Block 0840, lot 006
364 Page St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 22
- Rooms
- 22 bathrooms
- Building
- 18,900 sq ft
- Lot
- 6,899 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2025 | In progress issued Oct 2025 | 364 Page St | Sure, Inc. | minor dry rot repair at the rear wooden staircase approx 5% and non street facingDetails
minor dry rot repair at the rear wooden staircase approx 5% and non street facing | $2,500 |
| Sep 13, 2024 | Completed final sign-off Dec 2024 | 364 Page St | Sure, Inc. | unit 9 convert existing 1 bedroom unit to a 2 bedroom unit. no structural work. no exterior work.Details
unit 9 convert existing 1 bedroom unit to a 2 bedroom unit. no structural work. no exterior work. | $30,000 |
| Jan 21, 2022 | Completed final sign-off Mar 2022 | 364 Page St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $30,000 |
| Jul 30, 2021 | Completed final sign-off Nov 2021 | 364 Page St | Sure, Inc. | unit #35: kitchen and bath remodel, no change to layout, replace tub with new shower in bath room, kitchen 50sf bath 45sfDetails
unit #35: kitchen and bath remodel, no change to layout, replace tub with new shower in bath room, kitchen 50sf bath 45sf | $34,000 |
| Jul 15, 2021 | Completed final sign-off Nov 2021 | 364 Page St | Sure, Inc. | unit #26: interior remodel of 2nd fl. studio, relocate (e) kitchen to create new den & laumdery room, no structural or exterior work. bathroom remodel, replace tub with walk in shower.Details
unit #26: interior remodel of 2nd fl. studio, relocate (e) kitchen to create new den & laumdery room, no structural or exterior work. bathroom remodel, replace tub with walk in shower. | $20,000 |
| Jun 7, 2021 | Never finaled filed Jun 2021, never issued | 364 Page St | Crime Watch Security Sys Llc | new installation of fire alarm system: (1) fire alarm control unit ifp-75, (1) new wireless communicator, (1) monitor module, (1) power supply, (3) manual pull stations, (9) smoke detectors, (4) wall mounted horn strobes, and (37_ new low frequency soundersDetails
new installation of fire alarm system: (1) fire alarm control unit ifp-75, (1) new wireless communicator, (1) monitor module, (1) power supply, (3) manual pull stations, (9) smoke detectors, (4) wall mounted horn strobes, and (37_ new low frequency sounders | $34,321 |
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 364 Page St | Sure, Inc. | unit #39: interior remodel of 3rd floor one bedroom unit. relocate existing kitchen to create new bedroom. convert existing bathtub to shower. no structural or exterior work.Details
unit #39: interior remodel of 3rd floor one bedroom unit. relocate existing kitchen to create new bedroom. convert existing bathtub to shower. no structural or exterior work. | $10,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 364 Page St | Sure, Inc. | interior remodel of unit #6 on first. new kitchen cabinets and counters, new bathroom fixtures and finishes. no exterior work. convert studio into 1 bedroom. no sprinkler or fire alarm work.Details
interior remodel of unit #6 on first. new kitchen cabinets and counters, new bathroom fixtures and finishes. no exterior work. convert studio into 1 bedroom. no sprinkler or fire alarm work. | $50,000 |
| Nov 7, 2017 | Completed final sign-off Jan 2018 | 364 Page St | Sure, Inc. | interior remodel of 1st fl studio unit 2. relocate existing kitchen to create 1 bedroom. no structural work or window alteration. plumbing and elec work to be performedDetails
interior remodel of 1st fl studio unit 2. relocate existing kitchen to create 1 bedroom. no structural work or window alteration. plumbing and elec work to be performed | $30,000 |
| Oct 11, 2017 | Completed final sign-off Dec 2017 | 364 Page St | Sure, Inc. | #21- replace kitchen counter tops & all appliances, remodel bath room.Details
#21- replace kitchen counter tops & all appliances, remodel bath room. | $25,000 |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 364 Page St | Sure, Inc. | 3/f #28- convert studio into a one bedroom unit, relocate kitchen & remodel bathroom. electrical & plumbing work to be performed. no structural work, (e) windows to remain.Details
3/f #28- convert studio into a one bedroom unit, relocate kitchen & remodel bathroom. electrical & plumbing work to be performed. no structural work, (e) windows to remain. | $35,000 |
| Jul 13, 2017 | Completed final sign-off Oct 2017 | 364 Page St | Sure, Inc. | #8: converting 2nd floor studio unit #8 in 22 unit bldg into a one bedroom unit. relocate kitchen and remodel bathoom. electrical and plumbing work to be performed. no structural work to be performed, extg windows to remain. n/a for maher.Details
#8: converting 2nd floor studio unit #8 in 22 unit bldg into a one bedroom unit. relocate kitchen and remodel bathoom. electrical and plumbing work to be performed. no structural work to be performed, extg windows to remain. n/a for maher. | $25,000 |
| Nov 17, 2016 | Completed final sign-off Apr 2017 | 364 Page St | Sure, Inc. | kitchen & bathroom remodeling, no alteration of walls , windows & doors, unit # 34Details
kitchen & bathroom remodeling, no alteration of walls , windows & doors, unit # 34 | $30,000 |
| Oct 27, 2016 | Expired or cancelled cancelled Jan 2026 | 364 Page St | Sure, Inc. | #34 interior renovation to add one unit of studio apartment. turn unit 34 - 2bed/1bath into 34a with 2 bed/2 baths & 34b studio.Details
#34 interior renovation to add one unit of studio apartment. turn unit 34 - 2bed/1bath into 34a with 2 bed/2 baths & 34b studio. | $50,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2016 | 364 Page St | Sure, Inc. | soft story retrofit per sfbc chapter 34b "2012 iebc appendix a-4." comliance with mandatory soft story retrofit program, 2013 sfbc sec 34b & 2012 iebc appx a4.Details
soft story retrofit per sfbc chapter 34b "2012 iebc appendix a-4." comliance with mandatory soft story retrofit program, 2013 sfbc sec 34b & 2012 iebc appx a4. | $70,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 364 Page St | Sure, Inc. | unit 37 - replace kitchen caboinets & countertops; replace bathtub & tiles in bathroom ; relocate closet; replac4e vanity & medicine cabinets; no structural work; to comply with cec150.0(k)3 & 5Details
unit 37 - replace kitchen caboinets & countertops; replace bathtub & tiles in bathroom ; relocate closet; replac4e vanity & medicine cabinets; no structural work; to comply with cec150.0(k)3 & 5 | $15,000 |
| May 7, 2014 | Never finaled issued May 2014, no final | 364 Page St | Art General Roofing | reroofing | $24,000 |
| Nov 22, 2013 | Completed final sign-off Feb 2014 | 364 Page St | Sure, Inc. | replace kitchen cabinets & countertops, replace bathtub & tiles in bathroom, replace vanity in unit # 31Details
replace kitchen cabinets & countertops, replace bathtub & tiles in bathroom, replace vanity in unit # 31 | $18,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 364 Page St | street space | ||
| Jan 24, 2013 | Completed final sign-off Feb 2013 | 364 Page St | Sure, Inc. | replace/repair dryrot at rear stairs, less than 50% in kind. must maintain required means of egress at all times.Details
replace/repair dryrot at rear stairs, less than 50% in kind. must maintain required means of egress at all times. | $8,000 |
| Jan 17, 2012 | Completed final sign-off Jan 2012 | 364 Page St | Sure, Inc. | replace broken brick at front of bldg. by car. repalce damaged wood works at garage area. replace in kind. no structural work.Details
replace broken brick at front of bldg. by car. repalce damaged wood works at garage area. replace in kind. no structural work. | $3,000 |
| Nov 30, 2010 | Completed final sign-off Feb 2011 | 364 Page St | Sure, Inc. | #29- 1 kitchen- replace kitchen cabinets. 1 bath - replace bathtub, lighting to comply w/cec 150(k), replace tiles in tub enclosure, no change to exterior, replace vanity & medicine cabinet. no change to windows, door or change of walls.Details
#29- 1 kitchen- replace kitchen cabinets. 1 bath - replace bathtub, lighting to comply w/cec 150(k), replace tiles in tub enclosure, no change to exterior, replace vanity & medicine cabinet. no change to windows, door or change of walls. | $12,000 |
| Apr 22, 2010 | Completed final sign-off Jun 2010 | 364 Page St | Sure, Inc. | unit #35: replace kitchen cabinets & counter;replace bathtub;replace tiles for tub enclosure (bathroom);replace vanity & medicine cabinetDetails
unit #35: replace kitchen cabinets & counter;replace bathtub;replace tiles for tub enclosure (bathroom);replace vanity & medicine cabinet | $10,000 |
| Dec 23, 2009 | Completed final sign-off Mar 2010 | 364 Page St | Sure, Inc. | unit # 22. replace bathtub, tiles, vanity. kitchen cabinets. new lighting.Details
unit # 22. replace bathtub, tiles, vanity. kitchen cabinets. new lighting. | $12,000 |
| Feb 6, 2009 | Completed final sign-off Feb 2009 | 364 Page St | Sure, Inc. | install 5/8 threaded rod with epoxy to anchor sill plate to foundation for entire building perimeter. rods installed every 4 feet maximum,2 per plate,within 12" of end of plate with minimum 7" embedment.Details
install 5/8 threaded rod with epoxy to anchor sill plate to foundation for entire building perimeter. rods installed every 4 feet maximum,2 per plate,within 12" of end of plate with minimum 7" embedment. | $3,000 |
| Jan 13, 2009 | Completed final sign-off Mar 2009 | 364 Page St | Sure, Inc. | work @ unit# 9 only. kitchen alteration to include new cabinets and countertop. replace tile in bathtub enclosure. new vanity.Details
work @ unit# 9 only. kitchen alteration to include new cabinets and countertop. replace tile in bathtub enclosure. new vanity. | $10,000 |
| Nov 29, 2006 | Completed final sign-off Feb 2007 | 364 Page St | Sure, Inc. | work @ unit# 2. replace kitchen cabinets, replace tiles in bathtub enclosure. replace bath vanity. replace bath medicine cabinet. flourescent lighting. one bathroom. 1 kitchen.Details
work @ unit# 2. replace kitchen cabinets, replace tiles in bathtub enclosure. replace bath vanity. replace bath medicine cabinet. flourescent lighting. one bathroom. 1 kitchen. | $13,500 |
| Jan 10, 2005 | Completed final sign-off Feb 2005 | 364 Page St | Sure, Inc. | replace kitchen cabinets. replace bath pedestal in unit 25 only.Details
replace kitchen cabinets. replace bath pedestal in unit 25 only. | $11,000 |
| Dec 3, 2004 | Completed final sign-off Feb 2005 | 364 Page St | Sure, Inc. | replace kchn cabnts/replace bth vanity and mefdicine cbntsDetails
replace kchn cabnts/replace bth vanity and mefdicine cbnts | $11,000 |
| May 24, 2004 | Completed final sign-off Jul 2004 | 364 Page St | Lara Construction Co. | #4- remove (e)kit.cabinets,install new kit.cabinets & counter,no structural walls removedDetails
#4- remove (e)kit.cabinets,install new kit.cabinets & counter,no structural walls removed | $5,500 |
| Oct 14, 2003 | Completed final sign-off Nov 2003 | 364 Page St | Lara Construction Co. | #39-remove (e)kit.cabinet/counter,install new kit cabinet,laminate coutner top,replace bathtub tilesDetails
#39-remove (e)kit.cabinet/counter,install new kit cabinet,laminate coutner top,replace bathtub tiles | $6,800 |
| Jul 10, 2002 | Completed final sign-off Jul 2002 | 364 Page St | Lara Construction Co. | repair dryrotted rear stairs, replace 1 stringer, replace 9-12 steps under 50% repair in kindDetails
repair dryrotted rear stairs, replace 1 stringer, replace 9-12 steps under 50% repair in kind | $2,500 |
| Jan 16, 2002 | Completed final sign-off Mar 2002 | 364 Page St | Bellcore Construction Inc | replace kitchen cabinets,sink & countertops unit#24. no structural work.Details
replace kitchen cabinets,sink & countertops unit#24. no structural work. | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (25), Lara Construction Co. (3), Crime Watch Security Sys Llc (2), Art General Roofing, Bellcore Construction Inc
- Architects
- Anthony Pantaleoni (2), Anthony Pantaleoni, Jacob Herczeg, Stacy Lin
- Engineers
- Donald David
- Designers
- Stacy Lin, Stewart Toy
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.