Ian Read
- Listed as
- architect, authorized agent-others, designer
- Firm
- Medium Plenty
- Based in
- Oakland
- On San Francisco permits
- Dec 2004 to Nov 2025
17 permits since 2000 (architect on 15 permits, authorized agent-others on 1 permit, designer on 1 permit): 10 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | In progress filed Nov 2025, not yet issued | 667 Howard St | renovation of front egress door to swing in direction of travel. creation of a vestibule @ entry on howard st with security roll up gate mounted inside ceiling of vestibule. gate to be 75% transparent to perpindicular view.Details
renovation of front egress door to swing in direction of travel. creation of a vestibule @ entry on howard st with security roll up gate mounted inside ceiling of vestibule. gate to be 75% transparent to perpindicular view. | $24,000 | |
| Jan 11, 2024 | Completed final sign-off Apr 2024 | 52 Mirabel Av | Jetton Construction | reconfigurg interior at 3rd flr. modify windows on side(west). reconfigurg skylight at roof. alter 2 windows operation, add guardrail at rear deck. alteration to permit# 201812219035 & 202110261180. no changes visible from street.Details
reconfigurg interior at 3rd flr. modify windows on side(west). reconfigurg skylight at roof. alter 2 windows operation, add guardrail at rear deck. alteration to permit# 201812219035 & 202110261180. no changes visible from street. | $20,000 |
| Dec 27, 2019 | Expired or cancelled withdrawn Apr 2021 | 90 Mirabel Av | remodel & addition to existing multi family residence, new garage & horizontal addition, window & door changes, reconfiguration of interior apartment layout, increase in floor area to unit 90 "a" onlyDetails
remodel & addition to existing multi family residence, new garage & horizontal addition, window & door changes, reconfiguration of interior apartment layout, increase in floor area to unit 90 "a" only | $487,000 | |
| Apr 18, 2019 | Completed final sign-off Dec 2020 | 12 Prospect Av | Jetton Construction | interior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from streetDetails
interior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from street | $77,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 101 Christopher Dr | E F Mcginness And Sons | replace stucco with wood siding, alteration to windows on side and rearDetails
replace stucco with wood siding, alteration to windows on side and rear | $30,000 |
| Jan 4, 2019 | Completed final sign-off Jul 2019 | 28 South Park | limited ti - removal of stair partition in basement. removal of stair partition on 1st. removal of office portion on 2nd flr. addotopm pf man doors to garage on 1st flr maher naDetails
limited ti - removal of stair partition in basement. removal of stair partition on 1st. removal of office portion on 2nd flr. addotopm pf man doors to garage on 1st flr maher na | $12,000 | |
| Dec 21, 2018 | Completed final sign-off Apr 2024 | 52 Mirabel Av | Jetton Construction | renovation of single family dwelling. rebuild front & rear facades. replace windows & doors. replace siding. new roof. changes to interior layout.Details
renovation of single family dwelling. rebuild front & rear facades. replace windows & doors. replace siding. new roof. changes to interior layout. | $375,000 |
| Oct 11, 2017 | Completed final sign-off Apr 2018 | 28 South Park | E F Mcginness And Sons | ti for (e) office space on the 1st fl & basement. maher naDetails
ti for (e) office space on the 1st fl & basement. maher na | $30,000 |
| Jun 28, 2017 | Never finaled issued Apr 2018, no final | 65 Lippard Av | Jetton Construction | horizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation.Details
horizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation. | $175,000 |
| Nov 23, 2016 | Completed final sign-off Oct 2017 | 333 Oak Park Dr | Toolbox | renovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylightDetails
renovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylight | $110,000 |
| Sep 22, 2016 | Completed final sign-off Feb 2018 | 225 Dolores St | Extol Construction | understory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as neededDetails
understory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as needed | $137,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2018 | 4540 19th St | Cullinane Plastering, Sjk Development, Ethan Allen Construction | remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.Details
remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room. | $560,000 |
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 4540 19th St | Ethan Allen Construction | drill piers and associated concrete at west property line. no alteration to residence. shoring assocated with pa 201206253367Details
drill piers and associated concrete at west property line. no alteration to residence. shoring assocated with pa 201206253367 | $12,000 |
| Mar 14, 2013 | Never finaled issued May 2013, no final | 2512 Filbert St | Johnstone - Mc Auliffe Const. Inc. | kitchen remodel. replace stair to basement. replace windows at rear facade. start selective demolition immediately.Details
kitchen remodel. replace stair to basement. replace windows at rear facade. start selective demolition immediately. | $112,000 |
| Jan 17, 2013 | Never finaled issued Jul 2014, no final | 1655 Page St | to comply with nov# 20128253, dated 12/18/12. legalize a deck & stairs from upper level to rear yard.Details
to comply with nov# 20128253, dated 12/18/12. legalize a deck & stairs from upper level to rear yard. | $6,000 | |
| Jun 25, 2012 | Completed final sign-off Nov 2016 | 4546 19th St | Ethan Allen Construction | horizontal & vertical additions. add 2nd unit. add roof deck. renovation and structural upgrade.Details
horizontal & vertical additions. add 2nd unit. add roof deck. renovation and structural upgrade. | $287,000 |
| Dec 31, 2004 | Completed final sign-off Mar 2005 | 425 Battery St | Chow's Construction Co. | build out of current retail space to accomodate a barber shop.Details
build out of current retail space to accomodate a barber shop. | $81,900 |