Permit GraphShortlistSan Francisco building permits since 2000

Ian Read

License
C33360
Look the license up with the state
Listed as
architect, authorized agent-others, designer
Firm
Medium Plenty
Based in
Oakland
On San Francisco permits
Dec 2004 to Nov 2025

17 permits since 2000 (architect on 15 permits, authorized agent-others on 1 permit, designer on 1 permit): 10 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 25, 2025In progress
filed Nov 2025, not yet issued
667 Howard Strenovation of front egress door to swing in direction of travel. creation of a vestibule @ entry on howard st with security roll up gate mounted inside ceiling of vestibule. gate to be 75% transparent to perpindicular view.
Details
Permit
202511250428
Status
filed
Filed
Nov 25, 2025
Declared cost
$24,000
Address
667 Howard St

renovation of front egress door to swing in direction of travel. creation of a vestibule @ entry on howard st with security roll up gate mounted inside ceiling of vestibule. gate to be 75% transparent to perpindicular view.

Open the permit page

$24,000
Jan 11, 2024Completed
final sign-off Apr 2024
52 Mirabel AvJetton Constructionreconfigurg interior at 3rd flr. modify windows on side(west). reconfigurg skylight at roof. alter 2 windows operation, add guardrail at rear deck. alteration to permit# 201812219035 & 202110261180. no changes visible from street.
Details
Permit
202401113823
Status
complete
Filed
Jan 11, 2024
Permit issued
Jan 12, 2024
Final sign-off
Apr 3, 2024
Declared cost
$20,000
Address
52 Mirabel Av

reconfigurg interior at 3rd flr. modify windows on side(west). reconfigurg skylight at roof. alter 2 windows operation, add guardrail at rear deck. alteration to permit# 201812219035 & 202110261180. no changes visible from street.

Open the permit page

$20,000
Dec 27, 2019Expired or cancelled
withdrawn Apr 2021
90 Mirabel Avremodel & addition to existing multi family residence, new garage & horizontal addition, window & door changes, reconfiguration of interior apartment layout, increase in floor area to unit 90 "a" only
Details
Permit
201912270800
Status
withdrawn
Filed
Dec 27, 2019
Declared cost
$487,000
Address
90 Mirabel Av

remodel & addition to existing multi family residence, new garage & horizontal addition, window & door changes, reconfiguration of interior apartment layout, increase in floor area to unit 90 "a" only

Open the permit page

$487,000
Apr 18, 2019Completed
final sign-off Dec 2020
12 Prospect AvJetton Constructioninterior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from street
Details
Permit
201904188356
Status
complete
Filed
Apr 18, 2019
Permit issued
May 3, 2019
Final sign-off
Dec 17, 2020
Declared cost
$77,000
Address
12 Prospect Av

interior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from street

Open the permit page

$77,000
Feb 21, 2019Never finaled
issued Feb 2019, no final
101 Christopher DrE F Mcginness And Sonsreplace stucco with wood siding, alteration to windows on side and rear
Details
Permit
201902213480
Status
issued
Filed
Feb 21, 2019
Permit issued
Feb 26, 2019
Declared cost
$30,000
Address
101 Christopher Dr

replace stucco with wood siding, alteration to windows on side and rear

Open the permit page

$30,000
Jan 4, 2019Completed
final sign-off Jul 2019
28 South Parklimited ti - removal of stair partition in basement. removal of stair partition on 1st. removal of office portion on 2nd flr. addotopm pf man doors to garage on 1st flr maher na
Details
Permit
201901049689
Status
complete
Filed
Jan 4, 2019
Permit issued
Jan 9, 2019
Final sign-off
Jul 10, 2019
Declared cost
$12,000
Address
28 South Park

limited ti - removal of stair partition in basement. removal of stair partition on 1st. removal of office portion on 2nd flr. addotopm pf man doors to garage on 1st flr maher na

Open the permit page

$12,000
Dec 21, 2018Completed
final sign-off Apr 2024
52 Mirabel AvJetton Constructionrenovation of single family dwelling. rebuild front & rear facades. replace windows & doors. replace siding. new roof. changes to interior layout.
Details
Permit
201812219035
Status
complete
Filed
Dec 21, 2018
Permit issued
Jan 21, 2020
Final sign-off
Apr 3, 2024
Declared cost
$375,000
Address
52 Mirabel Av

renovation of single family dwelling. rebuild front & rear facades. replace windows & doors. replace siding. new roof. changes to interior layout.

Open the permit page

$375,000
Oct 11, 2017Completed
final sign-off Apr 2018
28 South ParkE F Mcginness And Sonsti for (e) office space on the 1st fl & basement. maher na
Details
Permit
201710110892
Status
complete
Filed
Oct 11, 2017
Permit issued
Oct 13, 2017
Final sign-off
Apr 24, 2018
Declared cost
$30,000
Address
28 South Park

ti for (e) office space on the 1st fl & basement. maher na

Open the permit page

$30,000
Jun 28, 2017Never finaled
issued Apr 2018, no final
65 Lippard AvJetton Constructionhorizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation.
Details
Permit
201706280554
Status
issued
Filed
Jun 28, 2017
Permit issued
Apr 27, 2018
Declared cost
$175,000
Address
65 Lippard Av

horizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation.

Open the permit page

$175,000
Nov 23, 2016Completed
final sign-off Oct 2017
333 Oak Park DrToolboxrenovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylight
Details
Permit
201611233449
Status
complete
Filed
Nov 23, 2016
Permit issued
Nov 28, 2016
Final sign-off
Oct 13, 2017
Declared cost
$110,000
Address
333 Oak Park Dr

renovation of existing kitchen and living room. renovation of e entry stair. interior electrical, plumb, finishes in affected areas only. minor structural to accommodate interior layout and raised ceiling in liv rm. 2 new windows, 1 skylight

Open the permit page

$110,000
Sep 22, 2016Completed
final sign-off Feb 2018
225 Dolores StExtol Constructionunderstory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as needed
Details
Permit
201609228557
Status
complete
Filed
Sep 22, 2016
Permit issued
Feb 17, 2017
Final sign-off
Feb 13, 2018
Declared cost
$137,000
Address
225 Dolores St

understory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as needed

Open the permit page

$137,000
Dec 3, 2014Completed
final sign-off Oct 2018
4540 19th StCullinane Plastering, Sjk Development, Ethan Allen Constructionremodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.
Details
Permit
201412032921
Status
complete
Filed
Dec 3, 2014
Permit issued
Jul 5, 2017
Final sign-off
Oct 1, 2018
Declared cost
$560,000
Address
4540 19th St

remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.

Open the permit page

$560,000
Jul 2, 2014Never finaled
issued Jul 2014, no final
4540 19th StEthan Allen Constructiondrill piers and associated concrete at west property line. no alteration to residence. shoring assocated with pa 201206253367
Details
Permit
201407020396
Status
issued
Filed
Jul 2, 2014
Permit issued
Jul 14, 2014
Declared cost
$12,000
Address
4540 19th St

drill piers and associated concrete at west property line. no alteration to residence. shoring assocated with pa 201206253367

Open the permit page

$12,000
Mar 14, 2013Never finaled
issued May 2013, no final
2512 Filbert StJohnstone - Mc Auliffe Const. Inc.kitchen remodel. replace stair to basement. replace windows at rear facade. start selective demolition immediately.
Details
Permit
201303142228
Status
issued
Filed
Mar 14, 2013
Permit issued
May 21, 2013
Declared cost
$112,000
Address
2512 Filbert St

kitchen remodel. replace stair to basement. replace windows at rear facade. start selective demolition immediately.

Open the permit page

$112,000
Jan 17, 2013Never finaled
issued Jul 2014, no final
1655 Page Stto comply with nov# 20128253, dated 12/18/12. legalize a deck & stairs from upper level to rear yard.
Details
Permit
201301178237
Status
issued
Filed
Jan 17, 2013
Permit issued
Jul 2, 2014
Declared cost
$6,000
Address
1655 Page St

to comply with nov# 20128253, dated 12/18/12. legalize a deck & stairs from upper level to rear yard.

Open the permit page

$6,000
Jun 25, 2012Completed
final sign-off Nov 2016
4546 19th StEthan Allen Constructionhorizontal & vertical additions. add 2nd unit. add roof deck. renovation and structural upgrade.
Details
Permit
201206253387
Status
complete
Filed
Jun 25, 2012
Permit issued
May 2, 2014
Final sign-off
Nov 18, 2016
Declared cost
$287,000
Address
4546 19th St

horizontal & vertical additions. add 2nd unit. add roof deck. renovation and structural upgrade.

Open the permit page

$287,000
Dec 31, 2004Completed
final sign-off Mar 2005
425 Battery StChow's Construction Co.build out of current retail space to accomodate a barber shop.
Details
Permit
200412312413
Status
complete
Filed
Dec 31, 2004
Permit issued
Dec 31, 2004
Final sign-off
Mar 30, 2005
Declared cost
$81,900
Address
425 Battery St

build out of current retail space to accomodate a barber shop.

Open the permit page

$81,900