Scott Brady
- Listed as
- architect
- Firm
- Lionakis-Beaumont Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to May 2022
23 permits since 2000 (architect on 23 permits): 20 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2022 | Never finaled issued Jun 2022, no final | 100 01st St | Novo Construction Inc | demo of (e) partitions, ceilings, mech and elec. construction of new partitons, ceilings, mechanical and elec life saety fire sprinkler under sep permitDetails
demo of (e) partitions, ceilings, mech and elec. construction of new partitons, ceilings, mechanical and elec life saety fire sprinkler under sep permit | $2,100,000 |
| Dec 29, 2014 | Expired or cancelled cancelled Jan 2026 | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/aDetails
scope is limited to demolition only, remove (e) food service equipment & related electrical and plumbing. partial demolition of suspended ceiling & flooring, accessibility will be provided as part of construction drawing sht see sfbc ab-017; space to remain vacant; maher n/a | $20,000 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 185 Berry St | Hathaway Dinwiddie Co. | suite 6600 & 6700: demo work only to be performed in suites located on the 6th fl within existing wharfside building in china basin. do consists of removal of doors, partitons, susp ceilings, finishes, fixtures and other elementsDetails
suite 6600 & 6700: demo work only to be performed in suites located on the 6th fl within existing wharfside building in china basin. do consists of removal of doors, partitons, susp ceilings, finishes, fixtures and other elements | $47,760 |
| Nov 18, 2014 | Completed final sign-off Apr 2015 | 200 California St | Novo Construction Inc | 5th floor t.i. - replace existing office fronts with new glazing, upgrade restrooms. mep, fire sprinkler & life safety under separate permit. n/a maher ordinanceDetails
5th floor t.i. - replace existing office fronts with new glazing, upgrade restrooms. mep, fire sprinkler & life safety under separate permit. n/a maher ordinance | $254,880 |
| Mar 24, 2010 | Completed final sign-off Jul 2010 | 185 Berry St | Commercial Interior Builders Inc | ste #2200 -existing tenant suite convert 3 small offices to 1 conf room, divide mail/copy room to add telecom room. add new counter with sink.Details
ste #2200 -existing tenant suite convert 3 small offices to 1 conf room, divide mail/copy room to add telecom room. add new counter with sink. | $110,000 |
| Nov 12, 2009 | Completed final sign-off Dec 2009 | 185 Berry St | Field Construction Inc. | revision to pa# 200910199287, add door along line 28, misc teledata outlet locations, relabel room iii to telcom, minor revision to ceiling. at ste #2400Details
revision to pa# 200910199287, add door along line 28, misc teledata outlet locations, relabel room iii to telcom, minor revision to ceiling. at ste #2400 | $25,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2009 | 185 Berry St | Dfi Construction Company | 6th floor - new demising wall to demise private office into 2 offices.Details
6th floor - new demising wall to demise private office into 2 offices. | $5,000 |
| Sep 5, 2008 | Completed final sign-off Feb 2009 | 185 Berry St | Skyline Construction | (1st floor suite 1600) new complete tenant improvement in shell space, new offices, ceiling, finishes (mechanical, electrical & plmg to suit tenent configuration under separated permit/design built)Details
(1st floor suite 1600) new complete tenant improvement in shell space, new offices, ceiling, finishes (mechanical, electrical & plmg to suit tenent configuration under separated permit/design built) | $1,600,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 185 Berry St | (1st floor suite 1600) interior demolition for future tenant improvement per ab-017.Details
(1st floor suite 1600) interior demolition for future tenant improvement per ab-017. | $35,000 | |
| May 14, 2008 | Completed final sign-off Jul 2008 | 685 Market St | Roebbelen Contracting Inc | change of use from retail store to yogurt store on the ground floor unit # 130 including new lighting, plumbing, millwork, cashier, hand sink and pre sinkDetails
change of use from retail store to yogurt store on the ground floor unit # 130 including new lighting, plumbing, millwork, cashier, hand sink and pre sink | $50,000 |
| May 2, 2008 | Completed final sign-off Oct 2008 | 185 Berry St | Merrcon Inc. | 1st floor, suite 1600: work consist of consturction of walls to close openings at corridors created by demolition see sheet a3. no mech, fire sprinkler or life safety alarm work in this scope. space will remain unoccupied in shell condition until leased.work performed under appl#200804179924.Details
1st floor, suite 1600: work consist of consturction of walls to close openings at corridors created by demolition see sheet a3. no mech, fire sprinkler or life safety alarm work in this scope. space will remain unoccupied in shell condition until leased.work performed under appl#200804179924. | $8,500 |
| Apr 17, 2008 | Completed final sign-off Jun 2008 | 185 Berry St | Merrcon Inc. | demolition of interior finishes and non-load bearing partitions per ab-17. space is to be left in "shell" condition pending future t.i., fire alarm, fire sprinkler system to be under separate permit. new construction is limited to short section of corridor wall to separate work area.Details
demolition of interior finishes and non-load bearing partitions per ab-17. space is to be left in "shell" condition pending future t.i., fire alarm, fire sprinkler system to be under separate permit. new construction is limited to short section of corridor wall to separate work area. | $50,000 |
| Dec 10, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | Merrcon Inc. | rev, to p/a # #2007.03.29.7634. misc. lobby/corridor changes - change to smoke guard doors, deleting scope. show accessible bathrooms as ref. for new work on 6th floor. reduce scope of work on 4th fl. by adding new door at corridor - addition or work on 2nd, 3rd fl. - elevator smoke doors change toDetails
rev, to p/a # #2007.03.29.7634. misc. lobby/corridor changes - change to smoke guard doors, deleting scope. show accessible bathrooms as ref. for new work on 6th floor. reduce scope of work on 4th fl. by adding new door at corridor - addition or work on 2nd, 3rd fl. - elevator smoke doors change to | $25,000 |
| Nov 19, 2007 | Never finaled issued Jul 2008, no final | 119 23rd Av | extend rear of house to add a breakfast room on the 1st floor. expand a bedroom on the 2nd floor and add a bathroom on the 2nd floor.Details
extend rear of house to add a breakfast room on the 1st floor. expand a bedroom on the 2nd floor and add a bathroom on the 2nd floor. | $80,000 | |
| May 7, 2007 | Completed final sign-off Jul 2007 | 101 Spear St | Roebbelen Contracting Inc | oti-1 rev, at & t, 2nd floor.Details
oti-1 rev, at & t, 2nd floor. | |
| Mar 27, 2007 | Completed final sign-off Dec 2007 | 185 Berry St | Merrcon Inc. | oti-1, china basin landing, 6th floor, ls, me, el.Details
oti-1, china basin landing, 6th floor, ls, me, el. | $75,000 |
| Nov 1, 2006 | Completed final sign-off Dec 2006 | 611 Folsom St | Roebbelen Contracting Inc | demolition of portion of raised floor, suspended acoustical ceiling, light fixtures, some (e) walls & door-frames. remove mechanical electrical, lighting and fire suppression system that will not affect other areas of the bldg. interior non-structural demolition only under this permit.Details
demolition of portion of raised floor, suspended acoustical ceiling, light fixtures, some (e) walls & door-frames. remove mechanical electrical, lighting and fire suppression system that will not affect other areas of the bldg. interior non-structural demolition only under this permit. | $45,000 |
| Sep 20, 2005 | Completed final sign-off Oct 2005 | 101 Spear St | demollish(e) office, construct (e) conference room, upgrade h.c. signage at restrooms, upgrade h.c.Details
demollish(e) office, construct (e) conference room, upgrade h.c. signage at restrooms, upgrade h.c. | $70,000 | |
| Apr 13, 2005 | Completed final sign-off Oct 2005 | 101 Spear St | oti-2 3rd floor el meDetails
oti-2 3rd floor el me | $128,000 | |
| Apr 6, 2005 | Completed final sign-off Sep 2005 | 111 Sutter St | Pankow Special Projects Lp | commercial - lss. install roll down fire door. install devices & programing. 3 devices only.Details
commercial - lss. install roll down fire door. install devices & programing. 3 devices only. | $2,500 |
| Mar 24, 2005 | Completed final sign-off Nov 2005 | 77 Beale St | Paradigm General Contractors | as built for review &approval appl 200305023738(mech equip model &layout minor changes only on 2/fl.Details
as built for review &approval appl 200305023738(mech equip model &layout minor changes only on 2/fl. | |
| Mar 4, 2005 | Completed final sign-off Sep 2005 | 45 Montgomery St | replace (e) wood floor framing in mezzanine w/ (n) steel framing & metal deck w/ replceDetails
replace (e) wood floor framing in mezzanine w/ (n) steel framing & metal deck w/ replce | $10,000 | |
| Nov 4, 2004 | Completed final sign-off Sep 2005 | 111 Sutter St | Pankow Special Projects Lp | install new fire rated roll down door to provide separation between the (e) exit stairwells. workDetails
install new fire rated roll down door to provide separation between the (e) exit stairwells. work | $20,000 |