Darren Wong
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Dwong Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Sep 2026
299 permits since 2000 (engineer on 254 permits, architect on 20 permits, authorized agent-others on 19 permits, designer on 6 permits, pmt consultant/expediter on 1 permit): 197 completed, 39 in progress, 26 never finaled, 37 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 299.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1269 Silver Av | interior remodel: 1) 2nd floor add new bath, bedroom, and laundry room. 2) 1st floor to add new bathroom, new bedroom and new entertainment room.Details
interior remodel: 1) 2nd floor add new bath, bedroom, and laundry room. 2) 1st floor to add new bathroom, new bedroom and new entertainment room. | $200,000 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 615 23rd Av | revision to pa 202609047748 remove footings on the 1st fl; remain existing garage door size; remove skylightDetails
revision to pa 202609047748 remove footings on the 1st fl; remain existing garage door size; remove skylight | ||
| Aug 28, 2026 | In progress issued Sep 2026 | 615 23rd Av | infill existing light wellDetails
infill existing light well | $6,000 | |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 1775 47th Av | interior remodel with remove interior walls, new deck and stair in the rear yard. infill interior stair.Details
interior remodel with remove interior walls, new deck and stair in the rear yard. infill interior stair. | $20,000 | |
| Aug 13, 2026 | In progress issued Aug 2026 | 1031 Noriega St | I E General Const Inc | interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck.Details
interior remodel: convert existing ground floor stoarage to new habitable space with 2 bedrooms, 2 bathrooms, 1 mudroom and 1 family room. reconfigure 2nd floor. replace existing windows and add 2 skylights. replace & relocate exiting furnace and water heater & build new deck. | $200,000 |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 1422 Powell St | interior remodel in the 2nd floor on existing unit.Details
interior remodel in the 2nd floor on existing unit. | $40,000 | |
| Jul 28, 2026 | In progress issued Jul 2026 | 1625 Polk St | Sincere Construction Company Inc | residential: seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2025 cebc appendix a4. commercial soft story pa # 202604280276Details
residential: seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2025 cebc appendix a4. commercial soft story pa # 202604280276 | $90,000 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 3557 Geary Bl | add rooms in the commercial space for proposed piano studioDetails
add rooms in the commercial space for proposed piano studio | $90,000 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 1830 Lyon St | G B U Construction Development | voluntary structural strenthening in the rear garage.Details
voluntary structural strenthening in the rear garage. | $20,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 55 Oliver St | Hong's General Construction Inc | interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storageDetails
interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storage | $150,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 2172 Pacific Av | Q & Qq Construction Inc | unit #1: interior refurbishment & bathroom remodel. (n) non-load partition wall in garage for laundry room. electrical refurbishment.Details
unit #1: interior refurbishment & bathroom remodel. (n) non-load partition wall in garage for laundry room. electrical refurbishment. | $25,000 |
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 1350 04th Av | interior remodel 1st floor, 2nd floor and 3rd floor.Details
interior remodel 1st floor, 2nd floor and 3rd floor. | $200,000 | |
| May 29, 2026 | In progress issued Jun 2026 | 2932 21st St | Lsr Maintenance Llc | interior remodel to the front apt units.Details
interior remodel to the front apt units. | $200,000 |
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 235 Holyoke St | Hong's General Construction Inc | to comply with nov 202426211 - infill internal stair, addition of bathroom and walls, and bathroom remodel.Details
to comply with nov 202426211 - infill internal stair, addition of bathroom and walls, and bathroom remodel. | $10,000 |
| Apr 21, 2026 | In progress issued Sep 2026 | 65 Upland Dr | Sincere Construction Company Inc | replace existing footing with new concrete footing.Details
replace existing footing with new concrete footing. | $30,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 554 Head St | L & G Construction | 1.wall removal on the 2nd floor. 2. 2nd floor relocate kitchen and add new bathroom ground level to comply to nov #202545967.Details
1.wall removal on the 2nd floor. 2. 2nd floor relocate kitchen and add new bathroom ground level to comply to nov #202545967. | $10,000 |
| Jan 16, 2026 | In progress filed Jan 2026, not yet issued | 1458 09th Av | legalize the new bedroom in the rear of the buildingDetails
legalize the new bedroom in the rear of the building | $30,000 | |
| Jan 9, 2026 | In progress filed Jan 2026, not yet issued | 230 Eureka St | construct new concrete retaining walls and new roof in the garage.Details
construct new concrete retaining walls and new roof in the garage. | $40,000 | |
| Oct 24, 2025 | In progress issued Oct 2025 | 1625 Polk St | Sincere Construction Company Inc | add concrete footing in the basement level.Details
add concrete footing in the basement level. | $60,000 |
| Oct 17, 2025 | In progress issued Oct 2025 | 200 Colon Av | Hong's General Construction Inc | add 1 more bathroom on main floor.Details
add 1 more bathroom on main floor. | $20,000 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 855 41st Av | J P F Construction | relocate the retaining walls in the basement level. reconfigure layout in the 1st floor. enlarge basement level, new wet bar. delete skylight in the roof. revison to pa #202207299584. comply to nov #202428123Details
relocate the retaining walls in the basement level. reconfigure layout in the 1st floor. enlarge basement level, new wet bar. delete skylight in the roof. revison to pa #202207299584. comply to nov #202428123 | $10,000 |
| Aug 15, 2025 | Completed final sign-off Aug 2026 | 2100 Van Ness Av | Bai Construction | voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door.Details
voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door. | $150,000 |
| Aug 15, 2025 | In progress issued Mar 2026 | 827 Goettingen St | Best Level Construction Inc | interior remodel: install smoke detector, reroute electrical conduit in the 1st floor, enlarge corridor in the 1st floor, seal skylight in the roof. comply to complaint # 202421718 and 202421722Details
interior remodel: install smoke detector, reroute electrical conduit in the 1st floor, enlarge corridor in the 1st floor, seal skylight in the roof. comply to complaint # 202421718 and 202421722 | $10,000 |
| Aug 8, 2025 | In progress filed Aug 2025, not yet issued | 40 Gaven St | revision to 201705055874. revise concrete footings and wood beamsDetails
revision to 201705055874. revise concrete footings and wood beams | ||
| Jul 11, 2025 | In progress filed Jul 2025, not yet issued | 1178 Union St | replace (e) stucco facade to be new hardie shingleDetails
replace (e) stucco facade to be new hardie shingle | $25,000 | |
| Jul 9, 2025 | In progress issued Jul 2025 | 2450 20th Av | G B U Construction Development, H & Bo Construction Inc. | revision 201803153794, change foundation design. change interior layout of unit to be legalized to comply with nov 201755441Details
revision 201803153794, change foundation design. change interior layout of unit to be legalized to comply with nov 201755441 | $150,000 |
| Jun 24, 2025 | In progress issued Jun 2025 | 1108 Stockton St | Sincere Construction Company Inc | replace existing plywood with new plywood in the first floor and add new concrete footing in the basement level.Details
replace existing plywood with new plywood in the first floor and add new concrete footing in the basement level. | $60,000 |
| Jun 13, 2025 | In progress filed Jun 2025, not yet issued | 377 Bay St | replace existing roof rafters with new roof rafters.Details
replace existing roof rafters with new roof rafters. | $40,000 | |
| Jun 10, 2025 | Completed final sign-off Jan 2026 | 356 Mount Vernon Av | S C Construction Company | remove posts, add new beam in the first flDetails
remove posts, add new beam in the first fl | $15,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 2973 16th St | Bai Construction | facade repair work in accordance with approved facade survey #17622-2eDetails
facade repair work in accordance with approved facade survey #17622-2e | $10,000 |
| May 9, 2025 | In progress issued Nov 2025 | 180 De Soto St | Hong's General Construction Inc | provide temporary shoring to facilitate excavation & construction of this proposed remodel per pa# 202503253026Details
provide temporary shoring to facilitate excavation & construction of this proposed remodel per pa# 202503253026 | $8,000 |
| May 6, 2025 | Completed final sign-off Jun 2026 | 1841 24th Av | 3b T's Construction Company | build new kitchenette on ground floor. infill (e) lightwell on second floor. reconfigure and remodel (e) kitchen on second floor.Details
build new kitchenette on ground floor. infill (e) lightwell on second floor. reconfigure and remodel (e) kitchen on second floor. | $50,000 |
| Apr 23, 2025 | Completed final sign-off May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | to obtain final inspection for work approved under pa# 201411060876, 201606170317, 201809281731. all work is complete.Details
to obtain final inspection for work approved under pa# 201411060876, 201606170317, 201809281731. all work is complete. | |
| Apr 23, 2025 | Completed final sign-off May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | to obtain final inspection for work approved under pa# 201608023968. all work is complete.Details
to obtain final inspection for work approved under pa# 201608023968. all work is complete. | |
| Apr 23, 2025 | Completed final sign-off May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | to obtain final inspection for work approved under pa# 202102164654, 202208261423. all work is complete.Details
to obtain final inspection for work approved under pa# 202102164654, 202208261423. all work is complete. | |
| Mar 18, 2025 | In progress filed Mar 2025, not yet issued | 1333 42nd Av | replace e footing and slab with new concrete footing and slabDetails
replace e footing and slab with new concrete footing and slab | $120,000 | |
| Jan 21, 2025 | Completed final sign-off Oct 2025 | 1619 Noe St | Jdesignbuild | remodel and reconfigure e 2 story single family dwelling. relocate e kitchen, relocate e bath 2nd fl.add 1 bath,bdrm, powder room, movie room and laundry at gr fl. relocate furnace and replace water heater. replace e windows in kind.Details
remodel and reconfigure e 2 story single family dwelling. relocate e kitchen, relocate e bath 2nd fl.add 1 bath,bdrm, powder room, movie room and laundry at gr fl. relocate furnace and replace water heater. replace e windows in kind. | $150,000 |
| Jan 21, 2025 | Completed final sign-off Jun 2026 | 1743 Larkin St | Fale Construction, E. Arias & Co | at 3/f: top unit remodel/relocate (e) kitchen and bathroom. remodel (e) kitchen to home office, add master bath to (e) bedroom, new furnace and w/h. new laundry.Details
at 3/f: top unit remodel/relocate (e) kitchen and bathroom. remodel (e) kitchen to home office, add master bath to (e) bedroom, new furnace and w/h. new laundry. | $89,000 |
| Dec 20, 2024 | Expired or cancelled expired Apr 2026 | 1555 41st Av | D L Construction | rehabilitate (e) bathroom at 2/f. install 2nd bathroom at 2/f. rahabilitate (e) bath 1. install new storage, laundry, and bathroom at 1/f. 1/f not habitable due to insufficient head height.Details
rehabilitate (e) bathroom at 2/f. install 2nd bathroom at 2/f. rahabilitate (e) bath 1. install new storage, laundry, and bathroom at 1/f. 1/f not habitable due to insufficient head height. | $60,000 |
| Nov 27, 2024 | In progress issued Dec 2024 | 375 Richland Av | Jdesignbuild | remodel (e) single family home. (n) skylight & (n) laundry at 3rd fl. add two half baths. replace & relocate water heater & furnace. replace all windows within (e) opening in kind. repair dry rot front exterior staircaseDetails
remodel (e) single family home. (n) skylight & (n) laundry at 3rd fl. add two half baths. replace & relocate water heater & furnace. replace all windows within (e) opening in kind. repair dry rot front exterior staircase | $100,000 |
| Nov 15, 2024 | In progress issued Sep 2025 | 3868 24th St | Leonard Schendel Const.Co | commercial: soft story retrofit per sfebc chapter 4d. 2022 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d. 2022 cebc appendix a-4 | $20,000 |
| Nov 15, 2024 | In progress issued Sep 2025 | 3864 24th St | Leonard Schendel Const.Co | residential: soft story retrofit per sfebc chapter 4d. 2022 cebc appendix a-4. to comply with nov# 2022-00114Details
residential: soft story retrofit per sfebc chapter 4d. 2022 cebc appendix a-4. to comply with nov# 2022-00114 | $40,000 |
| Oct 16, 2024 | In progress issued Oct 2026 | 1902 Webster St | Modern Construction Inc | convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cutDetails
convert b into r-3. replace windows inkind at rear. 3rd floor: add m.bedroom, bath, 1/2 bath, playroom, n deck 2nd floor: add 3 bedrooms, 3 baths, laundry. 1st floor: add living , kitchen, dining, family room, half bath. basement: add int.stairs, garage, bath, sauna, ,media rms n curb cut | $100,000 |
| Sep 18, 2024 | Completed final sign-off Oct 2025 | 855 41st Av | J P F Construction | relocate the retaining walls in the basement. revision to pa# 202207299584. to comply to nov #202428123. excavate basement and enlarge to be a study room, add new bath at basementDetails
relocate the retaining walls in the basement. revision to pa# 202207299584. to comply to nov #202428123. excavate basement and enlarge to be a study room, add new bath at basement | $8,000 |
| Sep 3, 2024 | In progress filed Sep 2024, not yet issued | 1055 Washington St | seismic retrofit of soft story to comply with sfbc 4d mandatory seismic retrofit per 2016 cebc appendix a4Details
seismic retrofit of soft story to comply with sfbc 4d mandatory seismic retrofit per 2016 cebc appendix a4 | $100,000 | |
| Aug 23, 2024 | Completed final sign-off Jul 2025 | 531 36th Av | building a new wood deck in the rear of the building.Details
building a new wood deck in the rear of the building. | $30,000 | |
| Jul 19, 2024 | Expired or cancelled withdrawn Jul 2026 | 1625 Polk St | voluntary structural strengthening in the building (see bldg comments)Details
voluntary structural strengthening in the building (see bldg comments) | $150,000 | |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 1400 Geneva Av | Dliu Construction | to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind.Details
to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind. | $40,000 |
| May 31, 2024 | Completed final sign-off Jan 2025 | 12 Neptune St | Dliu Construction | to comply w/ complaint# 202423669 & 202423323. construct new concrete footing along property line and repair (e) exterior siding above new concrete footing.Details
to comply w/ complaint# 202423669 & 202423323. construct new concrete footing along property line and repair (e) exterior siding above new concrete footing. | $30,000 |
| May 28, 2024 | In progress filed May 2024, not yet issued | 57 Loomis St | warehouse ti to include (n) bathroom and addition of (n) interior walls.Details
warehouse ti to include (n) bathroom and addition of (n) interior walls. | $40,000 | |
| May 17, 2024 | Completed final sign-off Jun 2025 | 2751 Greenwich St | Tritec Construction Co Inc--See Notes | construct new concrete retaining wall in the rear yard to replace existing in kindDetails
construct new concrete retaining wall in the rear yard to replace existing in kind | $20,000 |
| May 10, 2024 | In progress filed May 2024, not yet issued | 273 20th Av | englarge garage door in the front of the building.Details
englarge garage door in the front of the building. | $4,000 | |
| May 7, 2024 | In progress filed May 2024, not yet issued | 3180 San Bruno Av | enlarge meter room in the front of the building.Details
enlarge meter room in the front of the building. | $10,000 | |
| May 3, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | Threemile Construction | two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11).Details
two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11). | $40,000 |
| Apr 30, 2024 | Completed final sign-off Apr 2025 | 2027 22nd Av | Wong Construction Inc | replace (e) footing with new concrete footing and new wood beam in the second floor.Details
replace (e) footing with new concrete footing and new wood beam in the second floor. | $40,000 |
| Apr 25, 2024 | Completed final sign-off May 2024 | 1040 Montgomery St | J C General Construction | existing deck to be removed on the roof. complaint #202421767Details
existing deck to be removed on the roof. complaint #202421767 | $3,000 |
| Apr 11, 2024 | Completed final sign-off Jul 2024 | 2185 Fillmore St | Wong Construction Inc | enlarge ada bathroom in the 1st floor.Details
enlarge ada bathroom in the 1st floor. | $30,000 |
| Mar 13, 2024 | Completed final sign-off Jan 2025 | 850 30th Av | Skytec General Engineering | 2/f: remodel (e) 1 kitchen & add 1 (n) bathroom.Details
2/f: remodel (e) 1 kitchen & add 1 (n) bathroom. | $50,000 |
| Mar 4, 2024 | Completed final sign-off Sep 2024 | 225 Baden St | in-kind replacement replace existing stair with new stair and wood landingDetails
in-kind replacement replace existing stair with new stair and wood landing | $6,000 | |
| Feb 16, 2024 | In progress filed Feb 2024, not yet issued | 2400 Harrison St | residential: seismic retrofit of soft story comply with sfebc ad mandatory seismic retrofit per 2019 cebc appendix a4 c#202299626.Details
residential: seismic retrofit of soft story comply with sfebc ad mandatory seismic retrofit per 2019 cebc appendix a4 c#202299626. | $80,000 | |
| Feb 16, 2024 | In progress filed Feb 2024, not yet issued | 2400 Harrison St | commercial: seismic retrofit of soft story comply with sfebc ad mandatory seismic retrofit per 2019 cebc appendix a4 c#202299626.Details
commercial: seismic retrofit of soft story comply with sfebc ad mandatory seismic retrofit per 2019 cebc appendix a4 c#202299626. | $20,000 | |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 1103 Page St | Bai Construction | revision to pa 202312072137 add new concrete footing under plywood shear walls in the ground floorDetails
revision to pa 202312072137 add new concrete footing under plywood shear walls in the ground floor | $10,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2024 | 15 Lincoln Wy | Lordan Construction | revised plywood shear walls and relocate moment frame. revision to pa# 201709148290Details
revised plywood shear walls and relocate moment frame. revision to pa# 201709148290 | |
| Dec 14, 2023 | Completed final sign-off Nov 2024 | 800 40th Av | Kenny J M Yu | to comply w/ nov# 202314698: add post and footing to support (e) deck at rear yard.Details
to comply w/ nov# 202314698: add post and footing to support (e) deck at rear yard. | $5,000 |
| Dec 7, 2023 | Expired or cancelled withdrawn Dec 2023 | 2277 33rd Av | 1)interior renovation and conversion of extg senior care facility with 9 bedrooms and 3.5 baths into a single family home of 4 bedrooms and 4 baths. 2) relocate interior staircase. 3)extend garage at the ground foor to fit 2 cars tandem. 4)replace windows and exterior door, relocate roof topDetails
1)interior renovation and conversion of extg senior care facility with 9 bedrooms and 3.5 baths into a single family home of 4 bedrooms and 4 baths. 2) relocate interior staircase. 3)extend garage at the ground foor to fit 2 cars tandem. 4)replace windows and exterior door, relocate roof top | $150,000 | |
| Nov 15, 2023 | Completed final sign-off Sep 2026 | 1151 Kearny St | Gee Construction Co Inc | revision to 201709158522. revise footing annd detailDetails
revision to 201709158522. revise footing annd detail | |
| Nov 2, 2023 | Completed final sign-off Apr 2024 | 154 Hearst Av | Fox Brothers Construction Inc | replace existing footing with new concrete footings and replace front and rear siding in kindDetails
replace existing footing with new concrete footings and replace front and rear siding in kind | $40,000 |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 1255 09th Av | Wong Construction Inc | to comply with accessible business entrance ordinance at one business entrance. add door operator. abe# 202310278987Details
to comply with accessible business entrance ordinance at one business entrance. add door operator. abe# 202310278987 | $8,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 494 14th St | Wong Construction Inc | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313609Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313609 | $18,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 498 14th St | Wong Construction Inc | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313612Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313612 | $8,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 496 14th St | Wong Construction Inc | to comply with accessible business entrance ordinance at 1 business entrance abe 201812313611Details
to comply with accessible business entrance ordinance at 1 business entrance abe 201812313611 | $18,000 |
| Sep 27, 2023 | Completed final sign-off Nov 2023 | 1256 Hyde St | revision to bpa# 202101293684, rebuild and reconfig existing wood stair in the rear yardDetails
revision to bpa# 202101293684, rebuild and reconfig existing wood stair in the rear yard | ||
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2059 Fulton St | J P F Construction | remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater.Details
remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater. | $20,000 |
| Sep 1, 2023 | Completed final sign-off Nov 2023 | 924 Fulton St | Success Construction ***See Notes*** | to comply with non 202304471. add exhaust duct to the rear yard from the laundry room. no exterior work.Details
to comply with non 202304471. add exhaust duct to the rear yard from the laundry room. no exterior work. | $2,000 |
| Jul 27, 2023 | Completed final sign-off Mar 2025 | 1454 25th Av | Wei Dang Builders Inc. | to add a 408sqft rooftop on the roof and install new waterproofing for the whole roof. revision to an existing building permit pa# 202302232528. install roof hatch in lieu of penthouse per ab-057.Details
to add a 408sqft rooftop on the roof and install new waterproofing for the whole roof. revision to an existing building permit pa# 202302232528. install roof hatch in lieu of penthouse per ab-057. | $20,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 1719 43rd Av | Wei Dang Builders Inc. | revision to permit 202302232495. change layout for 2/f bathroom and g/f under stair closet. switch door and window location at g/f at rear.Details
revision to permit 202302232495. change layout for 2/f bathroom and g/f under stair closet. switch door and window location at g/f at rear. | |
| May 26, 2023 | Completed final sign-off May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | to comply w/nov# 2022-98092, construct new walls and set back garage door in the rear of the buildingDetails
to comply w/nov# 2022-98092, construct new walls and set back garage door in the rear of the building | $25,000 |
| May 2, 2023 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | add new concrete footings in the rear of the buildingDetails
add new concrete footings in the rear of the building | $15,000 |
| Jan 27, 2023 | Never finaled filed Jan 2023, never issued | 506 Silver Av | establish child care home capacity 12. install bike rack in garage to replace 1 car garage. alter existing stairway in garage w/new hallway for egress.Details
establish child care home capacity 12. install bike rack in garage to replace 1 car garage. alter existing stairway in garage w/new hallway for egress. | $5,000 | |
| Jan 10, 2023 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof.Details
revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof. | $10,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1098 Sutter St | to comply with abe ordiance at one business entrance. abe# 201902115106Details
to comply with abe ordiance at one business entrance. abe# 201902115106 | $6,000 | |
| Dec 29, 2022 | Completed final sign-off Sep 2024 | 1182 Fitzgerald Av | to rebuild extg ground and 2nd floor rear deck per structural plan due to fire damage. replace all extg window in kind windows at front to be wood aluminum clad. renew extg furnaces and water heater. replace all interior sheet rocks and insulation.Details
to rebuild extg ground and 2nd floor rear deck per structural plan due to fire damage. replace all extg window in kind windows at front to be wood aluminum clad. renew extg furnaces and water heater. replace all interior sheet rocks and insulation. | $150,000 | |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 1902 Webster St | Modern Construction Inc | voluntary structural strengthening in the basement level of the buildingDetails
voluntary structural strengthening in the basement level of the building | $60,000 |
| Oct 21, 2022 | Completed final sign-off Sep 2024 | 1555 Hyde St | J P F Construction | interior renovation in unit 2,3,4,6 and 7Details
interior renovation in unit 2,3,4,6 and 7 | $45,000 |
| Oct 13, 2022 | Expired or cancelled withdrawn Nov 2022 | 1650 Polk St | seismic structural strengthing in the buildingDetails
seismic structural strengthing in the building | $150,000 | |
| Oct 7, 2022 | Completed final sign-off Nov 2023 | 1105 Larkin St | Bai Construction | repair fire escape balcony in the front of the building. comply with complaint # 202185045Details
repair fire escape balcony in the front of the building. comply with complaint # 202185045 | $25,000 |
| Sep 30, 2022 | Completed final sign-off Apr 2023 | 301 Church St | Wong Construction Inc | to comply wiwth accessible business entrance ordinance at one business entrance. abe# 220207012263Details
to comply wiwth accessible business entrance ordinance at one business entrance. abe# 220207012263 | $6,000 |
| Sep 13, 2022 | Completed final sign-off May 2023 | 27 Saint Louis Al | West-Tec General Engineering Inc | to comply wth nov 2011-62089. remove/demo existing roof deck.Details
to comply wth nov 2011-62089. remove/demo existing roof deck. | $30,000 |
| Aug 26, 2022 | Expired or cancelled expired May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | remove (e) posts in the basement levelDetails
remove (e) posts in the basement level | $30,000 |
| Aug 2, 2022 | Completed final sign-off Aug 2023 | 900 Pine St | Nabi Construction & Engineering Inc | to comply w/accessible business entrance program per ordinance 51-16. abe201901144277. comply w/ada requirement @ front door. special inspections & tests are required as per building code section 1701Details
to comply w/accessible business entrance program per ordinance 51-16. abe201901144277. comply w/ada requirement @ front door. special inspections & tests are required as per building code section 1701 | $45,000 |
| Jul 18, 2022 | Never finaled issued Aug 2022, no final | 2632 Moraga St | D S Management Inc Dba Metrocon Builders | rev to pa 201808167589 to address a minor change of wall next to the garage door.Details
rev to pa 201808167589 to address a minor change of wall next to the garage door. | $1,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 1304 Lombard St | Bai Construction | revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4Details
revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4 | |
| May 31, 2022 | Completed final sign-off Sep 2022 | 1293 Green St | Wong Construction Inc | remove wall in the kitchen and enlarge bathroom on the third floor.Details
remove wall in the kitchen and enlarge bathroom on the third floor. | $24,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | Wong Construction Inc | rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | Wong Construction Inc | rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| Apr 12, 2022 | Never finaled issued Jul 2022, no final | 1555 Hyde St | J P F Construction | interior renovation in unit 2 and 3 on the second floorDetails
interior renovation in unit 2 and 3 on the second floor | $12,000 |
| Apr 1, 2022 | Completed final sign-off Aug 2024 | 2590 Sacramento St | Hbm Construction Inc | provide new beams post and footings to support in front of the building.Details
provide new beams post and footings to support in front of the building. | $40,000 |
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 401 Columbus Av | Wong Construction Inc | add new concrete footing under the plywood shear wall in the first floor. revision to pa# 202101253221Details
add new concrete footing under the plywood shear wall in the first floor. revision to pa# 202101253221 | $6,000 |
| Mar 23, 2022 | Completed final sign-off Jun 2022 | 1316 Stockton St | Sincere Construction Company Inc | revision to residential soft story pa 2018-0705-3816 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4Details
revision to residential soft story pa 2018-0705-3816 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4 | |
| Mar 23, 2022 | Completed final sign-off Jun 2022 | 1316 Stockton St | Sincere Construction Company Inc | revision to commercial soft story pa 2018-0705-3817 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4Details
revision to commercial soft story pa 2018-0705-3817 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4 |