Block 3711, lot 014A
45 Beale St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 45 Beale St | Ayoob & Peery Plumbing Co Inc | 5th floor tenant improvements - replace 14 sprinklers in mechanical room.Details
5th floor tenant improvements - replace 14 sprinklers in mechanical room. | $5,000 |
| Feb 12, 2009 | Completed final sign-off Apr 2010 | 45 Beale St | C B 2 Builders Incorporated | alternate 2-hour rated roof ceiling assembly duct & vent penetration details at 5th floor. revision to pa# 2008/07/31/8064.Details
alternate 2-hour rated roof ceiling assembly duct & vent penetration details at 5th floor. revision to pa# 2008/07/31/8064. | $25,000 |
| Nov 12, 2008 | Completed final sign-off Apr 2010 | 45 Beale St | Sierra Electric Co | add 1 auxillary power, 3 addressable heat. detectors, 3 addressable pull stations, 2 speakers/strobe.Details
add 1 auxillary power, 3 addressable heat. detectors, 3 addressable pull stations, 2 speakers/strobe. | $10,000 |
| Oct 27, 2008 | Completed final sign-off Jun 2010 | 45 Beale St | Ayoob & Peery Plumbing Co Inc | penthouse/mech - remove & re-install existing fire sprinkler piping for re-built roof per tenant improvement.Details
penthouse/mech - remove & re-install existing fire sprinkler piping for re-built roof per tenant improvement. | $8,000 |
| Jul 31, 2008 | Completed final sign-off Apr 2010 | 45 Beale St | C B 2 Builders Incorporated | installation of (4) new 600 kw back up generators to include new paralleling switchgear, dual wall fuel piping, electrical readers, exhaust piping complete. ***exhaust piping structural to support exhaust under separate permit***Details
installation of (4) new 600 kw back up generators to include new paralleling switchgear, dual wall fuel piping, electrical readers, exhaust piping complete. ***exhaust piping structural to support exhaust under separate permit*** | $1,500,000 |
| Jul 31, 2008 | Completed final sign-off Feb 2009 | 45 Beale St | C B 2 Builders Incorporated | remove abandoned mechanical equipment on roof top. demo only. ref. application 200807318064 (for construction)Details
remove abandoned mechanical equipment on roof top. demo only. ref. application 200807318064 (for construction) | $250,000 |
| Jan 4, 2008 | Completed final sign-off Jan 2008 | 45 Beale St | Paradigm General Contractors | renew pa#200605081028 for final inspection.Details
renew pa#200605081028 for final inspection. | |
| Aug 25, 2006 | Completed final sign-off Oct 2006 | 77 Beale St | Paradigm General Contractors | replace existing car washer equipment on existing basement slab (on grade)Details
replace existing car washer equipment on existing basement slab (on grade) | $25,000 |
| May 8, 2006 | Expired or cancelled expired Jan 2008 | 45 Beale St | renovation of auditorium including emergency lighting and exit lighting. revision to pa# 200509304396.Details
renovation of auditorium including emergency lighting and exit lighting. revision to pa# 200509304396. | $100,000 | |
| Oct 11, 2005 | Completed final sign-off Nov 2005 | 77 Beale St | Paradigm General Contractors | renew app #200503298671Details
renew app #200503298671 | |
| Mar 29, 2005 | Expired or cancelled expired Nov 2005 | 77 Beale St | Paradigm General Contractors | renew appl#200311261223 & 200409083592 for final inspectionDetails
renew appl#200311261223 & 200409083592 for final inspection | |
| Mar 24, 2005 | Completed final sign-off Nov 2005 | 77 Beale St | Paradigm General Contractors | as built for review &approval appl 200305023738(mech equip model &layout minor changes only on 2/fl.Details
as built for review &approval appl 200305023738(mech equip model &layout minor changes only on 2/fl. | |
| Dec 28, 2004 | Expired or cancelled expired Feb 2006 | 77 Beale St | Fuel Oil System | install 40 feet of supply and return piping from the day tank to the 2 generatorsDetails
install 40 feet of supply and return piping from the day tank to the 2 generators | $15,000 |
| Sep 8, 2004 | Expired or cancelled expired Nov 2005 | 77 Beale St | R L H Fire Protection Inc | add five head due to new 2hr wall const 1.5 boiler rm.Details
add five head due to new 2hr wall const 1.5 boiler rm. | $1,500 |
| Jul 13, 2004 | Completed final sign-off Apr 2005 | 77 Beale St | Paradigm General Contractors | life safety work building permit 1st floor loading dock double doorsDetails
life safety work building permit 1st floor loading dock double doors | $11,834 |
| Mar 31, 2004 | Completed final sign-off Aug 2004 | 77 Beale St | Paradigm General Contractors | tie-in and programinig for fire suppression equipment and duct detector @ level 1-b only.Details
tie-in and programinig for fire suppression equipment and duct detector @ level 1-b only. | $18,823 |
| Mar 31, 2004 | Completed final sign-off Aug 2004 | 77 Beale St | Paradigm General Contractors | tie-in and programing for water flow and tamper switch hardware @ levls 1st floor, b1, b2 & b3 onlyDetails
tie-in and programing for water flow and tamper switch hardware @ levls 1st floor, b1, b2 & b3 only | $8,242 |
| Nov 26, 2003 | Expired or cancelled expired Nov 2005 | 77 Beale St | Paradigm General Contractors | 2nd floor boiler room fire alarm plan only under this permitDetails
2nd floor boiler room fire alarm plan only under this permit | $6,000 |
| Nov 20, 2003 | Completed final sign-off Mar 2004 | 77 Beale St | Paradigm General Contractors | oti-1 . revised, 29th fl-no oti-2Details
oti-1 . revised, 29th fl-no oti-2 | $50,000 |
| Nov 20, 2003 | Completed final sign-off Mar 2004 | 77 Beale St | Paradigm General Contractors | oti-2 29th fl-elDetails
oti-2 29th fl-el | $20,000 |
| Sep 2, 2003 | Completed final sign-off Aug 2004 | 77 Beale St | Sabah International Incorporated | furnish, install & test one inergen fire suppression system at basement level b1Details
furnish, install & test one inergen fire suppression system at basement level b1 | $49,879 |
| Jul 3, 2003 | Expired or cancelled expired Aug 2006 | 77 Beale St | Paradigm General Contractors | install new smoke detectors and heat detectors for the bldg freight elevator @ level 3b up to 4th flDetails
install new smoke detectors and heat detectors for the bldg freight elevator @ level 3b up to 4th fl | $40,000 |
| May 2, 2003 | Completed final sign-off May 2005 | 45 Beale St | Paradigm General Contractors | replacement of (e) low pressure steam boilers w/9n) hydronic boilersDetails
replacement of (e) low pressure steam boilers w/9n) hydronic boilers | $750,000 |
| May 2, 2003 | Completed final sign-off Nov 2005 | 77 Beale St | Paradigm General Contractors | replace (e) boilers w/(n) hydronics. chiller/boiler room code upgrade, repair york chiller air & watDetails
replace (e) boilers w/(n) hydronics. chiller/boiler room code upgrade, repair york chiller air & wat | $2,800,000 |
| Jan 29, 2003 | Expired or cancelled expired Mar 2005 | 45 Beale St | Paradigm General Contractors | oti-2 3rd floor, el, meDetails
oti-2 3rd floor, el, me | $207,000 |
| Jan 29, 2003 | Expired or cancelled expired Mar 2005 | 45 Beale St | Paradigm General Contractors | oti-1 3rd floor, el, meDetails
oti-1 3rd floor, el, me | $26,000 |
| Sep 14, 2001 | Completed final sign-off Feb 2002 | 77 Beale St | Paradigm General Contractors | oti-3 27th floor sprinkler onlyDetails
oti-3 27th floor sprinkler only | $1,000 |
| May 1, 2001 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | oti-1 27th floor, el, me, spDetails
oti-1 27th floor, el, me, sp | $7,000 |
| May 1, 2001 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | oti-2 27th floor el, me.Details
oti-2 27th floor el, me. | $8,000 |
| Apr 4, 2001 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | installation of fire smoke dampers into ex hvac ductwork on floors b1 1st and 2ndDetails
installation of fire smoke dampers into ex hvac ductwork on floors b1 1st and 2nd | $214,000 |
| Oct 20, 2000 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | oti-1: (29 fl) el, me, l/s, spDetails
oti-1: (29 fl) el, me, l/s, sp | $35,000 |
| Sep 11, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | provide fire smoke dampers to replace dampers in fire rated corridors-17th floorDetails
provide fire smoke dampers to replace dampers in fire rated corridors-17th floor | $10,000 |
| Sep 11, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | provide fire smoke dampers to replace existing dampers in fire rated corridors-21st floorDetails
provide fire smoke dampers to replace existing dampers in fire rated corridors-21st floor | $10,000 |
| Sep 5, 2000 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | oti-1 26th floor mechanical,sprinklerDetails
oti-1 26th floor mechanical,sprinkler | $10,000 |
| Sep 5, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | install additin strobes, sprinklers, smoke dectectors, install sprinkler system (9th fl. only)Details
install additin strobes, sprinklers, smoke dectectors, install sprinkler system (9th fl. only) | $81,000 |
| Aug 28, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | fire corridor upgradeDetails
fire corridor upgrade | $30,000 |
| Aug 21, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | additional strobes/speakers/smoke detectors 6th floor locationDetails
additional strobes/speakers/smoke detectors 6th floor location | $42,000 |
| Aug 21, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | additonal strobes/speakers/smoke detectorsDetails
additonal strobes/speakers/smoke detectors | $42,000 |
| Aug 21, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | additional strobes/speakers/smoke detector/instl sprinkler system 10th flDetails
additional strobes/speakers/smoke detector/instl sprinkler system 10th fl | $82,000 |
| Aug 11, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | oti-2, 19th floor - el, me, spDetails
oti-2, 19th floor - el, me, sp | $50,000 |
| Jul 31, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | additional stairs, peakadditional strobes, speakers, smoke detectorsDetails
additional stairs, peakadditional strobes, speakers, smoke detectors | $110,000 |
| Jul 31, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | corridor wall upgrade/mechanicalDetails
corridor wall upgrade/mechanical | $20,000 |
| Jul 18, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | corridor wall upgradeDetails
corridor wall upgrade | $20,000 |
| Jul 18, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | corridor wall upgradeDetails
corridor wall upgrade | $30,000 |
| Jul 18, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | corridor wall upgradeDetails
corridor wall upgrade | $20,000 |
| Jun 20, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | oti-1 el, me, l/s, sp 19th floorDetails
oti-1 el, me, l/s, sp 19th floor | $238,000 |
| Jun 9, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | install of elevator lobby doors no lighting workDetails
install of elevator lobby doors no lighting work | $30,000 |
| May 4, 2000 | Never finaled filed May 2000, never issued | 77 Beale St | installation of elevator lobby doorsDetails
installation of elevator lobby doors | $500,000 | |
| Apr 26, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | additional strobes/speakers/smoke detectorsDetails
additional strobes/speakers/smoke detectors | $36,950 |
| Apr 26, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | additional strobes/speakers/smoke detectorsDetails
additional strobes/speakers/smoke detectors | $42,000 |
| Apr 26, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | additional strobes speakers/smoke detectorsxDetails
additional strobes speakers/smoke detectorsx | $41,000 |
| Mar 14, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | install additional strobes,speakers,smoke detectors & sprinkler systemDetails
install additional strobes,speakers,smoke detectors & sprinkler system | $121,000 |
| Feb 9, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | upgrade fire rating of (e) corridor walls add fire rated doors, audible and visual alarmDetails
upgrade fire rating of (e) corridor walls add fire rated doors, audible and visual alarm | $75,000 |
| Feb 9, 2000 | Completed final sign-off Dec 2000 | 77 Beale St | Paradigm General Contractors | upgrade fire rating of (e) corridor walls, add fire rated doors, audible & visual alarm for floorDetails
upgrade fire rating of (e) corridor walls, add fire rated doors, audible & visual alarm for floor | $75,000 |
| Feb 9, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | upgrade fire rating or (e) corridor walls, add fire rated doors, audible, visual alarmDetails
upgrade fire rating or (e) corridor walls, add fire rated doors, audible, visual alarm | $75,000 |
| Jan 14, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | oti-2 el ls 23rd floorDetails
oti-2 el ls 23rd floor | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Paradigm General Contractors (45), C B 2 Builders Incorporated (3), Ayoob & Peery Plumbing Co Inc (2), Fuel Oil System, R L H Fire Protection Inc, Sabah International Incorporated, Sierra Electric Co
- Architects
- Gwa Architects
- Engineers
- Donald Dammen, Winzler & Kelly