David G. Kallmeyer
- Listed as
- architect, engineer
- Firm
- Gfds Engineers
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Oct 2026
95 permits since 2000 (engineer on 89 permits, architect on 7 permits): 56 completed, 17 in progress, 11 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 101 Walnut St | revision to pa 202511139490 includes revised t24 minor architectural changes @ 1st level; and minor structural revision to levels 1,2, and 3Details
revision to pa 202511139490 includes revised t24 minor architectural changes @ 1st level; and minor structural revision to levels 1,2, and 3 | ||
| Aug 6, 2026 | In progress issued Sep 2026 | 4068 Cesar Chavez St | Distinctive Designs Californias Remodeli | revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof.Details
revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof. | |
| Aug 3, 2026 | In progress issued Aug 2026 | 3756 Jackson St | Clayton Timbrell & Co | to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress.Details
to comply with notice of correction 202205254937 dated 5/12/26 replace stairs @ rear yard as means of egress. | $20,603 |
| Jun 11, 2026 | In progress issued Jul 2026 | 2101 Divisadero St | Mueller Nicholls Inc | top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows.Details
top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows. | $293,560 |
| Apr 27, 2026 | In progress issued Apr 2026 | 2934 Broderick St | Toolbox, K L Construction | 2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement.Details
2nd floor kitchen and powderroom renovation, 2nd floor rear deck replacement and expansion, 2nd floor reardeck stairs to rear yard. select rear yard facing door and window replacement. | $79,000 |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 3145 Jackson St | revisiom to bpa:201810102850 s1-r1 - revise interior stair layout + elevator size, replace approved laundry with new bedroom/bath, remove approved spa, replace with laundry.Details
revisiom to bpa:201810102850 s1-r1 - revise interior stair layout + elevator size, replace approved laundry with new bedroom/bath, remove approved spa, replace with laundry. | $10,000 | |
| Feb 27, 2026 | In progress issued Mar 2026 | 3828 Jackson St | Plath & Company Inc | revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwellDetails
revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural slab in accordance with geotech req'd per supplemental letter. removal of (e) windows and lightwell | $100,000 |
| Feb 11, 2026 | In progress issued Apr 2026 | 4068 Cesar Chavez St | Christopher Gate Construction Inc | remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof.Details
remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof. | $120,000 |
| Dec 11, 2025 | In progress issued Apr 2026 | 101 Walnut St | Moroso Construction Inc | interior renovation. 1st flr excavation to expand (e) south wall. structural work (n) retaining walls and (n) 1st flr slab on grade. (n) mech equipment.Details
interior renovation. 1st flr excavation to expand (e) south wall. structural work (n) retaining walls and (n) 1st flr slab on grade. (n) mech equipment. | $900,000 |
| Nov 14, 2025 | In progress issued Jan 2026 | 461 Pacific Av | Two Bricks Design Build | exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/inclineDetails
exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/incline | $204,250 |
| Oct 8, 2025 | In progress issued Oct 2025 | 2799 Broadway | Van Acker Const Assoc Inc | revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprintDetails
revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprint | $48,000 |
| Sep 30, 2025 | In progress issued Nov 2025 | 2600 Green St | Colindres & Associates | revision to permit 202406204927 and 202409090314. relocate previously approved roofdeck. delete previously approved rollamatic retractable skylight and interior spiral stair.Details
revision to permit 202406204927 and 202409090314. relocate previously approved roofdeck. delete previously approved rollamatic retractable skylight and interior spiral stair. | |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 1908 Broadway | Bradford Construction | entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft.Details
entry level - remove wall between kitchen and dining. remodel kitchen. move powder room. reconfigure lower stairs. upper level - remodel master bath and bedroom. add 1 new bedroom. no exterior work. no new sq.ft. | $210,000 |
| Dec 27, 2024 | Completed final sign-off Jun 2025 | 2799 Broadway | Van Acker Const Assoc Inc | revision 202411054446- waterproofing repair on (e) property line wall. ioncludes repalcement of (e) wood framed wall (12'wx10'h) with shotcrete and (n) membrance with drainage. ref 202412056269.Details
revision 202411054446- waterproofing repair on (e) property line wall. ioncludes repalcement of (e) wood framed wall (12'wx10'h) with shotcrete and (n) membrance with drainage. ref 202412056269. | |
| Sep 27, 2024 | In progress issued Feb 2025 | 2600 Green St | Colindres & Associates | revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath.Details
revision to pa# 202406204927. relocate skylight & roof access. windows. 1st fl: bath remodel & (n) full bathroom at gym. 2nd fl: powder rm remodel. (n) kitchen cabinets, countertops, appliances, plumbing. replace (e) living room fireplace. 3rd fl: remodel 3 baths. 4rd fl: remodel 1 bath. | $923,500 |
| Aug 20, 2024 | Completed final sign-off Oct 2025 | 3075 Pacific Av | Upscale Construction Inc. | remodel to an (e) 2 story single family dwelling. project consists of an interior remodel of both floor levels, replacment of windows and exterior doors, new rear yard deck and landscaping.no increase of in bldg conditioned area,volume or size.Details
remodel to an (e) 2 story single family dwelling. project consists of an interior remodel of both floor levels, replacment of windows and exterior doors, new rear yard deck and landscaping.no increase of in bldg conditioned area,volume or size. | $200,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 45 Walnut St | Carroll Construction | 1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet toDetails
1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet to | $185,000 |
| Jul 18, 2024 | In progress issued Nov 2025 | 461 Pacific Av | Two Bricks Design Build, Bbc Construction Inc. | interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousureDetails
interior work only. replacement of (e) non-compliant stairs. removal of (e) non-bearing interior walls. 1 hour fire rated stair enclousure | $138,000 |
| Jun 26, 2024 | Completed final sign-off May 2025 | 870 Ashbury St | Ventana 76 | main level, recessed cans, remove & replace windows in family room. 2nd fl: redo hall bathroom shower & main bath floor & toilet. reproof deck & add tile. (n) recessed cans in 3 bedrooms. add (n) window to 1 bedroom.(n) hot water heater on 2nd fl. replace windows throughout. no work on 3rd fl.Details
main level, recessed cans, remove & replace windows in family room. 2nd fl: redo hall bathroom shower & main bath floor & toilet. reproof deck & add tile. (n) recessed cans in 3 bedrooms. add (n) window to 1 bedroom.(n) hot water heater on 2nd fl. replace windows throughout. no work on 3rd fl. | $250,000 |
| Apr 4, 2024 | Expired or cancelled expired Jan 2026 | 2 Belgrave Av | Dan Gillies Construction Services Inc | ref 202102245264- upgrade to (e) grade beam, voluntary upgrade.Details
ref 202102245264- upgrade to (e) grade beam, voluntary upgrade. | $10,000 |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 499 Jackson St | Trainor Commercial Construction Inc. | 5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit.Details
5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit. | $500,000 |
| Aug 3, 2023 | In progress issued May 2024 | 51 Lopez Av | Carroll Construction | 1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall.Details
1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall. | $15,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2026 | 3636 Clay St | Clayton Timbrell & Co | rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation.Details
rev pa# 202304196036, structural upgrades, interior renovation , increased basement floor area, interior reconfiguration of 1st , 2nd and 3rd flrs and exterior opening modifications at north elevation. | $400,000 |
| May 31, 2023 | Expired or cancelled cancelled Jan 2026 | 3501 Clay St | Thompson Suskind L P | revision to permit 202108045807. remove foundation work from proposed scope.Details
revision to permit 202108045807. remove foundation work from proposed scope. | |
| Apr 26, 2023 | Expired or cancelled cancelled Jan 2026 | 2509 Broadway | Citywest Construction Inc. | rear yard garden & landscape improvements. new retaining wall & stair; general repairs & upgrade to existing yard; new outdoor cooking fixtures; new fire pits (2); no work on residenceDetails
rear yard garden & landscape improvements. new retaining wall & stair; general repairs & upgrade to existing yard; new outdoor cooking fixtures; new fire pits (2); no work on residence | $187,940 |
| Apr 18, 2023 | Completed final sign-off Oct 2023 | 1138 Union St | B M D C Llc | rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remainDetails
rev to pa# 2022-0524-4885 brick wall in master bedroom of unit 1138 to remain | |
| Feb 1, 2023 | Completed final sign-off Aug 2024 | 1554 Masonic Av | Rico's General Construction | rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set)Details
rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set) | $10,000 |
| Jan 12, 2023 | Completed final sign-off Nov 2024 | 2628 Broderick St | Scott & Warner Builders Inc | kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace.Details
kitchen & bathrooms remodel. replace finishes including flooring & some lighting. replace furnace. | $50,000 |
| Nov 29, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | Edgewood Builders Inc | revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852Details
revised shear wall nailing & locations. revised sheets: s0.0, s0.1, s2.1, s2.2, s2.3, s2.4, s3.1, s8.2, s8.4, s8.6 & s8.8. pa# 201908158852 | |
| Oct 31, 2022 | Expired or cancelled cancelled Jan 2026 | 231 24th Av | Osmun Construction | new foundation at side alley on 1st fl. new enlarged pantry on 2nd fl. kitchen cabinetry improvements on 2nd fl. no change on 3rd fl.Details
new foundation at side alley on 1st fl. new enlarged pantry on 2nd fl. kitchen cabinetry improvements on 2nd fl. no change on 3rd fl. | $23,273 |
| Oct 14, 2022 | Never finaled issued Mar 2023, no final | 11 Yerba Buena Av | O'neill Construction | remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rearDetails
remodel master bedroom rear doors and closets. replace lower rear french doors. front porch remodel and replace french door at rear | $90,000 |
| Sep 21, 2022 | In progress issued Nov 2023 | 490 Avila St | Dowbuilt Inc. | interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade.Details
interior revised floor plans. updates to fixtures & finishes. updated lighting & power throughout. structural improvements to foundations at some locations. exterior work includes modifications to several windows & doors. replace windows in-kind at upper levels. infill (e) lightwell on east facade. | $1,500,000 |
| Aug 11, 2022 | Completed final sign-off May 2024 | 2505 Pacific Av | Colindres & Associates | swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower sDetails
swap out tub for standing shower- demo existing stairs to level 1 and reverse direction, demo stair wall, demo wall to (e) dark room. level 1: replace kitchen cabinets in kind, expand kitchen wall out into stair wall construct (n) wet bar . l/2 replace plumb fixtures and relocate toiler and shower s | $100,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement.Details
ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement. | $350,000 |
| Jun 24, 2022 | Completed final sign-off Dec 2023 | 3421 Jackson St | Van Acker Const Assoc Inc | voluntary structural upgrade replacing (e) brink foundations, basement renovation, convert crawl space to (n) laundry room adding 124 sf. no exterior work or changesDetails
voluntary structural upgrade replacing (e) brink foundations, basement renovation, convert crawl space to (n) laundry room adding 124 sf. no exterior work or changes | $200,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2023 | 3466 21st St | Moroso Construction Inc | revision to 202011058337. add new exterior wall and gate at east side yardDetails
revision to 202011058337. add new exterior wall and gate at east side yard | |
| May 25, 2022 | In progress issued Apr 2024 | 3756 Jackson St | Clayton Timbrell & Co | renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes **Details
renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes ** | $1,200,000 |
| May 24, 2022 | Completed final sign-off Dec 2023 | 3421 Jackson St | Van Acker Const Assoc Inc | renovate 2nd floor. enlarge 1 rear yard facing window. replace 1 lightwell window.Details
renovate 2nd floor. enlarge 1 rear yard facing window. replace 1 lightwell window. | $250,000 |
| May 24, 2022 | Completed final sign-off Oct 2023 | 1136 Union St | B M D C Llc | interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142.Details
interior remodel @ 2nd fl - layout change and kitchen remodel; no exterior envelope changes; relocating skylights on 3rd fl; new voluntary structural strengthening . unit 1140 and 1142 merged under bpa 9908287 resulting in only unit 1142. | $73,750 |
| May 19, 2022 | Completed final sign-off Aug 2023 | 246 Eureka St | Edgewood Builders Inc | revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details.Details
revision to pa# 201908158852. foundation revision. new perimeter foundation. new foundation details. | $2,000 |
| Apr 6, 2022 | Completed final sign-off Oct 2023 | 3500 Jackson St | Upscale Construction Inc. | rev to pa 201907166022 and 201912129405 to documetn structural rev required during course of construction.Details
rev to pa 201907166022 and 201912129405 to documetn structural rev required during course of construction. | |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 106 Presidio Av | Van Acker Const Assoc Inc | revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect.Details
revision to pa# 202104219077. changes are architect of record, guardrail attachment and general contractor & arcitect. | |
| Feb 9, 2022 | Never finaled issued May 2023, no final | 51 Lopez Av | Carroll Construction | 1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind.Details
1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind. | $385,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2023 | 2511 Pacific Av | repair of existing permit front stairs & small modification of interior garage space.Details
repair of existing permit front stairs & small modification of interior garage space. | $75,000 | |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 2431 Filbert St | Bryan Michelsen Construction | hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019Details
hand dun underpinning piers @ east side, based on geotechnical report by rollo & ridley, dated 5/3/2019 | $20,000 |
| Nov 4, 2021 | Expired or cancelled expired Feb 2023 | 565 Belvedere St | D V Rasmussen & Son Inc. | new deck guardrails for an existing roof deck.Details
new deck guardrails for an existing roof deck. | $20,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures.Details
conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures. | $1,100,000 |
| Apr 21, 2021 | Completed final sign-off Aug 2022 | 106 Presidio Av | Mcmullen Builders | to construct new 500 sq.ft roof deck. accessed by unit 106 onlyDetails
to construct new 500 sq.ft roof deck. accessed by unit 106 only | $85,000 |
| Apr 5, 2021 | Expired or cancelled withdrawn Jul 2021 | 200 Green St | Maven Maintenance Inc | addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris.Details
addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris. | $16,000 |
| Mar 24, 2021 | Never finaled issued Sep 2022, no final | 2825 Broadway | Brian Mac Namara Construction, Excel Site Services Inc | extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line.Details
extension of (e) single family elevator to serve top 2 levels. replace (e) elevator. work also includes modification to adjacent dormer and attic level roof line. | $50,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | create nook in (e) retaining wall for utility maters.Details
create nook in (e) retaining wall for utility maters. | $4,000 |
| Nov 20, 2020 | Completed final sign-off Jun 2022 | 3450 21st St | Moroso Construction Inc | underpin property line wall due to foundation work at 3466 21st street - pa 202011058337. approx 28 lf of underpinning.Details
underpin property line wall due to foundation work at 3466 21st street - pa 202011058337. approx 28 lf of underpinning. | |
| Nov 5, 2020 | Completed final sign-off Nov 2022 | 3466 21st St | Moroso Construction Inc | revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design.Details
revision #3 to pa# 2018-0911-9773 s4 regarding east and north property line wall structural foundation and design. | $25,000 |
| Oct 14, 2020 | Completed final sign-off Dec 2021 | 1900 Pierce St | Jeff King And Company Inc | renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade.Details
renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade. | $600,000 |
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 2324 Pacific Av | Upscale Construction Inc. | revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements.Details
revisions to pa#'s 2019-08-20-9253 & 2020-01-29-3017: replace first and fourth floor windows and misc minor exterior improvements. | $1,000,000 |
| Aug 17, 2020 | Completed final sign-off Oct 2021 | 1658 48th Av | S F Garage Company Inc. | foundation repair and replacement in-kind.Details
foundation repair and replacement in-kind. | $10,000 |
| Mar 5, 2020 | Expired or cancelled withdrawn Oct 2020 | 71 Water St | E W Lum Construction Co | revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams.Details
revision to permit #201701268036. change front & rear facades from painted redwood to stucco. revise (e) structural plans to includes (e) moment frame & other structural beams. | |
| Mar 3, 2020 | Completed final sign-off Jun 2020 | 2845 Union St | volunary seismic improvement - addition of connectors to existing interior posts & existing concrete spread footings, addition of concrete rat slab in existing crawl space/basement w.sub-slab drainage. enlarge access opening, stair repair.Details
volunary seismic improvement - addition of connectors to existing interior posts & existing concrete spread footings, addition of concrete rat slab in existing crawl space/basement w.sub-slab drainage. enlarge access opening, stair repair. | $50,000 | |
| Jan 31, 2020 | Expired or cancelled expired Feb 2023 | 565 Belvedere St | D V Rasmussen & Son Inc. | revision to pa 2018-0919-0766 minor foundation revision.Details
revision to pa 2018-0919-0766 minor foundation revision. | $100 |
| Jan 28, 2020 | Completed final sign-off Jun 2020 | 1402 Kearny St | B M D C Llc | voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed wallsDetails
voluntary seismic improvement @ basement/garage floor only, including the addition o f plywood shear & fasteners to (e) wood-framed walls | $10,000 |
| Jan 14, 2020 | Completed final sign-off Oct 2022 | 115 Jordan Av | Carroll Construction | voluntary structural upgrade and to extend existing basement.Details
voluntary structural upgrade and to extend existing basement. | $30,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 2526 Broadway | Joseph Ward General Contractor | revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles.Details
revision to pa# 201908209358 and 201908017616. work to include (5) new skylights at 407 dining room and (1) new skylight at 403 bath. structural revisions to skylight layout included in scope. electrical change on rcp include additional lights fixtures, switches and receptacles. | $7,000 |
| Nov 27, 2019 | Completed final sign-off Jun 2022 | 3746 Jackson St | Scott & Warner Builders Inc | to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail.Details
to replace existing wooden deck and stair with new translucent glass deck, stone stair and glass guardrail. | $30,000 |
| Nov 20, 2019 | Completed final sign-off Jan 2022 | 3838 Clay St | Cairn Construction, Nolan Construction Inc | to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade.Details
to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade. | $800,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2021 | 2526 Broadway | Joseph Ward General Contractor | renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights.Details
renovation of condo unti withing a 6 unit bldg. condo is on 3rd & 4th fl of 4-story bldg. no work on 1st & 2nd fl. scope includes selective demo & partial renovation of condo unit. new kitchen & bathroom fixtures. replacement of rear window on 4th fl. total of 5 proposed skylights. | $40,000 |
| Jul 24, 2019 | Completed final sign-off Oct 2020 | 147 Laidley St | Van Acker Const Assoc Inc | framing upgrade at (e) skylight opening. (n) framing to replace (e) insufficient roof framing members.Details
framing upgrade at (e) skylight opening. (n) framing to replace (e) insufficient roof framing members. | $2,500 |
| Jun 19, 2019 | Completed final sign-off Jan 2021 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | structural upgrades to (e) deck and conditioning of (e) garage house. no changes to building envelope. new deck guard railing to meet current building standards. existing deck surface surface to be replaced in-kind. reinforcement of (e) stairs. re-grading of garden rrof area for correct drainage.Details
structural upgrades to (e) deck and conditioning of (e) garage house. no changes to building envelope. new deck guard railing to meet current building standards. existing deck surface surface to be replaced in-kind. reinforcement of (e) stairs. re-grading of garden rrof area for correct drainage. | $45,000 |
| Jan 23, 2019 | Completed final sign-off Dec 2019 | 135 Parker Av | Thompson Suskind L P | new windows, new exterior entry doors, new garage door at front facade. new stone veneer at bottom story front facade. install new steel trowl smooth finish to remainder of front facade. install metal edge detail at roof and new light at entryDetails
new windows, new exterior entry doors, new garage door at front facade. new stone veneer at bottom story front facade. install new steel trowl smooth finish to remainder of front facade. install metal edge detail at roof and new light at entry | $50,000 |
| Dec 21, 2018 | Completed final sign-off Dec 2019 | 135 Parker Av | Thompson Suskind L P | revision to pa# 2018/03/02/2647. revised bathroom, stairs, add 1 bathroom, windows, doors, closets. added elevations, lighting, outlets, plumbing fixture schedule, finish plans, revised deck guard.Details
revision to pa# 2018/03/02/2647. revised bathroom, stairs, add 1 bathroom, windows, doors, closets. added elevations, lighting, outlets, plumbing fixture schedule, finish plans, revised deck guard. | |
| Apr 19, 2018 | Completed final sign-off Jun 2019 | 465 Tehama St | J P F Construction | existing industrial space: rebuild floors as noted in plans,construct new accesible bathrooms, add platform lift. demo floor between first and second floor. remove (e) skylight, replace w/ (n) skylight. full sprinkler system under seperate permit. no change in use, replace garage doors, restore allDetails
existing industrial space: rebuild floors as noted in plans,construct new accesible bathrooms, add platform lift. demo floor between first and second floor. remove (e) skylight, replace w/ (n) skylight. full sprinkler system under seperate permit. no change in use, replace garage doors, restore all | $360,000 |
| Jan 10, 2018 | Completed final sign-off Apr 2026 | 71 Water St | E W Lum Construction Co | add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a **Details
add one (n) adu on 1st flr garage using ord 162-16. relocate electric & gas meters. (n) tankless water heater. (n) bike parking & storage on 1st flr. (n) electrical & plumbing. remove (e) curb cut on sidewalk. ref #2017-0126-8036 re: units 1-3. ** maher: n/a ** | $100,000 |
| Dec 6, 2017 | Completed final sign-off Feb 2019 | 364 Bush St | Cal C A D E Construction Inc | expansion of (e) restaurant into adjoining space, construct new bar in adjoining space, new accessible restrooms, expand existing kitchen, expand basement, new fire sprinklers throughout.Details
expansion of (e) restaurant into adjoining space, construct new bar in adjoining space, new accessible restrooms, expand existing kitchen, expand basement, new fire sprinklers throughout. | $225,000 |
| Sep 22, 2017 | Expired or cancelled cancelled Jan 2026 | 364 Bush St | basement- removal of (e) brick retaining wall and new support post. all work in basement.Details
basement- removal of (e) brick retaining wall and new support post. all work in basement. | $15,000 | |
| Apr 18, 2017 | Never finaled issued Jun 2017, no final | 2255 Octavia St | Jeff King And Company Inc | structural upgrade of (e) foundation. (e) basement slab to be removed, excavation of soil to lower floor 2ft to have 9ft clearance below (e) first floor framing. install new peirs, footings & stem wall to reinforce (e) foundation. space to remain storage.Details
structural upgrade of (e) foundation. (e) basement slab to be removed, excavation of soil to lower floor 2ft to have 9ft clearance below (e) first floor framing. install new peirs, footings & stem wall to reinforce (e) foundation. space to remain storage. | $75,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2018 | 3639 Washington St | Stroub Construction | new interior concrete wall, full bathroom, partition wall. 1 hr separation at ceiling, beam strengthening maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengtheningDetails
new interior concrete wall, full bathroom, partition wall. 1 hr separation at ceiling, beam strengthening maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengthening | $75,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2018 | 3637 Washington St | Stroub Construction | add office and bathroom. remove columns and replace beams maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengtheningDetails
add office and bathroom. remove columns and replace beams maher not req new interior concrete wall, bathroom and partition wall. 1 hr separation at ceiling, beam strengthening | $75,000 |
| Feb 16, 2016 | Completed final sign-off May 2016 | 151 03rd St | Plant Construction Co, Lp | defered submittal of interior suspended sculptural wood ceiling canopy in a full service restaurant and assembly space on the ground floor of an existing museum. t.i. pa#201507272564. n/a ordinance #155-13Details
defered submittal of interior suspended sculptural wood ceiling canopy in a full service restaurant and assembly space on the ground floor of an existing museum. t.i. pa#201507272564. n/a ordinance #155-13 | $40,000 |
| Feb 11, 2016 | Completed final sign-off Aug 2016 | 292 Juanita Wy | Oak Leaf Construction | interior remodel of kitchen, living, bathrooms, closets. reconstruct existing stair, replace/upgrade some windows.Details
interior remodel of kitchen, living, bathrooms, closets. reconstruct existing stair, replace/upgrade some windows. | $300,000 |
| Dec 10, 2015 | Completed final sign-off Sep 2016 | 2422 Clay St | D V Rasmussen & Son Inc. | remodel to pa#201410027871, detail adjustments to existing conditions exposed during construction. n/a ordinance #155-13Details
remodel to pa#201410027871, detail adjustments to existing conditions exposed during construction. n/a ordinance #155-13 | |
| Nov 13, 2015 | Completed final sign-off Apr 2018 | 829 Clayton St | Clonduff Construction Inc. | remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths.Details
remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths. | $415,000 |
| Nov 2, 2015 | Never finaled issued Oct 2022, no final | 2832 Union St | Fontana Construction, Inc. | construct (n) 3-story single family residenceDetails
construct (n) 3-story single family residence | $1,300,000 |
| Jul 23, 2015 | Completed final sign-off Dec 2015 | 2850 Broadway | Van Acker Const Assoc Inc | underpinning of extg foundation at east wall of garage at interior. n/a for maher.Details
underpinning of extg foundation at east wall of garage at interior. n/a for maher. | $200,000 |
| Jun 25, 2015 | Completed final sign-off Apr 2016 | 2550 Lyon St | P J M Construction | revision to app#201505115884. framing and shear wall modification for interior wall reconfiguration at garage/hallway.Details
revision to app#201505115884. framing and shear wall modification for interior wall reconfiguration at garage/hallway. | |
| May 28, 2015 | Never finaled issued Jul 2015, no final | 151 03rd St | Plant Construction Co, Lp | modification to existing storefront and existing mechanical vents on g/f for a new a-2 occupancy restaurant. n/a ordinance #155-13. arch, mep, fire alarm and fire sprinkler submittals are under separate applicationDetails
modification to existing storefront and existing mechanical vents on g/f for a new a-2 occupancy restaurant. n/a ordinance #155-13. arch, mep, fire alarm and fire sprinkler submittals are under separate application | $150,000 |
| Mar 4, 2015 | Completed final sign-off Mar 2016 | 3637 Washington St | Evolve Building Inc. | interior remodel of lower floor condominium in a 2 unit building. remdel e dining and kitchen to create open plan. modify interior of e vistibule, remove e fireplace and base, relocate powder room. n/a maher ordinanceDetails
interior remodel of lower floor condominium in a 2 unit building. remdel e dining and kitchen to create open plan. modify interior of e vistibule, remove e fireplace and base, relocate powder room. n/a maher ordinance | $90,000 |
| Dec 2, 2014 | Completed final sign-off Apr 2018 | 3660 Jackson St | Clayton Timbrell & Co | interior alterations on all floors including renovation of all bathrooms, master suite, (n) mep. (n) structural work at foundation, garage, seismic upgrade, (n) roof @ garage, main roof, no change of use.Details
interior alterations on all floors including renovation of all bathrooms, master suite, (n) mep. (n) structural work at foundation, garage, seismic upgrade, (n) roof @ garage, main roof, no change of use. | $750,000 |
| Jul 29, 2014 | Never finaled issued Aug 2014, no final | 54 Commonwealth Av | Plath & Company Inc | interior remodel within (e) bldg including remodeling 5 (e) bathrooms, adding 2 bathrooms & remodeling kitchen, limited structural work. to comply with current requirements for siesmic resistance. replace (e) windows in kind @ front elevations & new windows @ sides & back.Details
interior remodel within (e) bldg including remodeling 5 (e) bathrooms, adding 2 bathrooms & remodeling kitchen, limited structural work. to comply with current requirements for siesmic resistance. replace (e) windows in kind @ front elevations & new windows @ sides & back. | $500,000 |
| Jul 14, 2014 | Completed final sign-off Jan 2015 | 4052 25th St | replace bearing wall at second floor kitchen with steel beams and posts in wall.Details
replace bearing wall at second floor kitchen with steel beams and posts in wall. | $25,000 | |
| Jul 9, 2014 | Completed final sign-off Nov 2020 | 2815 Polk St | Partners Contracting Inc., Design Line Construction, Nuport Construction Inc | to erect 3 stories, 1 basement, type iii-a, 3 units residential building.Details
to erect 3 stories, 1 basement, type iii-a, 3 units residential building. | $1,500,000 |
| Apr 9, 2014 | Expired or cancelled expired Dec 2017 | 2950 Broadway | Pete Moffat Construction Inc | add new grade beams & micropile foundations under existing structure, add foundation.Details
add new grade beams & micropile foundations under existing structure, add foundation. | $85,000 |
| Feb 20, 2014 | Completed final sign-off Dec 2015 | 15 Arguello Bl | Van Acker Const Assoc Inc | minor interior partition relocation. replace windows and doors in kind where noted on drawings, voluntary soft story retrofit in garage. replacement of skylightDetails
minor interior partition relocation. replace windows and doors in kind where noted on drawings, voluntary soft story retrofit in garage. replacement of skylight | $90,000 |
| Nov 10, 2011 | Never finaled issued Mar 2012, no final | 110 Freelon St | Jungsten Construction Inc | interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted.Details
interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted. | $800,000 |
| Dec 11, 2009 | Expired or cancelled cancelled Apr 2025 | 655 Alvarado St | addition of story above existing and addition of story below existing, extension of existing lower floors, repair landscaping areas affected by propopsed additionDetails
addition of story above existing and addition of story below existing, extension of existing lower floors, repair landscaping areas affected by propopsed addition | $700,000 | |
| Nov 2, 2007 | Completed final sign-off Feb 2009 | 1405 Lyon St | Scott & Warner Builders Inc | remodel kitchen, add 2-new bathrooms, new lighting and electrical, plumbing, paint, millwork and finishes.Details
remodel kitchen, add 2-new bathrooms, new lighting and electrical, plumbing, paint, millwork and finishes. | $65,000 |
| Aug 2, 2005 | Never finaled issued Aug 2005, no final | 3401 Washington St | Muratore Inc | voluntary strengthenery. add three story moment frame @ rear.Details
voluntary strengthenery. add three story moment frame @ rear. | $25,000 |