Gregor Markel
- Listed as
- architect
- Firm
- Dahlin Group Inc
- Based in
- Pleasanton
- On San Francisco permits
- Oct 2017 to Sep 2026
25 permits since 2000 (architect on 25 permits): 20 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1580 Valencia St | Herrero Builders Incorporated | 1st fl: renovation of project area on 1st fl for eos imaging suite.Details
1st fl: renovation of project area on 1st fl for eos imaging suite. | $180,000 |
| Mar 12, 2025 | Completed final sign-off Jan 2026 | 225 30th St | t. i. addition of prefabricated walk in freezer in existing storage space.Details
t. i. addition of prefabricated walk in freezer in existing storage space. | $25,000 | |
| Oct 17, 2024 | Completed final sign-off Oct 2025 | 1000 Montgomery St | Jfieco | revision to 202108045707. replacement in kind of vinyl windows at penthouse (non visible from public right of way).Details
revision to 202108045707. replacement in kind of vinyl windows at penthouse (non visible from public right of way). | $10,000 |
| May 22, 2024 | Completed final sign-off May 2025 | 1333 Bush St | C B 2 Builders Incorporated | ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed.Details
ti of existing commercial kitchen. addition of new two compartment prep sinks, relocate existing station, addition of two gfci receptacles in existing dry storage room and associated breakers in existing electrical panels. replace finishes as needed. | $20,000 |
| Nov 28, 2023 | Completed final sign-off May 2024 | 1000 Montgomery St | C B 2 Builders Incorporated | revision to 202102044020: addition of upper casework in room 326 laundry room.Details
revision to 202102044020: addition of upper casework in room 326 laundry room. | $1,000 |
| Oct 19, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | C B 2 Builders Incorporated | revision to 202102044020; revision of rooms 224 and 324 from accessible shower room to shower roomDetails
revision to 202102044020; revision of rooms 224 and 324 from accessible shower room to shower room | |
| Sep 14, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | C B 2 Builders Incorporated | revision to bpa#202102044020, room 424 from "accessible shower room" to "shower room"Details
revision to bpa#202102044020, room 424 from "accessible shower room" to "shower room" | |
| Jan 31, 2023 | Completed final sign-off Aug 2024 | 1000 Montgomery St | C B 2 Builders Incorporated | revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail.Details
revision to pa# 202102044020. deficiencies in several (e) fire barries & partitions were discovered that were approved as part of pa# 8405871 & pa# 8715181 but not installed in their entirety. scope of this project is to repair those deficiencies & bring them back up to level & detail. | $600,000 |
| Aug 4, 2021 | Completed final sign-off Oct 2025 | 1000 Montgomery St | Jfieco | exterior- remove (e) vnyl sid,exposed wd sd remains. preserve orig wd sid, trim & decorative elements. repair where needed. non-orig wd sid & trim to match orig wd species/vernacular. paint exterior. remove mtl gate. replc gar dr, awning,entry dr, lt fixtrsDetails
exterior- remove (e) vnyl sid,exposed wd sd remains. preserve orig wd sid, trim & decorative elements. repair where needed. non-orig wd sid & trim to match orig wd species/vernacular. paint exterior. remove mtl gate. replc gar dr, awning,entry dr, lt fixtrs | $600,000 |
| Feb 4, 2021 | Completed final sign-off Aug 2024 | 1000 Montgomery St | interior renovation of (e) resigential care facility for elderly, no change of occupancy. scope if on flr 2-4 w/ (n) elect panels in penthouse, (n) mech equipment on roof. few walls moved in each flr's core toliet areas to make spaces. 11b fully accesible shower rms, all toilet plumbing fixtures -Details
interior renovation of (e) resigential care facility for elderly, no change of occupancy. scope if on flr 2-4 w/ (n) elect panels in penthouse, (n) mech equipment on roof. few walls moved in each flr's core toliet areas to make spaces. 11b fully accesible shower rms, all toilet plumbing fixtures - | $3,750,000 | |
| Feb 6, 2020 | Completed final sign-off Jun 2020 | 1 Post St | Husher Inc Dba Husher Construction | revision to pa #201910305992, reduce scope of work, eliminate exterior make up air duct - no longer required and no longer part of scope. duct is not required. updates to existing mechanical system. connect outside to (e) mechanical system.Details
revision to pa #201910305992, reduce scope of work, eliminate exterior make up air duct - no longer required and no longer part of scope. duct is not required. updates to existing mechanical system. connect outside to (e) mechanical system. | |
| Nov 13, 2019 | Never finaled issued Feb 2020, no final | 505 Sansome St | Husher Inc Dba Husher Construction | 2299sqft interior remodel to an existing cafe & mep. maher na.Details
2299sqft interior remodel to an existing cafe & mep. maher na. | $275,000 |
| Oct 30, 2019 | Completed final sign-off Jun 2020 | 1 Post St | Husher Inc Dba Husher Construction | interior improvement to an existing cafe 2693 sf - mep updates to accomodate. duplicate 201910305992Details
interior improvement to an existing cafe 2693 sf - mep updates to accomodate. duplicate 201910305992 | $350,000 |
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084763; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084763; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084764; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084764; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084762; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084762; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 29, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | revision to app#201903074712. changes to furniture layout and occupancy calcs. finish changes. lighting change. mech ducts & plmg equipment.Details
revision to app#201903074712. changes to furniture layout and occupancy calcs. finish changes. lighting change. mech ducts & plmg equipment. | |
| Mar 8, 2019 | Expired or cancelled cancelled Dec 2019 | 430 California St | Sc Builders, Inc | 18th & 19th flrs - convert (e) outdoor terrace area to usable space, accessory to the office not open to the public; add aceesible ramp & install non-visible glass rail behind parapet max. 10" above (e)parapet.Details
18th & 19th flrs - convert (e) outdoor terrace area to usable space, accessory to the office not open to the public; add aceesible ramp & install non-visible glass rail behind parapet max. 10" above (e)parapet. | $20,000 |
| Mar 8, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 14th & 15th flrs - revision to 201810042316 bathrooms it rooms finishes and mep upgrades to accomodate changes maher naDetails
14th & 15th flrs - revision to 201810042316 bathrooms it rooms finishes and mep upgrades to accomodate changes maher na | $150,000 |
| Mar 8, 2019 | Completed final sign-off Feb 2022 | 430 California St | Sc Builders, Inc | 18th & 19th flrs - revision to 201810042316 bathrooms it rooms finishes, add mezz wall & structural for wall. mep upgrades to accomodate changes maher naDetails
18th & 19th flrs - revision to 201810042316 bathrooms it rooms finishes, add mezz wall & structural for wall. mep upgrades to accomodate changes maher na | $150,000 |
| Mar 8, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 16th & 17th flrs - revision to 201810042317 bathrooms it rooms finishes and mep upgrades to accomodate changes maher naDetails
16th & 17th flrs - revision to 201810042317 bathrooms it rooms finishes and mep upgrades to accomodate changes maher na | $150,000 |
| Jan 25, 2019 | Completed final sign-off Jan 2020 | 1455 Market St | Dome Construction Corp | 2nd floor:54854 sq ft tenant improvement for office :mech, elec, plmg part of scope. fire life safety deffered/sep permits. n/a for maherDetails
2nd floor:54854 sq ft tenant improvement for office :mech, elec, plmg part of scope. fire life safety deffered/sep permits. n/a for maher | $7,000,000 |
| Sep 20, 2018 | Expired or cancelled cancelled Jan 2026 | 430 California St | floor 12-19., total of 8 floors. interior demo - partition walls, floor finishes and fixtures per ab-017.Details
floor 12-19., total of 8 floors. interior demo - partition walls, floor finishes and fixtures per ab-017. | $50,000 | |
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 2 Embarcadero Center | Dome Construction Corp | 29th & 30th floors - 10,442 interior remodel - ti for office top (2) floors of 30 story bldg. mep, interior wall partitions, interior storefront, ceiling & floor finishes. maher naDetails
29th & 30th floors - 10,442 interior remodel - ti for office top (2) floors of 30 story bldg. mep, interior wall partitions, interior storefront, ceiling & floor finishes. maher na | $1,300,000 |
| Oct 24, 2017 | Never finaled issued Oct 2017, no final | 925 Market St | E G T Enterprise Inc | 2nd floor - construction of non-structural walls & ceiling & electrical /data work for new confernece room.Details
2nd floor - construction of non-structural walls & ceiling & electrical /data work for new confernece room. | $30,000 |