279 permits since 2000 (architect on 255 permits, authorized agent-others on 18 permits, engineer on 7 permits, designer on 2 permits): 188 completed, 13 in progress, 43 never finaled, 35 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 279.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 353 Lexington St | structural foundation replacement & building upgrade. (e) brick foundation to be removed & replaced w/ (n) concrete foundation. (n) shearwalls & holddowns for building upgrade. (n) foundation, walls & roof for single-story 37 s.f. addition. architectural work under separate permit.Details
structural foundation replacement & building upgrade. (e) brick foundation to be removed & replaced w/ (n) concrete foundation. (n) shearwalls & holddowns for building upgrade. (n) foundation, walls & roof for single-story 37 s.f. addition. architectural work under separate permit. | $200,000 | |
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 68 Monterey Bl | non-structural interior demolition of (e) study conversion to (n) primary bathroom. plumbing and electrical work to be included.Details
non-structural interior demolition of (e) study conversion to (n) primary bathroom. plumbing and electrical work to be included. | $20,000 | |
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 301 Howard St | Kr Johnston Construction Inc | suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done.Details
suite 550: installation of 7 pre-fab privacy booths. no pluminbg or electrical work to be done. | $5,000 |
| Mar 25, 2026 | Completed final sign-off Aug 2026 | 44 Lynch St | interior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed.Details
interior remodel. (e) bathroom fixtures to be relaced, (e) dining room & kitchen to reconfigures, electrical & plumbing work to be performed. | $120,000 | |
| Dec 16, 2025 | In progress issued Apr 2026 | 137 Lundys Ln | L Cabral Construction | non-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e).Details
non-structural renovation of (e) kitchen. plumbing and electrical work to be performed. moving one window on rear of building and add siding to match (e). | $35,000 |
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 428 Ofarrell St | Clear Windows And Clear Doors Inc | abate planning enforcement case 2025002087 enf. remove e opaque glass blocks and solid interior partitoins at gr fl. storefront. replace 2 windows. remove 1 sign copy, 1 awning copy. legalize e awning structure under awning amnesty program.Details
abate planning enforcement case 2025002087 enf. remove e opaque glass blocks and solid interior partitoins at gr fl. storefront. replace 2 windows. remove 1 sign copy, 1 awning copy. legalize e awning structure under awning amnesty program. | $10,000 |
| Nov 6, 2025 | Completed final sign-off Sep 2026 | 1615 20th St | Curran & Associates General Contractors | barrier removal: new ada restroom. change swing of door.Details
barrier removal: new ada restroom. change swing of door. | $10,000 |
| Aug 4, 2025 | In progress issued Apr 2026 | 137 Lundys Ln | L Cabral Construction | detached garage: demolition of (e) detached garage and rebuild in kind. existing foundation to remain.Details
detached garage: demolition of (e) detached garage and rebuild in kind. existing foundation to remain. | $18,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 17 Heather Av | Maguire Construction | 1st fl addition: addition of 45 sqft replace (e) entry & garage doors. 2nd fl: addition of 45 sq ft scope to include interior renovation of kitchen, bedrroms, bathrooms (n) powder room. (e) windows to be replaced. plumbing and eletrical workDetails
1st fl addition: addition of 45 sqft replace (e) entry & garage doors. 2nd fl: addition of 45 sq ft scope to include interior renovation of kitchen, bedrroms, bathrooms (n) powder room. (e) windows to be replaced. plumbing and eletrical work | $400,000 |
| Jun 10, 2025 | Completed final sign-off May 2026 | 95 Nordhoff St | revision to 202501087919, to document fence boards to run horizontally.Details
revision to 202501087919, to document fence boards to run horizontally. | ||
| May 29, 2025 | Completed final sign-off Feb 2026 | 1620 Dolores St | Spiers & Sons Inc | convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom.Details
convert existing closet area into new bathroom on 3rd floor.construct vertical expansion to accomodate bathroom. | $40,000 |
| May 12, 2025 | Completed final sign-off Sep 2025 | 2142 Bay St | Jeffrey Sterneberg | interior remodel of (e) 1st floor unit. replace in kind 4 single pane windows and door with double pane windows and doors. no work visible from street.Details
interior remodel of (e) 1st floor unit. replace in kind 4 single pane windows and door with double pane windows and doors. no work visible from street. | $20,000 |
| May 7, 2025 | In progress issued May 2025 | 17 Heather Av | Maguire Construction | foundation replacement. revision to pa# 202501238889Details
foundation replacement. revision to pa# 202501238889 | $40,000 |
| May 6, 2025 | Completed final sign-off Sep 2025 | 175 Frida Kahlo Wy | Build Group Inc. | barrier removal; non structural renovation of (e) restrooms to gender neutral multi-accomodation ada compliant restroom.Details
barrier removal; non structural renovation of (e) restrooms to gender neutral multi-accomodation ada compliant restroom. | $25,000 |
| Feb 25, 2025 | Completed final sign-off Jun 2025 | 46 Surrey St | rev to pa 202102174789 & 202210275329 at the basement and 1/f. replace kitchen removed during the remodel.Details
rev to pa 202102174789 & 202210275329 at the basement and 1/f. replace kitchen removed during the remodel. | $2,200 | |
| Jan 31, 2025 | Completed final sign-off Sep 2026 | 401 Twin Peaks Bl | Centrix Builders Inc. | divide existing master bathroom into 2 bathrooms. provide enclosure for master bathroom toilet. provide new insulation, sheetrock, carpet, tile, and hardwood flooring in water damaged areas. no structural work. exterior work limited to painting onlyDetails
divide existing master bathroom into 2 bathrooms. provide enclosure for master bathroom toilet. provide new insulation, sheetrock, carpet, tile, and hardwood flooring in water damaged areas. no structural work. exterior work limited to painting only | $12,000 |
| Jan 23, 2025 | In progress issued Feb 2025 | 17 Heather Av | Maguire Construction | interior renovation of (e) 1st floor : convert unconditioned garage space to family room, powder room, and (n) stairs to 2nd floor. interior renovation of unit a- interior renovation of (e) 2nd floor: (n) stair from 1st floor and minor alteration of kitchen. include mep workDetails
interior renovation of (e) 1st floor : convert unconditioned garage space to family room, powder room, and (n) stairs to 2nd floor. interior renovation of unit a- interior renovation of (e) 2nd floor: (n) stair from 1st floor and minor alteration of kitchen. include mep work | $140,000 |
| Jan 8, 2025 | Completed final sign-off May 2026 | 95 Nordhoff St | replace (e) 6' wood fence to be rebuilt at appx. 9 feet tall. install (n) passage gate as well as a dual gate entrance to rear yard. fence is facing front of street. top of gable at +10'Details
replace (e) 6' wood fence to be rebuilt at appx. 9 feet tall. install (n) passage gate as well as a dual gate entrance to rear yard. fence is facing front of street. top of gable at +10' | $2,200 | |
| Oct 1, 2024 | Completed final sign-off Nov 2025 | 631 Folsom St | Build Group Inc. | tenant improvement conversion of e open work area to new 298 sf conference room. work to include electrical and ada upgrades. mep deferred.Details
tenant improvement conversion of e open work area to new 298 sf conference room. work to include electrical and ada upgrades. mep deferred. | $40,000 |
| Jun 21, 2024 | Completed final sign-off Mar 2025 | 175 Frida Kahlo Wy | Build Group Inc. | barrier removal- demolition of existing ada wheelchair lift and steps. replace with new ada compliant ramp and steps.Details
barrier removal- demolition of existing ada wheelchair lift and steps. replace with new ada compliant ramp and steps. | $30,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 175 Frida Kahlo Wy | Build Group Inc. | cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit.Details
cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit. | $25,000 |
| May 23, 2024 | Completed final sign-off Jun 2025 | 46 Surrey St | enlarge closet & add dormer for new 2nd fl bathroomDetails
enlarge closet & add dormer for new 2nd fl bathroom | $12,000 | |
| May 23, 2024 | Completed final sign-off Apr 2025 | 8 Sequoia Wy | rebuild e front steps and landings in kins. finish materials to match existing. no work outside property lineDetails
rebuild e front steps and landings in kins. finish materials to match existing. no work outside property line | $10,000 | |
| May 20, 2024 | Completed final sign-off Mar 2025 | 175 Frida Kahlo Wy | Build Group Inc. | conversion of 2 existing classrooms into 9 counselor's offices. scope of work to include electric work.Details
conversion of 2 existing classrooms into 9 counselor's offices. scope of work to include electric work. | $150,000 |
| Jan 24, 2024 | Completed final sign-off Dec 2024 | 519 Guerrero St | Rg Construction | non-structural conversion of existing storage room to new laundry room; laundry room to include plumbing and electrical workDetails
non-structural conversion of existing storage room to new laundry room; laundry room to include plumbing and electrical work | $8,000 |
| Jan 23, 2024 | In progress issued Apr 2024 | 1783 39th Av | Fondare Finish Construction Inc. | construct new 2nd floor deck at rear. deck height not to exceed 10'-0" from grade and roughly 18'-7" x 10'-0"Details
construct new 2nd floor deck at rear. deck height not to exceed 10'-0" from grade and roughly 18'-7" x 10'-0" | $8,000 |
| Jan 11, 2024 | Completed final sign-off Apr 2026 | 175 San Anselmo Av | Quinlan Construction | 3-story horizontal addition of 517.5 sq ft. extending (e) garage on basement level,(n) breakfast room on 1/f, (n) sitting area/office on 2/f.Details
3-story horizontal addition of 517.5 sq ft. extending (e) garage on basement level,(n) breakfast room on 1/f, (n) sitting area/office on 2/f. | $200,000 |
| Dec 26, 2023 | In progress issued Jun 2025 | 2134 30th Av | 557 sf 3rd fl. vertical addition, & interior remodel of (e) 1st and 2nd flrs to incl: convert 641 sf of (e) garage to living space. (n) interior stair. reconfigure (e) room layouts at 2nd flr. (n) rear yard patio's and stairs. (n) 3rd floor roof deck. no change to front facade.Details
557 sf 3rd fl. vertical addition, & interior remodel of (e) 1st and 2nd flrs to incl: convert 641 sf of (e) garage to living space. (n) interior stair. reconfigure (e) room layouts at 2nd flr. (n) rear yard patio's and stairs. (n) 3rd floor roof deck. no change to front facade. | $250,000 | |
| Dec 13, 2023 | Completed final sign-off Jan 2025 | 986 South Van Ness Av | Eastwood Development Incorporated | revision to pa# 201809140274, add access hatch at top of elevator shaft to service and maintain fire alarm device per sffc request.Details
revision to pa# 201809140274, add access hatch at top of elevator shaft to service and maintain fire alarm device per sffc request. | $2,000 |
| Aug 24, 2023 | Never finaled filed Aug 2023, never issued | 211 30th St | remodel existing entry, remove existing wrought iron gate, brick, planters and entry door. install new gate, mailbox, glass door with side lights and new finishes.Details
remodel existing entry, remove existing wrought iron gate, brick, planters and entry door. install new gate, mailbox, glass door with side lights and new finishes. | $20,000 | |
| Aug 7, 2023 | Never finaled filed Aug 2023, never issued | 5024 03rd St | demolish a one story detached garage.Details
demolish a one story detached garage. | $6,000 | |
| Aug 7, 2023 | Never finaled filed Aug 2023, never issued | 5024 03rd St | demolish a dettached storage(shed)Details
demolish a dettached storage(shed) | $4,000 | |
| Aug 7, 2023 | Never finaled filed Aug 2023, never issued | 5024 03rd St | erect a new 4 story multifamily housing bldg, with 8 dwelling units, 1 basement type v-a.Details
erect a new 4 story multifamily housing bldg, with 8 dwelling units, 1 basement type v-a. | $4,200,000 | |
| Jul 27, 2023 | Completed final sign-off Oct 2023 | 690 Folsom St | Broadway Building Group Co. | construct new partition wall on 2nd fl. wall to include aluminum framed glass doors and glass side lights. sprinkler and fire alarm under separate permits, if applicable.Details
construct new partition wall on 2nd fl. wall to include aluminum framed glass doors and glass side lights. sprinkler and fire alarm under separate permits, if applicable. | $30,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 550 27th St | Sure, Inc. | unit 103: partial remodel of 1 bedroom unit to 2 bedrooms unit. relocate (e) kitchen and create new bedroom. no structural work or exterior work. remodel (e) bathroom.Details
unit 103: partial remodel of 1 bedroom unit to 2 bedrooms unit. relocate (e) kitchen and create new bedroom. no structural work or exterior work. remodel (e) bathroom. | $20,000 |
| Jul 11, 2023 | Completed final sign-off Jan 2025 | 986 South Van Ness Av | Eastwood Development Incorporated | revision to approved bldg permit#2018-0914-0274, addendum# 3 arch/mep. remove 2-hours of backup power for the elevator required per cbc 1009.4. replace w/ horizontal exits per cbc 1009.2.1 exception # 1. backup power is not required if horizontal exits are provided.Details
revision to approved bldg permit#2018-0914-0274, addendum# 3 arch/mep. remove 2-hours of backup power for the elevator required per cbc 1009.4. replace w/ horizontal exits per cbc 1009.2.1 exception # 1. backup power is not required if horizontal exits are provided. | $5,000 |
| Jun 13, 2023 | Expired or cancelled expired May 2026 | 95 Nordhoff St | revision to arch 201811145858. basement: redesign bath, add new kitchen and spiral stair to 1st fl grade w/in lightwell. add t2 new gareage windows.1st fl relocate wndws,convert 1/2 bath to full.2nd fl:add full bath,fr doors in bdrm 2. add laundry.relocate main bath,closet.replace main bdrm windowsDetails
revision to arch 201811145858. basement: redesign bath, add new kitchen and spiral stair to 1st fl grade w/in lightwell. add t2 new gareage windows.1st fl relocate wndws,convert 1/2 bath to full.2nd fl:add full bath,fr doors in bdrm 2. add laundry.relocate main bath,closet.replace main bdrm windows | ||
| Jun 1, 2023 | Completed final sign-off Sep 2026 | 2960 25th Av | L Cabral Construction | 226 square foot ground & 2nd floor rear addition. remodel of existing 1st fl bedroom, laundry room and addition of full bathroom. remodel and addition to existing 2nd floor kitchen.Details
226 square foot ground & 2nd floor rear addition. remodel of existing 1st fl bedroom, laundry room and addition of full bathroom. remodel and addition to existing 2nd floor kitchen. | $120,000 |
| May 25, 2023 | In progress issued May 2024 | 235 Gellert Dr | Atom Construction Inc | to erect a 3-story, 1-unit, type v-b, single family residential building (bldg d) - sb9Details
to erect a 3-story, 1-unit, type v-b, single family residential building (bldg d) - sb9 | $600,000 |
| May 25, 2023 | In progress issued May 2024 | 245 Gellert Dr | Atom Construction Inc | :to erect a 3-story, 1-unit, type v-b, single family residential building (bldg c) - sb9 - adu under separate pa#202305258653Details
:to erect a 3-story, 1-unit, type v-b, single family residential building (bldg c) - sb9 - adu under separate pa#202305258653 | $600,000 |
| May 24, 2023 | In progress issued May 2025 | 3065 23rd St | preserve front facade of two existing multi-family/commercial bldgs. demo less 50% of the three fls & walls behind facade. merge two lots. create additional floor area to build a 9-unit multi-family bldg over residential & pdr space. horizontal & vertical additionDetails
preserve front facade of two existing multi-family/commercial bldgs. demo less 50% of the three fls & walls behind facade. merge two lots. create additional floor area to build a 9-unit multi-family bldg over residential & pdr space. horizontal & vertical addition | $800,000 | |
| May 16, 2023 | Completed final sign-off Aug 2023 | 866 Foerster St | revision to 202106243157. expand rear deck at grade. add clarification info and notes to denote existing and built conditions per inspector requests.Details
revision to 202106243157. expand rear deck at grade. add clarification info and notes to denote existing and built conditions per inspector requests. | ||
| Apr 25, 2023 | Never finaled filed Apr 2023, never issued | 2332 Clement St | to convert (e) restaurant on 2nd fl to two new residential units. add new 2nd means of exit to (e) restaurant on ground floor.Details
to convert (e) restaurant on 2nd fl to two new residential units. add new 2nd means of exit to (e) restaurant on ground floor. | $98,000 | |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 175 Frida Kahlo Wy | Build Group Inc. | 2nd fl. renovation of (e) library and accessory rooms, work to include (2) new classrooms and video studio verticle platform lift to be provided for accessibilityDetails
2nd fl. renovation of (e) library and accessory rooms, work to include (2) new classrooms and video studio verticle platform lift to be provided for accessibility | $600,000 |
| Mar 17, 2023 | Never finaled filed Mar 2023, never issued | 101 Poppy Ln | install new residential sized elevator adjacent to existing stairway.Details
install new residential sized elevator adjacent to existing stairway. | $70,000 | |
| Mar 9, 2023 | Completed final sign-off Jul 2023 | 322 Ritch St | Principal Builders Inc. | tenant improvement to include: minor non-structural demo, 2 new doors to e restrooms on 1/flr, additions to e stair & relocation of 2 e restrooms on 2/flr, demo under permit# 202302091690, new lights & plumbing in 2/flr restrooms.Details
tenant improvement to include: minor non-structural demo, 2 new doors to e restrooms on 1/flr, additions to e stair & relocation of 2 e restrooms on 2/flr, demo under permit# 202302091690, new lights & plumbing in 2/flr restrooms. | $30,000 |
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 2356 Funston Av | Building Sensibly | construct 1-hr rated corridor in garage.Details
construct 1-hr rated corridor in garage. | $4,000 |
| Feb 9, 2023 | Completed final sign-off Jul 2023 | 322 Ritch St | Principal Builders Inc. | tenant improvement non structural interior demo of vacant buildingDetails
tenant improvement non structural interior demo of vacant building | $20,000 |
| Jan 13, 2023 | Completed final sign-off May 2023 | 550 27th St | Sure, Inc. | unit 307: 1 bedroom to 2 bedrooms. relocation of (e) kitchen & create new bedroom. no structural/ exterior workDetails
unit 307: 1 bedroom to 2 bedrooms. relocation of (e) kitchen & create new bedroom. no structural/ exterior work | $15,000 |
| Dec 15, 2022 | Completed final sign-off May 2023 | 1538 Filbert St | Sure, Inc. | unit 8: interior remodel of existing 3rd florr 1 bedroom. relocate kitchen and family room. recuce size of existing bedroom.Details
unit 8: interior remodel of existing 3rd florr 1 bedroom. relocate kitchen and family room. recuce size of existing bedroom. | $5,000 |
| Oct 27, 2022 | Completed final sign-off Jun 2025 | 46 Surrey St | rev to pa# 2021-0217-4789: removed the stairs to access new storage roomDetails
rev to pa# 2021-0217-4789: removed the stairs to access new storage room | ||
| Oct 25, 2022 | Completed final sign-off Mar 2023 | 670 Lombard St | Sure, Inc. | unit #4: convert (e) 3rd fl one bdrm unit #4 to two bdrm unit. create new kitchen in existing living room. create 2 new bathrooms and closets for new bdrm. relocate (e) water heater. no structural.Details
unit #4: convert (e) 3rd fl one bdrm unit #4 to two bdrm unit. create new kitchen in existing living room. create 2 new bathrooms and closets for new bdrm. relocate (e) water heater. no structural. | $25,000 |
| Sep 16, 2022 | Completed final sign-off May 2023 | 1566 48th Av | Aquamatic Fire Protection | provide new sprinkler system throughout 3 story bldg starting @ 2 domestic water line in garage.reference bpa#201812117970.Details
provide new sprinkler system throughout 3 story bldg starting @ 2 domestic water line in garage.reference bpa#201812117970. | $2,800 |
| Sep 9, 2022 | Completed final sign-off Sep 2025 | 51 Bernard St | comply w/code enforcement case#2022-005109enf.legalized rear ground fl(6ft extension)remove pre-existing rear stairs & enclose area,change in bldg materials from siding to stucco as shown proposed elevations,conversion of planter into deck on 4th floorDetails
comply w/code enforcement case#2022-005109enf.legalized rear ground fl(6ft extension)remove pre-existing rear stairs & enclose area,change in bldg materials from siding to stucco as shown proposed elevations,conversion of planter into deck on 4th floor | $10,000 | |
| Sep 9, 2022 | Expired or cancelled withdrawn Nov 2022 | 4483 Mission St | Jeurieb Construction | to remove the (e) convience stair to rear yard.Details
to remove the (e) convience stair to rear yard. | $500 |
| Aug 11, 2022 | Expired or cancelled cancelled Jan 2026 | 681 Arguello Bl | creating new laundry area in (e) single car garage no loss of parking space as garage is not large enout to park a vehicleDetails
creating new laundry area in (e) single car garage no loss of parking space as garage is not large enout to park a vehicle | $15,000 | |
| Aug 4, 2022 | Completed final sign-off Dec 2022 | 2390 Chestnut St | Sure, Inc. | unit 302: interior remodel of (e) studio unit. relocate (e) kitchen to create new den. electrical and plumbing owrk to be performed. no structural work or alteration to street facing windows. building equipped with fire alarm system.Details
unit 302: interior remodel of (e) studio unit. relocate (e) kitchen to create new den. electrical and plumbing owrk to be performed. no structural work or alteration to street facing windows. building equipped with fire alarm system. | $15,000 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 175 Phelan Av | Build Group Inc. | interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical.Details
interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical. | $100,000 |
| Jun 16, 2022 | Completed final sign-off Jan 2023 | 3741 Buchanan St | Block 12 Construction | repair water damage in front bat windows from leaking decks above. replace in-kind all water damaged materials and finishes. all facilities are ada compliant, see pa# 201403181047 for ada upgrades.Details
repair water damage in front bat windows from leaking decks above. replace in-kind all water damaged materials and finishes. all facilities are ada compliant, see pa# 201403181047 for ada upgrades. | $15,000 |
| Jun 2, 2022 | Completed final sign-off Aug 2022 | 100 Haight St | Sure, Inc. | revision to 202203160140. relocate closet in new bedroom #2 in unit 100.Details
revision to 202203160140. relocate closet in new bedroom #2 in unit 100. | |
| May 26, 2022 | Completed final sign-off Dec 2022 | 1544 Mcallister St | Sure, Inc. | interior remodel of existing 3rd floor one bedroom unit #5 to one bedroom unit. work to include the relocation of the (e) kitchen and creation of a new office. no structural of exterior work.Details
interior remodel of existing 3rd floor one bedroom unit #5 to one bedroom unit. work to include the relocation of the (e) kitchen and creation of a new office. no structural of exterior work. | $15,000 |
| May 26, 2022 | Completed final sign-off Aug 2022 | 3700 Anza St | revision to pa# 202203160129. reduce scope of work. removing work for 1st floor.Details
revision to pa# 202203160129. reduce scope of work. removing work for 1st floor. | ||
| May 25, 2022 | Never finaled issued Jun 2022, no final | 550 27th St | Sure, Inc. | unit #306 (3rd fl): interior remodel from one-bedroom unit into two-bedroom unit. relocate existing kitchen & create 1 new bedroom. no structural or exterior work.Details
unit #306 (3rd fl): interior remodel from one-bedroom unit into two-bedroom unit. relocate existing kitchen & create 1 new bedroom. no structural or exterior work. | $15,000 |
| May 11, 2022 | Never finaled issued May 2022, no final | 1738 Lake St | Kendall S Miller Construction | revision to pa# 202103126449: reduced lowering family room slab. structural work only. proposed ceiling ht at family room to be 8'-3"+/-Details
revision to pa# 202103126449: reduced lowering family room slab. structural work only. proposed ceiling ht at family room to be 8'-3"+/- | |
| May 9, 2022 | Completed final sign-off Feb 2024 | 5030 03rd St | sidewalk over subbasement to be repaired for notice of violation. exterior work only. see sheet a1.1 for notice of violation & complaint.Details
sidewalk over subbasement to be repaired for notice of violation. exterior work only. see sheet a1.1 for notice of violation & complaint. | $15,000 | |
| May 3, 2022 | In progress issued Jun 2025 | 820 Laguna Honda Bl | L Cabral Construction | to comply with n.o.v# 202184157. legalize unpermitted 10'-0" horizontal additional to comply with code enforcement case no. 2021070708 enf. proposed new steel and glass deck. see variance application no.2020-004486var.Details
to comply with n.o.v# 202184157. legalize unpermitted 10'-0" horizontal additional to comply with code enforcement case no. 2021070708 enf. proposed new steel and glass deck. see variance application no.2020-004486var. | $200,000 |
| Apr 27, 2022 | Never finaled filed Apr 2022, never issued | 654 28th St | to demolish a 2-story, type 5b, single family building per sb-9.Details
to demolish a 2-story, type 5b, single family building per sb-9. | $25,000 | |
| Apr 27, 2022 | Never finaled filed Apr 2022, never issued | 654 28th St | to erect a 3-story, type 5b, two residential unit building per sb-9.Details
to erect a 3-story, type 5b, two residential unit building per sb-9. | $750,000 | |
| Apr 12, 2022 | Never finaled filed Apr 2022, never issued | 834 41st Av | remodel of existing two-story single family home. rear addition of 684 s.f. (114 s.f. at 1st floor and 570 s.f. at 2nd floor) to create a 516 s.f. ground floor 1 bedroom unit and a 3 bedroom 2,022 s.f. unit.Details
remodel of existing two-story single family home. rear addition of 684 s.f. (114 s.f. at 1st floor and 570 s.f. at 2nd floor) to create a 516 s.f. ground floor 1 bedroom unit and a 3 bedroom 2,022 s.f. unit. | $450,000 | |
| Apr 12, 2022 | Completed final sign-off Dec 2023 | 16 Sharp Pl | Terence Mcmahon Construction | revision to 201909202256 sr1. relocate unit 16, 18, 20 entries to fit within (e) garage door openings.Details
revision to 201909202256 sr1. relocate unit 16, 18, 20 entries to fit within (e) garage door openings. | |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 100 Haight St | Sure, Inc. | work to be in 100 haight st, half of bldg on 1st flr. interior remodel of (e) one bedroom front unit. relocate (e) kitchen to create 2 bedroom unit. electrical & plumbing work to be performed. no structural work or alteration to street facing wiindows. building has fire alarm system.Details
work to be in 100 haight st, half of bldg on 1st flr. interior remodel of (e) one bedroom front unit. relocate (e) kitchen to create 2 bedroom unit. electrical & plumbing work to be performed. no structural work or alteration to street facing wiindows. building has fire alarm system. | $25,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 3700 Anza St | A G D Construction | interior remodel of 1st & 2nd fl bathroooms. enlarge 1st fl powder room to create shower. combine 2nd fl bathroom & powder room to create full bathroom. no structural work.Details
interior remodel of 1st & 2nd fl bathroooms. enlarge 1st fl powder room to create shower. combine 2nd fl bathroom & powder room to create full bathroom. no structural work. | $20,000 |
| Feb 25, 2022 | Expired or cancelled expired Apr 2024 | 1335 Larkin St | provide a 2-hour rated horizontal separation in the corridors at flr 2-7 in lieu of back-up power. (ref permit 201403100361-s)Details
provide a 2-hour rated horizontal separation in the corridors at flr 2-7 in lieu of back-up power. (ref permit 201403100361-s) | $30,000 | |
| Feb 17, 2022 | Completed final sign-off May 2026 | 191 Gellert Dr | bldg b - to erect a 3-story, type 5a, a single family dwelling with one adu per state program. (2 units total).Details
bldg b - to erect a 3-story, type 5a, a single family dwelling with one adu per state program. (2 units total). | $600,000 | |
| Feb 17, 2022 | Completed final sign-off May 2026 | 201 Gellert Dr | James Keith Construction | bldg a - to erect a 3-story, type 5a, two dwellimg unit building.Details
bldg a - to erect a 3-story, type 5a, two dwellimg unit building. | $600,000 |
| Oct 27, 2021 | Completed final sign-off Feb 2022 | 663 10th Av | Sure, Inc. | unit 663: interior remodel of 2/f. convert existing family room to bedroom. all work in front building.Details
unit 663: interior remodel of 2/f. convert existing family room to bedroom. all work in front building. | $25,000 |
| Sep 29, 2021 | Completed final sign-off Mar 2022 | 1538 Filbert St | Sure, Inc. | apt 4: interior remodel of (e) 1/f 1 bedroom unit. relocate ktichen and 1 new bedroom to create 2 bedroom unit. no structural work.Details
apt 4: interior remodel of (e) 1/f 1 bedroom unit. relocate ktichen and 1 new bedroom to create 2 bedroom unit. no structural work. | $20,000 |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 1736 Fitzgerald Av | revision to pa 2017-1120-4402 s1 exterior loading dock stair to relocated and changed to a prefabricated metal stair. new stair to meet all code rquirementsDetails
revision to pa 2017-1120-4402 s1 exterior loading dock stair to relocated and changed to a prefabricated metal stair. new stair to meet all code rquirements | ||
| Sep 14, 2021 | Completed final sign-off Feb 2022 | 3645 17th St | Sure, Inc. | interior remodel 2nd fl unit. add new bath and enlarge wall opening between existing kitchen and sun roomDetails
interior remodel 2nd fl unit. add new bath and enlarge wall opening between existing kitchen and sun room | $12,000 |
| Sep 13, 2021 | Never finaled issued Sep 2021, no final | 678 Green St | provide concentrated seating on the stage of the theater. no exterior work to be performed.Details
provide concentrated seating on the stage of the theater. no exterior work to be performed. | $300 | |
| Sep 2, 2021 | Completed final sign-off Sep 2024 | 16 Cole St | G M M Construction Co | corrective actions for n.o.v. complaint #202180708. #2,#7,#8,#9,#10,#11. replace 2 doors with fire rated doors. install gypsum board in hallway for fire rating.Details
corrective actions for n.o.v. complaint #202180708. #2,#7,#8,#9,#10,#11. replace 2 doors with fire rated doors. install gypsum board in hallway for fire rating. | $2,000 |
| Aug 26, 2021 | Completed final sign-off Mar 2022 | 2390 Chestnut St | Sure, Inc. | interior remodel of e 1 bdrm unit 209. relocate e kitchen to create new 1 bdrm unit. int remodel of e studio unit 207. relocate e kitchen t create new den. electrical and plumbing. no structural or ext alterationsDetails
interior remodel of e 1 bdrm unit 209. relocate e kitchen to create new 1 bdrm unit. int remodel of e studio unit 207. relocate e kitchen t create new den. electrical and plumbing. no structural or ext alterations | $40,000 |
| Jul 15, 2021 | Completed final sign-off Nov 2021 | 364 Page St | Sure, Inc. | unit #26: interior remodel of 2nd fl. studio, relocate (e) kitchen to create new den & laumdery room, no structural or exterior work. bathroom remodel, replace tub with walk in shower.Details
unit #26: interior remodel of 2nd fl. studio, relocate (e) kitchen to create new den & laumdery room, no structural or exterior work. bathroom remodel, replace tub with walk in shower. | $20,000 |
| Jul 13, 2021 | Completed final sign-off Mar 2022 | 2390 Chestnut St | Sure, Inc. | unit 109 & 309: interior remode of (e) 1 bedroom units. relocate (e) kitchen to create 2 bedrooms unit 109. plumbing and electrical work to be performed. no alter to st facing windows. relocate (e) kitchen and bedroom to create new family room and maintain 1 bedroom unit 309.Details
unit 109 & 309: interior remode of (e) 1 bedroom units. relocate (e) kitchen to create 2 bedrooms unit 109. plumbing and electrical work to be performed. no alter to st facing windows. relocate (e) kitchen and bedroom to create new family room and maintain 1 bedroom unit 309. | $40,000 |
| Jul 8, 2021 | Completed final sign-off Dec 2021 | 102 Haight St | Sure, Inc. | interior remodel of extg one bedroom unit #102. relocate extg kitchen to create 2 bedroom unit. electrical and plumbing work to be performed. no structural work or alteration to street facing windows. building equipped with fire alarm system.Details
interior remodel of extg one bedroom unit #102. relocate extg kitchen to create 2 bedroom unit. electrical and plumbing work to be performed. no structural work or alteration to street facing windows. building equipped with fire alarm system. | $25,000 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 678 Green St | Wong Construction Inc | remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood.Details
remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood. | $75,000 |
| Feb 17, 2021 | Completed final sign-off Jun 2025 | 46 Surrey St | construct new 2 car garage with concrete patio above. create new master bedroom, study and bathroom in (e) basement. scope to include new windows and siding at front and rear elevations. repair, in-kind, wood stairs and 1st floor deck as needed.Details
construct new 2 car garage with concrete patio above. create new master bedroom, study and bathroom in (e) basement. scope to include new windows and siding at front and rear elevations. repair, in-kind, wood stairs and 1st floor deck as needed. | $175,000 | |
| Feb 8, 2021 | Never finaled filed Feb 2021, never issued | 1238 Twin Peaks Bl | new adu unit within new single family home single family home bpn 2021-0121-2968Details
new adu unit within new single family home single family home bpn 2021-0121-2968 | ||
| Feb 8, 2021 | Never finaled filed Feb 2021, never issued | 1234 Twin Peaks Bl | new adu unit within new single family home single family home bpn 2021-0121-2967Details
new adu unit within new single family home single family home bpn 2021-0121-2967 | ||
| Feb 8, 2021 | Never finaled filed Feb 2021, never issued | 1240 Twin Peaks Bl | new adu unit within new single family home single family home bpn 2021-0121-2969Details
new adu unit within new single family home single family home bpn 2021-0121-2969 | ||
| Jan 30, 2021 | Never finaled issued Sep 2022, no final | 2285 Jerrold Av | erect 6 stories commerical and self storage buildingDetails
erect 6 stories commerical and self storage building | $3,000,000 | |
| Jan 21, 2021 | Never finaled filed Jan 2021, never issued | 1238 Twin Peaks Bl | to erect 4 stories, 1 basement, type v-b, single family home w/ adu. adu under separate permit.Details
to erect 4 stories, 1 basement, type v-b, single family home w/ adu. adu under separate permit. | $200,000 | |
| Jan 21, 2021 | Never finaled filed Jan 2021, never issued | 1230 Twin Peaks Bl | to erect 4 stories, 1 basement, type v-b, single family home.Details
to erect 4 stories, 1 basement, type v-b, single family home. | $200,000 | |
| Oct 21, 2020 | Completed final sign-off Aug 2022 | 1254 23rd Av | Sure, Inc. | non-structural interior renovation of (e) kitchen, bathrooms and bedrooms. minor demo of non-structural interior walls, (n) plumbing, lighting & electrical. no sidewalk work to be performed.Details
non-structural interior renovation of (e) kitchen, bathrooms and bedrooms. minor demo of non-structural interior walls, (n) plumbing, lighting & electrical. no sidewalk work to be performed. | $85,000 |
| Sep 14, 2020 | Completed final sign-off Jan 2022 | 1671 47th Av | Cs Construction Co | revision to pa# 201907035100: reduction in scope of work. extend 1st fl 134 sf into rear yard under (e) 2nd fl 525 sf accessory dewlling unit added in conformance with ordinance 95-17. work to include plumbing, electrical & structural.Details
revision to pa# 201907035100: reduction in scope of work. extend 1st fl 134 sf into rear yard under (e) 2nd fl 525 sf accessory dewlling unit added in conformance with ordinance 95-17. work to include plumbing, electrical & structural. | |
| Aug 25, 2020 | Completed final sign-off Jun 2023 | 1566 48th Av | Sam Hoyer Construction Inc | construction of an adu unit per ord#95-17. a bpa # 2018-1211-7970 has already been filed to add a residential unit to the existing single family home. cost of construction is already included in the original bpa. the adu would be the 3rd unit.Details
construction of an adu unit per ord#95-17. a bpa # 2018-1211-7970 has already been filed to add a residential unit to the existing single family home. cost of construction is already included in the original bpa. the adu would be the 3rd unit. | |
| Aug 22, 2020 | Never finaled issued Sep 2020, no final | 175 Phelan Av | Build Group Inc. | mechanical and electrical work. architecture under 202006098293Details
mechanical and electrical work. architecture under 202006098293 | $15,000 |
| Jul 23, 2020 | Completed final sign-off Feb 2023 | 320 Ritch St | revision to 201408042929 to address planning enforcement 201408042929 to address planning enforcement 2018-000774 by documenting existing office use at 2nd floor and change of use and occupancy from pdr to office use on ground floor. maher not req route to xinyu liangDetails
revision to 201408042929 to address planning enforcement 201408042929 to address planning enforcement 2018-000774 by documenting existing office use at 2nd floor and change of use and occupancy from pdr to office use on ground floor. maher not req route to xinyu liang | ||
| Jul 22, 2020 | Completed final sign-off Mar 2021 | 713 Rhode Island St | Saturn Construction Co | kitchen interior remodel and new skylight.Details
kitchen interior remodel and new skylight. | $25,000 |
| Jul 22, 2020 | Never finaled issued Jan 2021, no final | 575 Crestlake Dr | Henry J Rabbitt & Sons Inc | interior remodel consisting of relocation of laundry, enlargement of family room, interior stair relocation and addition of a full bathroom on 1/f. split level to include kitchen remodel. removal of half bath, and relocation of interior stair to 1/f, 2/f to include new full bathroom, master bathroomDetails
interior remodel consisting of relocation of laundry, enlargement of family room, interior stair relocation and addition of a full bathroom on 1/f. split level to include kitchen remodel. removal of half bath, and relocation of interior stair to 1/f, 2/f to include new full bathroom, master bathroom | $75,000 |