision to pa #2015.0129.7010 to include demo calculations for planing purposes.Details
front bldg - revision to pa #2015.0129.7010 to include demo calculations for planing purposes. | |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 68 Landers St | Cullinane Plastering | this is a (n) deck at the roof a 3-story, 2-unit residential bldg the deck is private belonging to the 3rd flr flat & accessed theough a sliding sylightDetails
this is a (n) deck at the roof a 3-story, 2-unit residential bldg the deck is private belonging to the 3rd flr flat & accessed theough a sliding sylight | $20,000 |
| Mar 27, 2015 | Completed final sign-off Sep 2015 | 1725 Wawona St | Cullinane Plastering | revision to pa# 2014 0307 0218: revise stair, garage wall and exterior doors at basementDetails
revision to pa# 2014 0307 0218: revise stair, garage wall and exterior doors at basement | |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 1062 Valencia St | Cullinane Plastering | repair dry rot approx 40' west exterior. all work in kind.Details
repair dry rot approx 40' west exterior. all work in kind. | $3,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 251 Arkansas St | Cullinane Plastering | revision to app#200905208827 /s r4. foundation work.Details
revision to app#200905208827 /s r4. foundation work. | $1,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2015 | 806 Dolores St | Cullinane Plastering | relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit.Details
relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit. | |
| Feb 3, 2015 | Completed final sign-off Oct 2019 | 2600 Harrison St | Cullinane Plastering | demolish one story warehouse. n/a for maher ordinance no.155-13.Details
demolish one story warehouse. n/a for maher ordinance no.155-13. | $65,000 |
| Jan 30, 2015 | Completed final sign-off Feb 2017 | 1217 Sutter St | Cullinane Plastering | demo non-structural partition @ restrooms and staff office, demo bar @ eastern property, demo per ab-17Details
demo non-structural partition @ restrooms and staff office, demo bar @ eastern property, demo per ab-17 | $10,000 |
| Jan 29, 2015 | Completed final sign-off Dec 2015 | 66 Landers St | Cullinane Plastering | rear cottage - abatement of n.o.v. #201490832 & 201492516 and abatement of planning complaint #13499: remove entry stairs @ 2nd floor, (n) stair @ rear, relocate kitchen from 2nd to ground floor, configure windows, add (n) entry door.Details
rear cottage - abatement of n.o.v. #201490832 & 201492516 and abatement of planning complaint #13499: remove entry stairs @ 2nd floor, (n) stair @ rear, relocate kitchen from 2nd to ground floor, configure windows, add (n) entry door. | |
| Jan 29, 2015 | Completed final sign-off Aug 2016 | 3953 24th St | Cullinane Plastering | repairs to elevated decking, rail caps, associated siding, windows and doors. repairs to light well windows, doors and siding. replace (e) stucoo at rear at first level per plan & reflash opening.Details
repairs to elevated decking, rail caps, associated siding, windows and doors. repairs to light well windows, doors and siding. replace (e) stucoo at rear at first level per plan & reflash opening. | $75,000 |
| Jan 29, 2015 | Completed final sign-off Dec 2015 | 68 Landers St | Cullinane Plastering | front bldg - abaement of n.o.v. #201490832 & 201492516: remodel interior of 2 units 2nd & 3rd floors. remodel ground floor to add corridor to rear yard. add bathroom on both floors. reconfigure rear stairs. infill ground floor below second floor.Details
front bldg - abaement of n.o.v. #201490832 & 201492516: remodel interior of 2 units 2nd & 3rd floors. remodel ground floor to add corridor to rear yard. add bathroom on both floors. reconfigure rear stairs. infill ground floor below second floor. | $1,000 |
| Dec 23, 2014 | Never finaled issued Mar 2017, no final | 37 Rutledge St | Cullinane Plastering | demolish 2 story single family house.Details
demolish 2 story single family house. | $15,000 |
| Dec 23, 2014 | Completed final sign-off Aug 2019 | 35 Rutledge St | Cullinane Plastering | demolish 1 story garage.Details
demolish 1 story garage. | $7,000 |
| Dec 23, 2014 | Completed final sign-off Aug 2019 | 35 Rutledge St | Cullinane Plastering | to erect 3 stories, no basement, type vb, single family residence.Details
to erect 3 stories, no basement, type vb, single family residence. | $350,000 |
| Dec 23, 2014 | Completed final sign-off Aug 2019 | 37 Rutledge St | Cullinane Plastering | to erect 4 stories, 1 basement, type vb, single family residence.Details
to erect 4 stories, 1 basement, type vb, single family residence. | $350,000 |
| Dec 11, 2014 | Completed final sign-off Mar 2019 | 835 South Van Ness Av | Cullinane Plastering | to erect 4 stories, no basement, type 3a, 3 dwelling units building.Details
to erect 4 stories, no basement, type 3a, 3 dwelling units building. | $1,500,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2018 | 4540 19th St | Cullinane Plastering, Sjk Development, Ethan Allen Construction | remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.Details
remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room. | $560,000 |
| Nov 26, 2014 | Completed final sign-off May 2015 | 2889 24th St | Cullinane Plastering | revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl.Details
revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl. | $5,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2016 | 837 South Van Ness Av | Cullinane Plastering | revision to pa# 2014/09/12/6185. (n) elevator and stair dormer at 4th floor.Details
revision to pa# 2014/09/12/6185. (n) elevator and stair dormer at 4th floor. | $15,000 |